Impulse tubing shall be made with metallurgy compatible to process and


ambient conditions. Threaded fittings shall be used.
34-SAMSS-831,
Sec. 8.1.1
A11 Impulse lines shall be as short as possible.
34-SAMSS-831,
Sec. 8.1.1
34-SAMSS-831
Sec 8.1.1
A10
Mounting : All instruments shall be mounted as close to the process
connection as possible.
34-SAMSS-831,
Sec. 8.1.1
A9
Cables between skid mounted instruments and junction boxes shall be
routed in conduits. The conduit installation shall be in accordance with
NFPA 70 and 17-SAMSS-515.
A8
Pressure and D/P instruments in gas service shall be self-draining (i.e.,
mounted above the process connections) with all lines sloping downward
approximately 1:10 minimum toward the process connection.
34-SAMSS-831
Sec 8.1.1
A7
Pressure and D/P instruments in liquid or condensable vapor service
shall be self-venting (i.e., mounted below the process connections) with
all impulse lines sloping downward approximately 1:10 minimum toward
the instrument.
34-SAMSS-831
Sec 8.1.1
34-SAMSS-831
Sec 8.1.1
A6
Pressure transmitters in gas service may be mounted on panels below
their process connections provided that the process connections are
located on the top of the process lines, low point drains are provided, and
the impulse lines slope toward the low point.
34-SAMSS-831
Sec 8.1.1
A5
The location of instruments shall be so that direct drainage of
condensate, water or process fluids from adjacent equipment has no
adverse effect.
A13
Cables between skid mounted instruments and junction boxes shall be
routed in conduits. The conduit installation shall be in accordance with
NFPA 70 and 17-SAMSS-515 . Refer to SATIP-P-104-05.
34-SAMSS-831,
Sec. 8.1.1
A. Instrumentation work space Requirements
34-SAMSS-831
Sec 8.1.1
A1
All local instrumentation and associated control equipment shall be
readily accessible from grade, platform, fixed walkway, or fixed ladder.
34-SAMSS-831
Sec 8.1.1
A2
Local indicating instruments shall be visible from where related
equipment is operated or primary instruments are tested or calibrated.
A3
All instruments shall be mounted as close to the process connection as
possible.
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAUDI ARAMCO INSPECTION CHECKLIST
SAIC NUMBER DATE APPROVED QR NUMBER
PROJ ECT TITLE WBS / BI / J O NUMBER CONTRACTOR / SUBCONTRACTOR
General- Instrumentation Workspace Clearances. SAIC-J-6022 1-Oct-05 INST
EQPT CODE SYSTEM ID.
SAUDI ARAMCO INSPECTION LEVEL
LAYOUT DRAWING NUMBER
PLANT NO. EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION
SCHEDULED INSPECTION DATE & TIME TRAVEL TIME QUANTITY INSP.
WORK PERMIT REQUIRED?
ACTUAL INSPECTION DATE & TIME
SAUDI ARAMCO USE ONLY
MH's SPENT
CONTRACTOR INSPECTION LEVEL
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER
RE-INSP DATE
ITEM
No.
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A
EC / PMCC / MCC NO. REV. NO. PURCHASE ORDER NUMBER
A4 Instruments shall be mounted in locations where vibration is negligible.
34-SAMSS-831
Sec 8.1.1
34-SAMSS-831
Sec 8.1.1
Page 1 of 13
A17
Orifice Runs, Venturi Tubes and Flow Nozzles The minimum required
lengths of straight and unobstructed pipe upstream and downstream of
the primary element shall be based on a beta ratio of 0.7, and be in
accordance with Standard Drawing AA-036197(Attachment -7)
34-SAMSS-831,
Sec. 8.1.1.3
A16
Level Gauge Glasses Refer to Library Drawing DB-950046 (Attachment-
6) for typical liquid level gauge glasses installations. Weld pad type level
gauges are acceptable for lube oil tanks. Refer to SATIP-J -300-01 for
different types of installations
34-SAMSS-831,
Sec. 8.1.1.2
A15
Tagging Instruments shall have permanently attached engraved
phoenolic / laminate or plastic nameplates, showing instrument tag
numbers. Phoenolic nameplates shall be installed with two stainless
steel screws.
34-SAMSS-831,
Sec. 8.1.2
B4
Explosion proof Equipment . Conduit seals shall be provided for each
conduit entering explosion proof equipment according to (a), (b), and (c).
(a) In each conduit entry into an explosion proof enclosure where either
(1) the enclosure contains apparatus,(2) the entry is metric designator 53
(trade size 2) or larger and the enclosure contains terminals, splices, or
taps.
(b) Conduit seals shall be installed within 450 mm (18 in.) from the
enclosure. Only explosion proof unions, that are not larger than the trade
size of the conduit shall be permitted between the sealing fitting and the
explosion proof enclosure
(c) Where two or more explosion proof enclosures for which conduit
seals are required , are connected by nipples or by runs of conduit not
more than 900 mm (36 in.) long.
NEC Article
505.16 (B)(2)
A14
Different instruments signals shall be segregated from each other and
from power wiring.
34-SAMSS-831,
Sec. 8.1.1
B. Conduit and Cable sealing work space Requirements
B5
Pressurized Enclosures. Conduit seals shall be provided in each
conduit entry into a pressurized enclosure where the conduit is not
pressurized as part of the protection system. Conduit seals shall be
installed within 450 mm (18 in.) from the pressurized enclosure.
NEC Article
505.16 (B)(3)
B3
In Class I, Zone 1 locations, seals shall be located in accordance with
the following:
(1) Type of Protection d or e Enclosures. Conduit seals shall be
provided for each conduit entering enclosures having type of protection
d or e. Exception: Where the enclosure having type of protection
d is marked to indicate that a seal is not required.
NEC Article
505.16 (B)(1)
NEC Article
505.16 (A)(2)
B1
In Class I, Zone 0 locations, (1) Conduit Seals. Seals shall be provided
within 3.05 m (10 ft) of where a conduit leaves a Zone 0 location. There
shall be no unions, couplings, boxes, or fittings, except listed reducers at
the seal, in the conduit run between the seal and the point at which the
conduit leaves the location. Exception: A rigid unbroken conduit that
passes completely through the Zone 0 location with no fittings less than
300 mm (12 in.) beyond each boundary shall not be required to be
sealed if the termination points of the unbroken conduit are in
unclassified locations.
NEC Article
505.16 (A)(1)
B2
Cable Seals. Seals shall be provided on cables at the first point of
termination after entry into the Zone 0 location.
RE-INSP DATE
ITEM
No.
ACCEPTANCE CRITERIA REFERENCE
CONTRACTOR / SUBCONTRACTOR
General- Instrumentation Workspace Clearances. SAIC-J-6022 1-Oct-05 INST
PROJ ECT TITLE WBS / BI / J O NUMBER
PASS FAIL N/A
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAUDI ARAMCO INSPECTION CHECKLIST
SAIC NUMBER DATE APPROVED QR NUMBER
Page 2 of 13
RE-INSP DATE
ITEM
No.
ACCEPTANCE CRITERIA REFERENCE
CONTRACTOR / SUBCONTRACTOR
General- Instrumentation Workspace Clearances. SAIC-J-6022 1-Oct-05 INST
PROJ ECT TITLE WBS / BI / J O NUMBER
PASS FAIL N/A
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAUDI ARAMCO INSPECTION CHECKLIST
SAIC NUMBER DATE APPROVED QR NUMBER
B7
Equipment which is not enclosed or hermetically sealed, but is situated
offshore or near shore, shall be protected against corrosion and
operational failure due to wind-borne sea water spray and the
accumulation of wetted salt (NaCl).
34-SAMSS-831,
Sec. 5.3.2
Class I, Zone 1 Boundary. Conduit seals shall be provided in each
conduit run leaving a Class I, Zone 1 location. The sealing fitting shall be
permitted on either side of the boundary of such location within 3.05 m
(10 ft) of the boundary and shall be designed and installed so as to
minimize the amount of gas or vapor within the Zone 1 portion of the
conduit from being communicated to the conduit beyond the seal. Except
for listed explosion proof reducers at the conduit seal, there shall be no
union, coupling, box, or fitting between the conduit seal and the point at
which the conduit leaves the Zone 1 location.
B8
B6
NEC Article
505.16 (B)(4)
The field junction box, in a Class I, Zone 2 location and in non-
hazardous areas, shall be a single door NEMA Type 4X or IEC 60529
Type IP 66 box. The box construction shall meet the following
requirements: 7.2.1 Type 316 stainless steel body, door and hardware.
7.2.2 Continuously welded seams, finished smooth.
7.2.3 Continuous stainless steel hinge with removable pin.
7.2.4 Stainless steel captive clamps.
7.2.5 Data/Print pocket on inside of door.
7.2.6 External mounting brackets.
7.2.7 Collar studs for mounting inside panel.
7.2.8 Ground stud for terminating A/C safety ground wire.
7.2.9 Painted steel panel (back-pan); in 'severe corrosive environments'
a stainless-steel panel shall be used.
SAES-J -902,
Sec. 7.2
SAES-J -902,
Sec. 7.4
B11
All piping, tubing and valves shall be adequately supported and fastened
in a manner which facilitates replacement, and prevents vibration. Refer
to Drawing AB-036521 for valve bracing. Attachment 2)
01-SAMSS-017,
Sec. 5.1.4
B15
All piping systems shall be provided with vent valves at high points and
drain valves at low points. Horizontal runs in pressure piping shall slope
gradually towards drain points. The minimum slope of drain lines shall be
1:50.
01-SAMSS-017,
Sec. 5.1.9
B9
Instrument enclosures and junction boxes having an internal volume
exceeding 2,000 cm shall be provided with Type 300 Series stainless
steel breather and drain fittings, or a combination breather and drain
fitting.
B10
Instrument enclosures and junction boxes having an internal volume
exceeding 2,000 cm shall be provided with Type 300 Series stainless
steel breather and drain fittings, or a combination breather and drain
fitting.
SAES-J -902,
Sec. 7.4
B12
The minimum size of auxiliary piping and tubing for mechanical
equipment shall be 1/2-inch NPS with the exception of air compressor
packages which shall be 3/8-inch NPS.
01-SAMSS-017,
Sec. 5.1.3
B13
All piping, tubing and valves shall be adequately supported and fastened
in a manner which facilitates replacement, and prevents vibration. Refer
to Drawing AB-036521 for valve bracing. (Attachment 2)
01-SAMSS-017,
Sec. 5.1.4
B14
Unions are not permitted in pressurized lines carrying flammable or toxic
fluids unless they are required for removal or assembly of the equipment
and cannot otherwise be substituted by flanges.
01-SAMSS-017,
Sec. 5.1.8
Page 3 of 13
RE-INSP DATE
ITEM
No.
ACCEPTANCE CRITERIA REFERENCE
CONTRACTOR / SUBCONTRACTOR
General- Instrumentation Workspace Clearances. SAIC-J-6022 1-Oct-05 INST
PROJ ECT TITLE WBS / BI / J O NUMBER
PASS FAIL N/A
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAUDI ARAMCO INSPECTION CHECKLIST
SAIC NUMBER DATE APPROVED QR NUMBER
C. Enclosures & Associated workspace Requirements
C2
Spaces About Electrical Equipment. Sufficient access and working space
shall be provided and maintained about all electric equipment to permit
ready and safe operation and maintenance of such equipment.
NEC Article
110.26
34-SAMSS-831,
Sec. 7.1.1
C5
Terminals Wiring connections shall be made to channel (rail) mounted
terminal blocks. These terminal blocks shall have tubular box clamp
connector and compression bar or yoke for wire termination. More than
two connections per terminal point are not allowed. If open screw type
terminals are used, terminal lugs shall be ring tongue, compression type,
with insulated sleeves.
C7
Splices are not permitted in wiring. When wiring must be extended,
connections shall be made via terminal blocks.
34-SAMSS-831,
Sec. 7.1.1
C6 Cables carrying analog signals shall also be shielded.
34-SAMSS-831,
Sec. 7.1.2
C4
Flexible hoses shall be stainless steel armored, with integral connectors.
The hose length shall not exceed 600 mm. The hose lining shall be
suitable for the process and operating conditions.
34-SAMSS-831,
Sec. 9.2.2.2
C3
Depth of Working Space. The depth of the working space in the direction
of live parts shall not be less than that specified in Table 110.26(A)(1)
(Attachment 2) unless the requirements of110.26(A)(1)(a), (b), or (c) are
met. (a) Dead-Front Assemblies where all connections and all renewable
or adjustable parts, are accessible. (b) Low Voltage. By special
permission, smaller working spaces shall be permitted where all un-
insulated parts operate at not greater than 30 volts rms, 42 volts peak, or
60 volts dc.
(c) Existing Buildings. In existing buildings where electrical equipment is
being replaced,
NEC Article
110.26(A)(1)
C1
Class I, Division 2. In Class I, Division 2 locations, meters, instruments,
and relays shall comply with 501.3(B)(1) through (B)(6).
That is all meters, instruments, and relays, including kilowatt-hour
meters, instrument transformers, resistors, rectifiers, and
thermionic tubes, shall be provided with enclosures identified for Class I,
Division 1 locations. Enclosures for ClassI, Division 1
locations include explosion proof enclosures and purged and pressurized
enclosures.
Alternatively, equipment shall be permitted to be marked to indicate the
temperature class for which it is suitable, using the
temperature class (T Code) of Table 500.8(B).- See Attachment 3
NEC Article
501.3(B)
B17
Pipe may be bent where necessary to achieve the desired configuration.
Bending of the pipe shall conform to the following: Pipe bends shall have
surfaces free of cracks and buckles. Flattening of the cross section of
bends shall not exceed 8 percent of the nominal pipe diameter. Bending
procedures and required heat treatment shall be in accordance with
ASME B31.3.
01-SAMSS-017,
Sec. 5.1.11 and
Sec 6.2
B16
A block valve, 3/4-inch NPS minimum, shall be installed in each
instrument take-off connection and shall be located as close as feasible
to the line, vessel, or mechanical equipment. Thermocouples and
thermometers are excluded from the 3/4-inch NPS minimum
requirement.
01-SAMSS-017,
Sec. 5.1.10
Page 4 of 13
RE-INSP DATE
ITEM
No.
ACCEPTANCE CRITERIA REFERENCE
CONTRACTOR / SUBCONTRACTOR
General- Instrumentation Workspace Clearances. SAIC-J-6022 1-Oct-05 INST
PROJ ECT TITLE WBS / BI / J O NUMBER
PASS FAIL N/A
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAUDI ARAMCO INSPECTION CHECKLIST
SAIC NUMBER DATE APPROVED QR NUMBER
D. Cable tray & Associated workspace Requirements
C8
Terminals Wiring connections shall be made to channel (rail) mounted
terminal blocks. These terminal blocks shall have tubular box clamp
connector and compression bar or yoke for wire termination. More than
two connections per terminal point are not allowed. If open screw type
terminals are used, terminal lugs shall be ring tongue, compression type,
with insulated sleeves.
34-SAMSS-831,
Sec. 7.1.2
SAES-J -902 Sec
13.3.1
SAES-J -902 Sec
12.3.2
D2
Primary and backup data link cables shall preferentially enter cabinets or
consoles from opposite sides. Data link cables shall not be routed in the
same conduit, duct, or tray with other instrument cables.
D3
Instrumentation cables installed beneath raised computer-type floors in
control rooms shall be placed in ladder, trough or solid bottom cable tray.
D1
Cable tray supporting armored cables extending between field
instruments and junction boxes shall be NEMA VE 1, Class C, ventilated
bottom, channel cable tray.
SAES-J -902 Sec
9.6
C16
In new grass root projects, cable trays extending between the process
area and the control room or process interface building, or trays installed
beneath raised computer floors, in control rooms or PIB shall be sized for
a minimum of 20% spare space for future expansions. This spare
capacity is in addition to the installed 20% spare cabling.
SAES-J -902 Sec
9.6
C15
Flexible conduit shall be used at the instrument end of the conduit to
provide isolation from vibration, protection against thermal expansion of
the rigid conduit systems and for ease of maintenance.
SAES-J -902 Sec
8.4
C14
The new transmitters and digital valve controllers have very small
connection heads compared to previous models. Therefore, a conduit
outlet box is being mandated within 18" of the device to allow for a spare
loop of cable. This can potentially prevent maintenance from having to re-
pull cable if the cable end has been damaged.
SAES-J -902 Sec
8.3
C12
All incoming and outgoing interconnection lines shall terminate in
bulkhead fittings. The lines shall be marked with the tag numbers of the
corresponding instruments. Bulkhead fittings shall be installed with
adequate spacing to ensure that any connection can be removed without
the need to remove other fittings.
34-SAMSS-831,
Sec. 8.3
34-SAMSS-831,
Sec. 8.2.1
C11
Instrument tubing shall be adequately supported to eliminate any
vibration transmission to the instruments or excessive load to the piping
connection, process line or vessel. Tubing to and from non-indicating
instruments shall have a plugged tee or equivalent test point for
calibration and testing purposes. All threaded connections shall be
tapered per ASME B1.20.1.
34-SAMSS-831,
Sec. 8.3
C13
A conduit outlet box (e.g., GUAT) shall be installed within eighteen (18)
inches of the field device. The cable to the instrument shall be looped
one or more times within this fitting; the sizing of the conduit outlet box
Process Connections: Threaded All threaded process connections
shall be tapered per ASME B1.20.1. All threaded process connections to
vessels, standpipes and lines, except thermowells, shall have heavy
welding bosses per Standard Drawing AE-036175, and threaded gate
type block valves as close to the vessel, standpipe or line as possible.
(Attachment-5)
SAES-J -902 Sec
8.3
C9
C10
Instrument Piping and Tubing The instrument piping and tubing
installation shall ensure It is possible to test all alarm and shutdown
initiating devices, without interfering with the process operation of the
packaged unit.
34-SAMSS-831,
Sec. 8.3
Page 5 of 13
RE-INSP DATE
ITEM
No.
ACCEPTANCE CRITERIA REFERENCE
CONTRACTOR / SUBCONTRACTOR
General- Instrumentation Workspace Clearances. SAIC-J-6022 1-Oct-05 INST
PROJ ECT TITLE WBS / BI / J O NUMBER
PASS FAIL N/A
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAUDI ARAMCO INSPECTION CHECKLIST
SAIC NUMBER DATE APPROVED QR NUMBER
5. 34-SAMSS-820, Instrumentation Control Cabinets- indoor, 29 May 2002
34-SAMSS-820,
Sec.6.3.12
D15
Rotating Equipment cabinets or other cabinets, which require diagnostic
equipment to be connected for long periods of time, shall have hand
removable doors unless otherwise stated in the Purchase Order.
D14
All doors must be capable of swinging at least 90-degrees open at the
installed location.
34-SAMSS-820,
Sec.6.3.11
D13
The marshalling cabinets, from the front surface to the surface of rear
terminal blocks, shall not be more than 46 cm (18 inches) deep to
provide for safe access. The preferred design is to divide a 76 cm (30
inch) deep cabinet into 38 cm (15 inch) sections with front and rear
access.
34-SAMSS-820,
Sec.6.3.10
D11 Minimum separation requirements between various instrumentation
D12
Instrument control cabinets(indoor): Cabinet doors shall be full-height.
All doors shall be dust-tight and reinforced against buckling. The
maximum door width shall be 900 mm (36 inches) unless otherwise
specified in the Purchase Order.
34-SAMSS-820,
Sec.6.3.9
SAES-J -902 Sec
14.2.8
SAES-J -902 Sec
14.2.1
SAES-J -902 Sec
12.3.2
D4
Minimum separation requirements between various instrumentation
cables and data link cables (copper or fiber optic) shall be per the
manufacturer's recommendation.
D5
Tray Spacing: Table 3 indicates the minimum distance in millimeters
between the top of one tray and the bottom of the tray above, or between
the sides of adjacent trays. This also applies to the distance between
trays and power equipment of less than 100 kVA. (Attachment -1)
4. 34-SAMSS-831, Instrumentation for Packaged Units, 29 September, 2004
D6
Tray-Conduit Spacing: Table 4 indicates the minimum distance in
millimeters between trays and conduits. This also applies to the distance
between trays or conduits and power equipment of less than 100 kVA.
(Attachment -1)
D10
When entering terminal equipment (e.g., motor control center) and the
spacing listed in tables 3, 4, or 5 cannot be maintained, parallel runs
shall not exceed 5 ft in the overall run.
SAES-J -902 Sec
14.2.7
D8
When routing instrumentation and control signal cabling (level 1 or 2)
near sources of strong electromagnetic fields, such as large
transformers, motors and generators, defined for purposes of this
standard as greater than 100 kVA, a minimum spacing of 2 meters shall
be maintained between the cables and the devices.
For direct buried cable, cable spacing shall be as shown in Table 3.
SAES-J -902 Sec
14.2.6
SAES-J -902 Sec
14.2.5
SAES-J -902 Sec
14.2.2
6. 01-SAMSS-017, Auxiliary Piping For Mechanical Equipment, 30 November, 1998
7. NEC 2002- National Electric Code 2002
D9
D7
Conduit Spacing: Table 5 indicates the minimum distance in millimeters
between the outside surfaces of conduits being run in banks. This also
applies to the distance between conduits and power equipment of less
than 100 kVA.
SAES-J -902 Sec
14.2.3
1. Schedule G -- Material, Tools and Equipment (Pro Forma MP-IK-LS Contract), J uly 1993
2. Schedule Q -- Quality Requirements (Pro Forma Contract), November 2003
REFERENCE DOCUMENTS:
3. SAES-J -902, Electrical Systems for Instrumentation, 31 J uly 2004
Page 6 of 13
RE-INSP DATE
ITEM
No.
ACCEPTANCE CRITERIA REFERENCE
CONTRACTOR / SUBCONTRACTOR
General- Instrumentation Workspace Clearances. SAIC-J-6022 1-Oct-05 INST
PROJ ECT TITLE WBS / BI / J O NUMBER
PASS FAIL N/A
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAUDI ARAMCO INSPECTION CHECKLIST
SAIC NUMBER DATE APPROVED QR NUMBER
2. Identified - Recognizable as suitable for the specific application by a qualified testing laboratory (i.e., listing and/or labeling).
2. Attachment 2 -Work space requirements Minimum distance in mm
3. Listed - Equipment and materials included in a list published by an approved qualified organization concerned with evaluation of products
or services, that maintains periodic inspection of production of listed equipment or materials or periodic evaluation of services, and whose listing
1. Attachment 1 Minimum distance in mm between top of one tray and the bottom of the tray above- Table 3
3. Attachment 3 -Electrical Equipment Temperature class NEC table 500.8(B)
4. Attachment 4 - Valve bracings std DWG AB-036521 sht 1 rev 08
5. Attachment 5 -- Details of heavy welding boss for threaded connections to vessels.
6. Attachment 6 -- Liquid level gauge glasses, instrument piping details lib. Dwg DB950046
7. Attachment 7 -- Straight pipe requirements for Orifice , Venturi and flow nozzles Std. Dwg AA-036197
NOTES:
Work is Complete and Ready for Inspection:
Name, Initials and Date:
that the equipment, material, or services either meets appropriate designated standards or has been tested and found suitable for a specified
Contractor / Third-Party Saudi Aramco
indicates compliance with appropriate standards or performance in a specified manner.
with product evaluation, that maintains periodic inspection of production of labeled equipment or materials, and by whose labeling the
4. Labeled - Equipment or materials to which has been attached a label, symbol, or other identifying mark of an approved qualified organization
5. Remarks - (Does not apply for Custom engineered Package units but only for pre-engineered, pre-assembled and
pre- wired skid mounted packaged units)
PID Representative
T&I Witnessed QC Record Reviewed Work Verified
Construction Representative* PMT Representative
Name, Initials and Date:
ATTACHMENTS:
*Person Responsible for Completion of Quality Work / Test Y =YES N =NO F =FAILED
1. Approved - Acceptable to the authority having jurisdiction (i.e., Saudi Aramco ID).
QC Inspector
Work Verified
Name, Initials and Date:
Performed Inspection Work / Rework May Proceed Work Verified
QC Supervisor
T&I Witnessed QC Record Reviewed
Name, Initials and Date:
QC Record Reviewed T&I Witnessed
Name, Sign and Date:
Quality Record Approved:
Name, Organization,
Initials and Date:
Proponent and Others
Page 7 of 13
Attachment 2 -Work space requirements Minimum distance in mm
Attachment 1 -- Minimum distance in mm between top of one tray and the bottom of the tray above- Table 3
General- Instrumentation Workspace Clearances. SAIC-J-6022 1-Oct-05 INST
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAUDI ARAMCO INSPECTION CHECKLIST
SAIC NUMBER DATE APPROVED QR NUMBER
Page 8 of 13
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAUDI ARAMCO INSPECTION CHECKLIST
SAIC NUMBER DATE APPROVED QR NUMBER
Attachment 3 -Electrical Equipment Temperature class NEC table 500.8(B)
General- Instrumentation Workspace Clearances. SAIC-J-6022 1-Oct-05 INST
Page 9 of 13
INST
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAUDI ARAMCO INSPECTION CHECKLIST
SAIC NUMBER DATE APPROVED QR NUMBER
Attachment 4 -- Valve bracings std DWG AB-036521 sht 1 rev 08
General- Instrumentation Workspace Clearances. SAIC-J-6022 1-Oct-05
Page 10 of 13
General- Instrumentation Workspace Clearances. SAIC-J-6022 1-Oct-05 INST
Attachment 4 -- Electrical Equipment Temperature class NEC table 500.8(B)
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAUDI ARAMCO INSPECTION CHECKLIST
SAIC NUMBER DATE APPROVED QR NUMBER
Attachment 5 -- Details of heavy welding boss for threaded connections to vessels.
Page 11 of 13
Attachment 6 -- Liquid level guage glasses, instrument piping details lib. Dwg DB950046
General- Instrumentation Workspace Clearances. SAIC-J-6022 1-Oct-05 INST
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAUDI ARAMCO INSPECTION CHECKLIST
SAIC NUMBER DATE APPROVED QR NUMBER
Page 12 of 13
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAUDI ARAMCO INSPECTION CHECKLIST
SAIC NUMBER DATE APPROVED QR NUMBER
Attachment 7 -- Straight pipe requirements for Orifice , Venturi and flow nozzles Std. Dwg AA-
General- Instrumentation Workspace Clearances. SAIC-J-6022 1-Oct-05 INST
Page 13 of 13

Anda mungkin juga menyukai