Flow of Radio
Network Planning
ISSUE 4.0
RNP Staff Training Dept.
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
Color: R153 G0 B0
Corporate Font :
FrutigerNext LT Medium
Font to be used by
customers and
partners: Arial
22pt
:
18pt
Color: Black
Corporate Font :
FrutigerNext LT Medium
Font to be used by
customers and
partners: Arial
Page 3
After this course, you will
Know the flow of radio network planning
Grasp the key parts of the stages of radio
network planning
Make the radio network planning be more
standard and controllable
Objectives
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
Color: R153 G0 B0
Corporate Font :
FrutigerNext LT Medium
Font to be used by
customers and
partners: Arial
22pt
:
18pt
Color: Black
Corporate Font :
FrutigerNext LT Medium
Font to be used by
customers and
partners: Arial
Page 4
Procedure of Mobile Network Construction
Network
Planning
Implementation
Network
Optimization
Target
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
Color: R153 G0 B0
Corporate Font :
FrutigerNext LT Medium
Font to be used by
customers and
partners: Arial
22pt
:
18pt
Color: Black
Corporate Font :
FrutigerNext LT Medium
Font to be used by
customers and
partners: Arial
Page 5
RNP&O Service
There are four phases during network lifecycle: Pre-Bidding, Bidding,
Implementation, Maintenance
The RNP&O services are present throughout the network lifecycle,
divided by four parts: Scheme Traction, Radio Network Planning
(including Nominal Planning, Site Selection, Detail Planning), Radio
Networking Optimization (including Initial Tuning, Network
Performance Improvement), On-going
Pre-
Bidding
Bidding
Implementation
RNP&RNO Nominal planning Scheme Traction
Maintenance
On-going
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
Color: R153 G0 B0
Corporate Font :
FrutigerNext LT Medium
Font to be used by
customers and
partners: Arial
22pt
:
18pt
Color: Black
Corporate Font :
FrutigerNext LT Medium
Font to be used by
customers and
partners: Arial
Page 6
Nominal Planning Procedure (bidding)
RNP Service
optional
RNP Service
compulsory
Scheme Clarification
SOC Reply
Customer
Traction
Tender documents acquire
and project kick off
Information collection
CW Test
Spectrum Test
Propagation Model Tuning
Network Dimensioning
RNP Technical Proposal
RF Survey
Performance Promise (KPI)
Bidding
Bidding invitation
Open bidding
Simulation
Customer Requirement Analysis
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
Color: R153 G0 B0
Corporate Font :
FrutigerNext LT Medium
Font to be used by
customers and
partners: Arial
22pt
:
18pt
Color: Black
Corporate Font :
FrutigerNext LT Medium
Font to be used by
customers and
partners: Arial
Page 7
Radio Network Pre-planning Report
implementation
Key Points RNP scheme and Risk Estimation Report, Pre-planning Report
RNP Information Collection
CW Test
Simulation
Requirement Analysis
Project Kick Off Site Selection
For detail, please
refer to the
appendix RNP
FLOW
RNP scheme and risk estimation
Nominal Planning Procedure (implementation)
Propagation Model Tuning
Network Dimensioning
Spectrum Test
RF Survey
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
Color: R153 G0 B0
Corporate Font :
FrutigerNext LT Medium
Font to be used by
customers and
partners: Arial
22pt
:
18pt
Color: Black
Corporate Font :
FrutigerNext LT Medium
Font to be used by
customers and
partners: Arial
Page 8
Nominal Planning Procedure
Information
Collection
CW Test
Propagatio
n Model
Tuning
Site Selection
Spectrum Test
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
Color: R153 G0 B0
Corporate Font :
FrutigerNext LT Medium
Font to be used by
customers and
partners: Arial
22pt
:
18pt
Color: Black
Corporate Font :
FrutigerNext LT Medium
Font to be used by
customers and
partners: Arial
Page 9
MI
The project pre-sales documents
The information about the
destination areas
The target of network construction
Phase plan of network and scale of
network construction
Available sites and frequencies
owned by the customers
Digital map
MapInfo format map
VIP user survey
Collects the detailed information about the network to meet
the requirements of network dimensioning and simulation. It
is a basis to get a perfect planning result.
Output
Network Planning Information
Collection CHECKLIST
Former optimization report
The network configuration
information
Former drive test analysis
Former network traffic
analysis
User complaint analysis
Related references
For expansion, move or change,
the collected information includes
Nominal Planning Procedure
Attention:
Try to get more information from the
marketing and pre-sales before the
project is kick off
Confirm the information and make sure
it is correct. We can have a repeated
discussion with the customers.
The VIP users should gain more
attention.
Information Collection
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
Color: R153 G0 B0
Corporate Font :
FrutigerNext LT Medium
Font to be used by
customers and
partners: Arial
22pt
:
18pt
Color: Black
Corporate Font :
FrutigerNext LT Medium
Font to be used by
customers and
partners: Arial
Page 10
Project background analysis
Network deployment analysis
the network Acceptance Test
Requirement (KPI) analysis
The analysis to the
competitors
Resource Requirement
analysis
Sub-contract strategy analysis
According to the collection and analysis of the information, output
the RNP Scheme
Output
RNP SCHEME REPORT
and RISK ANALYSIS REPORT
Nominal Planning Procedure
Attention:
PM must focus on the technology
risk, including the network
deployment, the KPI requirement,
and the PAC requirement.
Are the risks related to the PAC?
Scheme Output and Risk Analysis (PM focus)
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
Color: R153 G0 B0
Corporate Font :
FrutigerNext LT Medium
Font to be used by
customers and
partners: Arial
22pt
:
18pt
Color: Black
Corporate Font :
FrutigerNext LT Medium
Font to be used by
customers and
partners: Arial
Page 11
CW Test and Propagation Model Tuning (Optional)
The Propagation model is the basis of the network planning. Whether the model is
effectual or not affects the planning result, and it also decides whether we can meet the
requirement with economic and proper investment.
Propagation scene
classification
Representative test
location selection
Preparation of the testing
instruments and software
The related reference
PROPAGATION MODEL
TUNING REPORT
Output
Attention:
For years development, the company
has a model library. It is recommended to
obtain the model from the model library.
For the requirement from the customers,
we can choose the typical area and have a
CW test. The model Tuning is base on the
test result.
Nominal Planning Procedure
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
Color: R153 G0 B0
Corporate Font :
FrutigerNext LT Medium
Font to be used by
customers and
partners: Arial
22pt
:
18pt
Color: Black
Corporate Font :
FrutigerNext LT Medium
Font to be used by
customers and
partners: Arial
Page 12
Output
Link budget result
Works out final result based
on the capacity and coverage
NETWORK DIMENSIONING
REPORT
Through the dimensioning, we can perform a quantitative analysis and
get the construction scale for the network. Thus, the construction period, as
well as the cost budget is worked out.
Scenes classification, and the
Propagation Model confirm
The Coverage, Capacity,
Quality for each scenes
Traffic model and service
model
Other related parameters
Dimensioning tool software
Related references
Key points:
Network input parameters, RND documents and the result.
THE RADIO NETWORK DIMENSIONING REPORT
should be reviewed before it is submit to the customer.
Attention:
If the customer can not provide the input parameters,
refer to the company planning principle to provide a set of
recommended values and submit to the customer for
confirmation.
For the improper input parameters, consult with the
customers. Besides, notify to the project team and the
result need to be gone through.
Nominal Planning Procedure
Radio Network Dimensioning
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
Color: R153 G0 B0
Corporate Font :
FrutigerNext LT Medium
Font to be used by
customers and
partners: Arial
22pt
:
18pt
Color: Black
Corporate Font :
FrutigerNext LT Medium
Font to be used by
customers and
partners: Arial
Page 13
Nominal Planning Procedure
To have a survey for each candidate site. Collect RNP and environment
Information and confirm whether the site spot meet the requirements or not.
Topology map
of the network base stations
Survey equipments
Related references
Key points to be monitors:
The following needed to be reviewed: Engineering parameters table,
base station topology, and antenna feeders selection.
spot-check the survey result.
ENGINEERINGPARAMETER
TABLE
RF SURVEY REPORT
On site survey table
SURVEY MEMO
Attention:
For the matching site spots, record and confirm the
engineering parameters; for the ones unsuited, give
the replacing suggestion and perform the simulation
All the site spots which are failed to be survey by
customers cause should be recorded in the survey
memo.
For co-site RF survey, enough independence should
be considered.
RF survey factors
RF Survey (optional)
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
Color: R153 G0 B0
Corporate Font :
FrutigerNext LT Medium
Font to be used by
customers and
partners: Arial
22pt
:
18pt
Color: Black
Corporate Font :
FrutigerNext LT Medium
Font to be used by
customers and
partners: Arial
Page 14
To make sure that the occupied spectrum is available, we can have a to spectrum
test on site. Generally, the test can be performed during the survey.
The test instruments
and fittings
Related reference
EM INTERFERENCE TEST TABLE
EM BACKGROUND TEST REPORT
Output
Attention:
For large-scale trail network, spot-check is
acceptable considering the workload.
Drive Test should be taken for the downlink band
Nominal Planning Procedure
Spectrum Test (Optional)
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
Color: R153 G0 B0
Corporate Font :
FrutigerNext LT Medium
Font to be used by
customers and
partners: Arial
22pt
:
18pt
Color: Black
Corporate Font :
FrutigerNext LT Medium
Font to be used by
customers and
partners: Arial
Page 15
Simulation should be performed after survey based on the survey result. The
simulation is a process keep adjusting the planning configuration to meet the
requirement of the customers.
ENGINEERING PARAMETERS TABLE
Propagation Model
Parameters required in the simulation
Simulation software
Digital map
Related references
XXX Project Network Simulation Report
Attention:
If the sites situation do not meet the
requirements, judgment should be taken to
determine whether to select a new site or not.
If the simulation result does not meet the
requirement. Survey and simulation should be
reworked until the target was fulfilled. Then,
we can output the NETWORK SIMULATION
REPORT.
Nominal Planning Procedure
Simulation
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
Color: R153 G0 B0
Corporate Font :
FrutigerNext LT Medium
Font to be used by
customers and
partners: Arial
22pt
:
18pt
Color: Black
Corporate Font :
FrutigerNext LT Medium
Font to be used by
customers and
partners: Arial
Page 16
XXX Project Network Pre-planning Report
Network Pre-planning Scheme
and Review Self-Checking
Input
Template of the network
pre-planning report
Import information for
the network planning
NETWORK DIMENSIONING
REPORT
RF SURVEY REPORT
SIMULATION REPORT
Integrating the previous information collection, network dimensioning, RF survey, and
simulation, to summarize the result and output the NETWORK PRE-PLANNING
REPORT.
Attention:
The Preliminary Planning Report after
review must be submitted to the Marketing
Dep. of the regional office for improvement
before it is submitted to the customer.
Submit the simulation result as soon as
possible to promote the progress of the
project.
Key Point:
Pre-planning result and pre-planning report review
Nominal Planning Procedure
RNP Pre-planning Report
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
Color: R153 G0 B0
Corporate Font :
FrutigerNext LT Medium
Font to be used by
customers and
partners: Arial
22pt
:
18pt
Color: Black
Corporate Font :
FrutigerNext LT Medium
Font to be used by
customers and
partners: Arial
Page 17
Site Selection Procedure
Implementation
Key point
The cooperation of RF survey, MW survey, and site design survey
RF Survey Report, Site Evaluation Report, Engineering Parameters Table
Information
Collection
Site
Evaluation
Simulation
Site
Searching
Nominal Planning
Procedure
Site Selection
Procedure
RF Survey
Engineering Parameters
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
Color: R153 G0 B0
Corporate Font :
FrutigerNext LT Medium
Font to be used by
customers and
partners: Arial
22pt
:
18pt
Color: Black
Corporate Font :
FrutigerNext LT Medium
Font to be used by
customers and
partners: Arial
Page 18
Neighbor Planning
Equipment
Installation
System Parameters Design
LAC Planning
Cell Parameters Design
Create the parameters
running script or DBF
Site Selection
Information
Collection
Frequency/PN/
Scrambling Code Design
Implementation
Radio Network Planning Proposal
Key Points
The Radio Network Planning Proposal must be evaluated internally,
and be confirmed by the customers
Detail Planning Procedure
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
Color: R153 G0 B0
Corporate Font :
FrutigerNext LT Medium
Font to be used by
customers and
partners: Arial
22pt
:
18pt
Color: Black
Corporate Font :
FrutigerNext LT Medium
Font to be used by
customers and
partners: Arial
Page 19
CELL PARAMETER DESIGN
REPORT or NETWORK
DESIGN REPORT
Set the single cell into a connected network and guide the later
implementation
NETWORK PRE-PLANNING REPORT
ENGINEERING PARAMETERS TABLE
NETWORK PLANNING
INFORMATION COLLECTION
TABLE
DEFAULT PARAMETER
COMPARISON TABLE
Related References
The cell parameters include the following:
LAC, RAC/RNC Area, Neighbor Cell List, Frequency/PN/Scrambling Code,
Power Distribution, Handover and Access Parameters
Detail Planning Procedure
Parameters Design
Attention:
The rules for cell numbering, frequency
reuse, and code planning.
For the GSM network, the cooperation of the
dual band.
For the network supports both 2G and 3G,
focus on the cooperation of inter-operation of
different system parameters
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
Color: R153 G0 B0
Corporate Font :
FrutigerNext LT Medium
Font to be used by
customers and
partners: Arial
22pt
:
18pt
Color: Black
Corporate Font :
FrutigerNext LT Medium
Font to be used by
customers and
partners: Arial
Page 20
Make the parameter running script or DBF files according to the parameters design
result.
CELL PARAMETERS DESIGN
REPORT or NETWORK PLANNING
DESIGN REPORT
DBF file or the script file
Attention:
The DBF file or the
script file must be
consistent with the
network planning result
Detail Planning Procedure
Make the parameters running script and DBF
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
Color: R153 G0 B0
Corporate Font :
FrutigerNext LT Medium
Font to be used by
customers and
partners: Arial
22pt
:
18pt
Color: Black
Corporate Font :
FrutigerNext LT Medium
Font to be used by
customers and
partners: Arial
Page 21
Integrate the network pre-planning report and the cell parameter design report, output the
RADIO NETWORK PLANNING PROPOSAL and submit to the regional office and TS for review,
and then have a presentation to the customer.
RADIO NETWORK PRE-PLANNING REPORT
CELL PARAMETER DESIGN REPORT
RADIO NETWORK
PLANNING PROPOSAL
NETWORK PLANNING SCHEME
NETWORK PLANNING SCHEME
COMMUNICATION REPORT
Attention:
The planning rule of all parameters
must be embodied in the Planning
Scheme for the convenience of others,
and it is help to guide the later network
optimization.
Key points:
To review the Planning Proposal and planning scheme
Detail Planning Procedure
Radio Network Planning Proposal
Thank you