Anda di halaman 1dari 1

Batang Hari Irrigation System Schematic Map

Ver.31 October 2006


LCB Package-6 Lot-4 SG6Ki
-
SG7Ki
-
SG8Ki
- LCB Package-5 Lot-3 LCB Package-4 Lot-2 LCB Package-3 Lot-1 LCB Package-7-1 Lot-5-1
PT. Brantas Abipraya 17.7
-
27.0
-
5.7
-
8.7
-
15.8
-
24.2
-
SG8M PT. Istaka Karya PT. Waskita Karya BRA11M
-
PT. Adhi Karya PT. Ashfri Putralora
A=237 Ha
Q=0.391m3/s
BSG6

A=149 Ha
BSG7

Q=0.246 m3/s
BSG8
87.5
-
SG9
113.9
-
113.9 173.7
- - Main / Secondary Canals
SG6Ka SG7Ka SG8Ka BR7KiM BRA8Ki BRA9Ki BRA10Ki BRA11Ki BRA13Ki
- - - BBRA.11M
- - - - - -
63.6 97.4 5.3 8.1 13.2 20.2
49.7 76.1 21.7 33.2 38 63 37.6 57.5 38.8 59.3 A=114 Ha 62.1 95.0
Construction Work is not yet
SIGUNTUR SC

- - - - - - Q=0.188 m3/s
- - - - - - - - - - - -
BR7Ki2 BBRA.8 BBRA.9 BBRA.10 BATU RIZAL A SC BBRA.11 BBRA.12 BBRA.13
-
Under Construction

Q=0.076 m3/s
A=511 Ha A=470 Ha A=328 Ha A=111 Ha A=94 Ha

Q=1.087 m3/s Q=0.879 m3/s


SG5Ki 24.7 37.9 Q=0.843 m3/s Q=0.776 m3/s Q=0.541 m3/s Q=0.183 m3/s Q=0.155 m3/s
SG5Ka RK1Ki RK2Ki RK2Ki(RK3Ki) - -

A=46 Ha
A=533 Ha
- BRA9Ka BRA10Ka1 BRA10Ka2 BRA11Ka BRA12Ka BRA13Ka
25.6
-
39.1
- 39.8
-
-
60.9
-
10.1
-
-
15.5
-
-
-
-
-
-
24.2
-
-
37.1
-
RK3M
BR7Ki1
-
17.3 26.5
BRA7Ka

32.7
-
50.1 40.8
-
62.4
-
36.2 55.4
-
20.8 31.9 63.3
-
96.9
-
16.7 25.5
-
31.0 47.5
Completed
BBRA.7 - - - - - - - - - - - -
RAWAH KAPEH SC BRK1 BRK2 BRK3 BRK3M BRK4Tg - - - -

A=659 Ha
BSG5 84.1 128.7 BRA6Ki BRA6Ka BRA10KaM
ST5M
Q=0.927 m3/s

A=338 Ha A=284 Ha A=196 Ha A=72 Ha - -


Q=0.558 m3/s Q=0.469 m3/s Q=0.323 m3/s Q=0.119 m3/s - - -
SD5 BBRA.6
A=589 Ha

63.8 97.6 49.6 75.8 45.7 70


SG4Ki RK1Ka RK2Ka RK2Ka(RK3Ka) 48.8 74.7 - -
- - - - - -
- - - -

Q=1.259 m3/s
BSG4
BRA5Ki1 SP3M
7.8 10.7 12.0 18.4 - - 89.6 137.1 -

A=763 Ha
Q=0.988 m3/s

- - - - - - - - BST.5M -

PULAU MAINAN SC
ST5Ka 111.0 170.0
A=599 Ha

30.0 45.9
- -
SG3Ka SD5Kr-Kn - -
BST.5 7.1 10.9
- KBR6M
Tertiary Block
BSG3 - - BRA5Ki2 BRA5Ka BSP3M
14.0 21.4

SIPANGKUR SC
- - - - - TRT2M
ST4Ka BBRA.5
-

Q=0.107 m3/s
SG2Ki A=620 Ha 9.8 15.0 15.2 23.3 69.3 106.0
SD5Kr-Kn

Q=1.587 m3/s
Q=1.023 m3/s - - 84.1 128.7
BST.4 - - - -
- SKB3M

A=65 Ha
BSG2
Q=0.099 m3/s

(BST.3M) 9.8 15.0 - -


BRC1Ki A=819 Ha
Q=1.039 m3/s

3.6 5.4 - - -
- - BATU RIZAL C SC
A=60 Ha

- BKBR.5M
A=630 Ha

63.1 96.6 SA4M


- - ST3Ka 58.8 90.0 KBR6Ki KBR6Ka T2M SP3Ki SP3Ka
SG1Ki' SG1Ki SG1Ka PLi3M BRC1M - BT2M BSP3 PM3
TR2Ki TR3Ki TR2M SD5Kr-Kn - - - - - - - SM10Ki SM10Ka
BRA4Ka
- M9Kr BSG1 LK1Kr SD11Kr-Kn - 30.9 47.3 -
Name

Q=0.521 m3/s Q=0.4952 m3/s Q=0.259 m3/s Q=0.2012 m3/s Q=0.061 m3/s
SD3Kr - - BST.3 9.6 15.0 21.1 32.3 42.5 65.0 31.5 48.2 93.2 142.6 9.4 14.4
- BSM.10 -

Q=0.225 m3/s
Q=0.120 m3/s

25.9 41.3 9.6 14.6 54 21 BSKB3M BBRC1M BBRC1 BBRA.4 - - - - - 106 77


4.1 6.2 85.9 131.4 56 86 - - 81.5 124.7 55.3 84.7 - - - - - - - - PP2M
Q=0.155 m3/s

- - - - BM9 - - - - 27.4 41.9 18.3 28.0

A=37 Ha
11.2 17.2

A=139 Ha
- - - - A=52 Ha

PADANG BINTUNGAN Ki SC
- - - - - - T2Ki -
A=73 Ha

A=685 Ha ST2Ka1 TKT2Ki TKT2Ka Q=0.086 m3/s - - BRB1Ki BRB2Ki BRB3Ki SA4Ki SA4Ka KBR5Ki KBR5Ka - - - -
Q=1.130 m3/s SKB3Ka SP2Ki SP2Ka
A=94 Ha

Q=0.050 m3/s
PLiA2Tg BTRT2M - 72.0 110.2
- - -

Q = 0.096 m3/s
SD5Kr-Kn SD6Kr SD6Kr BRC1Ka - -

Q = 0.162 m3/s
BTKT.2 - BSA4M - BKBR5
Q=1.587 m3/s

M8Ka - BTR3 - BSP2 - - -


Old Name (SEDASI)
BTR2 A=56 Ha 29.1 44.5 BPM.3M
SD10Kr 36.6 56.0 52.0 75.6 35.5 54.2

Q=0.348 m3/s Q=0.221 m3/s Q=0.135 m3/s


46 70 48 73 131.4 201.0 - 14.8 22.2 10.0 15.3 16.0 24.5 16.0 24.5

A=30 Ha
BSKB3
A=962 Ha

Q=0.092 m3/s (BTR2M)

A = 58 Ha
29.0 44.4 7.1 10.9
Q=0.153 m3/s

A = 98 Ha
- 83.4 127.6 - - - - - - - - - - - - - - - - - -
- - - - SM9Ki2
Q=0.132 m3/s

32.6 49.8 BPL3M


Q=0.231 m3/s

15.3 23.4 - - - -

Q=0.380 m3/s
KHA1Ki KHA1M

Q=0.135 m3/s
BM8 - - TR2Ka TR3Ka

A=122 Ha
TARAKTAK KOTO TUO SC

PM3Ka

A=82 Ha
5.7 8.7 BPP.2M PM3 (PM3Ki)
- - PLi3Ka - - SA3Ki -
A=93 Ha

M7Ki M7Ka ST2Ka TKT1Ka (TKT1Ka1) SA3Ka


A=140 Ha

Q = 0.134 m/s
SD3Kr - KBR4Ki KBR4Ka PBKi1M T2Ki T2Ka TRT1Ka1 SP1Ki2 - -

A=230 Ha
- -
A=80 Ha

BPLi.A.2 - - -

A=82 Ha
BPL3 BATU RIZAL B SC - 40.5 62.0
SD5Kr SD6Kr BRA3Ki - SM9Ka

TIUMANG SC
- - 18.5 28.4 55.7 85.3 PLi2Ki BSA3
- - - - BT2 - - - 53.6 82.0 30 46

A = 81 Ha
BST.2 PLi.A2Ki PLiA2Ka 43.1 65.9 BKBR4 90.1 137.9 48 73 - -
SKB2Ka - BBRA.3 BBRB.1 BBRB.2 BBRB.3 51.0 78.0 62 94.9
Plan
32.1 49.1 37.5 57.4 BSM.9 -
Area (Ha) Q (Lit/sec)
0.8 1.2 BM7 5.2 8.0 - - - - - - - - - - - -
SITIUNG SC

SD11Kr-Kn BPL2 - - 41.8 64.0 39.5 60.4 83.1 127 71.8 109.9 27.0 41.3 44.7 68.4 26.5 40.5

Q=0.211 m3/s
- - - - - - - - - -

A=134 Ha
- - - - 27.4 41.9 SM9Ki1
- - - - - - - - - - - - - - - 22.7 34.7

TARANTANG SC
SIKABAU SC

Q=1.945 m3/s

A=187 Ha

A=157 Ha
KT2Ki KT2Ka
TERANG SC

55.3 84.5

PULAU PENDAM SC
BSKB2 BTKT.1 A=118 Ha A=66 Ha PP2Ki PP2Ka PM2Ki
29.1 44.5 5.8 8.8

A=128 Ha
SA2Ki

KOTO BERINGIN S C
- - - -
PULAI A. SC.

Q=0.111 m3/s

A=14 Ha M6Ka ST2Ka2 Q=0.308 m3/s Q=0.195 m3/s Q=0.019 m3/s


Q=0.338 m3/s

KOTO HILALANG A SC
- - - - -

ATANG SC
A=1179 Ha

- - - - - - KBR3Ki KBR3Ka T1Ki2 TRT1Ka2 SP1M SP1Ka SL1Ki(SL1Ki1) SL1Ki2 SL2 (SL2Ki) SL3Ki - BPP.2 - -
Q=0.310 m3/s

Q=0.023 m3/s BKT2 A=64 Ha BPM.2


-

Q = 0.246 m3/s
- - - SD5Kr BSA2 BPBK.i1M BSP1 82.4 126.0
Actual
A=205 Ha

Q=0.106 m3/s
Q=0.226 m3/s

- BKBR3 - - - - - - - - -
Area (Ha) Q (Lit/Sec)

Q = 0.234 m/s
SUNGAI
A=67 Ha

26.4 40.3 25.4 38.9 TKT1Ka2 PLi.A1Ki2 25.0 38.2 26.8 41.0 37.3 57.1
Q=0.083 m3/s
Q=1.130 m3/s

A=188 Ha

BM6 PLi1Ki BRA2Ki BRA2Ka 21.1 32.3 - -

Q=0.099 m3/s
Q=0.155 m3/s

A = 149 Ha
6.6 10.0 21 32

A = 142 Ha
- - - - 34.6 52.9 42.8 65.5 48 73 57.8 88.5 64 98 17.7 27.1 93.7 143.3 62 95 26.2 40.1 68 104 - - - - - -
A=161 Ha

Q=0.360 m3/s

BSP.1M
PULAI SC

- -

A=211 Ha
- - SD7Kr -
A=685 Ha

- - SD11Kr-Kn - BBRA.2 - - - - - - - - - - - - - - - - - - - - -
A=50 Ha

SL3M SLB1Ki SLB1M A = 30 Ha

A=60 Ha
A=300 Ha
A=94 Ha

KOTO TUO SC

A=24 Ha
A=218 Ha

55 84 8.2 12.5 18.0 27.6 27.1 41.5 22.4 34.3 SA1Ki


Q=2.166 m3/s Q=2.028 m3/s

M5Ki Q=0.040 m3/s SKB1Ka TR1Ka KT1Ki ST1Ka BRB1Ka BRB3Ka KBR2Ki KBR2Ka PBKi1Ki T1Ki1 T1Ka TRT1Ka3 SP1Ki1 BSL2 BSL3 BSL3M - - - PP1Ki PP1Ka Q = 0.050 m3/s
PM1Ki BH27Ki BH28Ki SM1Ki SM3Ki1 SM3Ki2 SM4Ki SM5Ki SM7Ki SM8Ki SM8Ki2

SIMALIDU SC
Q = 0.356 m3/s
- - - - BPL1

Q=0.714 m3/s
- - - - - - - BKHA.1M
A=1229 Ha

BSA1

Q=0.365 m3/s
- BM5 - SD3Kr - BKT1 SD5Kr PLiA1Ka - - - - - - - - - - - - BPM.1 - - - - - - -
BSKB1 BKBR2 BT1 49 75 52.5 80.2 49.0 74.9 BPP.1 BKHA.1 - - -

A = 216 Ha
BTR1 34.7 53.1 A=171 Ha A=117 Ha A=49 Ha

A=433 Ha
BST.1 BPBKi.1 BSL1

Q = 0.272 m3/s
1.1 1.7 41.7 63.7 8.1 12.4 22.0 33.6 69.3 106.0 BRA1Ki BRA1Ka A=320 Ha - - - - - -

A=221 Ha
A=33 Ha - 32.0 48.9 31.4 48.0 17 26 43.0 65.8 65 99 74.4 113.8 44.7 68.4 42.0 64.3 63.0 96.4 Q=0.282m3/s Q=0.193m3/s Q=0.081m3/s 48.0 73.5 17.9 27.3 10.4 15.9 27.2 41.6 18 28 18 28 25 38 82 125 70.0 107.2 69.5 106.3
Q=0.373 m3/s

BBH8Ki PLiA1Ki1 PLi1Ki1 12.4 19.0 81.0 124.0 26 40

Q=0.490 m3/s
- - - -
- - Q=0.528 m3/s S25M
Q=0.203 m3/s

- - - - - -
Q=0.144 m3/s

Q=0.206 m3/s
Q=0.054 m3/s
Q=0.493 m3/s

Q = 0.35 m/s
BBRA.1 - - - - - - - - - - - - - - - - - - SUNGAI LANGKOK SC - - - - - - - - - - - - - - - - - - - -
Q=0.188 m3/s

- - - - - - - -

Q = 0.087 m3/s

A = 165 Ha
Q=315 m3/s

Working Drawing LD is prepared


14.1 21.6

A=316 Ha

A = 212 Ha
- - SD11Kr-Kn -
A=226 Ha

A=297 Ha
A=269 Ha A = 117 Ha A = 49 Ha
A=191 Ha

M4Ki M4Ka - - Q = 0.193 m3/s Q = 0.081 m3/s


A=123 Ha

KBR1Ka

A=125 Ha
A=299 Ha
BPLi.A.1

34.6 52.9 49.1 75.0 BSLB.1 BSLB.1M


A=114 Ha

A=87 Ha

39.7 60.7 12.2 18.6 69 106 Q=0.444m3/s 76 116

A = 53 Ha
BATANG HARI MAIN CANAL
A=1313 Ha

- - - - - - -
- - - - - - BKBR1 - -
4.4 6.7 BM4 9.9 15.2 A=14431 Ha A=14174 Ha A=13400 Ha A=13277 Ha A=13062 Ha A=12666Ha A=12446Ha A=12095 Ha A=11902 Ha A=10660 Ha A=9209 Ha A=425 Ha 70.9 108.5 A=7504 Ha A=6688 Ha A=6467 Ha A=6372 Ha A=5549 Ha SUNGAI LANGKOK B SC A = 5257 Ha A = 5045 Ha A = 4905 Ha A = 4504 Ha
- - - - Q=0.701 m3/s
BBH1 Q=23.811 m3/s BBH2 Q=23.387 m3/s BBH3 Q=22.110 m3/s BBH4 Q=21.907 m3/s BBH5 Q=21.522 m3/s BBH.6 Q=20.899 m3/s BBH.7 Q=20.539m3/s BBH.8 Q=19.957 m3/s BBH.9 BBH.10-1 Q=19.638 m3/s BBH.10-2 Q=17.589 m3/s BBH.11 Q=15.195 m3/s BBH12 BBH13 - - Q=12.382 m3/s BBH14 BBH15-1 BBH15-2 BBH16 Q=11.035 m3/s Q=10.671 m3/s Q=10.514 m3/s BBH19 BBH20 BBH.21 BBH.22 Q=9.156m3/s BBH.23 Q = 8.493 m3/s BBH.24 Q = 8.143 m3/s Q = 7.912 m3/s BBH.26 BBH.27 Q = 7.316 m3/s BBH.28 SIMALIDU SC BSM.1 BSM.2 BSM.3 BSM.4 BSM.5 BSM.6 BSM.7 BSM.8 S25M

Under Construction

Q = 0.302 m3/s
-

Q = 5.056 m3/s
Q=0.318 m3/s

Q = 0.292 m3/s
A = 1352 Ha A = 1233 Ha A = 1050 Ha A = 882 Ha A = 785 Ha A = 665 Ha A = 643 Ha A = 330 Ha
A=7304 Ha A=6985 Ha A=5939 Ha BBH.25

Q = 0.144 m/s
A=15,271 Ha KW1Ka KW1Ki G1Ki A=5818 Ha A = 5730 Ha A = 71 Ha A = 4740 Ha
Q=0.066 m3/s

A=45 Ha KA1Ka(KA1Ka2) SGG1Ki1 BBH17 BBH18 S1Ka (S1Ka1)

Q=0.526 m3/s
Q = 2.231 m3/s Q = 2.034 m3/s Q = 1.733 m3/s Q = 1.455 m3/s Q = 1.295 m3/s Q = 1.097 m3/s Q = 1.061 m3/s Q = 0.545 m/s
A=774 Ha
BBH.23

Q = 0.299 m3/s
SUNGAI LANGKOK C SC

A = 183 Ha
Q=0.338 m3/s

KA1Ki KA2Ki KA4Ki Q=12.052 m3/s Q=11.525 m3/s A = 79 Ha 76 116


Q=0.167 m3/s

P1Ki BBH11 PG1Ka PG1Ki

A = 3134 Ha
A=991 Ha A=960 Ha Q=9.799 m3/s Q = 0.117 m/s Q = 7.640 m3/s SM8Ka
A=193 Ha

A = 177 Ha
Q=1.277 m3/s Q=9.600 m3/s Q = 9.349 m/s
PISANG REBUS SC

BBH8Ka G1Ka ~ BBH.2 Q = 0.130 m3/s

A = 87 Ha
Q=25.197 m3/s Q=0.074 m3/s

SEBERANG PIRUKO SC
- BKW1 SD3Kn Q=1.635m3/s BG.1 SD8Tg - Q=1.584 m3/s
- - - -

A=319 Ha
3M SSC

A = 181 Ha
- - SD10Kn A=470 Ha
A=205 Ha
A=40 Ha

BH2Ka P1Kr - - -
A=101 Ha

BPG1 BBH.23M

Q=0.200 m3/s
- SD8Kn Q=775 m3/s BP.1 BSLC.1 BSLC.1M -

Q=0.124 m3/s
26.1 39.9 65.1 99.6 80.1 122.5 33.8 51.6 P1Ka 11.7 17.9

SUNGAI KALANG SC
Q=0.927 m3/s Q=1.109 m3/s

14.9 22.8 45.3 69.3 34 52 49 75 A = 40 Ha A = 26 Ha


- 33.2 50.7 71 109 60
0.4 92.4 18.6 28.5 S1Ki SM1Ka3 SM1Ka2 SM1Ka1 K1Ka K1Ki SM3Ka SM4Ka SM5Ka SM6Ka

Q = 0.492 m3/s
Q=0.157 m3/s
- - - - - - - - TP1Ki SLC1Ka SLC1M A1Ka A1Ki PK1Ka PK1Ki - - 37.0 56.6

A=121 Ha
- - 23.8 36.4
Q=0.182 m3/s

- - - - - - - - - BH23Ka(BH23M) Q = 0.066 m3/s Q = 0.043 m3/s S25M


A=672 Ha

- - - - - - - -
Q=1.503 m3/s

A=75 Ha
28.5 43.8 - - - - - - - - - BK.1 - - - - - - -

A = 298 Ha
KW2Ka KW2Ki TT1Ka TT1Ki PR1Ka G2Ki1 KA1Ka1 A=437 Ha - - - - - - BKHB.1 - BPK.1 - S1Ka2
Levelling is completed
A=110 Ha

A=95 Ha
LK1Ka - - BKA.1 24.5 37.5
KPd1Ki KPd2Ki KPd3Ki1 KPd3Ki2 PBKa1Ka SGG1Ka SGG1M SLK1Ka BH21Ka
A=911 Ha

BAMBANG SUGIANTO SC
Q=921 m3/s
Q=1.460 m3/s
BKHB.2 BKHB.2M 18.5 28.3 41 63 33.5 51.2 52.6 80.5 39.0 59.7 59.2 90.5 50.8 77.8 17 26 78.0 119.3 12.4 19.0
- - - BTT.1 - - G1Ka1 G1Kr-Kn - KOTO AGUNG SC - - 40.4 61.8 59.9 91.7 62.7 95.9 36 46 19.2 29.4 62.0 94.8 6.0 9.2 7 15 -

Q = 4.990 m3/s
BWK2 76 116

Q = 0.277 m3/s
Q = 0.276 m3/s
- BSGG1M BA.1 - - - - - - - - - - - - - - - - - - - -
Q=0.259 m3/s

BPR.1 - - - - - - - - - KOTO HILALANG B SC

AMPALU SC
BSKL1 - - - - - - - - - - - - - - - -
A=885 Ha
BSGG1

KUPON SC
BS.1

A = 3094 Ha
BLK1 76.7 117.3 90.9 139.1 23.2 35.4 40.6 62.1 57.0 87.1 - 43.5 66.6 35 54 BKA.2 BKA.3 BKA.4 BP.2 A=344 Ha BPBKa1 14 21 - -
63.2 96.7

A = 168 Ha
BS1Ka BS1Ki

A = 167 Ha
Q=0.106 m3/s

Q=0.066 m3/s
S2Ki1

Q = 0.269 m3/s
4.5 6.9 83.6 127.9 5.6 8.6 24.8 37.9 24.9 38.1 10.9 16.7 82 - 81 124 25.8 39.5
A=157 Ha

Q=568 m3/s - -
- - - - - - - - - - - - 43 - - - - - A=128 Ha A=68 Ha A=82 Ha TELUK PURI SC
PADANG CANDI SC

A=98 Ha - - - - - - - - - - - - - - - - - -
A=562 Ha

BTP.1 - -

Q=0.071m3/s
P3Ka P3Ki Q=0.135 m3/s - BBS.1

A = 163 Ha
- -
A=64 Ha

Q=0.211 m3/s

A=40 Ha
KW3Ki KW2Ka PR2Ki G2Ki2 Q=0.162 m3/s Q=0.112 m3/s BSS.14

Q = 0.419 m3/s
Q=0.153 m3/s

KW3Ka2 S25M

PADANG BINTUNGAN KANAN SC


KAPEH SC

TEBING TINGGI SC

SGG1Ki2 SP1Ka2 8.9 10.5 22.2 44.7

SIALANG GAUNG SC
P2Kr P2Kr A=769 Ha 68.0 104.0

A=43 Ha
G2Ka BP.3
- - BPR.2 - G1Kr-Kn KA2Ka KA3Ka KA4Ka KPd3M TP2Ka A2Ka A2Ki PK2Ka PK2Ki S2Ka S2Ki2 K2Ka K2Ki
Levelling and Canal Work are completed

A = 254 Ha
BLK1M - BWK3 BTT.1M BG.2
- - Q=1.384m3/s - - - - - - -
A=93 Ha

13.5 20.7 18.2 27.8 A=468 Ha SS14Ka1(TP1Ka) BKHB.1M


LIMAU

41 99 10.1 15.5 19 29 48.6 74.4 G1Kn 32.4 49.5 - - SD11Kn BKPd1 BKPd2 Q=0.772 m3/s BKPd3M1 - - - - - - - BS.2 - - BK.2 - 76 116
Q=0.228 m3/s

BPK.2

PADUKUHAN SC
BSKL1M

Q=0.130 m3/s
- - - -

Q=1.535m3/s
- - - - - - - - 36 55 60 92 - BTP2 BS2Ka BS2Ki
- - 42.7 62.3 BPG2 KHB1Ka KHB2Ka KHB2M - -

Q=1.297m3/s
LK1M 30 46 34 52 81.3 124.4 46.5 71.2 54.4 83.2 19.2 29.4 8.4 12.9 26.3 40.2 9.5 14.5 42.8 65.5 30.5 46.7 17.6 27.0

Q = 4.811 m3/s
4.9 7.5 A=586 Ha A=562 Ha - - - -
A=138 Ha

P3AKi BKPd3 34.0 52.0 BA.2 S2Ki3 - -

A=860 Ha

Q = 0.250 m3/s
- - BBSP.1 BBS.2

Q = 0.107 m3/s
- -

A=79 Ha
- - - - - - Q=0.967 m3/s Q=0.911 m3/s - - - - - - - - - - - - - - - - - -

A = 2986 Ha
- - -

A=716 Ha
KW3Ka (KW3Ka1)
- TT1M K3Ka PR3Ki G2Ki3 - -

Q=0.561 m3/s
- BPBKa1M SGG2Ka SGG2Ki1 SKL1M -

Q = 0.195 m3/s
BP.3A 22.2 34.0 39.6 60.1

Q = 0.317 m3/s
TP3Ka TP3Ki A2M

A = 124 Ha
PINANG GADANG SC

SP1Ka(SP1Ka1)
PIRUKO KANAN SC

- KPd1Ka KPd3Ka 35.5 54.5 14 21 26 40 S25M

A = 65 Ha
36.6 55.9 G1Kr-Kn - - - -
- - - G2M1 52.5 80.2 - - - - 16 24

SIAT KUPON SC
A=340 Ha
BPR.3 BTP3 - - - - - -

A = 118 Ha
- -

A = 192 Ha
-
Canceled
- - 34.4 53.6 - -
- - 64 98 75.0 111.7 32.0 49.0 G1Kn 35 58 - - 43.7 66.9 BSGG2 63.8 97.6 37.5 57.4 BBSP.1M 40 61 - - -
PIRUKO SC

LCB Package-8 Lot-6 91.6 140.1 33.3 50.9 29.0 44.4


Q=0.488 m3/s

- - PKa1Ki 28.2 43.1 14.5 22.2

Q = 1.120 m/s
- - - - - - 26.1 39.9 - - - - - - - - - - - - - - S3Ka S3Ki K3Ka K3Ki SKD4Ki SKD4Ka BS3M2 BS3Ki KM3M 76 116
Q=0.160 m3/s

Q=1.237 m3/s

PC1Ka PC1Ki BPR.4 - - - - A = 71 Ha - -


A=296 Ha

A = 609 Ha
BPKa1 PA1
Q=516 m3/s

- - PT. Duta Graha Inda


Q=0.701 m3/s

DU1Ki DU2Ki DU3(DU3Ki) SGG2Ki2 TP4Ka A3Ka A3Ki KHB1M PK3Ka PK3Ki - - - BK.3 - - BSKD.4 - - Q = 0.117 m3/s BBS.3 - -

Q=0.089 m3/s
PR4Ka PR4Ki
A=313 Ha

BS.3
A=750 Ha

PC4Kr PC4Kr 11.8 18.1 PG3Ki2 KPd4Ka KPd4Ki PBKa1M KOTO BARU SC
A=97 Ha

G2M2

Q = 0.089 m3/s
P4Kr-Kn DU1Kr DU2Kr -
Q=0.135 m3/s
A=425 Ha

- - - - - - 10.5 16.1 29.3 44.9 40 61 25 38 26 40 53 81 64.3 98.3 31 47 52 80

Q = 0.130 m3/s
20.6 31.5 15.1 23.1 - - - - BSS.13 BA.3 BPK.3 BBS.3M2
- - - -

A=54 Ha
BPC1 G1Kn 56.9 87.0 32 49 73.1 111.8 BKPd4 16.6 25.4 SP1KaM A=329 Ha - - - - - - - - - - - - - - - - - -
- - - - 95 - 26 40 26 40 29.3 44.9 37.7 57.7 61 49

Q = 0.109 m3/s
65 99 32 49

KOTO PADANG SC.


TP3Ki1(TP4Ki1)

A = 54 Ha
A=82 Ha

A = 79 Ha
Q=0.248 m3/s Q=0.474 m3/s
- - - - - - DU3M 41.0 62.7 11.5 17.6 40.5 62.0 17.4 26.6 - - Q=0.542m3/s

Q=2.755m3/s
- - - - 57.7 88.3 - - - - - - - - - - - - -
PKa1AKa PKa1AKi - - - - - - - - - SK5Ki SK5Ka

A=1189 Ha
- - SKD3Ki SKD3Ka BS3Ka KM3Ki KM3Ka

A = 66 Ha
A=287 Ha
BDU.1 BDU.2 BDU.3 BDU.3M DU2Tg SGG2M 42.7 15.3 - BSK.5
-
PA1 PA1 BP.4 PG3M KPd5Ka KPd5Ki KB1Ki 27.2 41.6
BKM.3
G3Ka G3Ki 43 66 - - - BSKD.3 - - - -

Q = 0.201 m3/s
KW4Ki KW5Ki KW6Ki KW7Ki KW7M1(KW6M1) 3.8 5.9 3.2 4.8 A=313 Ha A=313 Ha A=226 Ha A=43 Ha
PG3Ka - BKB1 BTP3 - - 80 122 42 64 BBS.3 M1
BPKa1A

-
MIMPI MC

Q=0.516 m3/s Q=0.516 m3/s Q=0.373 m3/s Q=0.071 m3/s - - BA.3M


- - -

Q = 0.320 m3/s
G2Kn BG.3 G2Tg - - - - BKPd5 (BTP4) - - - - 71 109 44 67 33.0 50.3 34 52 34 52

A = 122 Ha
- 25.6 39.2

SIAT KIRI DURI SC


- - - - - BPG3 BPG3M BSGG2M 97.4 149.1 - - - - - - - - - -

Q=0.135m3/s Q=0.239m3/s Q=0.424m3/s


11.2 17.2 67.2 102.8 36.0 55.1 69.0 105.6 - -

A = 194 Ha
89.7 106.7 32.6 49.9 BSGG3 - - TP3Ki2(TP4Ki2) A3M PK3Te SK4Ki SK4Ka
79.1 121.1 12.3 18.9 69.5 106.3 29.7 45.5 DU1Ka DU2Ka DU3Ka2 DU3Ka1 9.0 13
3.8 - - - - - -
- - - - A=67 Ha

A=257 Ha
A=181 Ha
- - - - - - - - - - - - - -
A=707 Ha
PKa2Ka PKa2Ki P4Kr-Kn D1Kn - - - - Q=0.111 m3/s SGG3Ka SGG3Ki SS12Ka KB2Ka KB2Ki
BSK.4
SKD2Ki SKD2Ka BS3M1 BS3M2

Q=0.825m3/s
G4Ka
Q=1.166 m3/s
G4Ki PG3Ki1 KPd6Ka KPd6Ki - - - 62.4 95.4 66 101 35 54 30 46 22 34
BKW7M1 GA2Ki - - 31 47 99.5 152.2 71 109 78 119 BSS.12 - - - BSKD.2 - - -

A=501 Ha
- BKB2 - - - - - - - - - - BKM.2
BKPd6 -

Q = 0.142m3/s
(BKW6M1) - BG.4 - 41.2 63.1 41.3 63.1
- - - - - - - - - 3.5 5.4 16.3 25.9 62.0 94.8
47.6 72.8 47.8 73.1 A = 174 Ha 43 66 15 23 47.8 73.1 34 52
P6Kn

Q = 0.416 m3/s
Q=0.158 m3/s

A=48 Ha BPKa2 30.3 46.4 BSGG3M SK3Ki SK3Ka


A=150 Ha - - - - - - S25M S30M S31M

A=1239 Ha
KELAWA SC A=264 Ha 78.8 120.6
38.3 58.7 54.4 83.2 - - - - SUNGAI DUO SECONDARY CANAL 83.4 127.6 Q = 0.287 m3/s - - - - - - - -
Q=0.092 m3/s

Q=0.079 m3/s - - - -

SIAT SC

A = 86 Ha
Q=0.248 m3/s

A=145 Ha
Q=0.406 m3/s 25.6 39.2 - -
Q=0.081 m3/s

- - - -

A = 252 Ha
- - - - - - BSK.3 - - -
A=96 Ha

A=615 Ha - - GA2Tg KB3Ka TP4Ka (TP5Ka) TP4Ki (TP5Ki)


A=56 Ha

BKW4 G5Ka Q=1.015 m3/s 56 86 23 35


M3Ka BKW5 BKW6 BKW7 A=214 Ha A=147 Ha PG4Ka PG4Ki - -
BTP4
- SKD1Ki SKD1Ka KM1Ka 119.7 183.1 100.6 153.9 99.7 152.5
A=49 Ha

BKW4M BKW7M2 BG.5 Q=353 m3/s BG.A.1 Q=242 m3/s BG.A.2 P5Kr BKB3 (BTP5) - - - - - - - - - -
M3Kr Q=0.134 m3/s BKW6M2 Q=0.087 m3/s - - BPG4 - SGG3M 38.2 58.4 91.7 140.2 22.5 34.4
A = 253 Ha - BSKD.1 - BKM.1 -
SK2Ki SK2Ka

Q=0.241m3/s
A=53 Ha 57.8 88.4 Q = 0.417 m3/s
56.5 86.5 28.4 43.4 8.0 12.2 BKPd6M1 BKPd6M2 - SS4A Ka SS10Ki - - - - - - 19 29 28 43 39 60
Q=0.058 m3/s

- - 53.9 82.5

A=146 Ha
A=82 Ha

KUAMANG SC
- - KW4Ka(KW4M) KW4Ka KW5Ka1 KW5Ka2 KW6M2 KW6Ka KW7M2 - - - - - - 64.3 98.4 - - - BSK.2 - - - - - - -
- G5Ki GA1Ka1 GA1Ka2 GA2Ka KB3Ki TPK1Ki 15 23 17 26
- - - - - -
A=35 Ha

BPG4M - - 0 61 58.3 89.2 A = 285 Ha BS.31M

Q = 0.493 m3/s
- - - P6Kr BSS.11 - - - - Q = 0.470 m/s - - BS.25M BS.30M

Q = 0.091 m3/s
M3Tg 13.0 19.9 - - - - KB4Ka

Q = 0.112 m/s
16 57 84.6 129.4 36.5 55.9 53 83 13.6 20.8 31.5 48.2

A = 299 Ha
- - - - - - - - - - - - - - 30 50 37.3 57.1 30.7 47.2 65.5 100.4 31.9 48.8 25.2 38.6 SK1Ki S5Ki S6Ki S7Ki S8Ki S9Ki S10Ki S11Ki S12Ki S14Ki S15Ki S16Ki S17Ki S18Ki S20Ki S21Ki S22Ki1 S22Ki2 S23Ki S25Ki1 S25Ki2 S26Ki S27Ki S29Ki S30Ki S31Ki1 S31Ki2 S32Ki

Q = 0.497 m3/s
M2Kr -

A = 68 Ha
A = 55 Ha
BM3 - - - - - - - - KPd6M1 KPd6M2 - - - -
- PG4M 16.3 24.9 TELUK PURI - BSK.1 - - - - - - - - - - - - - - - - - - - - - - - - - - -

A = 301 Ha
GUNUNG MEDAN SC

G5Ki1 GUNUNG MEDAN A SC - - KIRI SC TPK1Tg

Q=0.582m3/s
- - - BSS.0 BSS.1 BSS.2 BSS.3
SIAT MC BSS.4 BSS.4A BSS.5 BSS.6 BSS.7 BSS.8 BSS.9 BSS.10 - - TP5Ka (TP6Ka)
BTP5
16 24 10.8 16.5 29.6 45.3 35.9 54.9 30.6 46.8 18.2 27.9 29.1 44.5 17.4 26.6 5.1 7.8 42.8 65.5 14.6 22.3 16.2 10.6 28.5 43.6 35 54 4.5 6.9 5.4 8.3 8.5 13.0 6.8 10.4 29.7 45.4 77.6 118.7 7.6 11.6 33.0 50.5 48.4 74.1 45.2 69.2 31 47 65.0 99.5 15.8 24.2 71.7 109.7
Q=604 m3/s

- 14.7 22.5 55.9 85.5 BTPK1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

A=353 Ha
35.0 53.6 A=1513 Ha - (BTP6) -
A=366 Ha

- - - - NKB4M
Q=0.288 m3/s

4.1 6.2 - - A=2420 Ha A=2368 Ha A=2328 Ha A=2299 Ha A=1857 Ha A=1803 Ha A=1800 Ha A=1708 Ha A=1573 Ha Q=3.703m3/s 44.2 67.6 37.4 57.2 BS.4 BS.5 BS.6 BS.7 BS.8 BS.9 BS.10 BS.11 BS.12 BS.13 BS.14 BS.15 BS.16 BS.17 BS.18 BS.19 BS.20 BS.21 BS.22 BS.23 BS.24 BS.25 BS.26 BS.27 BS.28 BS.29 BS.30 BS.32

Q=0.277m3/s Q=0.376m3/s
Q=0.056 m3/s
(BKB3M)
MP1Ki MP3Ki KpB1ki KpB2Ki KpB3Ki - - Q=5.037m3/s Q=5.924m3/s Q=5.837 m3/s Q=5.370 m3/s Q=4.805 m3/s Q=4.687 m3/s Q=3.373m3/s Q=4.420 m3/s Q=3.747m3/s - - - -
Q=0.809 m3/s

Q=0.223 m3/s
A = 2934 Ha A = 2633 Ha A = 2598 Ha A = 2545 Ha A = 2471 Ha A = 2425 Ha A = 2382 Ha A = 2365 Ha A = 2347 Ha A = 2336 Ha A = 2037 Ha A = 2006 Ha A = 1991 Ha A = 1965 Ha A = 1950 Ha A = 1915 Ha A = 1790 Ha A = 1747 Ha A = 1731 Ha A = 1637 Ha A = 1564 Ha A = 1453 Ha A = 1196 Ha A = 1130 Ha A = 1077 Ha A = 387 Ha A = 327 Ha A = 241 Ha BS.31 A = 133 Ha

Q=0.304 m3/s

A=228 Ha
A=138 Ha

SD1Kr SD1Kr - Q = 4.726 m3/s Q = 4.229 m3/s Q = 4.171 m3/s Q = 4.084 m3/s Q = 3.962 m3/s Q = 3.911 m3/s Q = 3.840 m3/s Q = 3.812 m3/s Q = 3.782 m3/s Q = 3.764 m3/s Q = 3.270 m3/s Q = 3.219 m3/s Q = 3.194 m3/s Q = 3.127 m3/s Q = 3.069 m3/s Q = 2.863m3/s Q = 2.792 m3/s Q = 2.792 m3/s Q = 2.765 m3/s Q = 2.610 m3/s Q = 2.490 m3/s Q = 2.307 m3/s Q = 1.883 m3/s Q = 1.774 m3/s Q = 1.711 m3/s Q = 0.639 m3/s Q = 0.540 m3/s Q = 0.398 m3/s Q = 0.219 m/s

A=40 Ha

Q=0.152 m3/s
- - G5Ki2 L1Ka KB4M (KB3M)
TPK1Ka

A=135 Ha
A=490 Ha

A=184 Ha
TP6Ka (TP7Ka)
- - - - 72.3 111.6 19.7 30.2 35.8 54.7 - -
- BL.1 BTP6 - S32Ka

A=92 Ha
-

SIMPANG KOTO BARU A SC


- - - - - - SS 1 M SS2M S5Ka S6Ka S7Ka S8Ka S22Ka S23Ka S25Ka S26Ka S27Ka

SIMPANG KOTO BARU B SC


- - - - (BPT7)

BIAWAK SC
RANAH BARU SC
122.5 187.4

Q=0.521m3/s
3.4 5.2 37.5 57.4 93.1 142.4 -

Q = 0.183 m3/s

Q = 1.073 m3/s
- - 42.0 64.2 - - - - - - - - -

Q=0.426 m3/s
- - SS1M SS2M SS3Ka RB1Ka SS4A SS6Ka SS7Ka SKBB1Ka SKBB1Ki SS10Ka L2Ki1 - -

A=316 Ha
- -
KAMPUNG BARU SC

A=168 Ha
MIMPI SC MP3M KpB4M - - 65.9 100.8

A = 111 Ha

A = 690 Ha
BmP2M BRB.1 13.4 20.5 16 24 23 35 21.3 32.6 38.5 58.9 50.6 77.4 46.5 71.2 7.6 11.6 26.1 39.9
-

A=256 Ha
BMP1 BMP2 (BMP3) (BMP3M) -
BKpB1 BKpB2 BKpB3 BKpB4 BKpB4M
- - - - - - - - - BSKBB.1 - - BPT7 TP7Ki (TP8Ki)
- - - - - - - - - -
- -
G6Ki
BPk5

(BPT8) - - - - - - - -
-

A=0.109 Ha
BM2 60.7 92.9 61.2 93.6 34.6 52.9 37.6 57.6 61.5 94.1 80.6 123.3 70.6 108.0 40.7 62.2 11.2 17.1 70.1 107.2 78.5 120.1

Q=86 m3/s
82.0 94.6 73 112
LCB Package-6 Lot-4

Q=0.124m3/s
KP1Ka KP1Ki

Q=0.244m3/s
-

AMPANG KURANJI SC
A=154 Ha A=141 Ha A=116 Ha A=45 Ha A=490 Ha A=362 Ha A=270 Ha A=214 Ha A=73 Ha BG.6 - - - - - - - - - - - - - - - - - - - - - -
- - Q=0.809 m3/s Q=0.597 m3/s Q=0.446 m3/s Q=0.353 m3/s Q=0.120 m3/s - - 32.0 48.8
Q=0.254 m3/s Q=0.233 m3/s Q=0.191 m3/s Q=0.074 m3/s

A=148 Ha
43.8 67.0 BL.2 - -
Q=0.482 m3/s

- - B1Ka B1Ki RG2Ka BKP.1

A=75 Ha
RB2Ka AK1Ka AK1Ki SKBA1Ki SKBA1Ka SKBB2Ki L2Ki2
SIAT 1 M

SIAT 2 M

- -

Q = 0.922 m3/s
48 73 43 66

LUBUK AUR SC
MP1Ka MP2Ka MP3Ka A=323 Ha
Brantas Abipraya BSKBA1 TP8Ki (TP9Ki) - BB.1 - -

Q=0.276m3/s
A=292 Ha

KpB1Ka KpB2Ka KpB3Ka KpB4Ka3 KpB4Ka2 KpB4Ka1 Q=533 m3/s G7Ki - BRB.2 - BAK.1 - - - - - - - -

A = 599 Ha
Q = 0.145 m3/s
- - - - 36 - 23 35 39 60

A=167 Ha
SD1Kr SD1Kr - - - - 52.3 80.1 4.4 5.8 63.0 95.8 96.1 147.0 5.1 7.7 9.5 14.5 23.5 35.9
BG.7 - - - - - - -

Q=0.099 m3/s
BPT8

Q=0.356 m3/s
37.8 57.9 23.5 35.9 - - - - - - - - - - - - - - - - 20.2 30.8 KP2Ka KP2Ki

A = 88 Ha
32.2 49.2 36.2 55.4 17.7 27.1 50.1 76.7 27.8 42.5 57.2 87.5 47.9 73.2 (BPT9)

Q=0.203m3/s
- - - - - - - -

A=216 Ha
- - - - - - - - - - - - - - BSKBB.2 - BKP.2 -

A=60 Ha
B2Ka B2Ki

A=123 Ha
A=276 Ha
M1Ka 41 63 66 101

Q = 0.746 m3/s
G8Ka Q=455 m3/s G8Ki SKBB2Ka SKBB2M L3Ki TP9Ki (TP10Ki) - BB.2 - - - - -
- - -

A = 492 Ha
BM1 BG.8 - - -

Q = 0.058 m3/s
26 40 27 41
9.1 13.9 BL.3 - - - KP4Ki KP5Ki KP6Ki KP7Ki KP8Ki
PK4Ka PK3Ka PK2Ka PK1Ka PL2Ka PL1Ka 20.7 31.7 20.4 31.2 RB2M AK2Ka AK2Ki BSKBA1M 25.7 39.3 28.1 42.9 44.5 68.1 BPT9 - - A = 93 Ha A = 108 Ha
Q=0.487 m3/s

- - BSKBB.2M 49.4 75.6

Q=0.178m3/s
BRG.1

A = 35 Ha
- - - - - - - - -

Q=0.218m3/s
- - - - - - (BPT10) Q = 0.153 m3/s Q = 0.178 m3/s
- - - - PL2Kn PL1Kn A=236 Ha - - BB.1 - - - BRG.2

A=108 Ha
A=295 Ha

G9Ka G9Ki 49 75 65 99 43 66 26 40 37 57

A=132 Ha
43 66 59.6 91.2 24.1 36.9 10 15 122.0 186.7 30.6 46.9
Q=389 m3/s
88.7 135.8 33.3 51.3 24.2 37.0 RIMBO GUNUNG SC BKP.3 KP8Tg

Q=0.218 m3/s
- - - - - - - - - -
- - - - - - - - - - - - - BG.9 - - - - - - -
SKBA1M SKBB3Ka SKBB3Ki L4Ki TP10Ka (TP11Ka) TP10Ki (TP11Ki) BKP.4 BKP.5 BKP.6 BKP.7 BKP.8 -

A=132 Ha
81.7 87 34 56 BB.2M
- - - - - - BSKBB.3 - - - - A = 384 Ha A = 277 Ha A = 252 Ha A = 209 Ha A = 140 Ha - -
A=533 Ha A=555 Ha A=565 Ha A=575 Ha A=110 Ha A=150 Ha AK3Ka AK3Ki BL.4 - -

Q=0.124m3/s
A=149 Ha 30.0 45.8 5.9 9.0 14.7 22.5 85.2 130.3 91.4 139.8 26.8 41.0 Q = 0.568 m3/s Q = 0.457 m3/s Q = 0.416 m3/s Q = 0.345 m3/s Q = 0.231 m3/s
Q=0.879 m3/s Q=0.916 m3/s Q=0.932 m3/s Q=0.949 m3/s Qs=0.500 m3/s Q=0.682 m3/s Q=0.748 m3/s G10Ka G10Ki
Q=246 m3/s
- BAK.3 - - - - - - - - - - - BPT10 - - B2M RG2Ki
KP4Ka KP7Ka KP8Ka

A=75 Ha
BM0 - - (BPT11) - - KAYU PUTIH SC

Q=0.135m3/s
BPk4 BPk3 BPk2 BPk1 BPL2 BPL1 BPL0 BG.10 78.5 120 112.7 172.4
111 183 38 63 - - -
PIRUKO MAIN CANAL PALANGKO MC - - - - 35 54 54 83

A=82Ha
- - - - - - - - 18 28 43 66 26 40
BSKB.B3M
- - - - - -
RG1Ki
SKBB3M
-
BL.4M
LCB Package-7-2 Lot-5-2 15
-
-
23
-
LCB Package-8 Lot-6 53.9
-
82.4
-
L4M
- LCB Package-6 Lot-4 PT. Hutama-PP (JO)
92.5 141.5
PT. Duta Graha Inda - -
PT. Brantas Abipraya

Anda mungkin juga menyukai