Satyanagar, BHUBANESWAR-751007 Phone: (0674)2570086/2571185 Fax:2571348 E-mail : CPowssb@qmail.com W-05/20M ' To M/s VATECH WABAG Ltd., "WABAG HOUSE" No.-17, 200 Feet Radial Road, S. Kolathur (Near Kamakshi Hospital), Chennai- 600117 Fax.: +91 - 44- 3923 2324/ 91-33- 4005 5690 Email : <soumitra_chandra@wabag.in> [Attention : Mr. Soumitra Chandra, Regional Manager, Kolkata] Sub.: Tender for the work - Construction of Wet well, Control building, Generator building and associated civil & mechanical works of P9 sewage pumping station at Zone-C2, Puri (Bid Identification NO.03/OWSSB of 2013- 14). Ref.: Your letter No. :10V 949 dt. 15.04.2014 Dear Sir, The following discrepancies were observed during preliminary evaluation of the bid proposal submitted by you vide letter under reference. SI. No Ref. Cl. of DTCN Requirement as per DTCN As per bid proposal submitted Compliance required. 1. 2.5 (c) Equipment capability The bidder should produce documentary evidence regarding availability of the specified machineries and equipment in working condition required for execution of the work (either owned in his name or obtained on hire purchase scheme or by hiring from the reputed firms/ contractor firms). If the machineries are to be procured for specific period for completion of the work on lease/ rental basis then a copy of registered MoU (Memorandum of Understanding) must be attached. Failure to attach documentary evidence in support of availability of required machineries may result in non-consideration of tender. No documentary evidence regarding availability of machineries & equipment has been furnished as per DTCN requirement. An undertaking should be furnished to the effect that upon award of work, necessary documentary evidence regarding availability of machineries & equipments shall be submitted as per DTCN requirement before signing of the contract. Pre-eval. lett P9 PS Apl.14 [P.T.O] SI. No Ref. Cl. of DTCN Requirement as per DTCN As per bid proposal submitted Compliance required. 2. 11.a of DTCN Any conditional tender shall be rejected. The scope of the work defined in the bid proposal is not in conformity with the terms and conditions of the DTCN as well as clarification issued vide OWSSB letter No. 1062 dt. 24.03.2014 & no. 1254 dt. 10.04.2014, thus rendering the tender conditional. An undertaking should be furnished to the effect that in the event of award of work, the tenderer shall abide by the provisions of DTCN as well as subsequent clarification issued by OWSSB unconditionally irrespective of the proposal submitted in the bid. Required compliance on the matter should be submitted to OWSSB within 7 (Seven) days of issue of this letter, failing which the bid will be evaluated on its own merit as per Cl. 11 (c) of the DTCN. Yours faithfully, Chief Engineer (S&UD) Memo No. _________ /dt. _____ Copy forwarded to the PD, PMC, OWSSB, Bhubaneswar / PE, PMU-I, OWSSB, Puri for information.
Chief Engineer (S&UD) Pre-eval. lett P9 PS Apl.14 orissa water supply & sewerage board (A Govt, of Odisha Undertaking) Satyanagar, BHUBANESWAR-751007 Phone: (0674)2570086/2571185 Fax:2571348 E-mailj: ceowssb@Qmail.com /dt 2syy .......................................... W-05/2014 To M/s AEC Engineers Pvt. Ltd., AD-5, Salt lake City, Kolkata - 700 064 Fax.: +91 - 33- 2334 7527/ 2358 4694/ 2358 8126 E- mail: aec@cal.vsnl.net.in [Attention : Mr. K. K. Biswas, Managing Director] Sub.: Tender for the work - Construction of Wet well, Control building, Generator building and associated civil & mechanical works of P9 sewage pumping station at Zone-C 2 , Puri (Bid Identification No.03/C)WSSB of 2013-14). Ref.: Your letter No. AEC : 657 : T : 8130 dt. 15.04.2014 Dear Sir, The following discrepancies were observed during preliminary evaluation of the bid proposal submitted by you vide letter under reference. SI. No Ref. Cl. of DTCN Requirement as per DTCN As per bid proposal submitted Compliance required. 1 2.5 (b) Work experience Tenderer should have experience in RCC construction of wet wells, intake wells employing in-situ construction methods or through well sinking methods including installation of pumps, panels, screens, sluice gates, EOT cranes , girders, laying of sewers of 600 mm diameter or above and associated civil constructions i.e. building to house the wet well and generator, having size of 372 m2 and above, all relating to sewage/ water pumping stations as a prime contractor during last 7 years. Sub-contractor's experience & resources shall not be taken into account in determining the bidder's compliance with the qualifying criteria (Attested copy of certificate of authenticity is to be enclosed issued by the concerned Officer in the rank of Executive Engineer or above). Failure to submit proof in support will result in non-consideration of the tender. Documents submitted in support of work experience do not demonstrate fulfillment of minimum qualifying criteria as per DTCN requirement. _____ ____ .. _ _ Necessary certificate demonstrating work experience as a prime contractor should be submitted conforming to DTCN requirement relating to the work (s) listed in Annexure-H only. Pre-eval. lett P9 PS Apl. 14 [p.t.o; SI. No Ref. Cl. of DTCN Requirement as per DTCN As per bid proposal submitted Compliance required. 2. 2.5 (c) Equipment capability The bidder should produce documentary evidence regarding availability of the following machineries and equipment in working condition required for execution of the work (either owned in his name or obtained on hire purchase scheme or by hiring from the reputed firms/ contractor firms). If the machineries are to be procured for specific period for completion of the work on lease/ rental basis then a copy of registered MoU (Memorandum of Understanding) must be attached. Failure to attach documentary evidence in support of availability of required machineries may result in non-consideration of tender. No documentary evidence regarding availability of machineries & equipment has been furnished as per DTCN requirement. An undertaking should be furnished to the effect that upon award of work, necessary documentary evidence regarding availability of machineries & equipments shall be submitted as per DTCN requirement before signing of contract. 3. 2.1(10) List of document Details of Key Technical & Administrative personnel who would be assigned to the work to be mentioned in Form-C. No such details have been furnished. An undertaking should be furnished to the effect that upon award of work, required details of Key personnel & administrative personnel to be assigned for the work shall be submitted before signing of the contract. 4. 2.3.3 Power of Attorney If the intending tenderer is a firm in partnership, a certified copy of power of attorney shall accompany with the technical bid documents. Certified copy has not been furnished for the tendered work. Certified copy of Power of Attorney for the tendered work to be furnished as per DTCN requirement 5. 27 of DTCN The tender may not be considered unless accompanied by attested true copies of VAT CC. No copy of VATCC has been furnished. Certified copy of VATCC to be furnished as per DTCN requirement. Required compliance on the matter should be submitted to OWSSB within 7 (Seven) days of issue of this letter, failing which the bid will be evaluated on its own merit as per Cl. 11 (c) of the DTCN. Yours faithfully, Memo No. _________ /dt._ Chief Engineer (S&UD)' Copy forwarded to the PD, PMC, OWSSB, Bhubaneswar / PE, PMU-I, OWSSB, Puri for information. Chief Engineer (S&UD) Pre-eval. lett P9 PS Apl. 14