Anda di halaman 1dari 4

orissa water supply & sewerage board

(A Govt, of Odisha Undertaking)


Satyanagar, BHUBANESWAR-751007 Phone: (0674)2570086/2571185 Fax:2571348 E-mail : CPowssb@qmail.com
W-05/20M '
To
M/s VATECH WABAG Ltd.,
"WABAG HOUSE" No.-17, 200 Feet Radial Road,
S. Kolathur (Near Kamakshi Hospital),
Chennai- 600117
Fax.: +91 - 44- 3923 2324/ 91-33- 4005 5690 Email :
<soumitra_chandra@wabag.in>
[Attention : Mr. Soumitra Chandra, Regional Manager, Kolkata]
Sub.: Tender for the work - Construction of Wet well, Control building, Generator building and associated civil &
mechanical works of P9 sewage pumping station at Zone-C2, Puri (Bid Identification NO.03/OWSSB of 2013-
14).
Ref.: Your letter No. :10V 949 dt. 15.04.2014 Dear
Sir,
The following discrepancies were observed during preliminary evaluation of the bid proposal submitted by you
vide letter under reference.
SI.
No
Ref. Cl. of DTCN
Requirement as per DTCN
As per bid proposal submitted
Compliance required.
1.
2.5 (c)
Equipment
capability
The bidder should produce documentary
evidence regarding availability of the
specified machineries and equipment in
working condition required for execution of
the work (either owned in his name or
obtained on hire purchase scheme or by
hiring from the reputed firms/ contractor
firms). If the machineries are to be procured
for specific period for completion of the work
on lease/ rental basis then a copy of
registered MoU (Memorandum of
Understanding) must be attached. Failure to
attach documentary evidence in support of
availability of required machineries may result
in non-consideration of tender.
No documentary evidence
regarding availability of
machineries & equipment has
been furnished as per DTCN
requirement.
An undertaking should be
furnished to the effect that
upon award of work, necessary
documentary evidence
regarding availability of
machineries & equipments
shall be submitted as per
DTCN requirement before
signing of the contract.
Pre-eval. lett P9 PS Apl.14 [P.T.O]
SI.
No
Ref. Cl. of DTCN
Requirement as per DTCN
As per bid proposal submitted
Compliance required.
2. 11.a of DTCN
Any conditional tender shall be rejected. The scope of the work defined in
the bid proposal is not in
conformity with the terms and
conditions of the DTCN as well as
clarification issued vide OWSSB
letter No. 1062 dt. 24.03.2014 &
no. 1254 dt. 10.04.2014, thus
rendering the tender conditional.
An undertaking should be
furnished to the effect that in
the event of award of work,
the tenderer shall abide by the
provisions of DTCN as well as
subsequent clarification issued
by OWSSB unconditionally
irrespective of the proposal
submitted in the bid.
Required compliance on the matter should be submitted to OWSSB within 7 (Seven) days of issue of this letter,
failing which the bid will be evaluated on its own merit as per Cl. 11 (c) of the DTCN.
Yours faithfully, Chief Engineer (S&UD)
Memo No. _________ /dt. _____
Copy forwarded to the PD, PMC, OWSSB, Bhubaneswar / PE, PMU-I, OWSSB, Puri for information.

Chief Engineer (S&UD)
Pre-eval. lett P9 PS Apl.14
orissa water supply & sewerage board
(A Govt, of Odisha Undertaking)
Satyanagar, BHUBANESWAR-751007 Phone: (0674)2570086/2571185 Fax:2571348 E-mailj: ceowssb@Qmail.com
/dt 2syy ..........................................
W-05/2014
To
M/s AEC Engineers Pvt. Ltd.,
AD-5, Salt lake City,
Kolkata - 700 064
Fax.: +91 - 33- 2334 7527/ 2358 4694/ 2358 8126 E-
mail: aec@cal.vsnl.net.in
[Attention : Mr. K. K. Biswas, Managing Director]
Sub.: Tender for the work - Construction of Wet well, Control building, Generator building and associated civil &
mechanical works of P9 sewage pumping station at Zone-C
2
, Puri (Bid Identification No.03/C)WSSB of 2013-14).
Ref.: Your letter No. AEC : 657 : T : 8130 dt. 15.04.2014 Dear
Sir,
The following discrepancies were observed during preliminary evaluation of the bid proposal submitted by you
vide letter under reference.
SI.
No
Ref. Cl. of DTCN
Requirement as per DTCN
As per bid proposal submitted
Compliance required.
1
2.5 (b) Work
experience
Tenderer should have experience in RCC
construction of wet wells, intake wells
employing in-situ construction methods or
through well sinking methods including
installation of pumps, panels, screens, sluice
gates, EOT cranes , girders, laying of sewers
of 600 mm diameter or above and associated
civil constructions i.e. building to house the
wet well and generator, having size of 372
m2 and above, all relating to sewage/ water
pumping stations as a prime contractor
during last 7 years.
Sub-contractor's experience & resources shall
not be taken into account in determining the
bidder's compliance with the qualifying
criteria (Attested copy of certificate of
authenticity is to be enclosed issued by the
concerned Officer in the rank of Executive
Engineer or above). Failure to submit proof in
support will result in non-consideration of the
tender.
Documents submitted in support
of work experience do not
demonstrate fulfillment of
minimum qualifying criteria as per
DTCN requirement.
_____ ____ .. _ _
Necessary certificate
demonstrating work experience
as a prime contractor should
be submitted conforming to
DTCN requirement relating to
the work (s) listed in
Annexure-H only.
Pre-eval. lett P9 PS Apl. 14
[p.t.o;
SI.
No
Ref. Cl. of DTCN
Requirement as per DTCN
As per bid proposal submitted
Compliance required.
2.
2.5 (c)
Equipment
capability
The bidder should produce documentary
evidence regarding availability of the
following machineries and equipment in
working condition required for execution of
the work (either owned in his name or
obtained on hire purchase scheme or by
hiring from the reputed firms/ contractor
firms). If the machineries are to be procured
for specific period for completion of the work
on lease/ rental basis then a copy of
registered MoU (Memorandum of
Understanding) must be attached. Failure to
attach documentary evidence in support of
availability of required machineries may result
in non-consideration of tender.
No documentary evidence
regarding availability of
machineries & equipment has
been furnished as per DTCN
requirement.
An undertaking should be
furnished to the effect that
upon award of work, necessary
documentary evidence
regarding availability of
machineries & equipments shall
be submitted as per DTCN
requirement before signing of
contract.
3.
2.1(10) List of
document
Details of Key Technical & Administrative
personnel who would be assigned to the work
to be mentioned in Form-C.
No such details have been
furnished.
An undertaking should be
furnished to the effect that
upon award of work, required
details of Key personnel &
administrative personnel to be
assigned for the work shall be
submitted before signing of the
contract.
4.
2.3.3 Power of
Attorney
If the intending tenderer is a firm in
partnership, a certified copy of power of
attorney shall accompany with the technical
bid documents.
Certified copy has not been
furnished for the tendered work.
Certified copy of Power of
Attorney for the tendered work
to be furnished as per DTCN
requirement
5. 27 of DTCN
The tender may not be considered unless
accompanied by attested true copies of VAT
CC.
No copy of VATCC has been
furnished.
Certified copy of VATCC to be
furnished as per DTCN
requirement.
Required compliance on the matter should be submitted to OWSSB within 7 (Seven) days of issue of this letter,
failing which the bid will be evaluated on its own merit as per Cl. 11 (c) of the DTCN.
Yours faithfully,
Memo No. _________ /dt._
Chief Engineer (S&UD)'
Copy forwarded to the PD, PMC, OWSSB, Bhubaneswar / PE, PMU-I, OWSSB, Puri for information.
Chief Engineer (S&UD)
Pre-eval. lett P9 PS Apl. 14