Anda di halaman 1dari 13

1

2 Rev Design Data Remarks


3 Tag number
4 Governing specification
5 Site specific data
6
7 Boiler Capacity: Maximum Continuous Rating (MCR) (kg/h):
8 2-Hour Peak (24 Hours Between Peaks) (kg/h):
9 Steam at Outlet: Pressure (kPag): Temperature (C):
10 Feedwater Temp. Entering: Boiler (C): Economizer (C):
11 Feedwater Treatment:
12
13 Boiler Water Analysis:
14 Steam Purity Required: TDS ppm Si ppb Cl Na ppb
15 Continuous Boiler Blowdown:
16 Type of Installation:
17 Construction:
18 Freezing Climate:
19 Provide:
20 FD Fan Drive: (1 Unit)
21 Dampers to be Provided:
22 Damper Operation:
23 Flue Gas Duct to be Provided:
24 Minimum Stack Height Abovegrade (m): Stack Supplier:
25 Emissions Sampling Points:
26 Site Conditions
27 Refer to
28 Utilities
29 Steam for Auxiliaries:
30 Fan Turbine Throttle (kPag): Max. (kPag): N/A Min. Temp. (C):
31 Exhaust (kPag):
32
33 Atomizing Steam (kPag):
34 Electrical Power Supply: Area Classification:
35 Frequency [(Hz) 3-Phase]:
36 Motors:
37
38
39 Instruments (volts):
40 Cooling Water: Inlet: kPag @ C Outlet: kPag @ C
41 BFW: kPag @ C
42 Plant Air (kPag):
43 Instrument Air (kPag): Dewpoint: @ C
44 Furnace Design:
Rev: 0
Plant/Area: Equip. No:
WO #: Equip. Name:
Client: DATA SHEET
Project: BOILER
Intermittent Blowdown: Design: CBD:
Location:
Sootblowers (from Plant Mains) (kPag) :
Feedwater Analysis:
PURCHASER'S DATA
ADL Doc. No: ENG-DAT-000374
Design Data
Indoor Outdoor
Field Erected Shop Assembled
Yes No
Economizer Air Heater Air Heater (Recuperative)
Electric Motor Steam Turbine Dual Drivers; Motor and Turbine
Yes
No
Manual Automatic
Boiler Vendor Other:
Boiler Drum Plant Mains
Boiler Superheater
Yes
No
No
Steam Coil Air Heater
Page 1 of 13
Rev: 0
Plant/Area: Equip. No:
WO #: Equip. Name:
Client: DATA SHEET
Project: BOILER
PURCHASER'S DATA
ADL Doc. No: ENG-DAT-000374
1 Maximum Heat Absorption Rate based on Effective Projected Radiant Surface( EPRS): (kW/m)
2 Maximum Heat Liberation Rate (kW/m
3
): (kW/m3)
3 Burner Data
4 Type Required:
5
6
7 Class of Igniter Required: (as defined in NFPA 85)
8 Fuel Gas @ kPag, at (C):
9
10
11
12
13
14
15 Flash Point (C): 38 H
2 % Hydrogen H
2 % Hydrogen
Specific Gravity (API): CH
4 % Methane CH
4 % Methane
17 Viscosity (38C) (SSU) :Min. 32.6 C
2
H
2 % Acetylene C
2
H
2 % Acetylene
18 Viscosity (38C) (SSU) :Max. 37.93 C
2
H
4 % Ethylene C
2
H
4 % Ethylene
19 Total H
2
: % Wt C
2
H
6 % Ethane C
2
H
6 % Ethane
20 LHV (kJ/kg): C
3
H
6 % Propylene C
3
H
6 % Propylene
21 HHV (kJ/kg): C
3
H
8 % Propane C
3
H
8 % Propane
22 C
4
H
8 % Butylene C
4
H
8 % Butylene
23 Carbon C
4
H
10 % Butane C
4
H
10 % Butane
24 Hydrogen C
5
H
12 % Pentane C
5
H
12 % Pentane
25 Oxygen C
6
H
14 % Hexane & Heavier C
6
H
14 % Hexane & Heavier
26 Nitrogen CO % Carbon Monoxide CO % Carbon Monoxide
27 Sulfur CO
2 % Carbon Dioxide CO
2 % Carbon Dioxide
28 Fuel Data (continue)
29
30 Ash 0 O
2 % Oxygen O
2 % Oxygen
31 Moisture N
2 % Nitrogen N
2 % Nitrogen
32 Total H
2
S % Hydrogen Sulfide H
2
S % Hydrogen Sulfide
33 Ash Fusion Temp (C): Total (Dry): Total (Dry):
34 Sodium (ppm): Mol Wt (Dry): Mol Wt (Dry):
35 Vanadium (ppm): H
2
O: C H
2
O: Dew Pt @ kPag & C
36 Nickel (ppm): H
2
O: % Vol H
2
O % Vol
37 kPa Max. HHV kJ/kg HHV kJ/kg
38 Header Pressure: kPa Min. kJ/m
3
(std) kJ/m3 (std)
39 LHV kJ/kg LHV kJ/kg
40 kJ/m
3
(std) kJ/m
3
(std)
41 Heating Value Range Heating Value Range
42 (kJ/kg ) (kJ/m
3
): Max: (kJ/kg ) (kJ/m
3
): Max:
43 Min: Min:
44 Mol Wt (Dry): Max: Mol Wt (Dry): Max:
45 Min: Min:
Dew Pt @ kPag &
Diesel Oil (Typical)
Diesel Oil (Typical)
16
Ultimate Analysis Percent Weight
Header Pressure:
Fuel Data
Natural Gas (TCPL)
32-36 Light Diesel, 30-36 Heavy Diesel
Natural Gas (TCPL) (Note 8) Igniter Fueling N/A
Proximate Analysis Volume Percent Proximate Analysis Volume Percent
Igniter Fueling N/A
Oil Gas Other: Combination
Page 2 of 13
Rev: 0
Plant/Area: Equip. No:
WO #: Equip. Name:
Client: DATA SHEET
Project: BOILER
PURCHASER'S DATA
ADL Doc. No: ENG-DAT-000374
1 Header Pressure: Max: kPa Header Pressure: Max: kPa
2 Min: kPa Min: kPa
3 Additional Comments:
4 MANUFACTURER'S DATA
5 Boiler
6 Manufacturer: Type:
7 Design Code: No. of Boilers:
8 Maximum Continuous Rating: Peak Rating:
9 Superheater Outlet Pressure: Temperature:
10
11 Feedwater Pressure Required at: Economizer (kPag): Control Station (kPag):
12 Construction Details
13 Furnace Tube OD (mm) Tube Thickness (mm) Tube Pitch (mm) CA (mm) * Tube Material
14 Side Walls
15 Division Walls
16 Roof
17 Floor
18 Rear Wall
19 Front Wall
20 Furnace Volume (m
3
): Projected Heating Surface Based on EPRS (m
2
):
21 Furnace Length (m-mm): Width (m-mm): Height (m-mm):
22 Overall Dimensions: Front-to-Stack Length (m-mm): Over Steam Drum Height (m-mm):
23 Steam Drum Dia. & Length Width (mm): Front-to-Fan Width (m-mm):
24 Superheater Screen
25 Arrangement:
26 Tube: Material:
27
28
29
30 Superheater
31 Type:
32 Arrangement:
33 Primary Superheater
34 Gas Space: Width (m-mm): Height (m-mm):
35 No. of Stream Passes:
36 Tubes:
37
38
39 CA (mm):
40
41
42 No. of Tubes Wide: Pitch (mm): Gas Space: Width (m-mm): Height (m-mm):
43 No. of Rows Deep: Pitch (mm): No. of Steam Passes: No. of Gas Passes:
44 Tubes: OD (mm): Thickness (mm): Material: No. Rows:
45 OD (mm): Thickness (mm): Material: No. Rows:
46 OD (mm): Thickness (mm): Material: No. Rows:
47 CA (mm)*:
Pitch (mm): No. of Rows Deep:
Effective Heating Surface (m
2
): Effective Tube Lenth (m-mm):
No. of Tubes Wide: Pitch (mm):
No. of Tubes Wide: Pitch (mm): Gas Space Width (m-mm):
Gas Space Height (m-mm):
OD (mm): Thickness (mm): CA (mm):
No. of Rows Deep: Pitch (mm): No. of Gas Passes:
OD (mm): Thickness (mm): Material: No. Rows:
OD (mm): Thickness (mm): Material: No. Rows:
OD (mm): Thickness (mm):
Effective Tube Length (m-mm):
Secondary Superheater
Material:
Effective Heating Surface (m
2
):
Staggered In-Line Single Row None
Drainable Nondrainable Radiant-Convection Convection
Staggered In-Line U-Tube Pendant Horizontal Vertical
Page 3 of 13
Rev: 0
Plant/Area: Equip. No:
WO #: Equip. Name:
Client: DATA SHEET
Project: BOILER
PURCHASER'S DATA
ADL Doc. No: ENG-DAT-000374
1 Effective Heating Surface (m
2
): Effective Tube Length (m-mm):
2 Primary Superheater: Max. (C) (First Row):
3 Max. (C) (Last Row): Design (C):
4 Secondary Superheater: Max. (C) (First Row):
5 Max. (C) (Last Row): Design (C):
6 Intermediate Screen
7 Arrangement:
8 Tubes: Thickness (mm):
9
10
11
12 Effective Tube Length (m-mm):
13 Boiler Bank
14 Arrangement:
15 Tubes:
16
17 Gas Space Width (m-mm):
18 Gas Space Height (m-mm):
19 No. Gas Passes:
20 Economizer
21 Manufacturer: Type:
22 Arrangement: Effective Tube Length (m-mm):
23 No. Tubes Wide: Pitch (mm):
24 No. Rows Deep: Pitch (mm):
25 Tube: OD (mm):
26 CA (mm)*:
27 Fins: OD (mm): Thickness (mm): Spacing (# fins/cm)
28 Total: (m
2
) bare
29 No. Water Passes: No. Gas Passes: Min. Tube Metal Temp (C):
30
31 Manufacturer: Overall Dimension:
32 Type :
33 Arrangement:
34 Air:
35 Tube: OD (mm): Thickness (mm): Material:
36 CA (mm)*:
37 No. Tubes Wide: Pitch (mm):
38 No. Rows Deep: Pitch (mm):
39 Effective Heating Surface (m
2
): Effective Tube Length (m-mm):
40 No. Air Passes: No. Gas Passes:
41 Minimum Calculated Tube Material Temperature (C):
42 Corrosion Prevention Feature:
43 Steam Drum
44 Design Pressure (kPa): ID (mm): Lengths Between Welds (m-mm):
45 Wrapper Plate Thickness (mm):
46
47 Manholes: No.
OD (mm): Material:
CA (mm)*:
Metal Temperature (C):
Metal Temperature (C):
OD (mm): Thickness (mm): Material:
CA (mm)*:
Height (m-mm):
No. of Rows Deep: Pitch (mm):
Effective Heating Surface (m
2
):
No. of Tubes Wide: Pitch (mm): Gas Space: Width (m-mm):
Effective Heating Surface (m
2
):
Gas Space Width (m-mm):
Gas Space Height (m-mm):
No. Tubes Wide: Pitch (mm):
No. Rows Deep: Pitch (mm):
Air Heater (N/A)
Tube Plate Thickness (mm): Material:
Thickness (mm): Material:
Material:
Effective Heating Surface (m
2
):
Type of Heads: Thickness (mm): Material:
Size:
Staggered In-Line
Finned Bare Tube
Staggered In-Line
Staggered In-Line Horizontal Vertical
Inside Tubes Outside Tubes
Welded Expanded
Staggered In-Line Single Row None
Page 4 of 13
Rev: 0
Plant/Area: Equip. No:
WO #: Equip. Name:
Client: DATA SHEET
Project: BOILER
PURCHASER'S DATA
ADL Doc. No: ENG-DAT-000374
1 Tube Connection: Ligament Efficiency:
2 Normal Water Level (NWL):
3 High Water Level:
4 Water Level Cutoff:
5 Steam Drum Volume : 8.34
6 Steam Drum Internals
7
8
9 Vane Separators: Manufacturer: Model No.
10
11 Design Pressure (kPa): ID (mm): Lengths Between Welds (m-mm):
12 Plate Thickness (mm): Material:
13 Type of Heads: Thickness (mm): Material:
14 Manholes: No. Size:
15 Tube Connection: Ligament Efficiency:
16 Volume of Water Drum (m
3
): Total Internal Volume of Tubes (m
3
):
17 Vertical Distance Between Steam and Water Drums (m):
18 Wall Headers
19 CA (mm)*:
20 Tube Connection:
21
22
23 CA (mm)*:
24 Tube Connection:
25
26
27 CA (mm)*:
28 Tube Connection:
29
30
31 CA (mm)*:
32 Tube Connection:
33
34
35 Primary Superheater Headers
36
37
38 Tube Connection: CA (mm)*:
39
40
41 Inlet OD (mm): Thickness (mm): Material:
42 Outlet: OD (mm): Thickness (mm): Material:
43 Tube Connection: CA (mm)*:1.59
44 Economizer Headers
45 Inlet
46 Outlet:
47 Tube Connection:
mm Below NWL (Low): Trip mm Above NWL (High): Trip
mm Below NWL : Alarm Low Water Level:
Below Drum Centerline (mm): Above Drum Centerline (mm):
Location: Design Pressure (kPa):
mm Above NWL :
OD (mm): Thickness (mm): Material:
m
3
(Below NWL): 1.53 m
3
(Between LLA and LLCO):
Brief Description:Cyclones and scrubbers
Water Drum
Risers No.: OD (mm): Thickness (mm): Material:
Supplies No.: OD (mm): Thickness (mm): Material:
Supplies No.: OD (mm): Thickness (mm): Material:
Location:Furnace sidewalls Design Pressure (kPa):
OD (mm): Thickness (mm): Material:
Location: Design Pressure (kPa):
OD (mm): Thickness (mm): Material:
Risers No.: OD (mm): Thickness (mm): Material:
Risers No.: OD (mm): Thickness (mm): Material:
Supplies No.: OD (mm): Thickness (mm): Material:
Supplies No.: OD (mm): Thickness (mm): Material:
Location: Design Pressure (kPa):
OD (mm): Thickness (mm): Material:
Inlet OD (mm): Thickness (mm): Material:
Risers No.: OD (mm): Thickness (mm): Material:
Saturated Connections No.: OD(mm) Thickness (mm): Material:
Outlet: OD (mm): Thickness (mm): Material:
Material:
CA (mm)*:
Secondary Superheater Headers
OD (mm): Thickness (mm): Material:
OD (mm): Thickness (mm):
Welded Expanded
Welded Expanded
Welded Expanded
Welded Expanded
Welded Expanded
Welded Expanded
Welded Expanded
Welded Expanded
Welded Expanded
Page 5 of 13
Rev: 0
Plant/Area: Equip. No:
WO #: Equip. Name:
Client: DATA SHEET
Project: BOILER
PURCHASER'S DATA
ADL Doc. No: ENG-DAT-000374
1 Connection to Drum No.:
2 Overall Boiler Dimensions
3 Boiler: Height (m-mm): Width (m-mm): Length(m-mm):
4 Overall Plot Dimensions
5 Plot Dimensions: Length (m-mm): Width (m-mm):
6 Burners
7 Manufacturer:
8 No. Oil Guns/Burner: No. Gas Elements/Burner:
9 Max. Capacity/Burner: Oil (kJ/h): Gas (kJ/h): (kg/h):
10 Max. Pressure Req'd at Burner: Oil (kPag): Gas (kPag):
11 Min. Pressure Req'd at Burner: Oil (kPag): Gas (kPag):
12 Min. Pressure Req'd at Fuel Train Inlet: Oil (kPag): Gas (kPag):
13 Max. Temperature Req'd at Burner: Oil (C): N/A Gas (C):
14 Min. Temperature Req'd at Burner: Oil (C): Gas (C):
15 Max./Min. Atomizing Steam Pressure (kPag):
16 Steam/Oil Pressure Differential (kPag):
17 Steam/Oil Flow Ratio: kg/kg.
18 Igniters
19 Type: Manufacturer:
20 Capacity (kJ/h): Class:
21 Description:
22 No. of Igniters/Boiler: Auto Retraction of Spark Device:
23 Item No.:
24 Manufacturer:
25 Inlet Vane Flow Control:
26 Speed (rpm):
27 Air Flow at MCR: Oil: At &
28 Gas: At &
29 Test Block: At &
30 Fan Sound Level: (dBA) (Reference 0.0002 microbar) at m from Fan
31 Motor Driver:
32 Motor Sound Level: (dBA) (Reference 0.0002 microbar) at m from Motor
33 Steam Turbine Driver: Type
34 Manufacturer:
35 Water Rate: kg/kW/h kW:
36 Exhaust Steam Temperature (C):
37 Governer:
38 Turbine Sound Level: (dBA) (Reference 0.0002 microbar) at m from Turbine
39 Max. Sound Level of Fan & Driver: (dBA) (Reference 0.0002 microbar) at m from Fan
40 Sootblowers N/A
41 Retractable: No.: Manufacturer:
42 Location: Length:
43 No. of Jets: Control:
44 Steam/Blower: kg/h @ kPag & C
45 Blowing Time: Sec/Blower: DP Across Control Valve (kPa): Press. @ Nozzle Block (kPag):
46 Rotary: No.: Manufacturer:
47 Location: Length:
OD (mm) Thickness (mm): Material:
Type:
No./Boiler:
(kg/h):
No. Required:
Type:
0
C mm H2O
Impeller Diameter (mm):
kW
mm H2O kW
0
C mm H2O kW
456,813 m3/h 73.9
0
C
Type: Manufacturer: kW
Burner Turndown Ratio:
Burner Turndown Ratio:
Mechanical Hydraulic
Welded Expanded
Yes No
Page 6 of 13
Rev: 0
Plant/Area: Equip. No:
WO #: Equip. Name:
Client: DATA SHEET
Project: BOILER
PURCHASER'S DATA
ADL Doc. No: ENG-DAT-000374
1 No. of Jets: Control:
2 Multiple Jets:
3 Steam/Blower: kg/h @ kPag & C
4 Blowing Time: Sec/Blower: DP Across Control Valve (kPa):
5 Others: Type:
6 No.: Manufacturer:
7 Location: Length:
8 No. of Jets: Control:
9 Steam/Blower: kg/h @ kPag & C
10 Blowing Time: Sec/Blower: DP Across Control Valve (kPa):
11
12
13 Desuperheater
14 Type:
15 Location:
16 Max. Cooling Fluid Requirements: Inlet Water Temp: C Inlet Water Pressure: kPag
17 Max. Condensate Requirements: kg/h @ kPag & C
18 Boiler Structural Supports
19
20
21
22
23 Superheater Supports
24
25
26
27
28
29 Furnace: Front:
30
31
32 Side:
33
34
35 Rear: N/A
36
37
38 Floor:
39
40
41 Roof:
42
43
44 Boiler: Front:
45
46
47 Side:
Manufacturer:
kg/hr
Description (Including Material):
Description:
Casing, Refractory, and Insulation See B&W Proposal Section 6 Page
Spray Noncontact
Interstage Superheater Outlet
No Yes
Page 7 of 13
Rev: 0
Plant/Area: Equip. No:
WO #: Equip. Name:
Client: DATA SHEET
Project: BOILER
PURCHASER'S DATA
ADL Doc. No: ENG-DAT-000374
1
2
3 Rear:
4
5
6 Exposed Part of Steam Drum to Flue Gas:
7 Exposed Part of Water Drum to Flue Gas: N/A
8 Economizer Casing:
9
10
11 Air Heater Casing: N/A
12
13
14 Piping:
15
16
17 Air Ducting:
18 Flue Gas Ducting:
19 Others:
20
21
22 Main Steam: NPS: Schedule: Material:
23 Boiler Feedwater Line: NPS: Schedule: Material:
24 Sootblower Steam: NPS: Schedule: Material:
25 Atomizing Steam: NPS: Schedule: Material:
26 Fuel: Oil: NPS: Schedule: Material:
27 Gas: NPS: Schedule: Material:
28 Igniter Gas: NPS: Schedule: Material:
29 Blowdown: Continuous: NPS: Schedule: Material:
30 Intermittent: NPS: Schedule: Material:
31 Superheater
32 Relief Valve Piping: NPS: Schedule: Material:
33 Drains: Boiler: NPS: Schedule: Material:
34 Waterwalls: NPS: Schedule: Material:
35 Level Gauges: NPS: Schedule: Material:
36 Water Columns: NPS: Schedule: Material:
37 Superheater: NPS: Schedule: Material:
38 Economizer: NPS: Schedule: Material:
39 Others: NPS: Schedule: Material:
40 Sealing and/or Aspirating Air: To Burner Gun Positioning Tube:
41 To Sootblowers:
42 To Inspection Ports:
43
44 FD Fan Suction: Size (m-mm):
45
46 FD Fan to Windbox: (Air Heater) Size (m-mm):
47 Venturi Included:
Air Ducting Supplied
Thickness (mm):
Piping Supplied:
Piping See B&W Proposal Section 6 Page
Material:
Thickness (mm):
Material: Carbon Steel
No Yes
Yes
Yes No
No
Yes
Multivane
No
Yes No Single Vane
Page 8 of 13
Rev: 0
Plant/Area: Equip. No:
WO #: Equip. Name:
Client: DATA SHEET
Project: BOILER
PURCHASER'S DATA
ADL Doc. No: ENG-DAT-000374
1 Damper Included: Damper:
2 Expansion Joints: No.: Location: Type:
3 Maximum Design Temperature (C): Manufacturer:
4 Supports Included: Max. Air Velocity (m/s):
5 Air Htr to Windbox Size (m-mm):
6
7 Expansion Joints: No.: Location: Type:
8 Maximum Design Temperature (C): Manufacturer:
9 Supports Included: Max. Air Velocity (m/s):
10
11 Boiler to: Size (m-mm):
12
13 Expansion Joints: No.: Location: Type:
14 Maximum Design Temperature (C): Manufacturer:
15 Supports Included: Max. Air Velocity (m/s):
16 Size (m-mm):
17
18 Damper Included: Damper:
19 To Expansion Joints: No.: Location: Type:
20 Maximum Design Temperature (C): Manufacturer:
21 Supports Included: Max. Air Velocity (m/s):
22 Main Duct
23 Size (m-mm): Thickness (mm):
24 Material: Terminal Point:
25 Damper Included: Damper:
26 Expansion Joints: No.: Location: Type:
27 Maximum Design Temperature (C): Manufacturer:
28 Isolating Blind Included: Max. Air Velocity (m/s):
29 Stack
30 ID (m-mm): Thickness (mm): Height (m): Material:
31 Lining: Thickness (mm): Material:
32 Max.Gas Velocity (m/s):
33 Additional Details
34
35
36 Boiler Bank Tube Joint Inspection Ports (Give Details):
37
38
39
40 Gas-Side Water Washing (Details of Provision):
41
42 Boiler Circulation Circuits (Give Details Below and Accompany with Sketch):
43
44
45
46
47
Thickness (mm):
Material:
Thickness (mm):
Material:
Access Doors (Location and Size):
Material:
Furnace Observation Ports (Location, Size, and Number):
Thickness (mm):
Platforms and Ladders (Give Details):
Flue Gas Ducting SupplieD
Multivane Yes No Single Vane
No Yes
Multivane Yes No Single Vane
No Yes
Economizer
Air/Heater
No Yes
Boiler
Economizer
Main Flue
Air/Heater
Stack
Multivane Yes No Single Vane
No Yes
No Yes
Page 9 of 13
Rev: 0
Plant/Area: Equip. No:
WO #: Equip. Name:
Client: DATA SHEET
Project: BOILER
PURCHASER'S DATA
ADL Doc. No: ENG-DAT-000374
1
2
3
4 Efficiency Test (Extent Covered by Proposal):
5
6
7 Material Tests (Extent Covered by Proposal):
8
9
10 Hydrostatic Tests (Extent Covered by Proposal):
11
12
13 Minimum Required Quality of Boiler Feedwater:
14
15
16 Recommended Boiler Feedwater Chemicals (Types and Amounts):
17
18
19
20 Guarantees:
21
22
23
24
25 Additional Data:
26
27
28
29 No. Size Material Con.(note 5) Mfr. Cat. No.
30
31
32 No. Size Material Con.(note 5) Mfr. Cat. No.
33
34
35
36 Anticipated Performance Oil Firing
37 Load % MCR 25 50 75 100 110
38 Fuel (Type) Oil Oil Oil
39 Steam Flowrate to Mains kg/h
40 Feedwater Flowrate to Economizer kg/h
41 Feedwater Flowrate to Steam Drum kg/h
42 Continuous Blowdown Flowrate kg/h
43 Spraywater Flowrate kg/h
44 Steam Pressure to Mains Downstream of Nonreturn Valve kPag
45 Superheater Outlet Pressure kPag
46 Steam Drum Pressure kPag
47 Desuperheater Average Steam Pressure kPag
Boiler Valve Fittings
Boiler Valve Fittings
Page 10 of 13
Rev: 0
Plant/Area: Equip. No:
WO #: Equip. Name:
Client: DATA SHEET
Project: BOILER
PURCHASER'S DATA
ADL Doc. No: ENG-DAT-000374
1 Feedwater Temperature C
2 Feedwater Temperature to Economizer C
3 Feedwater Temperature from Economizer C
4 Feedwater Temperature to Steam Drum C
5 Saturation Temperature C
6 Steam Temperature to Desuperheater C
7 Steam Temperature from Desuperheater C
8 Steam Temperature to Mains C
9 Spraywater Temperature C
10 Noncontact Desuperheater: Cooling Water Flowrate kg/h
11 Cooling Water Inlet Temperature C
12 Cooling Water Outlet Temperature C
13 Cooling Water Pressure Drop kPa
14 Fuel Fired kg/h
15 Excess Air/O
2
in Dry Flue Gas %
16 Air Flowrate to Airheater kg/h
17 Air Flowrate to Windbox kg/h
18 Anticipated Performance Oil Firing
19 Load % MCR 25 50 75 100 110
20 Flue Gas Flowrate to Economizer (Wet) kg/h
21 Flue Gas Flowrate to Airheater (Wet) kg/h
22 Flue Gas Flowrate to Stack (Wet) kg/h
23 Furnace Exit Gas Temperature C
24 Superheater Inlet Gas Temperaure C
25 Boiler Bank Inlet Gas Temperature C
26 Economizer Inlet Gas Temperature C
27 Economizer Outlet Gas Temperature C
28 Airheater Inlet Gas Temperature C
29 Airheater Outlet Gas Temperature C
30 Flue Gas Temperature to Stack C
31 Ambient Air Temperature (Used for Efficiency Calculations) C
32 Ambient Air Relative Humidity (Used for Efficiency Calculations) %
33 Air Temperature to SCAH C
34 Air Temperature from SCAH C
35 Air Temperature to Windbox C
36 Atomizing Steam Flowrate steam/air kg/h
37 Moisture in Combustion Air Flowrate kg/h
38 Injection Steam for NO
x
Control Flowrate kg/h
39 Moisture from Combustion Flowrate kg/h
40 Total Moisture in Flue Gas Flowrate kg/h
41 Dry Flue Gas Flowrate kg/h
42 Furnace Net Heat Liberation (EPRS)** kW/m
2
43 Furnace Net Heat Liberation (Volume) kW/m
3
44 Furnace Average Absorption Rate kW/m
2
/h
45 Furnace Maximum Absorption Rate kW/m
2
/h
46 Furnace Average Circulation Ratio
47 Furnace Circulation Ratio Maximum Absorption Rate
Page 11 of 13
Rev: 0
Plant/Area: Equip. No:
WO #: Equip. Name:
Client: DATA SHEET
Project: BOILER
PURCHASER'S DATA
ADL Doc. No: ENG-DAT-000374
1 Furnace Circulation Ratio at Weakest Circuit
2 Boiler Bank Average Circulation Ratio
3 Boiler Bank Circulation Ratio at Weakest Circuit
4 Furnace Heat Transfer Coefficient W/m
2
K
5 Stage 1 Supherheater Heat Transfer Coefficient W/m
2
K
6 Stage 2 Supherheater Heat Transfer Coefficient W/m
2
K
7 Stage 3 Supherheater Heat Transfer Coefficient W/m
2
K
8 Anticipated Performance Oil Firing
9 Load % MCR 25 50 75 100 110
10 Boiler Bank Heat Transfer Coefficient W/m
2
K
11 Economizer Heat Transfer Coefficient W/m
2
K
12 Airheater Heat Transfer Coefficient W/m
2
K
13 Flue Gas Velocity Through Stage 1 Superheater m/s
14 Flue Gas Velocity Through Stage 2 Superheater m/s
15 Flue Gas Velocity Through Stage 3 Superheater m/s
16 Flue Gas Velocity Through Boiler Bank m/s
17 Flue Gas Velocity Through Economizer m/s
18 Flue Gas Velocity Through Airheater m/s
19 Air Velocity Through Airheater m/s
20 Feedwater Velocity Through Supply Pipe to Steam Drum m/s
21 Steam Velocity Through Saturated Steam Connections m/s
22 Steam Velocity Through Stage 1 Superheater m/s
23 Steam Velocity Through Stage 2 Superheater m/s
24 Steam Velocity Through Stage 3 Superheater m/s
25 Feedwater Velocity Through Supply Pipe to Mains m/s
26 Steam Velocity Through Economizer Inlet Connections m/s
27 Steam Velocity Through Economizer m/s
28 Feedwater Pressure Drop Through Economizer kPa
29 Steam Pressure Drop Through Stage 1 Superheater kPa
30 Steam Pressure Drop Through Stage 2 Superheater kPa
31 Steam Pressure Drop Through Stage 3 Superheater kPa
32 Stage 1 Superheater Maximum Metal Temperature C
33 Stage 2 Superheater Maximum Metal Temperature C
34 Stage 3 Superheater Maximum Metal Temperature C
35 Economizer Minimum Metal Temperature C
36 Airheater Minimum Metal Temperature C
37 C
38 FD Fan Suction Pressure kPag
39 FD Fan Discharge Pressure kPag
40 Air Pressure in Windbox kPag
41 Flue Gas Pressure in Furnace kPag
42 Flue Gas Pressure Leaving Superheater kPag
43 Flue Gas Pressure Leaving Boiler Bank kPag
44 Flue Gas Pressure Leaving Economizer kPag
45 Anticipated Performance Oil Firing
46 Load % MCR 25 50 75 100 110
47 Flue Gas Pressure Leaving Airheater kPag
Minimum Acid Dewpoint Temperature (TDP) (based on 0.5%S,2% conversion SO2 to SO3)
Page 12 of 13
Rev: 0
Plant/Area: Equip. No:
WO #: Equip. Name:
Client: DATA SHEET
Project: BOILER
PURCHASER'S DATA
ADL Doc. No: ENG-DAT-000374
1 Flue Gas Pressure at Stack Inlet kPag
2 SO
2
at Stack Discharge at 3% O
2 mg/Nm
3
3 NO
x
at Stack Discharge at 3% O
2 mg/Nm
3
4 NO
x
at Stack Discharge at 3% O
2 ppm
5 Particulates at Stack Discharge mg/Nm
3
6 CO at Stack Discharge mg/Nm
3
7 VOC at Stack Discharge mg/Nm
3
8 Dry Gas Loss (HHV/LHV) %
9 H
2
O from Combustion Loss (HHV/LHV) %
10 Radiation Loss (HHV/LHV) %
11 Unaccounted Loss (HHV/LHV) %
12 Total Loss (HHV/LHV) %
13 Gross Efficiency on HHV %
14 Gross Efficiency on LHV %
15 Guaranteed Gross Efficiency on HHV %
16 Fuel HHV kJ/kg
17 Fuel LHV kJ/kg
18
Notes:
BY CHK'D REV: DESCRIPTION DATE APP'D
Revision Log
Page 13 of 13