The city of Caledonia, MS, has performed a preliminary
analysis and programing through GLM Collaborative
Partners to establish the base needs for a new Lowndes County Volunteer Fire Department District 1 Fire Station. The intent of the architect and constructor team is to create a project delivery that is aimed to providing the owner with the best building design to meet the needed requirements, while maintaining the best value in construction and cost effciency. The budget of the project depicts certain restraints on what realistically can be designed and constructed. The prefabricated industrial shed with a small mezzanine for the administration building is the low-cost solution that most communities have opted for because of the effciency. The design intent was to take the prefabricated shed and make it more visually appealing and functional for the surrounding neighborhood. Through the developing of the design with the intention of reinterpreting the prefabricated shed design, we established design objectives to further establish modularity, functionality, sustainability, and constructability, with the use of logic and proportionality. Caledonia Fire Station 1 Carter Brown Patrick Brown Bryan Marks Casey Walker The city of Caledonia, MS, has performed a preliminary analysis and programing through GLM Collaborative Partners to establish the base needs for a new Lowndes County Volunteer Fire Department District 1 Fire Station. The intent of the architect and constructor team is to create a project delivery that is aimed to providing the owner with the best building design to meet the needed requirements, while maintaining the best value in construction and cost on what realistically can be designed and constructed. The prefabricated industrial shed with a small mezzanine for the administration building is the low-cost solution that most design intent was to take the prefabricated shed and make it more visually appealing and functional for the surrounding neighborhood. Through the developing of the design with the intention of reinterpreting the prefabricated shed design, we established design objectives to further establish modularity, functionality, sustainability, and constructability, with the use of logic and proportionality. Caledonia FireStation 1 UP 01 02 04 06 08 01 01 07 05 03 C A B DN C A B 01 16 12 15 14 13 11 17 01 02 03 04 05 06 07 07 08 09 10 11 12 13 14 15 16 1st Floor Plan 1/8 : 1 0 2nd Floor Plan 1/8 : 1 0 2nd Floor Plan Detail 1 1/2 : 1 0 1st Floor Plan 1 1/2 : 1 0 Light Well : Perspective No Scale Standing Rib Panel Joints Foam insulation 10 C-Channel Weldid Steel Cleat Portal Frame Wood Slats Masonry Tie Standard Brick 2 Air Cavity 1 Rigid Board Insulation Bituminous Coating CMU non-load bearing wall Kingzip Standing Rib Panel UP 01 02 04 06 08 01 01 07 05 03 C A B DN C A B 01 16 12 15 14 13 11 17 01 02 03 04 05 06 07 07 08 09 10 11 12 13 14 15 16 1st Floor Plan 1/8 : 1 0 2nd Floor Plan 1/8 : 1 0 2nd Floor Plan Detail 1 1/2 : 1 0 1st Floor Plan 1 1/2 : 1 0 Standing Rib Panel Joints Foam insulation 10 C-Channel Weldid Steel Cleat Portal Frame Wood Slats Masonry Tie Standard Brick 2 Air Cavity 1 Rigid Board Insulation Bituminous Coating CMU non-load bearing wall Kingzip Standing Rib Panel Standing Rib Panel Joints Foam insulation 10 C-Channel Wood Blocking Welded Steel Cleat Portal Frame Wood Slats 3 1/2 Aluminum Mullion Panel Spreader Polycarbonate Panel Air Cavity Kingzip Standing Rib Panel Apparatus Bay Training Room Restroom Stairs Laundry Room / Elsctrical Room Chiefs Office Storage Room / Safe Room Captains Office DayRoom Kitchen / Dinning Room Womens Bathroom Stairs Mens Bathroom Locker Room / Maintenance Room Fitness Room Mens Bunk Room Womens Bunk Room Plan Details Structural Details Defined Interior Defined Exterior UP 01 02 04 06 08 01 01 07 05 03 C A B DN C A B 01 16 12 15 14 13 11 17 01 02 03 04 05 06 07 07 08 09 10 11 12 13 14 15 16 1st Floor Plan 1/8 : 1 0 2nd Floor Plan 1/8 : 1 0 2nd Floor Plan Detail 1 1/2 : 1 0 1st Floor Plan 1 1/2 : 1 0 Standing Rib Panel Joints Foam insulation 10 C-Channel Weldid Steel Cleat Portal Frame Wood Slats Masonry Tie Standard Brick 2 Air Cavity 1 Rigid Board Insulation Bituminous Coating CMU non-load bearing wall Kingzip Standing Rib Panel Standing Rib Panel Joints Foam insulation 10 C-Channel Wood Blocking Welded Steel Cleat Portal Frame Wood Slats 3 1/2 Aluminum Mullion Panel Spreader Polycarbonate Panel Air Cavity Kingzip Standing Rib Panel Apparatus Bay Training Room Restroom Stairs Laundry Room / Elsctrical Room Chiefs Office Storage Room / Safe Room Captains Office DayRoom Kitchen / Dinning Room Womens Bathroom Stairs Mens Bathroom Locker Room / Maintenance Room Fitness Room Mens Bunk Room Womens Bunk Room Plan Details Structural Details The metal plaques that fit the same dimension of the brick coursing to emphasis the brick, contain the name of all of the firefighters that would have worked at the fire station. The rank of the firefighter is indicated by the length of the offset from the wall. The further away the higher rank. The red indicates the chiefs. 1 A B C D 2 3 4 5 6 7 8 9 10 1 A B C D 2 3 4 5 6 7 8 9 10 Kingzip Insulated Metal Panels Wood blocking Purlins Drop Down Ceiling Polycarbonate Spandrel Panel Polycarbonate Panel Wood Slats W 36 x 135 Beam Aluminum mullion CMU Non-load bearing wall Gypsum board Insulating foam inserts in cores Bituminous coating on face of CMU block 2 air cavity Masonry ties Brick facing W 16 x 67 Beam 6 Concrete topping on corrugated steel floor decking 1 Rigid board insulation Continuous flashing W 12 x 22 Column Weep holes J-bolt Welded wire fabric Polyethylene moisture barrier 2 layer of sand 4 Gravel base course 6 Concrete slab Reinforced concrete grade beam Isolated column footing Filter fabric Gravel Perforated 4 drain pipe Aluminum Mullion 5/8 Panel Batten Polycarbonate Panels Sill Frame w/ Fastener Weep Notch Window Flashing Blocking Standard Brick w/ 3/8 Mortar Panel Threader 20 GA. Stainless steel top clip with thermal break 14 GA. Galvanized base clip 1/4 14 Hex head fasteners Aluminum Mullion w/ Fastener Steel cleat welded to steel beam Wood slat 1/2 bolt Drop down ceiling purlin clip Polycarbonate Panel 5/8 Panel Batten Wood blocking 10 Purlins Panel Threader 2 Air Cavity 1 Rigid Board Insulation Bituminous coating on face of CMU block CMU non-load bearing wall Insulating foam inserts in cores Gypsum Board Masonry Tie Invisible Structure Inc. Gravelpave2 and Grasspave2 are structural systems that provide heavy load bearing support and containment of gravel to create a porous surface with unlimited traffic volume. The system can be used for storage and filtration of rainwater. ADA - Both systems create wheelchair accessible surfaces. Paths with Gravelpave2 and Grasspave2 systems eliminate the neccessity of concrete or other impermeable surfaces and provides porous surfaces that allow increased site drainage and rainwater filtration. Gravelpave2 system replaces the need of concrete and asphalt driveways, and has been specificly designed for traffic loads large enough for firetrucks, while also having a permeable surface that filters pollutants and provides stormwater mitigation Grass Gravel Grass Two piece clip with thermal bridge 1/4 - 14x7/8 low profile tek screws High eave trim Wood Slats Portal frame shoulder moment connection Wall Girt Strengthening plate Metal hex screws for wood slats Base trim Flashing Eave strut Pop rivet W 36x135 Crushed limestone Grass Gravelpave 2 system Compact gravel Grasspave 2 system Perforated 4 drainage pipe Grasspave2 / Gravelpave2 system fastener Wall Section C 1 : 1 Steel base plate J-bolts Isolated footing Grasspave2 / Gravelpave2 Plan View 1 : 1 Window Sill 3 : 1 Roof Detail 3 : 1 SOUTHWEST ELEVATION 1/8 = 1 TRANSVERSE SECTION 1/8 = 1 NORTHEAST ELEVATION 1/8 = 1 LONGITUDINAL SECTION 1/8 = 1 SOUTHEAST ELEVATION 1/8 = 1 NORTHWEST ELEVATION 1/8 = 1 1 2 3 4 5 6 7 8 9 10 Level 3 : 14 0 Level 5 : 22 10 Level 6 : 25 3 Level 1 : 0 2 Level 3 : 14 0 Level 5 : 22 10 Level 6 : 25 3 Level 1 : 0 2 Level 4 : 14 0 Level 5 : 21 3 Level 3 : 12 0 Level 2 : 9 11 9 11 7 3 Level 6 : 22 10 Level 7 : 25 3 Level 1 : 0 2 10 0 15 0 15 0 15 0 15 0 15 0 15 0 10 0 10 0 0 20 40 60 80 100 120 140 Project Close-Out Building Sitework Services Interiors Shell Substructure Site Prepara;on General Condi;ons Pre-Construc;on Total Project Dura;on Caledonia Fire Sta.on: Total Project Dura.on 132 Days 16 Days 3 Days 4 Days 35 Days 74 Days 14 Days 4 Days 5 Days 8 Days Project Start Date 4/21/2014 Project Finish Date 10/21/2014 $0.00 $100,000.00 $200,000.00 $300,000.00 $400,000.00 $500,000.00 $600,000.00 $700,000.00 $800,000.00 Hard Cost General Condi;ons Fees Total Project Cost Caledonia Fire Sta.on: Total Project Cost $ 703,048.10 $ 52,679.82 $ 48,901.40 $ 601,466.88 Hard Cost Breakdown Substructure Shell Interiors Services Equipment Building Sitework 9.5% of Hard Cost 59.8% of Hard Cost 5.3% of Hard Cost 20.0% of Hard Cost 3.0% of Hard Cost 2.4% of Hard Cost Cost/Building S.F $ 48.86/S.F Constructability Analysis Portal Frame BeamSystem:
Con;nuous Span (115) vs. 2-Part Span (70 & 45) Advantages: Cheaper material cost Smaller size members Disadvantages: Thermal bridge between buildings Structural columns are needed for bridge Price Comparison:
Con;nuous Span - $ 195,545.00
2-part Beam - $ 154,678.00
Exterior Wall/Roof Paneling System: PARKING LOT STORAGE CONTAINERS OFFICE TRAILER PORTABLE TOILETS TEMPORARY ROAD CRANE AREA LAY-DOWN AREA DUMPSTER WHEEL WASH AREA PPE / FIRST AID STATION TEMPORARY FENCE SCAFFOLDING AREA EROSION CONTROL FENCE ONE-WAY TRAFFIC FLOW SITE ENTRANCE SITE EXIT MOCK-UP AREA Temporary Fence 6' High Lay-Down Area 28' x 80' Wheel Wash Area 20' x 50' Storage Containers 8' x 10' PPE/First Aid 8' x 8' Parking Lot 40' x 80' Office Trailer 8' x 28' Crane Area 20' x 28' Portable Toilets 3 1/2' x 3 1/2' Dumpsters 8' x 20' Mock-Up Area 25' x 35' Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/) PARKING LOT STORAGE CONTAINERS OFFICE TRAILER PORTABLE TOILETS TEMPORARY ROAD CRANE AREA LAY-DOWN AREA DUMPSTER WHEEL WASH AREA PPE / FIRST AID STATION TEMPORARY FENCE SCAFFOLDING AREA EROSION CONTROL FENCE ONE-WAY TRAFFIC FLOW SITE ENTRANCE SITE EXIT MOCK-UP AREA Temporary Fence 6' High Lay-Down Area 28' x 80' Wheel Wash Area 20' x 50' Storage Containers 8' x 10' PPE/First Aid 8' x 8' Parking Lot 40' x 80' Office Trailer 8' x 28' Crane Area 20' x 28' Portable Toilets 3 1/2' x 3 1/2' Dumpsters 8' x 20' Mock-Up Area 25' x 35' Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/) SITE PLAN 1/32 = 1 SITE UTILIZATION PLAN 1/32 = 1