SITE INSPECTION AND TEST RECORD

AT&C
Description:
DISTANCE + line diff RELAY RED 670
Contract no:
CNR- 0!0"6#
C$sto%er:
AL-&ANAR C'(
End Client:
SEC-C'A
S)eet:
1 'f 28
Site:
S!S 0"*
+anel!Desi,nation!Location
+ANEL RE& : SERIAL N' :
+- -+- .'LTA/E : ""*. +- C0RRENT A++LIED: "A
&RE10ENCY : 60-2 'RDER N034ER :
CT RATI' : "500!"A +T RATI' : "65!0(""*7.
3EC-ANICAL C-EC7 AND .IS0AL INS+ECTI'N:
Item Description Checked
1 Inspection for physical damage / defects.
2 Check tightness of all connections
3 Check ferrules
4 Check apparatus list
ELECTRICAL TEST:
&$nction Test:
Item Description Checked
1 Human Machine Interface HMI! checked.
2 "est s#itch checked for correct function.
3 Case earthing checked.
4 Indications checked.
$ %larm contacts checked.
& "rip contacts checked.
' (eset of indications checked.
3. ()*%+ ,-(D)./
I")M DC 0oltage 0! Current m%! 1atts *imits 1
1
healthy case!
$21 "+3IC%**+
2
faulty case !
*imits/ according to the Catalogue for "echnical Data 4 $21 "ypically
D%")/ C%((I)D 5-" ,+
%"6C ).7I.))(
1I".)88)D ,+
8)C
.%M)/
ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR
8I7.%"-()/
The relay distance function is tested on final setting
SITE INSPECTION AND TEST RECORD
AT&C
Description:
DISTANCE + line diff RELAY RED 670
Contract no:
CNR- 0!0"6#
C$sto%er:
AL-&ANAR C'(
End Client:
SEC-C'A
S)eet:
2 'f 28
Site:
S!S 0"*
+anel!Desi,nation!Location
4. 8-33*+ 599
")(MI.%*8 C*58)D! : ;11/2< ;11/3! /
")(MI.%*8 53).! :/;11/1<;11/2! /
8-33*+ 5.
")(MI.%*8 C*58)D! :/;11/1<;11/2! /
")(MI.%*8 53).! : ;11/2< ;11/3! /
$. "IM) %.D D%") CH)C=/:
"o check time 6date go to main menu on the display for ()D&'2 6go to setting6 time 6system time
6ad>ust time 6date.
"o test this< remo?e the au@iliary supply from to the relay for appro@imately 32 seconds< on restoring the au@iliary
supply the time and date should Ae correct.
(esult/ BBBBBBBBBBBB
6(" - '+ERATI'NAL 3EAS0RE3ENTS:
APPLIED: 0PH - N C 66.4 V I PH C 1 AMP V-I = 0.
8..2
3%(%M)")(
M)%8-()D 0%*-)8 I. "H) ()*%+
3(IM%(+
M)%8-()M)."
8)C5.D%(+
M)%8-()M)."
C%*C3(I! M)%8. C%*C8)C! M)%8.
2. -1 76.15KV 66.4V
3. -2 76.15KV 66.4V
4. -3 76.15KV 66.4V
$. I1 1200A 1A
&. I2 1200A 1A
'. I3 1200A 1A
D. -*1:2 132KV
E. -*2:3 132KV
12. -1:3 132KV
11. 9 60HZ
12. 8 274.14 MVA
13. 3 274.14 MW
14. F 0 MVAR
D%")/ C%((I)D 5-" ,+
%"6C ).7I.))(
1I".)88)D ,+
8)C
.%M)/
ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR
8I7.%"-()/
The relay distance function is tested on final setting
SITE INSPECTION AND TEST RECORD
AT&C
Description:
DISTANCE + line diff RELAY RED 670
Contract no:
CNR- 0!0"6#
C$sto%er:
AL-&ANAR C'(
End Client:
SEC-C'A
S)eet:
3 'f 28
Site:
S!S 0"*
+anel!Desi,nation!Location
"
H
)
)
8
)


0
%
*
-
)
8

C
%
.

.
5
"

,
)
(
)
%
D

I
.

8
)
C
5
.
D
%
(
+
1$. 39 1
7( I3+EDANCE 3EAS0RE3ENTS:
Injected Impedance Z = 66.4 HM!
" = Z # $! % & = Z # !IN
ALL "EADIN' ( " ) & IN ("E*A A"E M+L,IPLIED -. V,"/$," = 1140/1100
"ead t2e3e 4a56e3 789m 79559:;n< pat2:
"ed6=0 > te3t > 76n. !tat63 > d;8ect;9na5 ;mpedance > ZD01
N9te : 3;n<5e p2a3e 7a65t 98 ? p2a3e 7a65t 789m "& pa<e and t:9 p2a3e 7a65t 789m <ene8a5 pa<e
IM3)D%.C)
C &2 C 242
C%*C-*%")D M)%8-()D C%*C-*%")D M)%8-()D
The relay distance function is tested on final setting
0
O
90
O
180
O
RV
RV
UND
165
O
45
O
SITE INSPECTION AND TEST RECORD
AT&C
Description:
DISTANCE + line diff RELAY RED 670
Contract no:
CNR- 0!0"6#
C$sto%er:
AL-&ANAR C'(
End Client:
SEC-C'A
S)eet:
4 'f 28
Site:
S!S 0"*
+anel!Desi,nation!Location
;*1
57.50 -57.50
(*1
33.2 -33.2
;*2
57.50 -57.50
(*2
33.2 -33.2
;*3
57.5 -57.5
(*3
33.2 -33.2
#( DIRECTI'NAL TEST:
* Test procedure: -APP! "#N$% P&A"% V ' # UND%R P&" "%TT#N$(
- )&AN$% T&% VOTA$% AN$% *RO+ 0 D%$R%% UP TO
360 D%$R%% UNT# T&% #ND#)AT#ON O* *,- R%V%"%
AND NON D#R%)T#ONA APP%AR" A" P%R "%TT#N$ APP#%D(
8)""I.7 A"' DI(C1$ %(7 .)7 ()8C11$
DI()C"I5.
%.7*)
9(5M "5
);3. M)%8. );3. M)%8.
-.D)9I.)D
165 115
()0)(8)
295 165
-.D)9I.)D
345 295
D%")/ C%((I)D 5-" ,+
%"6C ).7I.))(
1I".)88)D ,+
8)C
.%M)/
ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR
8I7.%"-()/
The relay distance function is tested on final setting
2.0
115
O
*,
295
O
345
O
SITE INSPECTION AND TEST RECORD
AT&C
Description:
DISTANCE + line diff RELAY RED 670
Contract no:
CNR- 0!0"6#
C$sto%er:
AL-&ANAR C'(
End Client:
SEC-C'A
S)eet:
5 'f 28
Site:
S!S 0"*
+anel!Desi,nation!Location
95(1%(D
115 345
-TI3E C-EC7 8 9'NE C-EC7:
8etting %dopted/
Re/er e0c1osed sett203 pr20tout
SEC'NDARY IN:ECTI'N TESTS:
(" DISTANCE +R'TECTI'N:
9'NE REAC- 3EAS0RE3ENTS:
Item Description Checked
1 Pr20t out /ro4 *re56 6tt6c7ed(
P&-% 8P%9: -Res2st2:e re6c7: R*0 8@;1oop9 < R*0 8@;1oop9*+/
-Re6ct2:e re6c7: =0 8@;1oop9 < =0 8@;p76se9 > =N0 8@;p76se9- =N0 < ?N@* =0 8@;p76se9-
?N@< 1; 3 88=0 A =19; =19
"0: =0 8@;1oop9 < 1; 3 A82 * =0 8@;p76se9 > =00 8@;p76se9B#M7.
P&-P& 8PP'3P&9: -Res2st2:e re6c7: R*0 8@;p76se9 < 1; 2 R*0 8@;1oop9*+/(
- Re6ct2:e re6c7: =0 8@;p76se9 < =0 8@;p76se9*+/(
R*0: Bo0e 0 res2st2:e re6c7 res2st60ce(
=0: Co0e 0 pos2t2:e seDue0ce re6ct60ce(
=N0: Co0e 0 e6rt7 retur0s re6ct60ce(
?N@: re6ct2:e co4pe0s6t2o0 /6ctor(
=00: Co0e 0 Cero seDue0ce re6ct60ce(
=0: 120e Cero seDue0ce re6ct60ce(
=1: 120e pos2t2:e seDue0ce re6ct60ce(
+/:)TR;VTR(
9'NE TI3IN/ TEST:
Item Description Checked
1 Pr20t out /ro4 *re56 6tt6c7ed(
242t: 24 4s tEp2c611E F 104s F 0(5 G(
(5 +-ASE SELECTI'N &0NCTI'N ;+-S<:
(5("( +-S REAC- 3EAS0RE3ENTS:
Item Description Checked
1 Pr20t out /ro4 *re56 6tt6c7ed(
P&-% 8P%9: -Res2st2:e re6c7: Rd/Hp7s 8@;1oop9 < Rd/Hp7s 8@;1oop9*+/('R*r:p7s8@;1oop9< R*r:p7s8@;1oop9*+/
-Re6ct2:e re6c7: =1p7s 8@;1oop9 < 1; 3 A82 * =1p7s 8@;p76se9 > =0p7s 8@;p76se9B*+/(
P&-P& 8PP9: -Res2st2:e re6c7: R*p7s 8@;p76se9 < 1; 2 R*p7s 8@;1oop9*+/(
D%")/ C%((I)D 5-" ,+
%"6C ).7I.))(
1I".)88)D ,+
8)C
.%M)/
ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR
8I7.%"-()/
The relay distance function is tested on final setting
SITE INSPECTION AND TEST RECORD
AT&C
Description:
DISTANCE + line diff RELAY RED 670
Contract no:
CNR- 0!0"6#
C$sto%er:
AL-&ANAR C'(
End Client:
SEC-C'A
S)eet:
6 'f 28
Site:
S!S 0"*
+anel!Desi,nation!Location
- Re6ct2:e re6c7: =1p7s 8@;p76se9 < =1p7s 8@;p76se9*+/(
3P&: -Res2st2:e re6c7: R*p7s 8@;p76se9 < 0(666 R*p7s 8@;p76se9*+/
- Re6ct2:e re6c7: =1p7s 8@;p76se9 < 1(333 * =1p7s 8@;p76se9*+/(
(5(5( +-S TI3IN/ TEST:
Item Description Checked
1 Pr20t out /ro4 *re56 6tt6c7ed(
242t: 24 4s tEp2c611E F 104s F 0(5 G(
(6+'=ER S=IN/ DETECTI'N ;+SD<:
?.4.?.1 P!D "eac2 te3t Mea368ement:
Item Description Checked
1 Pr20t out /ro4 *re56 6tt6c7ed(
C-EC7 T-E '+ERATIN/ TI3E ;T+"<:
"ype of fault "p1 setting
msec
"p1 actual
msec
3 phase 42 3$
-*re56 3e0er61 4ode- seDue0ce- 3 st63es(
-1
"T
"TA$%: 3p76se V'# to 3et t7e 24ped60ce outs2de t7e outer Co0e 6re6 8#<#r ' V;#IBouter 60d T <1 "%)9(
-2
ND
"TA$%: 3p76se V'# to 3et t7e 24ped60ce JetHee0 t7e outer 60d t7e 200er Co0e 6re6 8#<#r- V;#KBouter-
V;# IB200er 60d 6d5ust t7e t24eL st6rt H2t7 30 4secL t211 Eou 3et P"D st6rt9(
-3
RD
"TA$%: 3p76se V'# to 3et t7e 24ped60ce 20s2de Co0e1 8#<#r ' V;#KBCo0e1 60d T <0(1 "%)9(

C-EC7 T-E 4L'C7IN/ TI3E ;TR5<:

8)""I.7 0%*-) sec
M)%8-()D 0%*-)
2.22 8 2.224 8
L;m;t: C 10 m3 D3ee t2e tec2. 8e7. man6a5 pa<e E0F.
- *R%MA $%N%RA +OD%
-1
"T
"TA$%: 3P&A"% V'# 8#<#r- V;# Iouter Co0e sett203 24ped60ce9(
D%")/ C%((I)D 5-" ,+
%"6C ).7I.))(
1I".)88)D ,+
8)C
.%M)/
ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR
8I7.%"-()/
The relay distance function is tested on final setting
SITE INSPECTION AND TEST RECORD
AT&C
Description:
DISTANCE + line diff RELAY RED 670
Contract no:
CNR- 0!0"6#
C$sto%er:
AL-&ANAR C'(
End Client:
SEC-C'A
S)eet:
. 'f 28
Site:
S!S 0"*
+anel!Desi,nation!Location
-2
ND
"TA$%: 3P&A"% V'# 8#<#r- V;# K200er Co0e sett203 24ped60ce9(
-3
RD
"TA$% TA?% du;dt < 0(2 :;sec(
-P"D st6rt co0t6ct to du61 t24er(

C-EC7 T-E -'LDIN/ TI3E ;T-<:
"ype of fault "H actual
8ec
"H setting
8ec
phase 2.$ 2.4E'
-Test procedure: "A+% A" N%*OR NUT
-use t24er JE st6rt co0t6ct 83e0er61 tr2p9 60d stop co0t6ct 8P"D9(
C-EC7 T-E +SD 4L'C7IN/ TI3E /
G5.) ()*%+ 53)(%"I5. 1I"H5-" 38 m8ec! ()*%+ 53)(%"I5. 1I"H 38 8ec!
G1
G2
G3
G4 ./% ./%
"0 - &0SE &AIL S0+ER.ISI'N ;&SD"< :
pM9d +Z3IZ3
8etting Measured ?alues
3-2H0 3I2I% 3hase 3-2H0! 3I2I%!
D%")/ C%((I)D 5-" ,+
%"6C ).7I.))(
1I".)88)D ,+
8)C
.%M)/
ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR
8I7.%"-()/
The relay distance function is tested on final setting
SITE INSPECTION AND TEST RECORD
AT&C
Description:
DISTANCE + line diff RELAY RED 670
Contract no:
CNR- 0!0"6#
C$sto%er:
AL-&ANAR C'(
End Client:
SEC-C'A
S)eet:
8 'f 28
Site:
S!S 0"*
+anel!Desi,nation!Location
12J &.&40 12J 2.1%
% 59.67 0.902
,
C
?+0= +a G +H G +c
?I0= Ia G IH G Ic
L;m;t: C 1 I 97 +8 798 ?+0J and C 1 I 97 I8 D3ee t2e tec2. 8e7. man6a5 pa<e 460 taH5e 1K6F.
'ENE"AL MDE
-1
!,
!,A'E: ?PHA!E V)I HEAL,H. $A!E.
- DE$"EA!E NE PHA!E VL,A'E ,ILL ,HE INDI$AIN LED (+!E (AIL APPE"A!.
- DE$"EA!E ,HE !AME PHA!E $+""EN, ,ILL ,HE INDI$,IN LED (+!E (AIL "E!E,.
9use 9ail 5perating "ime/ 2&.2 msec
-1
!,
!,A'E: ?PHA!E V)I HEAL,H. $A!E.
-1
ND
!,A'E: P+, (+!E (AIL $NDI,IN D,ALE $N,A$, (+!E (AIL (+!E -LL ZF
::: 0." super?ision latching time C $.21 sec.
* $e0er61 4ode:
- 1
"T
"TA$%: 3P&A"%" V'# &%AT&! )A"%( 8TA?% T#+% 1 "%)9
-2
ND
"TA$%: PUT 3 P&A"% 8V9 TO A)&#V% T&% DD AND *U"% *A# *OR +OR% T&AN 5 "%)(

::: Check the relay operation if a fault occurred during the fuse fail K L.
* $e0er61 4ode:
- 1
"T
"TA$%: *U"% *A# )OND#T#ON 8TA?% T#+% 1 "%)9
-2
ND
"TA$%: *AUT )OND#T#ON
::: Check seal I. 9-.C"I5./ ::::::::::::::
U SEALIN (SETTING) = 46.48 V
U (MEAS.) =
.T 3C4 TRI+:

Check the blocking of the relay when the general block functions (VT MCB TRIP) is activated
D%")/ C%((I)D 5-" ,+
%"6C ).7I.))(
1I".)88)D ,+
8)C
.%M)/
ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR
8I7.%"-()/
The relay distance function is tested on final setting
SITE INSPECTION AND TEST RECORD
AT&C
Description:
DISTANCE + line diff RELAY RED 670
Contract no:
CNR- 0!0"6#
C$sto%er:
AL-&ANAR C'(
End Client:
SEC-C'A
S)eet:
9 'f 28
Site:
S!S 0"*
+anel!Desi,nation!Location

G5.) 1/ 1I"H 5-" 0" MC, "(I3 / "(I3 1I"H "IM) C 1E.2 msec
1I"H 0" MC, "(I3/ ,*5C=
G5.) 2/ 1I"H 5-" 0" MC, "(I3 / "(I3 1I"H "IM) C 42&.$ msec
1I"H 0" MC, "(I3/ ,*5C=
G5.) 3/ 1I"H 5-" 0" MC, "(I3 / "(I3 1I"H "IM) C D22.3 msec
1I"H 0" MC, "(I3: ,*5C=
C-EC7IN/ T-E '+ERATI'N '& T-E D.!DT AND DI!DT:
8etting Measured 0alues
);3. 0%*-)
I.D
DUI
"ett203
D#K
"ett203
P76se
DUI
8V9
D#K
DAF
DUI
%@p(
D#K
%@p(
60G UJ6se
839(849
25G#J6se
80(259
A
26(56 V 0(.5 A O?
N
)
- Act2:e OPDUD# < ON(
- T7e0 205ect 2 st63es :
- *2rst st63e ; 7e61t7E
- "eco0d st63e ; Oeep Eour :o1t63e 6t s2031e p76se 4ore t760 UDD 60d ot7er tHo p76ses 6re 7e61t7E
60d 3 p7 curre0t 7e61t7E t7e0 decre6se :o1t63es up to /use /621 detected 60d repe6t t72s test /or curre0t(
- T7e /use /621 H211 oper6te( t7e co0t6ct o/ N?B H211 Je oper6te 16tc7ed up to :o1t63e retur0 J6cO
to 4ore t760 sett203 o/ Up7
DEAD LINE DETECTI'N &0NCTI'N ;DLD< 0SED &'R &0SE &AIL
D%")/ C%((I)D 5-" ,+
%"6C ).7I.))(
1I".)88)D ,+
8)C
.%M)/
ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR
8I7.%"-()/
The relay distance function is tested on final setting
SITE INSPECTION AND TEST RECORD
AT&C
Description:
DISTANCE + line diff RELAY RED 670
Contract no:
CNR- 0!0"6#
C$sto%er:
AL-&ANAR C'(
End Client:
SEC-C'A
S)eet:
10 'f 28
Site:
S!S 0"*
+anel!Desi,nation!Location
Phase
Setting
Measured Vaues
U!(V) I!(A) U!(V) I!(A)
A 60G8 39(849 5G80(059
"
60G8 39(849
5G80(059
#
60G8 39(849
5G80(059
A"#
60G8 39(849
5G80(059
242t: F 1 G o/ Ur /or UM 60d F 1 G o/ #r 8see t7e tec7( re/( 460u61 p63e 242 t6J1e 125 9(
Test203 3u2de120es: re/er to t7e /u0ct2o0 1o32c 60d t7e co442ss2o0203 460u61 p63e 95(
TEST P$%#E&U$E'
- APP! 3 P&A"% V ' # AT &%AT&! )A"% ON $%N%RA +OD%(
- D%)R%A"% ON% P&A"% VOTA$% UNT# T&% DDU #ND#)AT#ON APP%AR"(
- D%)R%A"% ON% P&A"% )URR%NT UNT# T&% DD# #ND#)AT#ON APP%AR"(
"" ( A0T'3ATIC S=IC-T 'N T' &A0LT ;S&."<:
DI8"%.C) 3(5")C"I5.
85"9 4 5. "rip "ime msec! ()M%(=8
Internal 85"9 #ith 8elect
impedance mode.
%ll Mones trip inst.
N Make at setting auto init 5.!.
)@ternal 85"9 #ith manual
Close pulse.
G1 6 G4 5.*+ "(I3 I.8". 1I"H 85"9
9-.C"I5.
85"9 1I"H DI8"%.C) 3(5")C"I5./
M9de Impedance A6t9 In;t 977
1 -;/p $- 9pen G $- Man6a5 $593e
85"9 1I"H G1 "ime 1/5 85"9 C m8ec
"ime 1I"H 85"9 C m8ec
85"9 1I"H G2 "ime 1/5 85"9 C m8ec
"ime 1I"H 85"9 C m8ec
D%")/ C%((I)D 5-" ,+
%"6C ).7I.))(
1I".)88)D ,+
8)C
.%M)/
ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR
8I7.%"-()/
The relay distance function is tested on final setting
SITE INSPECTION AND TEST RECORD
AT&C
Description:
DISTANCE + line diff RELAY RED 670
Contract no:
CNR- 0!0"6#
C$sto%er:
AL-&ANAR C'(
End Client:
SEC-C'A
S)eet:
11 'f 28
Site:
S!S 0"*
+anel!Desi,nation!Location
85"9 1I"H G3 "ime 1/5 85"9 C m8ec
"ime 1I"H 85"9 C m8ec
85"9 1I"H G4 "ime 1/5 85"9 C m8ec
"ime 1I"H 85"9 C m8ec
Test of dead line detection ti%e ; TDLD <:
Put td1d < 0(2 sec - 4ode < 24ped60ce - 6uto202t < o0 (
- 205ect t7ree st63es 12Oe t76t :
- /2rst st63e : 7e61t7E H2t7 t24e 4sec
- seco0d st63e : 8 V'#9 Cero H2t7 t24e 0(15 sec
- t72rd st63e : Co0e /6u1t H2t7 t24e 1 sec
- so 2t H211 tr2p JE Co0e /6u1t t24e Jec6use td1d 2s 0(2sec t7e 20cre6se t7e t24e o/ seco0d st63e up to 4or t760 0(2 sec
t7e0 2t H211 Je tr2p JE sot/ (
- TDD 8 +%A"(9 <
test of drop off ti%e for sotf ; TS'T&< :
put tsot/ < 1 sec - 4ode < 24ped60ce - 6uto202t < o0 (
- 205ect 2 st63e /ro4 R= p3e :
- /2rst st63e : 7e61t7E H2t7 t24e 58 ccs
- seco0d st63e : /6u1t H2t7 t24e 300 ccs
- t7e0 2t H211 Je tr2p JE sot/ t7e0 20cre6se t24e o/ /2rst st63e up to 60 ccs t7e0 2tCo0e /6u H211 tr2p JE Co0e t24e (
- T"OT* 8+%A"(9 <
S'T& >it) 0I Le?el:
M9de = +ILe4e5 % A6t9In;t = 977 % tD68at;9n = 13ec
3hase
8etting Measured 0alues
-I0! II%! -I0! II%!
% '2J 4&.4D! 22J2.2%!
, '2J 4&.4D! 22J2.2%!
C '2J 4&.4D! 22J2.2%!
%,C '2J 4&.4D! 22J2.2%!
"duration set! C 2.2sec "duration Meas! C sec
")8" 3(5C)D-()/
D%")/ C%((I)D 5-" ,+
%"6C ).7I.))(
1I".)88)D ,+
8)C
.%M)/
ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR
8I7.%"-()/
The relay distance function is tested on final setting
SITE INSPECTION AND TEST RECORD
AT&C
Description:
DISTANCE + line diff RELAY RED 670
Contract no:
CNR- 0!0"6#
C$sto%er:
AL-&ANAR C'(
End Client:
SEC-C'A
S)eet:
12 'f 28
Site:
S!S 0"*
+anel!Desi,nation!Location
- APP! 3 P&A"% V ' # 611 3-p76se 50V' #<0(0(2.A AT $%N%RA +OD%(
- D%)R%A"% ON% P&A"% VOTA$% UNT# T&% "OT* TR#P APP%AR"
-
- APP! 3 P&A"% V ' # 611 3-p76se 39(.V' #<0(190A AT $%N%RA +OD%(
- #N)R%A"% ON% P&A"% )URR%NT UNT# T&% "OT* TR#P APP%AR"
-
"5 (SC-E3E C'3(TEST ;9C'3<:
"coord C 2.2' s < "send min C 2.22 s
"send min meas! C
%! 8cheme selected/ 3ermissi?e under reach.
8end *ogic / C8 O GM1 ! 5.*+ G1
"rip *ogic / "rip C GM2PC( ! "(I3 %9")( "coord "IM)
"rip *ogic / "rip C GM2P.5C( ! "(I3 %9")( G5.)2 "IM)
"rip *ogic / "rip C GM3< 4P C( ! "(I3 %9")( )0)(+G5.) "IM)
,! 3ermissi?e 5?er (each 8cheme
8end *ogic / C8 O GM2 ! 5.*+ G2
"rip *ogic / "rip C GM2PC( ! "(I3 %9")( "coord "IM)
"rip *ogic / "rip C GM2P.5C( ! "(I3 %9")( G5.)2 "IM)
"rip *ogic / "rip C GM3 P C( ! "(I3 %9")( )0(+G5.) "IM)


C! Direct Intertrip 8cheme/
8end *ogic/ C8 C GM1 ! 5.*+ G1
"rip *ogic / "rip C C( ! "(I3 %9")( "coord "IM)
D! ,locking 8cheme/ 9inal setting!
8end *ogic / C8 O ()0)(8) G5.)8 ! 5.*+ G3
"rip *ogic / "rip C GM2P.5C( ! "(I3 %9")( "coord "IM)
"rip *ogic / "rip C GM2PC( ! "(I3 %9")( G5.)2 "IM)
D%")/ C%((I)D 5-" ,+
%"6C ).7I.))(
1I".)88)D ,+
8)C
.%M)/
ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR
8I7.%"-()/
The relay distance function is tested on final setting
SITE INSPECTION AND TEST RECORD
AT&C
Description:
DISTANCE + line diff RELAY RED 670
Contract no:
CNR- 0!0"6#
C$sto%er:
AL-&ANAR C'(
End Client:
SEC-C'A
S)eet:
13 'f 28
Site:
S!S 0"*
+anel!Desi,nation!Location
"6 - =EA7 END IN&EED EC-';9CAL<:
1)I )CH5C 5.

%. %pply momentary pulse to Channel (ecei?e Input 1ith out any fault in>ection and check
Channel send is gi?en C, should Ae in open position

8end *ogic/ C8 C C( P C, open ! %9")( "pickup 1)I "IM)

"6("- =EA7 END IN&EED TRI+:
(EI T$IP = %N
a. #he)* tri+ signa a,ter T+i)*u+ (EI ( %- )
T+i)*u+ (EI(set) = .../ se) T+i)*u+ (EI(0eas) = 0 se)
1. A++2 030entar2 +use t3 #hanne $e)ei4e In+ut and *ee+ 1inar2 in+ut ,3r #" )3se
and in5e)t 3n2 3ne stage 6ith under43tage setting then 6e ha4e e)h3 signa 6ith tri+.
* T7eco0d2t2o0 2s 3V0 I sett203 o/ VppK
"@( C0RRENT RE.ERSAL L'/IC C-EC7 ;9CAL< :
Curr(e? C 5. 6 GC5M 8cheme type 3ermissi?e 5(
%pply a re?erse fault to check/ t pick up Mone 3!
9re>a general mode< 2 stages
1
8"
8"%7)/ 3phase 06I to get the re?erse G3 fault 0.
1ith timeH3ick-p(e?
,i/p DI8"%.C) C(
2
.D
8"%7)/ 3phase 06I to get the get for#ard G2 fault
1ith time H tDelay(e?
,i/p DI8"%.C) C(

Increase the 1
st
stage time until the trip in the 2
nd
stage change from tCoord trip to G2 trip
if G2 trip I "delay re?! or "delay re? "delay re? IG2 trip!
"he time of 1
st
stage C 3ick-p(e? and the trip time in the 2
nd
stage C tDelay(e
" pick up setting C 2.22 sec " pick up Meas C msec

"delay re? setting C 2.2$ sec "delay re? Meas C msec
D%")/ C%((I)D 5-" ,+
%"6C ).7I.))(
1I".)88)D ,+
8)C
.%M)/
ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR
8I7.%"-()/
The relay distance function is tested on final setting
SITE INSPECTION AND TEST RECORD
AT&C
Description:
DISTANCE + line diff RELAY RED 670
Contract no:
CNR- 0!0"6#
C$sto%er:
AL-&ANAR C'(
End Client:
SEC-C'A
S)eet:
14 'f 28
Site:
S!S 0"*
+anel!Desi,nation!Location
ALL 4I!+ C-EC7ED '7
ALL 4'!+ C-EC7ED '7
(I!" #I$$ T"%T)
"( "- 3EAS0RE3ENTS:-
7 : 9or %ngle MeasurementQ 8et Measurement (ef is 0(..
3H%8)
%33*I)D
C-(()."

DI83*%+ 8)C5.D%(+
0%*-)
DI83*%+ 3(IM%(+
0%*-)
Magnitude %ngle Magnitude %ngle Magnitude %ngle
( 2.$ 2.2 8
8
+ 1.2 242.2
8 8
, 1.$2 122.2
8 8
N 2.D&& 1$2.2
8 8
3H%8)
%33*I)D
05*"%7)

DI83*%+ 8)C5.D%(+
0%*-)
DI83*%+ 3(IM%(+
0%*-)
Magnitude %ngle Magnitude %ngle Magnitude %ngle
(. &&.4 2.2 8
8
+. &&.4 242.2
8 8
,. &&.4 122.2
8 8
(+ 11$ 32 ----
8 8
+, 11$ 2'2 ---- 8 8
,( 11$ 1$2 ---- 8 8
D%")/ C%((I)D 5-" ,+
%"6C ).7I.))(
1I".)88)D ,+
8)C
.%M)/
ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR
8I7.%"-()/
The relay distance function is tested on final setting
SITE INSPECTION AND TEST RECORD
AT&C
Description:
DISTANCE + line diff RELAY RED 670
Contract no:
CNR- 0!0"6#
C$sto%er:
AL-&ANAR C'(
End Client:
SEC-C'A
S)eet:
15 'f 28
Site:
S!S 0"*
+anel!Desi,nation!Location
5( +IC7 0+ 8 DR'+ '&& TEST &'R DI&&ERENTIAL C0RRENT ;Id3in<:
%:%lso charge current should not acti?e in the setting. 3ick -p 0alue C IdMin %
*imits /
. 3ick up 6
Drop 5ut 92J of Ir
%ccording to the
Catalogue for
"echnical Data 3age/
132
.ote / 1! ,efore "esting 3ut Charging Current off 1ill Decrease 3ick -p 0alue "o $2J
2! ,efore "esting 3ut tId MinHigH C2.2 sec
D%")/ C%((I)D 5-" ,+
%"6C ).7I.))(
1I".)88)D ,+
8)C
.%M)/
ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR
8I7.%"-()/
The relay distance function is tested on final setting
3H%8)
8)""I.7
IdMin %!
Calculate
3ick -3 %!
Measured
3ick -p
0alue %!
Measured Drop
5ff 0alue %!
(:.
2.2 2.2
2.& 2.&
1.2 1
+:.
2.2 2.2
2.& 2.&
1.2 1
,:.
2.2 2.2
2.& 2.&
1.2 1
(:+ 2.4 2.4
+:, 2.4 2.4
,:( 2.4 2.4
(:+:, 2.4 2.4
SITE INSPECTION AND TEST RECORD
AT&C
Description:
DISTANCE + line diff RELAY RED 670
Contract no:
CNR- 0!0"6#
C$sto%er:
AL-&ANAR C'(
End Client:
SEC-C'A
S)eet:
16 'f 28
Site:
S!S 0"*
+anel!Desi,nation!Location
3- DE&INITE'+ERATIN/ TI3E TEST &'R DI&&ERENTIAL C0RRENT ;Id3in<:
8et/ D)9I.I") Mode 6 IdMin C 2.2IAase
.5")/ Aefore test put Id Min High 6 I diff %larm H 2 N Idmin!
.3H%8)
In>ect current %!
2NIdMin
NN set t Id
MinHigH at
s#itching cond.
5perating
"ime ms!
NN set t Id
MinHigH at
normal cond.
5perating
"ime ms!
(
2.42 2.2 2.2
2.42 122 122
2.42 $22 $22
+
2.42 2.2 2.2
2.42 122 122
2.42 $22 $22
,
2.42 2.2 2.2
2.42 122 122
2.42 $22 $22
NN "his time effecti?e during s#itching for inruch current and this time is en effecti?e during normal
Condition
9or check at normal condition put 1 st healthy condition more than t Idminhigh time and 2 nd st. at fault
condition.
%ccuracy/ Instantaneous 5peration/ 2$ ms.typically at 2 to 12NId
%ccording to the Catalogue for "echnical Data 43age/ 133
D%")/ C%((I)D 5-" ,+
%"6C ).7I.))(
1I".)88)D ,+
8)C
.%M)/
ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR
8I7.%"-()/
The relay distance function is tested on final setting
SITE INSPECTION AND TEST RECORD
AT&C
Description:
DISTANCE + line diff RELAY RED 670
Contract no:
CNR- 0!0"6#
C$sto%er:
AL-&ANAR C'(
End Client:
SEC-C'A
S)eet:
1. 'f 28
Site:
S!S 0"*
+anel!Desi,nation!Location
@ -+IC7 0+ 8 DR'+ '&& TEST8 '+ERATIN/ TI3E &'R DI&&ERENTIAL C0RRENT
ALAR3 ;Idiff Alar%<:
3H%8)
8)""I.7
Idiff %larm %!
Calculate
3ick -3
%!
Measured
3ick -p
0alue %!
Measured
Drop 5ff
0alue %!
Delay "ime
"diff
%larm sec!
5perating
"imesec! 2NIp.-

(
2.2 2.2
3.2
2.$ 2.$
$.2
+
2.2 2.2
3.2
2.$ 2.$
$.2
,
2.2 2.2
3.2
2.$ 2.$ $.2
*imits/
3ick up 6 Drop 5ut 92I of Ir %ccording to the Catalogue for "echnical Data 3age/ 1326133
%ccuracy/ Instantaneous 5peration/ 2$ ms .typically at 2 to 12NId
.5")/ ,efore "est for 3ick -p 3ut t %larm delay C2.2 sec6 take output contact I d %larm for time
D%")/ C%((I)D 5-" ,+
%"6C ).7I.))(
1I".)88)D ,+
8)C
.%M)/
ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR
8I7.%"-()/
The relay distance function is tested on final setting
SITE INSPECTION AND TEST RECORD
AT&C
Description:
DISTANCE + line diff RELAY RED 670
Contract no:
CNR- 0!0"6#
C$sto%er:
AL-&ANAR C'(
End Client:
SEC-C'A
S)eet:
18 'f 28
Site:
S!S 0"*
+anel!Desi,nation!Location
*( 4IAS C-ARACTERISTIC TESTIN/
-se fiAer optic communication Aet#een ch16ch2 then test differential protection elementQ
as sho#n figure.=eep charge current off!
D%")/ C%((I)D 5-" ,+
%"6C ).7I.))(
1I".)88)D ,+
8)C
.%M)/
ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR
8I7.%"-()/
The relay distance function is tested on final setting
SITE INSPECTION AND TEST RECORD
AT&C
Description:
DISTANCE + line diff RELAY RED 670
Contract no:
CNR- 0!0"6#
C$sto%er:
AL-&ANAR C'(
End Client:
SEC-C'A
S)eet:
19 'f 28
Site:
S!S 0"*
+anel!Desi,nation!Location
N% current is in>ected into the ( phase #hich is used as the Aias current and another current is
in>ected into the + phase #hich is used as differential current.
In>ect a Aias current of 1% in the ( phase. "he relay #ill trip and any contacts associated #ith the (
phase #ill operate.
8lo#ly increase the current in the + phase until phase + trips . (ecord the phase + current magnitude
and check that it corresponds to the follo#ing eRuationQ
Connect the test circuit as sho#n figure.
I-Section "
N2en H;a3 c688ent ;3 Het:een:
0 O IH;a3 O End3ect;9n1#I-a3e
D%")/ C%((I)D 5-" ,+
%"6C ).7I.))(
1I".)88)D ,+
8)C
.%M)/
ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR
8I7.%"-()/
The relay distance function is tested on final setting
8lope
section1
Idmin set I Aias In>ect
%
Id calculated"rip! Id Measured %!
( + ,
Idmin5p
2.2 1.2!1.2$NI,ase 2.22
2.4 1.2!1.2$NI,ase 2.42
2.& 1.2!1.2$NI,ase 2.&2
SITE INSPECTION AND TEST RECORD
AT&C
Description:
DISTANCE + line diff RELAY RED 670
Contract no:
CNR- 0!0"6#
C$sto%er:
AL-&ANAR C'(
End Client:
SEC-C'A
S)eet:
20 'f 28
Site:
S!S 0"*
+anel!Desi,nation!Location
*imitsQ 9 2 JIr %ccording to the Catalogue for Commissioning and Maintenance 4 3age132
.5")/ .5" I.S)C")D 05*"%7) .5" "%=) 0(ef 5( I(ef !
I A SL'+E Section 5
1hen Aias current is Aet#een/
)ndsection1NIAase T IAias T )ndsection2NI,ase
"rip C I
dmin5p
NIAaseP slope section2/122 NIAias : )nd section1NIAase ! %
1hereQ Idmin Q "he ,asic Diff Current 8etting.
"o check more than one point at the same slope< Change the Aias current ?alue and the eRuation aAo?e
can Ae used< and also for other differential settings UU Different slopes< U
%pply the aAo?e procedure for each phase.
8et )nd section1 C 1.2$NI,ase
)nd section2 C3.2NI,ase
I,ase C 1222%
*imitsQ 9 2 JIr %ccording to the Catalogue for Commissioning and Maintenance 4 3age132
D%")/ C%((I)D 5-" ,+
%"6C ).7I.))(
1I".)88)D ,+
8)C
.%M)/
ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR
8I7.%"-()/
The relay distance function is tested on final setting
8lope
section2
Idmin set I Aias
In>ect
%!
Id
calculated
"rip!
Id Measured %!
( + ,
32 J
2.2 1.$ 2.2'&
2.4 2.2 2.&2&
2.& 3.2 1.12&
$2 J
2.2 1.$ 2.32&
2.4 2.2 2.''&
2.& 3.2 1.4'&
SITE INSPECTION AND TEST RECORD
AT&C
Description:
DISTANCE + line diff RELAY RED 670
Contract no:
CNR- 0!0"6#
C$sto%er:
AL-&ANAR C'(
End Client:
SEC-C'A
S)eet:
21 'f 28
Site:
S!S 0"*
+anel!Desi,nation!Location
IA SL'+E Section6
(epeat the test and check the result #ith the follo#ing eRuationQ
1hen Aias current is more than/
IAias V )nd section2NIAase
"rip C IAaseNI
dmin5p
P slope section2/122N)nd section2 : )nd section1!! P
slope section3/122 N IAias: )nd section2NIAase ! %
8et )nd section1 C 1.2$NI,ase
)nd section2 C3.2NI,ase
I,ase C 1222%
8lope section2 C 32J
8lope
section3
Idmin
set.
I in>ected%
Id
calculated
"rip!
Id Measured
( + ,
$2J 2.2 4.2 1.22$
D%")/ C%((I)D 5-" ,+
%"6C ).7I.))(
1I".)88)D ,+
8)C
.%M)/
ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR
8I7.%"-()/
The relay distance function is tested on final setting
SITE INSPECTION AND TEST RECORD
AT&C
Description:
DISTANCE + line diff RELAY RED 670
Contract no:
CNR- 0!0"6#
C$sto%er:
AL-&ANAR C'(
End Client:
SEC-C'A
S)eet:
22 'f 28
Site:
S!S 0"*
+anel!Desi,nation!Location
2.4 $.2 1.E2$
2.& &.2 2.&2$
D2 J
2.2 4.2 1.$2$
2.4 $.2 2.$2$
2.& &.2 3.$2$
6( -ar%onic c$rrent c)ecB:
I( C)ecB t)e 5nd ClocBin,:
2
nd
Harmonic
current
setI2/I1!
(atio
Idmin set.
%
Iin>ected %! Iop Measured %!
9undamental
C-(()."
&2HG!
2
nd
Harm.
Calculated
122HG!
(
+ ,
J
Harm
J
Harm
J
Harm
14JI,ase
2.2N
I,ase
1.2 2.14
I in>ected C 1.2 &2 HG!
I in>ected C 2.14 122 HG!
*imitsQ 9 2 JIr %ccording to the Catalogue for Commissioning and Maintenance 4Q 3age132
II(C)ecB t)e *t) ClocBin,:

D%")/ C%((I)D 5-" ,+
%"6C ).7I.))(
1I".)88)D ,+
8)C
.%M)/
ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR
8I7.%"-()/
The relay distance function is tested on final setting
SITE INSPECTION AND TEST RECORD
AT&C
Description:
DISTANCE + line diff RELAY RED 670
Contract no:
CNR- 0!0"6#
C$sto%er:
AL-&ANAR C'(
End Client:
SEC-C'A
S)eet:
23 'f 28
Site:
S!S 0"*
+anel!Desi,nation!Location
$
th


Harmonic
current set
Idmin set.
%
Iin>ected %! Iop Measured %!
9undamental
C-(()."
&2HG!
$
th
Harm.
Calculated
322HG!
( + ,
J
Harm.
J
Harm
J
Harm
2$JI,ase
2.2N
I,ase
1.2 2.2$
*imitsQ 9 & JIr %ccording to the Catalogue for Commissioning and Maintenance 4Q 3age132
7( Id3in-i,) 8 Td3in-i,) :
3H%8)
Id Min High
53)("D "IM) "d Min High!
8)""I.7
3IC=-3 0%*-)
8)""I.7 8 !
I.S)C")" C-(()."
%" 2.$% %" 2.2%
%" 2.$% %" 2.2
3.- D.5 3.- D.5
(
2.$% 2% 2.2 8)C
+
,
: in>ect current inst. 9rom only one stage up to Idiff operate Ay Mero sec
#( Id$nres c$rrent c)ecB:
IAase C 1222% C"( C 1222/1 %
Idunres set.
%
C%* %!
Idunres Measured %!
( + ,
2.2N I,ase 2
4.2N I,ase 4
&.2N I,ase &
D.2N I,ase D
D%")/ C%((I)D 5-" ,+
%"6C ).7I.))(
1I".)88)D ,+
8)C
.%M)/
ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR
8I7.%"-()/
The relay distance function is tested on final setting
SITE INSPECTION AND TEST RECORD
AT&C
Description:
DISTANCE + line diff RELAY RED 670
Contract no:
CNR- 0!0"6#
C$sto%er:
AL-&ANAR C'(
End Client:
SEC-C'A
S)eet:
24 'f 28
Site:
S!S 0"*
+anel!Desi,nation!Location
12.2N I,ase
12
*imitsQ 9 2 JIr %ccording to the Catalogue for Commissioning and Maintenance 4Q 3age132
( CR'SS 4L'C7IN/ &0NCTI'N
#d 8 +2024u4 9 <
)ross N1ocO *u0ct2o0 < ON
I$ I: I"
#r3ss "3)* %N
#r3ss "3)*
%;;
Tri++ing
# Ip2cOup H2t7 20d 76r4o02c(
2Ip2cOup H2t7out 2
0d

76r4o02c(
NO)?%D
# Ip2cOup H2t7 20d
76r4o02c(
2Ip2cOup H2t7out 2
0d

76r4o02c(
NO)?%D
2Ip2cOup H2t7out 2
0d

76r4o02c(
# Ip2cOup H2t7 20d
76r4o02c(
NO)?%D
"0 - E&&ECT '& C-AR/IN/ C0RRENT:
Chargcur)naAle C 5..
3H%8)
8)""I.7
IdMin %!
Calculate
3ick -3 %!
Measured
3ick -p
0alue %!
Measured
Drop 5ff
0alue %!
CH%(.
C-((.
);3.
CH%(.
C-((.
M)%8.
(+,
2.2 2.4 2.2
2.&
1.2 2.&
2.'
1.4 2.'
D%")/ C%((I)D 5-" ,+
%"6C ).7I.))(
1I".)88)D ,+
8)C
.%M)/
ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR
8I7.%"-()/
The relay distance function is tested on final setting
SITE INSPECTION AND TEST RECORD
AT&C
Description:
DISTANCE + line diff RELAY RED 670
Contract no:
CNR- 0!0"6#
C$sto%er:
AL-&ANAR C'(
End Client:
SEC-C'A
S)eet:
25 'f 28
Site:
S!S 0"*
+anel!Desi,nation!Location
"": &INAL SETTIN/:
1:pick up 6drop off 6time test for diff .current Id Min!/ Kneg. seR. Diff. )nC5.<charg. Curr. )n.Con!
3H%8)
8)""I.7
Idmin %!
8)""I.7
"imesec!
tdMin high
Measured
3ick -p
0alue %!
Measured
Drop 5ut
0alue %!
Measured
"ime
%"
2N Is
(:.
2.2$ 1
+:.
,:.
(:+
D%")/ C%((I)D 5-" ,+
%"6C ).7I.))(
1I".)88)D ,+
8)C
.%M)/
ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR
8I7.%"-()/
The relay distance function is tested on final setting
SITE INSPECTION AND TEST RECORD
AT&C
Description:
DISTANCE + line diff RELAY RED 670
Contract no:
CNR- 0!0"6#
C$sto%er:
AL-&ANAR C'(
End Client:
SEC-C'A
S)eet:
26 'f 28
Site:
S!S 0"*
+anel!Desi,nation!Location
+:,
,:(
(:+:,
5-SL'+ TEST &'R SECTI'N -"
N).D 8)C"I5.1 C 1.2$ I,
N).D 8)C"I5.2 C 3 I,
8lope
section1
Idmin set I Aias
In>ect
%
Id
calculated
"rip!
Id Measured
( + ,
Idmin5p 2.2$ 1.2 2.2$
6-SL'+ TEST &'R SECTI'N-5
8lope
section2
Idmin set I Aias
In>ect
%
Id
calculated
"rip!
Id Measured
( + ,
42 J 2.2$ 1.$ 2.3$
@-SL'+ TEST &'R SECTI'N-6
8lope
section3
Idmin
set.
I in>ected%
Id
calculated
"rip!
Id Measured
( + ,
D2J 2.2$ 4.2 1.'$
* - Id3in-i,) 8 Td3in-i,)
D%")/ C%((I)D 5-" ,+
%"6C ).7I.))(
1I".)88)D ,+
8)C
.%M)/
ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR
8I7.%"-()/
The relay distance function is tested on final setting
SITE INSPECTION AND TEST RECORD
AT&C
Description:
DISTANCE + line diff RELAY RED 670
Contract no:
CNR- 0!0"6#
C$sto%er:
AL-&ANAR C'(
End Client:
SEC-C'A
S)eet:
2. 'f 28
Site:
S!S 0"*
+anel!Desi,nation!Location
3H%8)
Id Min High %!
"d Min High
8)""I.7
%!
3IC=-3
0%*-)
8)""I.7 8 !
53)(%")
%" 1 %
(
1.2
1.2
+
,
6( Id$nres c$rrent c)ecB:
Idunres set.
%!
Idunres Measured %!
( + ,
12 N I,ase
7( DI&&ERENTIAL C0RRENT ALAR3
3H%8)
8)""I.7
Id alarm
%!
8)""I.7
"ime 8!
Measured 3ick
-p 0alue %!
Measured Drop
5ut 0alue %!
Measured "ime
8ec! %"
2NI set
(:.
2.1$ 12.2
+:.
D%")/ C%((I)D 5-" ,+
%"6C ).7I.))(
1I".)88)D ,+
8)C
.%M)/
ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR
8I7.%"-()/
The relay distance function is tested on final setting
SITE INSPECTION AND TEST RECORD
AT&C
Description:
DISTANCE + line diff RELAY RED 670
Contract no:
CNR- 0!0"6#
C$sto%er:
AL-&ANAR C'(
End Client:
SEC-C'A
S)eet:
28 'f 28
Site:
S!S 0"*
+anel!Desi,nation!Location
,:.
#(-ar%onic c$rrent c)ecB:
I( C)ecB t)e 5nd ClocBin,:
2
nd
Harmonic
current
setI2/I1!
(atio
Idmin set.
%
I in>ected %! Iop Measured %!
9undamental
C-(()."
&2HG!
2
nd
Harm.
Calculated
122HG!
(
+ ,
J
Harm
J
Harm
J
Harm
1$JI,ase
2.2$N
I,ase
1.2 2.1$
II(C)ecB t)e *t) ClocBin,:
$
th


Harmonic
current set
Idmin set.
%
I in>ected %! Iop Measured %!
9undamental
C-(()."
&2HG!
$
th
Harm.
Calculated
322HG!
( + ,
J
Harm.
J
Harm
J
Harm
2$JI,ase
2.2$N
I,ase
1.2 2.2$
D%")/ C%((I)D 5-" ,+
%"6C ).7I.))(
1I".)88)D ,+
8)C
.%M)/
ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR
8I7.%"-()/
The relay distance function is tested on final setting