Anda di halaman 1dari 3

El Said Antar, PMP

Infrastructure Department 1

Name: Elsaid Antar, PMP e-mail Saeeedmohd@hotmail.com

Present Position: Construction Manager
Nationality: Egyptian



Profession: Infrastructure Design, Planning and Management
Specialisation: Design and construction management.
Qualifications: Bachelor of Structural Engineering, Al Mansoura University,
Faculty of Engineering, Egypt, May 2002.

Mobile 00974-7752-5497 (Mobile)


Profile
I am a Certified Project Management Professional (PMP); I joined Atkins as Infrastructure engineer in 2003 and am involved
in the Highways Design, Structural Design, Bridge Design and Planning and Team Management. Now Im working in
PARSONS Qatar for the largest project in Education City as a construction Manager. I have more than 12 years of
professional experience in the Egypt, UAE and Qatar.

Selected Experience

June 2013 to Till Now
Parsons-Al Doha Office
Construction Manager

South Site Wide Infrastructure and Landscaping, Education City: Responsible for monitoring field construction activities
for assigned construction packages for compliance with schedule and works with the contractor to develop mitigation
measures to control schedule when slippage is determined. Working with construction supervision team to monitor the
timely responses for RFIs, processing of change orders, and method statements approvals. Maintain awareness of possible
problem areas and work to implement preventative actions to manage meeting critical milestones for each phase of the
project. Preparing periodic reports summarizing progress of construction activities. Support site manager in maintain strong
client relation.

September 2012 to June 2013
Parsons-Al Doha Office
Sr. Civil Engineer

West Car Park, Education City: Responsible maintaining awareness of possible problem areas and work to implement
preventative actions to manage meeting critical milestones for each phase of the project. Preparing periodic reports
summarizing progress of shop drawings. Support site manager in maintain strong client relation.

February 2012 to September 2012
WS Atkins-Al Doha Office
Sr. Infrastructure Engineer, Planning Engineer

General Engineering Consultancy Service for Local Roads & Drainages Contract 2: Responsible for preparing time
schedule for design stages, basis of design report, preparing of initiation report, concept report and coordination with other
offices and Authorities, design verification according standards and special requirements, managing highway design team,
monitoring and control time schedule to schedule base line, supporting design team, validate design prepare by others,
preparing macros which is very useful in repeated work and preparing cost variation for additional requirements and work.

April 2011 to February2012
WS Atkins-Abu Dhabi Office
Sr. Infrastructure Engineer, Technical Coordinator

King Abdul-Aziz International Airport Development Project: Responsible for preparing time schedule for design stages
70% and 100% design submissions for landside package 3, preparing basis of design report, verification of all deliverables
to make sure it its matches client requirements and coordination with other disciplines and other Atkins offices such UK and
USA offices, managing highway design team, monitoring and control time schedule to schedule base line, supporting design
team, validate design prepare by others, preparing macros which is very useful in repeated work and preparing cost
variation for additional requirements and work.
El Said Antar, PMP
Infrastructure Department 2
April 2010 to April 2011
WS Atkins-Abu Dhabi Office
Highway Design Engineer

Improvement and maintenance of the road from Um Elzomol to Tawi Arbeen: Responsible for preparing time schedule
for design stages , preparing of design basis report,verification of surveying data to obtain the data as per requirements of
design team and preparing preliminary and final design. Also I was responsible for coordination with authorities to obtain
approvals, managing highway design team, time control and drawing verification as per standards and design requirements.
Finally I was responsible for preparing tender documents and tender analysis to select contractor.

October 2009 to April 2010
WS Atkins-Abu Dhabi Office
Highway Design Engineer

Road works in areas surrounding Abu Dhabi city: Responsible for preparing time schedule for design stages , preparing
draft and final tender documents in tendering stage , check work priorities on site in addition to prepare preliminary design of
work orders using MX Software. Also attend meetings with the client to get the required data and approval certificates,
preparing tender documents and tender analysis.

February 2009 to October2009
WS Atkins-Abu Dhabi Office
Highway Design Engineer Abu Dhabi Office

Upgrading of Eastern Road in Hili Khalif Area-al Ain: Responsible for preparing time schedule for design and following
and verification of surveying team to obtain the data as per requirements of design team, preparing basis of design report,
preparing preliminary and final design. Also I was responsible for coordination with authorities to obtain approvals, schedule
control, design validation and final check for drawings, and finally preparing tender documents.

September 2007 to February 2009
WS Atkins-Abu Dhabi Office
Team Leader for Bridge Design Team Abu Dhabi Office

Al Sowa Island Project - Elevated Structure: Responsible for concept design to detailed design of the elevated structure
supporting roads 11.0m above grade level of island. Total length of elevated roads is 4.0km. Work involved grillage analysis
of beam and slab deck, design of pretension concrete beams, pile foundations & post tensioned portal frames. Design was
carried out according to AASHTO LRFD, Coordination with highway design team, preparing spreadsheets for design work
and checking of design drawings.

March 2007-September 2007
WS Atkins-Abu Dhabi Office
Bridge Design Engineer

Dubai Metro Project - Green Line Under ground stations: Responsible for result analysis from PLAXIS software by
preparing spreadsheet contains macros for result analysis then design walls around 40m height, slabs and columns
(composite sections) of Al-Ras ,Al-Ghubiba and Palm Diera stations. Design carried out according BS5400, preparing
spreadsheets required for design and data analysis, preparing design drawings and design report.

December 2004-March 2007
WS Atkins-Abu Dhabi Office
Bridge Design Engineer

New Doha International Airport: Responsible for detailed design of 19 bridges for design. Work involved line beam and
grillage analysis, design of post tensioned concrete box girder bridge decks, integral bridges, pile foundations, reinforced
concrete drilled shafts. Design was carried out according to AASHTO LRFD & BS5400.Also I was responsible for preparing
spreadsheets used in design of sub-structure.

March 2003 December 2004
WS Atkins-Al Ain Office
Land surveyor

Side slopes protection for wadi Towayya: The total cost of this project was 40 million Dirham. In this project I was
responsible for all surveying work in the side such as preparing data for setting out , check the alignment (horizontal and
vertical) on site by total station and dumpy level and also I was responsible for revision of submittals drawings submitted
from contractor.
In this project we faced a lot of obstructions on sites, because of these obstructions I start in re-design of the alignment
using SDR software, and get the required approvals for municipality, town planning department and all other departments.
While this project I was preparing the cross sections using SDR software to calculate cut and fill quantities.
Finally I was preparing as built drawings.


El Said Antar, PMP
Infrastructure Department 3
June 2002 - March 2003
M Hassan Consulting Office, Egypt
Building Design Engineer
Hotels and Houses in Dahab: It was a several houses and hotels in Sinai; I have a lot of work packages to do in this time.
The first is construction design and preparing BOQ, The main issue is to get approval for municipality.
During construction I should do a good supervision to all sites to get the best quality of work.

Training course

Mx software
PMP (Project Management Professional).
ANSYS FEM.
RM for bridge design.
ROBOT Millennium for structural analysis.
Primavera
Civil 3D

Softwares

Road Design using Mx Software.
Road Design using SDR MAP & DESIGN Software.
Road Design using Land development Software (Idea about software).
Auto CAD (Good knowledge about LISP)
Micro station (Idea about software).
Primavera 6
Preparing spreadsheets using excel in addition to macros
Structural analysis by SAP2000
Structural analysis and design by ROBOT Millennium
Bridges analysis and design using RM Software.
ANSYS FEM for finite element analysis (Idea about software).

Employment History

September 2012- to date
February 2012- to September 2012
Parsons, Qatar Al Doha Office
WS Atkins & Partners Overseas, Qatar Al Doha Office
December 2004- February 2012 WS Atkins & Partners Overseas, Abu Dhabi
March 2003 December 2004 WS Atkins & Partners Overseas, Al-Ain
June 2002 - March 2003 M Hassan Consulting Office, Egypt

Anda mungkin juga menyukai