B. PERHITUNGAN PELAT LANTAI

1.

Beban, Momen, Perhitungan Tulangan Pelat


Ketentuan dimana :

ht

= 8,5 cm

= 100 cm

fc

= 300 kg / m2

fy

= 2400 kg / m3

= 12 cm

Pembebanan Pelat
A. Pembebanan Pelat
1.

Beban Mati ( DL )

Berat Sendiri Pelat ( t = 12 cm & = 2400 kg / m3 )

= 0,12 x 2400 = 288

kg / m2

2.

Beban spesi ( t = 8 cm & spesi = 2100 kg / m3 )

Beban plafon / Eternit, ME

= 0,08 x 2100 = 168 kg / m2


= 40 kg / m2
DL

= 496 kg / m2

LL

= 250 kg / m2

Beban Hidup ( LL )
Beban Hidup

Setiawan (022113178)

II - 1

Struktur Beton 2
3.

Beban Terfaktor ( qU )

= 1,2 DL + 1,6 LL
= ( 1,2 x 496 ) + ( 1,6 x 250 )
= 995,2 kg/m2

B. Pelat Lantai Ruang Mesin Genset


1.

Beban Mati ( DL )
Berat Sendiri Pelat ( t = 14 cm & = 2400 kg/m3)

= 0,14 x 2400 = 336 kg / m2

Beban spesi ( t = 8 cm & spesi = 2100 kg / m3 )

= 0,08 x 2100 = 168 kg / m2

Beban plafon / Eternit, ME

2.

DL

= 544 kg / m2

LL

= 400 kg / m2

Beban Hidup ( LL )
Beban Hidup Pelat

3.

= 40 kg / m2

Beban terfaktor ( qU )

= 1,2 DL + 1,6 LL
= ( 1,2 x 544 ) + ( 1,6 x 400 )
= 1292,8 kg/m2

a) Elemen Pelat Lantai II

Bidang 1A

Setiawan (022113178)

II - 2

2,00 m

Struktur Beton 2

4,15 m
Ly / Lx = 4,15 / 2,00 = 2,1 c = 60
Mu = ( c / 1000 ) * qU * Lx2
= ( 60 / 1000 ) * 968,8 * 2,002
= 232,512 kg.m/m = 23251,2 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 23251,2 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,016

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,016
= 0,016

= ( * 0,85 * fc ) / fy
= ( 0,016 * 0,85 * 300 ) / 2400
= 1,7 x 10-3

As = * b * d
= 1, 7 x 10-3 * 100 * 8,5
= 1,445
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

1,445

tulangan = Ab = 0,785 =1,840


Setiawan (022113178)

II - 3

Struktur Beton 2
Jarak = 100 / 1,840
= 54,35 cm 20 cm

2,00 m

Bidang 2A

3,2 m
Ly / Lx = 3,2 / 2,00 = 1,6 c = 49
Mu = ( c / 1000 ) * qU * Lx2
= ( 49 / 1000 ) * 968,8 * 2,002
= 189,885 kg.m/m = 18988,5 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 18988,5 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,013

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,013
= 0,013

= ( * 0,85 * fc ) / fy
= ( 0,013 * 0,85 * 300 ) / 2400
= 1,381 x 10-3

As = * b * d
= 1,381 x 10-3 * 100 * 8,5

Setiawan (022113178)

II - 4

Struktur Beton 2
= 1,174
Untuk tulangan 10 mm Ab

= * * d2
= 0,785

As

1,174

tulangan = Ab = 0,785 =1,495


Jarak = 100 / 1,495
= 66,89 cm 20 cm

2,20 m

Bidang 3A

4,15 m
Ly / Lx = 4,15 / 2,20 = 1,6 c = 55,5
Mu = ( c / 1000 ) * qU * Lx2
= ( 55,5 / 1000 ) * 968,8 * 2,202
= 260,239 kg.m/m = 26023,9 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 26023,9 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,017

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,017
= 0,017

= ( * 0,85 * fc ) / fy
= ( 0,017 * 0,85 * 300 ) / 2400
= 1,806 x 10-3

Setiawan (022113178)

II - 5

Struktur Beton 2
As = * b * d
= 1,806 x 10-3 * 100 * 8,5
= 1,535
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

1,535

tulangan = Ab = 0,785 =1,955


Jarak = 100 / 1,955
= 51,1508 cm 20 cm

2,20 m

Bidang 4A

3,20 m
Ly / Lx = 4,15 / 2,20 = 1,5 c = 45,5
Mu = ( c / 1000 ) * qU * Lx2
= ( 45,5 / 1000 ) * 968,8 * 2,202
= 213,349 kg.m/m = 21334,9 kg.cm/m
Rn

= Mu / ( * 0,85 * fc * b * d2 )
= 21334,9 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )
= 0,014

Setiawan (022113178)

II - 6

Struktur Beton 2

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,014
= 0,014

= ( * 0,85 * fc ) / fy
= ( 0,014 * 0,85 * 300 ) / 2400
= 1,488 x 10-3

As = * b * d
= 1,488 x 10-3 * 100 * 8,5
= 1,265
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

1,265

tulangan = Ab = 0,785 =1,611


Jarak = 100 / 1,611
= 62,0732 cm 50 cm

1,5 m

Bidang 5A

2,5 m
Ly / Lx = 2,5 / 1,5
= 1,7 c = 51
Mu = ( c / 1000 ) * qU * Lx2
= ( 51 / 1000 ) * 968,8 * 1,502
= 111,169 kg.m/m = 11116,9 kg.cm/m
Setiawan (022113178)

II - 7

Struktur Beton 2
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 11116,9 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,007

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,007
= 0,007

= ( * 0,85 * fc ) / fy
= ( 0,007 * 0,85 * 300 ) / 2400
= 7,438 x 10-4

As = * b * d
= 7,438 x 10-4 * 100 * 8,5
= 5,373

Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

5,373

tulangan = Ab = 0,785 = 6,844


Jarak = 100 / 6,844
= 14,611 cm 12,5 cm

2,50 m

Bidang 6A

Setiawan (022113178)

4,15 m

II - 8

Struktur Beton 2
Ly / Lx = 4,15 / 2,50 = 1,7 c = 51
Mu = ( c / 1000 ) * qU * Lx2
= ( 51 / 1000 ) * 968,8 * 2,502
= 308,805 kg.m/m = 30880,5 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 30880,5 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,021

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,021
= 0,021

= ( * 0,85 * fc ) / fy
= ( 0,021 * 0,85 * 300 ) / 2400
= 2,231 x 10-3

As = * b * d
= 2,231 x 10-3 * 100 * 8,5
= 1,896
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

1,896

tulangan = Ab = 0,785 = 2,415


Jarak = 100 / 2,415
= 41,407 cm 50 cm

2,50 m

Bidang 7A

II - 9

Setiawan (022113178)
3,2 m

Struktur Beton 2

Ly / Lx = 3,2 / 2,50

= 1,3 c = 38

Mu = ( c / 1000 ) * qU * Lx2
= ( 38 / 1000 ) * 968,8 * 2,502
= 230,09 kg.m/m = 23009 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 23009 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,016

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,016
= 0,016

= ( * 0,85 * fc ) / fy
= ( 0,016 * 0,85 * 300 ) / 2400
= 1,7 x 10-3

As = * b * d
= 1,7 x 10-3 * 100 * 8,5
= 1,445
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

1,445

tulangan = Ab = 0,785 =1,841


Jarak = 100 / 1,841
= 54,318 cm 50 cm
Setiawan (022113178)

II - 10

Struktur Beton 2

2,83 m

Bidang 10A

3,60 m
Ly / Lx = 3,60 / 2,83 = 1, c = 38
Mu = ( c / 1000 ) * qU * Lx2
= ( 38 / 1000 ) * 968,8 * 2,832
= 294,843 kg.m/m = 29484,3 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 29484,3 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,020

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,020
= 0,020

= ( * 0,85 * fc ) / fy
= ( 0,020 * 0,85 * 300 ) / 2400
= 2,125 x 10-3

As = * b * d
= 2,125 x 10-3 * 100 * 8,5
= 1,806
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

Setiawan (022113178)

II - 11

Struktur Beton 2
As

1,806

tulangan = Ab = 0,785 = 2,300


Jarak = 100 / 2,300
= 43,478 cm 50 cm

3,60 m

Bidang 11A

4,15 m
Ly / Lx = 4,15 / 3,600 = 1,2 c = 34
Mu = ( c / 1000 ) * qU * Lx2
= ( 34 / 1000 ) * 968,8 * 3,602
= 426,892 kg.m/m = 42689,2 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 42689,2 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,028

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,028
= 0,028

= ( * 0,85 * fc ) / fy
= ( 0,028 * 0,85 * 300 ) / 2400
= 3,305 x 10-3

As = * b * d
= 3,305 x 10-3 * 100 * 8,5
Setiawan (022113178)

II - 12

Struktur Beton 2
= 2,809
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

2,809

tulangan = Ab = 0,785 = 3,578


Jarak = 100 / 3,578
= 27,948 cm 25 cm

1,4 m

Bidang 12A

2,7 m
Ly / Lx = 4,15 / 2,20 = 1,9 c = 55,5
Mu = ( c / 1000 ) * qU * Lx2
= ( 55,5 / 1000 ) * 968,8 * 1,402
= 105,386 kg.m/m = 10538,6 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 10538,6 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,007

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,007
= 0,007

= ( * 0,85 * fc ) / fy
= ( 0,007 * 0,85 * 300 ) / 2400

Setiawan (022113178)

II - 13

Struktur Beton 2
= 7,437 x 10-4
As = * b * d
= 7,437 x 10-4 * 100 * 8,5
= 0,632
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

0,632

tulangan = Ab = 0,785 = 0,805


Jarak = 100 / 0,805
= 124,22 cm 125 cm

2,25 m

Bidang 13A

2,6 m
Ly / Lx = 2,60 / 2,25 = 1,2 c = 34
Mu = ( c / 1000 ) * qU * Lx2
= ( 34 / 1000 ) * 968,8 * 2,252
= 166,755 kg.m/m = 16675,5 kg.cm/m
Rn

= Mu / ( * 0,85 * fc * b * d2 )
= 16675,5 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )

Setiawan (022113178)

II - 14

Struktur Beton 2
= 0,011

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,011
= 0,011

= ( * 0,85 * fc ) / fy
= ( 0,011 * 0,85 * 300 ) / 2400
= 1,168 x 10-3

As = * b * d
= 1,168 x 10-3 * 100 * 8,5
= 0,993
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

0,993

tulangan = Ab = 0,785 =1,265


Jarak = 100 / 1,265
= 79,051 cm 75 cm

0,8 m

Bidang 14A

2,25 m
Ly / Lx = 2,25 / 0,8 = 2,8 c = 63,5
Mu = ( c / 1000 ) * qU * Lx2
= ( 63,5 / 1000 ) * 968,8 * 0,802
Setiawan (022113178)

II - 15

Struktur Beton 2
= 39,372 kg.m/m = 3937,2 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 3937,2 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,003

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,003
= 0,003

= ( * 0,85 * fc ) / fy
= ( 0,003 * 0,85 * 300 ) / 2400
= 3,188 x 10-4

As = * b * d
= 3,188 x 10-4 * 100 * 8,5
= 0,270

Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

0,270

tulangan = Ab = 0,785 = 0,344


Jarak = 100 / 0,344
= 290,698 cm 275 cm

2,25 m

Bidang 15A

II - 16

Setiawan (022113178)
3,00 m

Struktur Beton 2

Ly / Lx = 3,00 / 2,25 = 1,3 c = 38


Mu = ( c / 1000 ) * qU * Lx2
= ( 38 / 1000 ) * 968,8 * 2,252
= 186,373 kg.m/m = 18637,3 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 18637,3 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,013

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,013
= 0,013

= ( * 0,85 * fc ) / fy
= ( 0,013 * 0,85 * 300 ) / 2400
= 1,381 x 10-3

As = * b * d
= 1,381 x 10-3 * 100 * 8,5
= 1,174
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

1,174

tulangan = Ab = 0,785 =1,495


Jarak = 100 / 1,495
= 66,889 cm 50 cm

Setiawan (022113178)

II - 17

Struktur Beton 2

1,20 m

Bidang 16A

2,83 m
Ly / Lx = 2,83 / 1,20 = 2,4 c = 60
Mu = ( c / 1000 ) * qU * Lx2
= ( 60 / 1000 ) * 968,8 * 1,202
= 83,704 kg.m/m = 8370,4 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 8370,4 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,006

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,006
= 0,006

= ( * 0,85 * fc ) / fy
= ( 0,006 * 0,85 * 300 ) / 2400
= 6,375 x 10-4

As = * b * d
= 6,375 x 10-4 * 100 * 8,5
= 0,542
Untuk tulangan 10 mm

Setiawan (022113178)

Ab = * * d2

II - 18

Struktur Beton 2
= 0,785
As

0,542

tulangan = Ab = 0,785 = 0,690


Jarak = 100 / 0,690
= 144,927 cm 150 cm

2,30 m

Bidang 17A

2,83 m
Ly / Lx = 2,83 / 2,30 = 1,2 c = 34

Mu = ( c / 1000 ) * qU * Lx2
= ( 34 / 1000 ) * 968,8 * 2,302
= 174,248 kg.m/m = 17424,8 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 17424,8 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,012

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,012
= 0,012

= ( * 0,85 * fc ) / fy
= ( 0,012 * 0,85 * 300 ) / 2400
= 1,275 x 10-3

Setiawan (022113178)

II - 19

Struktur Beton 2
As = * b * d
= 1,275 x 10-3 * 100 * 8,5
= 1,084
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

1,084

tulangan = Ab = 0,785 =1,381


Jarak = 100 / 1,381
= 72,411 cm 75 cm

3,50 m

Bidang 18A

4,15 m
Ly / Lx = 4,15 / 2,20 = 1,2 c = 34

Mu = ( c / 1000 ) * qU * Lx2
= ( 34 / 1000 ) * 968,8 * 3,502
= 403,505 kg.m/m = 40350,5 kg.cm/m
Rn

= Mu / ( * 0,85 * fc * b * d2 )
= 40350,5 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )
= 0,027

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,027

Setiawan (022113178)

II - 20

Struktur Beton 2
= 0,027

= ( * 0,85 * fc ) / fy
= ( 0,027 * 0,85 * 300 ) / 2400
= 2,869 x 10-3

As = * b * d
= 2,869 x 10-3 * 100 * 8,5
= 2,438
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

2,438

tulangan = Ab = 0,785 = 3,106


Jarak = 100 / 3,106
= 32,195 cm 25 cm

3,20 m

Bidang 19A

3,50 m
Ly / Lx = 3,50 / 3,20 = 1,1 c = 29,5
Mu = ( c / 1000 ) * qU * Lx2
= ( 29,5 / 1000 ) * 968,8 * 3,202
= 292,655 kg.m/m = 29265,5 kg.cm/m
Setiawan (022113178)

II - 21

Struktur Beton 2
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 29265,5 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,019

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,019
= 0,019

= ( * 0,85 * fc ) / fy
= ( 0,019 * 0,85 * 300 ) / 2400
= 2,019 x 10-3

As = * b * d
= 2,019 x 10-3 * 100 * 8,5
= 1,716
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

1,716

tulangan = Ab = 0,785 = 2,186


Jarak = 100 / 2,186
= 45,745 cm 50 cm

1,33 m

Bidang 20A

2,20 m
Ly / Lx = 2,20 / 1,33 = 1,7 c = 51
Setiawan (022113178)

II - 22

Struktur Beton 2
Mu = ( c / 1000 ) * qU * Lx2
= ( 51 / 1000 ) * 968,8 * 1,332
= 87,399 kg.m/m = 8739,9 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 8739,9 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,006

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,006
= 0,006

= ( * 0,85 * fc ) / fy
= ( 0,006 * 0,85 * 300 ) / 2400
= 6,375 x 10-4

As = * b * d
= 6,375 x 10-4 * 100 * 8,5
= 0,542
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

0,542

tulangan = Ab = 0,785 = 0,690


Jarak = 100 / 0,690
= 144,927 cm 150 cm

1,5 m

Bidang 21A

II - 23

Setiawan (022113178)
2,20 m

Struktur Beton 2

Ly / Lx = 2,20 / 1,5

= 1,5 c = 45,5

Mu = ( c / 1000 ) * qU * Lx2
= ( 45,5 / 1000 ) * 968,8 * 1,52
= 99,181 kg.m/m = 9918,1 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 9918,1 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,007

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,007
= 0,007

= ( * 0,85 * fc ) / fy
= ( 0,007 * 0,85 * 300 ) / 2400
= 7,437 x 10-4

As = * b * d
= 7,437 x 10-4 * 100 * 8,5
= 0,632
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

0,632

tulangan = Ab = 0,785 = 0,805


Jarak = 100 / 0,805
= 124,223 cm 125 cm

Setiawan (022113178)

II - 24

Struktur Beton 2

1,33 m

Bidang 22A

2,00 m
Ly / Lx = 2,00 / 1,33 = 1,5 c = 45,5
Mu = ( c / 1000 ) * qU * Lx2
= ( 45,5 / 1000 ) * 968,8 * 1,332
= 77,974 kg.m/m = 7797,4 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 7797,4 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,005

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,005
= 0,005

= ( * 0,85 * fc ) / fy
= ( 0,005 * 0,85 * 300 ) / 2400
= 5,313 x 10-4

As = * b * d
= 5,313 x 10-4 * 100 * 8,5
= 0,452

Setiawan (022113178)

II - 25

Struktur Beton 2
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

0,452

tulangan = Ab = 0,785 = 0,576


Jarak = 100 / 0,576
= 173,611 cm 175 cm

1,50 m

Bidang 23A

2,00 m
Ly / Lx = 2,00 / 1,50 = 1,33 c = 38
Mu = ( c / 1000 ) * qU * Lx2
= ( 38 / 1000 ) * 968,8 * 22
= 147,258 kg.m/m = 14725,8 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 14725,8 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,009

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,009
= 0,009

= ( * 0,85 * fc ) / fy
= ( 0,009 * 0,85 * 300 ) / 2400
= 9,563 x 10-4

Setiawan (022113178)

II - 26

Struktur Beton 2
As = * b * d
= 9,563 x 10-4 * 100 * 8,5
= 0,813

Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

0,813

tulangan = Ab = 0,785 =1,036


Jarak = 100 / 1,036
= 96,525 cm 100 cm

2,50 m

Bidang 24A

2,83 m
Ly / Lx = 2,00 / 1,50 = 1,1 c = 29,5
Mu = ( c / 1000 ) * qU * Lx2
= ( 29,5 / 1000 ) * 968,8 * 2,52
= 178,623 kg.m/m = 17862,3 kg.cm/m
Rn

= Mu / ( * 0,85 * fc * b * d2 )
= 17862,3 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )
= 0,012

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,012

Setiawan (022113178)

II - 27

Struktur Beton 2
= 0,012

= ( * 0,85 * fc ) / fy
= ( 0,012 * 0,85 * 300 ) / 2400
= 1,275 x 10-3

As = * b * d
= 1,275 x 10-3 * 100 * 8,5
= 1,084
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

1,084

tulangan = Ab = 0,785 =1,381


Jarak = 100 / 1,381
= 72,411 cm 75 cm

2,08 m

Bidang 25A

2,50 m
Ly / Lx = 2,50 / 2,08 = 1,2 c = 34
Mu = ( c / 1000 ) * qU * Lx2
= ( 34 / 1000 ) * 968,8 * 2,082
= 142,508 kg.m/m = 14250,8 kg.cm/m
Rn

= Mu / ( * 0,85 * fc * b * d2 )
= 14250,8 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )

Setiawan (022113178)

II - 28

Struktur Beton 2
= 0,009

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,009
= 0,009

= ( * 0,85 * fc ) / fy
= ( 0,009 * 0,85 * 300 ) / 2400
= 9,563 x 10-4

As = * b * d
= 9,563 x 10-4 * 100 * 8,5
= 0,813
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

0,813

tulangan = Ab = 0,785 =1,036


Jarak = 100 / 1,036
= 96,525 cm 100 cm

2,13 m

Bidang 26A

2,50 m
Ly / Lx = 2,00 / 1,50 = 1,2 c = 34
Mu = ( c / 1000 ) * qU * Lx2
= ( 34 / 1000 ) * 968,8 * 2,132
Setiawan (022113178)

II - 29

Struktur Beton 2
= 149,441 kg.m/m = 14944,1 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 14944,1 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,010

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,010
= 0,010

= ( * 0,85 * fc ) / fy
= ( 0,010 * 0,85 * 300 ) / 2400
= 1,063 x 10-3

As = * b * d
= 1,063 x 10-3 * 100 * 8,5
= 0,903
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

0,903

tulangan = Ab = 0,785 =1,150


Jarak = 100 / 1,150
= 86,956 cm 75 cm

1,33 m

Bidang 5B

Setiawan (022113178)

2,50 m

II - 30

Struktur Beton 2
Ly / Lx = 2,50 / 1,33 = 1,9 c = 51
Mu = ( c / 1000 ) * qU * Lx2
= ( 51 / 1000 ) * 968,8 * 1,332
= 87,399 kg.m/m = 8739,9 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 8739,9 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,006

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,006
= 0,006

= ( * 0,85 * fc ) / fy
= ( 0,006 * 0,85 * 300 ) / 2400
= 6,375 x 10-4

As = * b * d
= 6,375 x 10-4 * 100 * 8,5
= 0,542
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

0,542

tulangan = Ab = 0,785 = 0,690


Jarak = 100 / 0,690
= 144,927 cm 150 cm

Setiawan (022113178)

II - 31

Struktur Beton 2

Setiawan (022113178)

II - 32

Struktur Beton 2

b) Elemen Pelat Lantai III

1,5 m

Bidang 5A

2,5 m
Ly / Lx = 2,5 / 1,5
= 1,7 c = 51
Mu = ( c / 1000 ) * qU * Lx2
= ( 51 / 1000 ) * 968,8 * 1,502
= 111,169 kg.m/m = 11116,9 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 11116,9 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,007

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,007
= 0,007

= ( * 0,85 * fc ) / fy
= ( 0,007 * 0,85 * 300 ) / 2400
= 7,438 x 10-4

As = * b * d
Setiawan (022113178)

II - 33

Struktur Beton 2
= 7,438 x 10-4 * 100 * 8,5
= 5,373
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

5,373

tulangan = Ab = 0,785 = 6,844


Jarak = 100 / 6,844
= 14,611 cm 12,5 cm

2,50 m

Bidang 6A

4,15 m
Ly / Lx = 4,15 / 2,50 = 1,7 c = 51
Mu = ( c / 1000 ) * qU * Lx2
= ( 51 / 1000 ) * 968,8 * 2,502
= 308,805 kg.m/m = 30880,5 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 30880,5 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,021

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,021
= 0,021

= ( * 0,85 * fc ) / fy

Setiawan (022113178)

II - 34

Struktur Beton 2
= ( 0,021 * 0,85 * 300 ) / 2400
= 2,231 x 10-3

As = * b * d
= 2,231 x 10-3 * 100 * 8,5
= 1,896
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

1,896

tulangan = Ab = 0,785 = 2,415


Jarak = 100 / 2,415
= 41,407 cm 50 cm

2,50 m

Bidang 7A

3,2 m
Ly / Lx = 3,2 / 2,50 = 1,3 c = 38
Mu = ( c / 1000 ) * qU * Lx2
= ( 38 / 1000 ) * 968,8 * 2,502
= 230,09 kg.m/m = 23009 kg.cm/m
Rn

= Mu / ( * 0,85 * fc * b * d2 )
= 23009 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )

Setiawan (022113178)

II - 35

Struktur Beton 2
= 0,016

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,016
= 0,016

= ( * 0,85 * fc ) / fy
= ( 0,016 * 0,85 * 300 ) / 2400
= 1,7 x 10-3

As = * b * d
= 1,7 x 10-3 * 100 * 8,5
= 1,445
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

1,445

tulangan = Ab = 0,785 =1,841


Jarak = 100 / 1,841
= 54,318 cm 50 cm

1,25 m

Bidang 8A

1,50 m
Ly / Lx = 1,50 / 1,25 = 1,2 c = 34
Mu = ( c / 1000 ) * qU * Lx2
= ( 34 / 1000 ) * 968,8 * 1,252
Setiawan (022113178)

II - 36

Struktur Beton 2
= 51,467 kg.m/m = 5146,7 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 5146,7 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,003

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,003
= 0,003

= ( * 0,85 * fc ) / fy
= ( 0,003 * 0,85 * 300 ) / 2400
= 3,188 x 10-4

As = * b * d
= 3,188 x 10-4 * 100 * 8,5
= 0,271
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

0,271

tulangan = Ab = 0,785 = 0,345


Jarak = 100 / 0,345
= 289,855 cm 275 cm

1,25 m

Bidang 9A

Setiawan (022113178)

1,33 m

II - 37

Struktur Beton 2
Ly / Lx = 1,33 / 1,25 = 1,1 c = 29,5
Mu = ( c / 1000 ) * qU * Lx2
= ( 29,5 / 1000 ) * 968,8 * 1,332
= 50,554 kg.m/m = 5055,4 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 5055,4 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,003

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,003
= 0,003

= ( * 0,85 * fc ) / fy
= ( 0,003 * 0,85 * 300 ) / 2400
= 3,188 x 10-4

As = * b * d
= 3,188 x 10-4 * 100 * 8,5
= 0,271
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

0,271

tulangan = Ab = 0,785 = 0,345


Jarak = 100 / 0,345
= 289,855 cm 275 cm

2,83 m

Bidang 10A

II - 38

Setiawan (022113178)
3,60 m

Struktur Beton 2

Ly / Lx = 3,60 / 2,83 = 1, c = 38
Mu = ( c / 1000 ) * qU * Lx2
= ( 38 / 1000 ) * 968,8 * 2,832
= 294,843 kg.m/m = 29484,3 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 29484,3 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,020

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,020
= 0,020

= ( * 0,85 * fc ) / fy
= ( 0,020 * 0,85 * 300 ) / 2400
= 2,125 x 10-3

As = * b * d
= 2,125 x 10-3 * 100 * 8,5
= 1,806
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

1,806

tulangan = Ab = 0,785 = 2,300


Jarak = 100 / 2,300
= 43,478 cm 50 cm
Setiawan (022113178)

II - 39

Struktur Beton 2

3,60 m

Bidang 11A

4,15 m
Ly / Lx = 4,15 / 3,600 = 1,2 c = 34
Mu = ( c / 1000 ) * qU * Lx2
= ( 34 / 1000 ) * 968,8 * 3,602
= 426,892 kg.m/m = 42689,2 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 42689,2 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,028

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,028
= 0,028

= ( * 0,85 * fc ) / fy
= ( 0,028 * 0,85 * 300 ) / 2400
= 3,305 x 10-3

As = * b * d
= 3,305 x 10-3 * 100 * 8,5

Setiawan (022113178)

II - 40

Struktur Beton 2
= 2,809
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

2,809

tulangan = Ab = 0,785 = 3,578


Jarak = 100 / 3,578
= 27,948 cm 25 cm

1,4 m

Bidang 12A

2,7 m
Ly / Lx = 4,15 / 2,20 = 1,9 c = 55,5

Mu = ( c / 1000 ) * qU * Lx2
= ( 55,5 / 1000 ) * 968,8 * 1,402
= 105,386 kg.m/m = 10538,6 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 10538,6 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,007

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,007
= 0,007

= ( * 0,85 * fc ) / fy

Setiawan (022113178)

II - 41

Struktur Beton 2
= ( 0,007 * 0,85 * 300 ) / 2400
= 7,437 x 10-4
As = * b * d
= 7,437 x 10-4 * 100 * 8,5
= 0,632
Ab = * * d2

Untuk tulangan 10 mm

= 0,785
As

0,632

tulangan = Ab = 0,785 = 0,805


Jarak = 100 / 0,805
= 124,22 cm 125 cm

2,25 m

Bidang 13A

2,6 m
Ly / Lx = 2,60 / 2,25 = 1,2 c = 34
Mu = ( c / 1000 ) * qU * Lx2
= ( 34 / 1000 ) * 968,8 * 2,252
= 166,755 kg.m/m = 16675,5 kg.cm/m
Rn

= Mu / ( * 0,85 * fc * b * d2 )
= 16675,5 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )
= 0,011

Setiawan (022113178)

= 1 - 1 2 * Rn
II - 42

Struktur Beton 2
= 1 - 1 2 * 0,011
= 0,011

= ( * 0,85 * fc ) / fy
= ( 0,011 * 0,85 * 300 ) / 2400
= 1,168 x 10-3

As = * b * d
= 1,168 x 10-3 * 100 * 8,5
= 0,993
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

0,993

tulangan = Ab = 0,785 =1,265


Jarak = 100 / 1,265
= 79,051 cm 75 cm

0,8 m

Bidang 14A

2,25 m
Ly / Lx = 2,25 / 0,8 = 2,8 c = 63,5
Mu = ( c / 1000 ) * qU * Lx2
= ( 63,5 / 1000 ) * 968,8 * 0,802
= 39,372 kg.m/m = 3937,2 kg.cm/m
Rn
Setiawan (022113178)

= Mu / ( * 0,85 * fc * b * d2 )
II - 43

Struktur Beton 2
= 3937,2 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )
= 0,003

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,003
= 0,003

= ( * 0,85 * fc ) / fy
= ( 0,003 * 0,85 * 300 ) / 2400
= 3,188 x 10-4

As = * b * d
= 3,188 x 10-4 * 100 * 8,5
= 0,270
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

0,270

tulangan = Ab = 0,785 = 0,344


Jarak = 100 / 0,344
= 290,698 cm 275 cm

2,25 m

Bidang 15A

3,00 m
Ly / Lx = 3,00 / 2,25 = 1,3 c = 38
Mu = ( c / 1000 ) * qU * Lx2
Setiawan (022113178)

II - 44

Struktur Beton 2
= ( 38 / 1000 ) * 968,8 * 2,252
= 186,373 kg.m/m = 18637,3 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 18637,3 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,013

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,013
= 0,013

= ( * 0,85 * fc ) / fy
= ( 0,013 * 0,85 * 300 ) / 2400
= 1,381 x 10-3

As = * b * d
= 1,381 x 10-3 * 100 * 8,5
= 1,174
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

1,174

tulangan = Ab = 0,785 =1,495


Jarak = 100 / 1,495
= 66,889 cm 50 cm

1,20 m

Bidang 16A

II - 45

Setiawan (022113178)
2,83 m

Struktur Beton 2

Ly / Lx = 2,83 / 1,20 = 2,4 c = 60


Mu = ( c / 1000 ) * qU * Lx2
= ( 60 / 1000 ) * 968,8 * 1,202
= 83,704 kg.m/m = 8370,4 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 8370,4 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,006

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,006
= 0,006

= ( * 0,85 * fc ) / fy
= ( 0,006 * 0,85 * 300 ) / 2400
= 6,375 x 10-4

As = * b * d
= 6,375 x 10-4 * 100 * 8,5
= 0,542
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

0,542

tulangan = Ab = 0,785 = 0,690


Jarak = 100 / 0,690
= 144,927 cm 150 cm

Bidang 18A
Setiawan (022113178)

II - 46

3,50 m

Struktur Beton 2

4,15 m
Ly / Lx = 4,15 / 2,20 = 1,2 c = 34
Mu = ( c / 1000 ) * qU * Lx2
= ( 34 / 1000 ) * 968,8 * 3,502
= 403,505 kg.m/m = 40350,5 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 40350,5 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,027

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,027
= 0,027

= ( * 0,85 * fc ) / fy
= ( 0,027 * 0,85 * 300 ) / 2400
= 2,869 x 10-3

As = * b * d
= 2,869 x 10-3 * 100 * 8,5
= 2,438
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

2,438

tulangan = Ab = 0,785 = 3,106


Jarak = 100 / 3,106
Setiawan (022113178)

II - 47

Struktur Beton 2
= 32,195 cm 25 cm

3,20 m

Bidang 19A

3,50 m
Ly / Lx = 3,50 / 3,20 = 1,1 c = 29,5
Mu = ( c / 1000 ) * qU * Lx2
= ( 29,5 / 1000 ) * 968,8 * 3,202
= 292,655 kg.m/m = 29265,5 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 29265,5 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,019

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,019
= 0,019

= ( * 0,85 * fc ) / fy
= ( 0,019 * 0,85 * 300 ) / 2400
= 2,019 x 10-3

As = * b * d

Setiawan (022113178)

II - 48

Struktur Beton 2
= 2,019 x 10-3 * 100 * 8,5
= 1,716
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

1,716

tulangan = Ab = 0,785 = 2,186


Jarak = 100 / 2,186
= 45,745 cm 50 cm

1,50 m

Bidang 27A

2,075 m
Ly / Lx = 2,075 / 1,50 = 1,4 c = 42

Mu = ( c / 1000 ) * qU * Lx2
= ( 42 / 1000 ) * 968,8 * 1,502
= 91,552 kg.m/m = 9155,2 kg.cm/m
Rn

= Mu / ( * 0,85 * fc * b * d2 )
= 9155,2 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )
= 0,006

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,006
= 0,006

Setiawan (022113178)

II - 49

Struktur Beton 2

= ( * 0,85 * fc ) / fy
= ( 0,006 * 0,85 * 300 ) / 2400
= 6,375 x 10-4

As = * b * d
= 6,375 x 10-4 * 100 * 8,5
= 0,542
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

0,542

tulangan = Ab = 0,785 = 0,690


Jarak = 100 / 0,690
= 144,927 cm 125 cm

2,00 m

Bidang 28A

2,133 m
Ly / Lx = 2,133 / 2,00 = 1,1 c = 34
Mu = ( c / 1000 ) * qU * Lx2
= ( 34 / 1000 ) * 968,8 * 2,1332
= 149,863 kg.m/m = 14986,3 kg.cm/m
Rn

= Mu / ( * 0,85 * fc * b * d2 )
= 14986,3 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )
= 0,010

Setiawan (022113178)

II - 50

Struktur Beton 2

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,010
= 0,010

= ( * 0,85 * fc ) / fy
= ( 0,010 * 0,85 * 300 ) / 2400
= 1,063 x 10-3

As = * b * d
= 1,063 x 10-3 * 100 * 8,5
= 0,903
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

0,903

tulangan = Ab = 0,785 =1,150


Jarak = 100 / 1,150
= 86,956 cm 75 cm

Setiawan (022113178)

II - 51

Struktur Beton 2

Setiawan (022113178)

II - 52

Struktur Beton 2

c)

Elemen Pelat Lantai IV

1,5 m

Bidang 5A

2,5 m
Ly / Lx = 2,5 / 1,5
= 1,7 c = 51
Mu = ( c / 1000 ) * qU * Lx2
= ( 51 / 1000 ) * 968,8 * 1,502
= 111,169 kg.m/m = 11116,9 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 11116,9 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,007

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,007
= 0,007

= ( * 0,85 * fc ) / fy
= ( 0,007 * 0,85 * 300 ) / 2400

Setiawan (022113178)

II - 53

Struktur Beton 2
= 7,438 x 10-4
As = * b * d
= 7,438 x 10-4 * 100 * 8,5
= 5,373
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

5,373

tulangan = Ab = 0,785 = 6,844


Jarak = 100 / 6,844
= 14,611 cm 12,5 cm

2,50 m

Bidang 6A

4,15 m
Ly / Lx = 4,15 / 2,50 = 1,7 c = 51

Mu = ( c / 1000 ) * qU * Lx2
= ( 51 / 1000 ) * 968,8 * 2,502
= 308,805 kg.m/m = 30880,5 kg.cm/m
Rn

= Mu / ( * 0,85 * fc * b * d2 )
= 30880,5 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )
= 0,021

Setiawan (022113178)

= 1 - 1 2 * Rn
II - 54

Struktur Beton 2
= 1 - 1 2 * 0,021
= 0,021

= ( * 0,85 * fc ) / fy
= ( 0,021 * 0,85 * 300 ) / 2400
= 2,231 x 10-3

As = * b * d
= 2,231 x 10-3 * 100 * 8,5
= 1,896

Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

1,896

tulangan = Ab = 0,785 = 2,415


Jarak = 100 / 2,415
= 41,407 cm 50 cm

2,50 m

Bidang 7A

3,2 m
Ly / Lx = 3,2 / 2,50 = 1,3 c = 38

Mu = ( c / 1000 ) * qU * Lx2
Setiawan (022113178)

II - 55

Struktur Beton 2
= ( 38 / 1000 ) * 968,8 * 2,502
= 230,09 kg.m/m = 23009 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 23009 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,016

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,016
= 0,016

= ( * 0,85 * fc ) / fy
= ( 0,016 * 0,85 * 300 ) / 2400
= 1,7 x 10-3

As = * b * d
= 1,7 x 10-3 * 100 * 8,5
= 1,445
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

1,445

tulangan = Ab = 0,785 =1,841


Jarak = 100 / 1,841
= 54,318 cm 50 cm

1,25 m

Bidang 8A

II - 56

Setiawan (022113178)
1,50 m

Struktur Beton 2

Ly / Lx = 1,50 / 1,25 = 1,2 c = 34


Mu = ( c / 1000 ) * qU * Lx2
= ( 34 / 1000 ) * 968,8 * 1,252
= 51,467 kg.m/m = 5146,7 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 5146,7 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,003

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,003
= 0,003

= ( * 0,85 * fc ) / fy
= ( 0,003 * 0,85 * 300 ) / 2400
= 3,188 x 10-4

As = * b * d
= 3,188 x 10-4 * 100 * 8,5
= 0,271
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

0,271

tulangan = Ab = 0,785 = 0,345


Jarak = 100 / 0,345
= 289,855 cm 275 cm

Setiawan (022113178)

II - 57

Struktur Beton 2

1,25 m

Bidang 9A

1,33 m
Ly / Lx = 1,33 / 1,25 = 1,1 c = 29,5
Mu = ( c / 1000 ) * qU * Lx2
= ( 29,5 / 1000 ) * 968,8 * 1,332
= 50,554 kg.m/m = 5055,4 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 5055,4 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,003

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,003
= 0,003

= ( * 0,85 * fc ) / fy
= ( 0,003 * 0,85 * 300 ) / 2400
= 3,188 x 10-4

As = * b * d
= 3,188 x 10-4 * 100 * 8,5
= 0,271
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

0,271

tulangan = Ab = 0,785 = 0,345


Setiawan (022113178)

II - 58

Struktur Beton 2
Jarak = 100 / 0,345
= 289,855 cm 275 cm

2,83 m

Bidang 10A

3,60 m
Ly / Lx = 3,60 / 2,83 = 1, c = 38
Mu = ( c / 1000 ) * qU * Lx2
= ( 38 / 1000 ) * 968,8 * 2,832
= 294,843 kg.m/m = 29484,3 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 29484,3 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,020

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,020
= 0,020

= ( * 0,85 * fc ) / fy
= ( 0,020 * 0,85 * 300 ) / 2400
= 2,125 x 10-3

Setiawan (022113178)

II - 59

Struktur Beton 2
As = * b * d
= 2,125 x 10-3 * 100 * 8,5
= 1,806
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

1,806

tulangan = Ab = 0,785 = 2,300


Jarak = 100 / 2,300
= 43,478 cm 50 cm

3,60 m

Bidang 11A

4,15 m
Ly / Lx = 4,15 / 3,600 = 1,2 c = 34

Mu = ( c / 1000 ) * qU * Lx2
= ( 34 / 1000 ) * 968,8 * 3,602
= 426,892 kg.m/m = 42689,2 kg.cm/m
Rn

= Mu / ( * 0,85 * fc * b * d2 )
= 42689,2 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )
= 0,028

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,028

Setiawan (022113178)

II - 60

Struktur Beton 2
= 0,028

= ( * 0,85 * fc ) / fy
= ( 0,028 * 0,85 * 300 ) / 2400
= 3,305 x 10-3

As = * b * d
= 3,305 x 10-3 * 100 * 8,5
= 2,809
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

2,809

tulangan = Ab = 0,785 = 3,578


Jarak = 100 / 3,578
= 27,948 cm 25 cm

1,4 m

Bidang 12A

2,7 m
Ly / Lx = 4,15 / 2,20 = 1,9 c = 55,5
Mu = ( c / 1000 ) * qU * Lx2
= ( 55,5 / 1000 ) * 968,8 * 1,402
= 105,386 kg.m/m = 10538,6 kg.cm/m
Rn

= Mu / ( * 0,85 * fc * b * d2 )
= 10538,6 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )

Setiawan (022113178)

II - 61

Struktur Beton 2
= 0,007

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,007
= 0,007

= ( * 0,85 * fc ) / fy
= ( 0,007 * 0,85 * 300 ) / 2400
= 7,437 x 10-4

As = * b * d
= 7,437 x 10-4 * 100 * 8,5
= 0,632
Ab = * * d2

Untuk tulangan 10 mm

= 0,785
As

0,632

tulangan = Ab = 0,785 = 0,805


Jarak = 100 / 0,805
= 124,22 cm 125 cm

2,25 m

Bidang 13A

2,6 m
Ly / Lx = 2,60 / 2,25 = 1,2 c = 34
Mu = ( c / 1000 ) * qU * Lx2
= ( 34 / 1000 ) * 968,8 * 2,252
Setiawan (022113178)

II - 62

Struktur Beton 2
= 166,755 kg.m/m = 16675,5 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 16675,5 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,011

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,011
= 0,011

= ( * 0,85 * fc ) / fy
= ( 0,011 * 0,85 * 300 ) / 2400
= 1,168 x 10-3

As = * b * d
= 1,168 x 10-3 * 100 * 8,5
= 0,993
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

0,993

tulangan = Ab = 0,785 =1,265


Jarak = 100 / 1,265
= 79,051 cm 75 cm

0,8 m

Bidang 14A

Setiawan (022113178)

2,25 m

II - 63

Struktur Beton 2
Ly / Lx = 2,25 / 0,8

= 2,8 c = 63,5

Mu = ( c / 1000 ) * qU * Lx2
= ( 63,5 / 1000 ) * 968,8 * 0,802
= 39,372 kg.m/m = 3937,2 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 3937,2 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,003

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,003
= 0,003

= ( * 0,85 * fc ) / fy
= ( 0,003 * 0,85 * 300 ) / 2400
= 3,188 x 10-4

As = * b * d
= 3,188 x 10-4 * 100 * 8,5
= 0,270
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

0,270

tulangan = Ab = 0,785 = 0,344


Jarak = 100 / 0,344
= 290,698 cm 275 cm

2,25 m

Bidang 15A

II - 64

Setiawan (022113178)
3,00 m

Struktur Beton 2

Ly / Lx = 3,00 / 2,25 = 1,3 c = 38


Mu = ( c / 1000 ) * qU * Lx2
= ( 38 / 1000 ) * 968,8 * 2,252
= 186,373 kg.m/m = 18637,3 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 18637,3 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,013

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,013
= 0,013

= ( * 0,85 * fc ) / fy
= ( 0,013 * 0,85 * 300 ) / 2400
= 1,381 x 10-3

As = * b * d
= 1,381 x 10-3 * 100 * 8,5
= 1,174
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

1,174

tulangan = Ab = 0,785 =1,495


Jarak = 100 / 1,495
= 66,889 cm 50 cm
Setiawan (022113178)

II - 65

Struktur Beton 2

1,20 m

Bidang 16A

2,83 m
Ly / Lx = 2,83 / 1,20 = 2,4 c = 60
Mu = ( c / 1000 ) * qU * Lx2
= ( 60 / 1000 ) * 968,8 * 1,202
= 83,704 kg.m/m = 8370,4 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 8370,4 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,006

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,006
= 0,006

= ( * 0,85 * fc ) / fy
= ( 0,006 * 0,85 * 300 ) / 2400
= 6,375 x 10-4

As = * b * d
= 6,375 x 10-4 * 100 * 8,5
= 0,542
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

Setiawan (022113178)

II - 66

Struktur Beton 2
As

0,542

tulangan = Ab = 0,785 = 0,690


Jarak = 100 / 0,690
= 144,927 cm 150 cm

3,50 m

Bidang 18A

4,15 m
Ly / Lx = 4,15 / 2,20 = 1,2 c = 34
Mu = ( c / 1000 ) * qU * Lx2
= ( 34 / 1000 ) * 968,8 * 3,502
= 403,505 kg.m/m = 40350,5 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 40350,5 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,027

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,027
= 0,027

= ( * 0,85 * fc ) / fy
= ( 0,027 * 0,85 * 300 ) / 2400

Setiawan (022113178)

II - 67

Struktur Beton 2
= 2,869 x 10-3
As = * b * d
= 2,869 x 10-3 * 100 * 8,5
= 2,438
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

2,438

tulangan = Ab = 0,785 = 3,106


Jarak = 100 / 3,106
= 32,195 cm 25 cm

3,20 m

Bidang 19A

3,50 m
Ly / Lx = 3,50 / 3,20 = 1,1 c = 29,5

Mu = ( c / 1000 ) * qU * Lx2
= ( 29,5 / 1000 ) * 968,8 * 3,202
= 292,655 kg.m/m = 29265,5 kg.cm/m
Rn

= Mu / ( * 0,85 * fc * b * d2 )
= 29265,5 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )
= 0,019

Setiawan (022113178)

= 1 - 1 2 * Rn
II - 68

Struktur Beton 2
= 1 - 1 2 * 0,019
= 0,019

= ( * 0,85 * fc ) / fy
= ( 0,019 * 0,85 * 300 ) / 2400
= 2,019 x 10-3

As = * b * d
= 2,019 x 10-3 * 100 * 8,5
= 1,716
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

1,716

tulangan = Ab = 0,785 = 2,186


Jarak = 100 / 2,186
= 45,745 cm 50 cm

1,50 m

Bidang 27A

2,075 m
Ly / Lx = 2,075 / 1,50 = 1,4 c = 42
Mu = ( c / 1000 ) * qU * Lx2
= ( 42 / 1000 ) * 968,8 * 1,502
= 91,552 kg.m/m = 9155,2 kg.cm/m
Rn
Setiawan (022113178)

= Mu / ( * 0,85 * fc * b * d2 )
II - 69

Struktur Beton 2
= 9155,2 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )
= 0,006

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,006
= 0,006

= ( * 0,85 * fc ) / fy
= ( 0,006 * 0,85 * 300 ) / 2400
= 6,375 x 10-4

As = * b * d
= 6,375 x 10-4 * 100 * 8,5
= 0,542
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

0,542

tulangan = Ab = 0,785 = 0,690


Jarak = 100 / 0,690
= 144,927 cm 125 cm

2,00 m

Bidang 28A

2,133 m
Ly / Lx = 2,133 / 2,00 = 1,1 c = 34
Mu = ( c / 1000 ) * qU * Lx2
Setiawan (022113178)

II - 70

Struktur Beton 2
= ( 34 / 1000 ) * 968,8 * 2,1332
= 149,863 kg.m/m = 14986,3 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 14986,3 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,010

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,010
= 0,010

= ( * 0,85 * fc ) / fy
= ( 0,010 * 0,85 * 300 ) / 2400
= 1,063 x 10-3

As = * b * d
= 1,063 x 10-3 * 100 * 8,5
= 0,903
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

0,903

tulangan = Ab = 0,785 =1,150


Jarak = 100 / 1,150
= 86,956 cm 75 cm

Setiawan (022113178)

II - 71

Struktur Beton 2

Setiawan (022113178)

II - 72

Struktur Beton 2

d) Elemen Pelat Lantai V

1,5 m

Bidang 5A

2,5 m
Ly / Lx = 2,5 / 1,5
= 1,7 c = 51
Mu = ( c / 1000 ) * qU * Lx2
= ( 51 / 1000 ) * 968,8 * 1,502
= 111,169 kg.m/m = 11116,9 kg.cm/m
Rn

= Mu / ( * 0,85 * fc * b * d2 )
= 11116,9 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )
= 0,007

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,007
= 0,007

Setiawan (022113178)

II - 73

Struktur Beton 2

= ( * 0,85 * fc ) / fy
= ( 0,007 * 0,85 * 300 ) / 2400
= 7,438 x 10-4

As = * b * d
= 7,438 x 10-4 * 100 * 8,5
= 5,373
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

5,373

tulangan = Ab = 0,785 = 6,844


Jarak = 100 / 6,844
= 14,611 cm 12,5 cm

2,50 m

Bidang 6A

4,15 m
Ly / Lx = 4,15 / 2,50 = 1,7 c = 51
Mu = ( c / 1000 ) * qU * Lx2
= ( 51 / 1000 ) * 968,8 * 2,502
= 308,805 kg.m/m = 30880,5 kg.cm/m
Rn

= Mu / ( * 0,85 * fc * b * d2 )
= 30880,5 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )
= 0,021

Setiawan (022113178)

II - 74

Struktur Beton 2

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,021
= 0,021

= ( * 0,85 * fc ) / fy
= ( 0,021 * 0,85 * 300 ) / 2400
= 2,231 x 10-3

As = * b * d
= 2,231 x 10-3 * 100 * 8,5
= 1,896
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

1,896

tulangan = Ab = 0,785 = 2,415


Jarak = 100 / 2,415
= 41,407 cm 50 cm

2,50 m

Bidang 7A

3,2 m
Ly / Lx = 3,2 / 2,50 = 1,3 c = 38
Mu = ( c / 1000 ) * qU * Lx2
Setiawan (022113178)

II - 75

Struktur Beton 2
= ( 38 / 1000 ) * 968,8 * 2,502
= 230,09 kg.m/m = 23009 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 23009 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,016

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,016
= 0,016

= ( * 0,85 * fc ) / fy
= ( 0,016 * 0,85 * 300 ) / 2400
= 1,7 x 10-3

As = * b * d
= 1,7 x 10-3 * 100 * 8,5
= 1,445
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

1,445

tulangan = Ab = 0,785 =1,841


Jarak = 100 / 1,841
= 54,318 cm 50 cm

1,25 m

Bidang 8A

II - 76

Setiawan (022113178)
1,50 m

Struktur Beton 2

Ly / Lx = 1,50 / 1,25 = 1,2 c = 34


Mu = ( c / 1000 ) * qU * Lx2
= ( 34 / 1000 ) * 968,8 * 1,252
= 51,467 kg.m/m = 5146,7 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 5146,7 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,003

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,003
= 0,003

= ( * 0,85 * fc ) / fy
= ( 0,003 * 0,85 * 300 ) / 2400
= 3,188 x 10-4

As = * b * d
= 3,188 x 10-4 * 100 * 8,5
= 0,271
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

0,271

tulangan = Ab = 0,785 = 0,345


Jarak = 100 / 0,345
= 289,855 cm 275 cm

Bidang 9A
Setiawan (022113178)

II - 77

1,25 m

Struktur Beton 2

1,33 m
Ly / Lx = 1,33 / 1,25 = 1,1 c = 29,5
Mu = ( c / 1000 ) * qU * Lx2
= ( 29,5 / 1000 ) * 968,8 * 1,332
= 50,554 kg.m/m = 5055,4 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 5055,4 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,003

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,003
= 0,003

= ( * 0,85 * fc ) / fy
= ( 0,003 * 0,85 * 300 ) / 2400
= 3,188 x 10-4

As = * b * d
= 3,188 x 10-4 * 100 * 8,5
= 0,271
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

0,271

tulangan = Ab = 0,785 = 0,345


Jarak = 100 / 0,345
Setiawan (022113178)

II - 78

Struktur Beton 2
= 289,855 cm 275 cm

2,83 m

Bidang 10A

3,60 m
Ly / Lx = 3,60 / 2,83 = 1, c = 38
Mu = ( c / 1000 ) * qU * Lx2
= ( 38 / 1000 ) * 968,8 * 2,832
= 294,843 kg.m/m = 29484,3 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 29484,3 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,020

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,020
= 0,020

= ( * 0,85 * fc ) / fy
= ( 0,020 * 0,85 * 300 ) / 2400
= 2,125 x 10-3

As = * b * d
= 2,125 x 10-3 * 100 * 8,5
= 1,806
Untuk tulangan 10 mm

Setiawan (022113178)

Ab = * * d2

II - 79

Struktur Beton 2
= 0,785
As

1,806

tulangan = Ab = 0,785 = 2,300


Jarak = 100 / 2,300
= 43,478 cm 50 cm

3,60 m

Bidang 11A

4,15 m
Ly / Lx = 4,15 / 3,600 = 1,2 c = 34
Mu = ( c / 1000 ) * qU * Lx2
= ( 34 / 1000 ) * 968,8 * 3,602
= 426,892 kg.m/m = 42689,2 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 42689,2 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,028

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,028
= 0,028

= ( * 0,85 * fc ) / fy

Setiawan (022113178)

II - 80

Struktur Beton 2
= ( 0,028 * 0,85 * 300 ) / 2400
= 3,305 x 10-3
As = * b * d
= 3,305 x 10-3 * 100 * 8,5
= 2,809
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

2,809

tulangan = Ab = 0,785 = 3,578


Jarak = 100 / 3,578
= 27,948 cm 25 cm

1,4 m

Bidang 12A

2,7 m
Ly / Lx = 4,15 / 2,20 = 1,9 c = 55,5

Mu = ( c / 1000 ) * qU * Lx2
= ( 55,5 / 1000 ) * 968,8 * 1,402
= 105,386 kg.m/m = 10538,6 kg.cm/m
Rn

= Mu / ( * 0,85 * fc * b * d2 )
= 10538,6 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )
= 0,007

Setiawan (022113178)

II - 81

Struktur Beton 2

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,007
= 0,007

= ( * 0,85 * fc ) / fy
= ( 0,007 * 0,85 * 300 ) / 2400
= 7,437 x 10-4

As = * b * d
= 7,437 x 10-4 * 100 * 8,5
= 0,632
Ab = * * d2

Untuk tulangan 10 mm

= 0,785
As

0,632

tulangan = Ab = 0,785 = 0,805


Jarak = 100 / 0,805
= 124,22 cm 125 cm

2,25 m

Bidang 13A

2,6 m
Ly / Lx = 2,60 / 2,25 = 1,2 c = 34
Mu = ( c / 1000 ) * qU * Lx2
= ( 34 / 1000 ) * 968,8 * 2,252
= 166,755 kg.m/m = 16675,5 kg.cm/m
Setiawan (022113178)

II - 82

Struktur Beton 2
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 16675,5 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,011

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,011
= 0,011

= ( * 0,85 * fc ) / fy
= ( 0,011 * 0,85 * 300 ) / 2400
= 1,168 x 10-3

As = * b * d
= 1,168 x 10-3 * 100 * 8,5
= 0,993
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

0,993

tulangan = Ab = 0,785 =1,265


Jarak = 100 / 1,265
= 79,051 cm 75 cm

0,8 m

Bidang 14A

2,25 m
Ly / Lx = 2,25 / 0,8 = 2,8 c = 63,5
Setiawan (022113178)

II - 83

Struktur Beton 2
Mu = ( c / 1000 ) * qU * Lx2
= ( 63,5 / 1000 ) * 968,8 * 0,802
= 39,372 kg.m/m = 3937,2 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 3937,2 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,003

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,003
= 0,003

= ( * 0,85 * fc ) / fy
= ( 0,003 * 0,85 * 300 ) / 2400
= 3,188 x 10-4

As = * b * d
= 3,188 x 10-4 * 100 * 8,5
= 0,270
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

0,270

tulangan = Ab = 0,785 = 0,344


Jarak = 100 / 0,344
= 290,698 cm 275 cm

2,25 m

Bidang 15A

II - 84

Setiawan (022113178)
3,00 m

Struktur Beton 2

Ly / Lx = 3,00 / 2,25 = 1,3 c = 38


Mu = ( c / 1000 ) * qU * Lx2
= ( 38 / 1000 ) * 968,8 * 2,252
= 186,373 kg.m/m = 18637,3 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 18637,3 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,013

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,013
= 0,013

= ( * 0,85 * fc ) / fy
= ( 0,013 * 0,85 * 300 ) / 2400
= 1,381 x 10-3

As = * b * d
= 1,381 x 10-3 * 100 * 8,5
= 1,174
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

1,174

tulangan = Ab = 0,785 =1,495


Jarak = 100 / 1,495
= 66,889 cm 50 cm

Setiawan (022113178)

II - 85

Struktur Beton 2

1,20 m

Bidang 16A

2,83 m
Ly / Lx = 2,83 / 1,20 = 2,4 c = 60
Mu = ( c / 1000 ) * qU * Lx2
= ( 60 / 1000 ) * 968,8 * 1,202
= 83,704 kg.m/m = 8370,4 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 8370,4 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,006

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,006
= 0,006

= ( * 0,85 * fc ) / fy
= ( 0,006 * 0,85 * 300 ) / 2400
= 6,375 x 10-4

As = * b * d
= 6,375 x 10-4 * 100 * 8,5
= 0,542
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

0,542

tulangan = Ab = 0,785 = 0,690


Setiawan (022113178)

II - 86

Struktur Beton 2
Jarak = 100 / 0,690
= 144,927 cm 150 cm

3,50 m

Bidang 18A

4,15 m
Ly / Lx = 4,15 / 2,20 = 1,2 c = 34
Mu = ( c / 1000 ) * qU * Lx2
= ( 34 / 1000 ) * 968,8 * 3,502
= 403,505 kg.m/m = 40350,5 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 40350,5 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,027

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,027
= 0,027

= ( * 0,85 * fc ) / fy
= ( 0,027 * 0,85 * 300 ) / 2400
= 2,869 x 10-3

As = * b * d
= 2,869 x 10-3 * 100 * 8,5
= 2,438

Setiawan (022113178)

II - 87

Struktur Beton 2
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

2,438

tulangan = Ab = 0,785 = 3,106


Jarak = 100 / 3,106
= 32,195 cm 25 cm

3,20 m

Bidang 19A

3,50 m
Ly / Lx = 3,50 / 3,20 = 1,1 c = 29,5
Mu = ( c / 1000 ) * qU * Lx2
= ( 29,5 / 1000 ) * 968,8 * 3,202
= 292,655 kg.m/m = 29265,5 kg.cm/m
Rn

= Mu / ( * 0,85 * fc * b * d2 )
= 29265,5 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )
= 0,019

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,019
= 0,019

Setiawan (022113178)

II - 88

Struktur Beton 2

= ( * 0,85 * fc ) / fy
= ( 0,019 * 0,85 * 300 ) / 2400
= 2,019 x 10-3

As = * b * d
= 2,019 x 10-3 * 100 * 8,5
= 1,716
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

1,716

tulangan = Ab = 0,785 = 2,186


Jarak = 100 / 2,186
= 45,745 cm 50 cm

1,50 m

Bidang 27A

2,075 m
Ly / Lx = 2,075 / 1,50 = 1,4 c = 42

Mu = ( c / 1000 ) * qU * Lx2
= ( 42 / 1000 ) * 968,8 * 1,502
= 91,552 kg.m/m = 9155,2 kg.cm/m
Rn

= Mu / ( * 0,85 * fc * b * d2 )
= 9155,2 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )

Setiawan (022113178)

II - 89

Struktur Beton 2
= 0,006

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,006
= 0,006

= ( * 0,85 * fc ) / fy
= ( 0,006 * 0,85 * 300 ) / 2400
= 6,375 x 10-4

As = * b * d
= 6,375 x 10-4 * 100 * 8,5
= 0,542
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

0,542

tulangan = Ab = 0,785 = 0,690


Jarak = 100 / 0,690
= 144,927 cm 125 cm

2,00 m

Bidang 28A

2,133 m
Ly / Lx = 2,133 / 2,00 = 1,1 c = 34
Mu = ( c / 1000 ) * qU * Lx2
= ( 34 / 1000 ) * 968,8 * 2,1332
Setiawan (022113178)

II - 90

Struktur Beton 2
= 149,863 kg.m/m = 14986,3 kg.cm/m
= Mu / ( * 0,85 * fc * b * d2 )

Rn

= 14986,3 / ( 0,8 * 0,85 * 300 * 100 * 8,52 )


= 0,010

= 1 - 1 2 * Rn
= 1 - 1 2 * 0,010
= 0,010

= ( * 0,85 * fc ) / fy
= ( 0,010 * 0,85 * 300 ) / 2400
= 1,063 x 10-3

As = * b * d
= 1,063 x 10-3 * 100 * 8,5
= 0,903
Untuk tulangan 10 mm

Ab = * * d2
= 0,785

As

0,903

tulangan = Ab = 0,785 =1,150


Jarak = 100 / 1,150
= 86,956 cm 75 cm

Setiawan (022113178)

II - 91

Struktur Beton 2

Setiawan (022113178)

II - 92