Heading Removal, Dismantle and Replace of Damage Components Item No. Page No.
Desc. Removal, dismantle and dispose the damaged guardrail beam. (a) 29
a) Machinery Cost
iii) Tipper truck (6-wheeler) operation, overhead cost incl. maintenance cost :-
Allow a est. sum for 1 day @ RM 100.00 per day = RM 100.00 per day
iii) Sub - Total Overall Cost for Workmen & Manpower = RM 255.00 per day
a) Machinery Cost
iii) Sub - Total Cost for Workmen & Manpower = RM 217.00 per day
Removal, dismantle and dispose the damaged Terminal Anchorage Unit Type 2)
A) MACHINERY
I) Ganger :
Removal, dismantle and dispose the damaged 90 degrees Twist Unit Type 3
A) MACHINERY
I) Ganger :
Removal, dismantle and dispose the damaged Terminal 1 : 6 / Sloping End Unit Type 4
A) MACHINERY
Total RM 250.00
B) Workmen
I) Ganger :
1 x 1 Day @ RM 65.00 Per day RM 65.00
RM 217.00
Take RM ###
ROAD FURNITURES
A) MACHINERY
ii) Backhoe :
Total RM 520.00
B) Workmen
I) Ganger :
RM 179.00
Take RM ###
ROAD FURNITURE
A) MACHINERY
I) Backhoe
ii) Miscellaneous
iii) Pick-up truck (3.0T) for carrying, materials, workers and tools :
Total RM 700.00
B) Workmen
I) Ganger :
RM 179.00
Take RM ###
ROAD FURNITURE
A) MACHINERY
I) Backhoe
ii) Miscellaneous
iii) Pick-up truck (3.0T) for carrying, materials, workers and tools :
Total RM 570.00
B) Workmen
I) Ganger :
RM 179.00
Take RM ###
ROAD FURNITURE
A) MACHINERY
I) Backhoe
ii) Miscellaneous
iii) Pick-up truck (3.0T) for carrying, materials, workers and tools :
Total RM 570.00
B)
I) Ganger :
RM 179.00
Take RM ###
ROAD FURNITURES
Realign and straighten the line of existing guardrail including correct the level and verticality position of
existing guardrail post.
A) MACHINERY
iii) Backhoe :
Total RM 520.00
B) Workmen
I) Ganger :
RM 255.00
Take RM ###
ROAD FURNITURES
A) MATERIAL
I) G.I strip, c/w, clip, washer, bolt and nuts (supply price/Set) = RM ###
B) MACHINERY
I) Pick-up truck (3.0T) for carrying materials, workers , tools and equipments :
ii) Miscellaneous items (Temporary traffic signs, cleaning tools and equipments)
I) General worker
Total RM 344.00
Take RM ###
ROAD FURNITURES
A) MATERIAL
B) MACHINERY
ii) Miscellaneous items (e.g. oxy-cutter, crowbar, hammer and hardware tools):
Total RM 250.00
I) Ganger :
RM 255.00
Take RM ###
ROAD FURNITURE
Supply and install galvanised End wing or Fish Tail (Terminal unitType 1)
A) MATERIAL
B) MACHINERY
ii) Miscellaneous items (e.g. oxy-cutter, crowbar, hammer and hardware tools):
Total RM 250.00
I) Ganger :
RM 255.00
Take RM ###
ROAD FURNITURE
A) MATERIAL
B) MACHINERY
ii) Miscellaneous items (e.g. oxy-cutter, crowbar, hammer and hardware tools):
Total RM 250.00
I) Ganger :
RM 255.00
Take RM ###
ROAD FURNITURE
A) MATERIAL
B) MACHINERY
ii) Miscellaneous items (e.g. oxy-cutter, crowbar, hammer and hardware tools):
Total RM 250.00
I) Ganger :
RM 255.00
Take RM ###
ROAD FURNITURE
Supply and install galvanised Terminal section 1:6 / Sloping End Type 4
A) Material
B) Machinery.
ii) Miscellaneous items (e.g. oxy-cutter, crowbar, hammer and hardware tools):
Total RM 250.00
I) Ganger :
RM 255.00
Take RM ###
ROAD FURNITURE
A) MATERIAL
B) MACHINERY
iii) Miscellaneous items (e.g. oxy-cutter, crowbar, hammer and hardware tools):
Total RM 550.00
I) Ganger :
RM 255.00
Take RM ###
ROAD FURNITURE
Supply and replace new yellow nose for the crash cushion inclusive of all necessary preparatory work.
A) MATERIAL
Take RM ###
ROAD FURNITURE
Supply and replace new cartridge for the crash cushion inclusive of all necessary preparatory work.
A) MATERIAL
I) Cartridge = RM ###
Take RM ###
ROAD FURNITURE
A) MATERIAL
I) Cartridge = RM ###
Take RM ###