This document provides a reference list of 27 pipeline projects completed by PT. Farrel Internusa Pratama between 2005-2010. The projects involved pipeline inspection, cleaning, repair, and commissioning services for various clients across Indonesia. They included intelligent pigging, caliper surveys, drying, purging, and other pipeline maintenance and pre-commissioning work. The document lists details of each project such as client, location, completion date, scope of work, and contract value.
This document provides a reference list of 27 pipeline projects completed by PT. Farrel Internusa Pratama between 2005-2010. The projects involved pipeline inspection, cleaning, repair, and commissioning services for various clients across Indonesia. They included intelligent pigging, caliper surveys, drying, purging, and other pipeline maintenance and pre-commissioning work. The document lists details of each project such as client, location, completion date, scope of work, and contract value.
This document provides a reference list of 27 pipeline projects completed by PT. Farrel Internusa Pratama between 2005-2010. The projects involved pipeline inspection, cleaning, repair, and commissioning services for various clients across Indonesia. They included intelligent pigging, caliper surveys, drying, purging, and other pipeline maintenance and pre-commissioning work. The document lists details of each project such as client, location, completion date, scope of work, and contract value.
Name Location Completion 1 PT. Moeladi Jasa Inspeksi Pemeriksaan Intelligent Pigging Cilamaya - KHT 30.12.2005 Scope : MLI Building Pipa 14" x 57 km dengan 14" x 57 km Indramayu - Cleaning Pig Jl. Let. Jend. MT. Haryono menggunakan Intelligent - EGP Caliper Pig Kav. 49 Jakarta 12770 Pigging - MFL - Final Report 2 PT. Moeladi Gas Pipeline Gas Pipeline Tegalgede 07.08.2008 Cleaning Pigging MLI Building On Line SKG Citarik for 2 (two) years Jl. Let. Jend. MT. Haryono Cleaning Pigging to SKG Tegalgede Includes pig materials Kav. 49 32" x 45 KM supply Jakarta 12770 Indonesia Gas Pipeline Gas Pipeline Subang 07.08.2008 Cleaning Pigging On Line SKG Subang for 2 (two) years Cleaning Pigging to SKG Citarik Includes pig materials 24" x 45 KM supply 3 PT. Moeladi Pemeliharaan dan perbai- Pemeliharaan Subang, Pasir Jadi, 04.09.2008 Supply : Manpower, MLI Building kan Valve dan perbaikan Valve Citarik, material, equipment and Jl. Let. Jend. MT. Haryono Tegalgede tools set Kav. 49 Jakarta 12770 4 PT. Bukit Pesona Teknindo Pigging Services Project Phase 1 Cilegon 15.12.2006 Includes pig materials Jl. Margonda Raya No. 32 and Purging Drying Gas Pipeline supply Depok 20" x 5 KM Indonesia PT. Krakatau Daya Listrik Pigging Services Project Phase 2 Cilegon 16.07.2007 Includes pig materials and Purging Drying Gas Pipeline supply 20" x 12 KM PT. Krakatau Daya Listrik 5 PT. Hanazono Engineering Pigging Service L-Project Cilegon 12.05.2007 Includes pig materials Indonesia for Radiant Tube and supply Jl. Raya Cilegon No. 49 Convection Tube for Bonakarta Block A/33 VDU COL Feed Heater Cilegon - Banten Indonesia 6 PT. Semanggi Technic Utama Gas Pipeline Maintenance Cikampek 24.05.2007 Includes pig materials Jl. Senayan No. 55 Blok S Cleaning Pigging supply Blok S - Senopati 4" x 1800 M Jakarta 12180 7 PT. Citra Panji Manunggal Hot Tapping Services Kambuna onshore Pangkalan 12.10.2007 Includes supply of 10.12.2006 597/ PO-B3 / X / 06 614/ MLI / X / 2005 119-JKT-0087 719 / MLI / VIII / 2006 Rp. 4.950.000.000,00 07.05.2007 09.10.2007 10.07.2007 No 11.10.2005 Postal Address of Client Commencement Date Project 07.08.2006 07.08.2006 04.09.2006 209/ MLI / IX / 2006 PO Number Contract Value 06049D-ME-PO-4410M 011 / PO-B3 / III / 07 STU / WO / 05-05 REFERENCE LIST OF PIPELINE SUPPLY & SERVICES 22.05.2007 Remarks Description of Works Reference List Page 1 of 7 PT. FARREL INTERNUSA PRATAMA Name Location Completion No Postal Address of Client Commencement Date Project PO Number Contract Value REFERENCE LIST OF PIPELINE SUPPLY & SERVICES Remarks Description of Works Pondok Pinang Center 10" on 14" Class 150# Pipeline and Modu- Brandan split tee material for Block A / B le-1 ORF Installation tapping branch Jl. Kebayoran Lama Project Jakarta Indonesia 8 PT. Depriwangga On Line Repair Intelligent Pig Cilamaya 05.01.2008 DW Building Ball Valve Prior to Gas Pipeline to Cilegon Jl. Cisanggiri I/8 Intelligent Pig 24" x 249 KM Kebayoran Baru Size 24", 10", 8" Cilamaya Jakarta 12170 to Cilegon Pertagas Indonesia Intellegent Pig for MFL with Tuboscope Gas Pipeline Size & Length Material Pig from Farrel 24" x 47 KM 05.01.2008 24" x 128 KM 24" x 74 KM 9 PT. PERTAGAS Perbaikan Sistem cathodic Protection Pipeline Pendopo, 10.02.2008 Gedung Oil Center Area I, II & III (Pendopo, Prabumulih & Plaju) Prabumulih, Jl. MH Thamrin No.55 Sumatera Bagian Selatan Plaju dan Includes repair Valve Jakarta termasuk repair valve Simpany Y 24" at SP Simpang Y 24" - 600# di simpang Y 10 PT. Citra Panji Manunggal Drying & Purging N2 Gas pipeline Suralaya 19.11.2007 Pondok Pinang Center Gas Pipeline 20" x 27,5 KM Block A / B 20" x 27,5 KM Candra Asri Jl. Kebayoran Lama to Suralaya Jakarta Indonesia 11 PT. Pertagas On Line Repair PT. Pertagas Sumbagsel 15.02.2008 Area Sumbagsel Ball Valve Prior to Pipeline (Simpang-Y, Plaju Intelligent Pig Area II, III P. Layang) Size 24", 22", 20", 14", 8" Sumbagsel and 6" 12 PT. Radiant Utama Intellegent Pig Intellegent Pig Sumbagsel 10.06.2008 MFL with TUBOSCOPE PIPELINE 14" X 52.5 KM Gas Pipeline (Simpang-Y, Plaju Material Pig from Farrel PIPELINE 20" X 58.3 KM PERTAGAS P. Layang) PIPELINE 22" X 17 KM Sumbagsel Termasuk Repair valve, PIPELINE 24" X 18 KM jika ada yang leak 13 PT. Rekayasa Industri Precommisioning Work Pigging for Gresik 10.04.2008 Includes pig materials Jl. Kalibata Timur I No. 36 EPCI Oggshore Pipeline - Commissioning supply 09.11.2007 010-CAPC-SO-02042 Drying Dew Point -64 C LOBP-10-P4-PO-096-R SPMP No. SPMP-044/PG0330/2007-S7 1091/RU/I/2008 3.01.2008 06.03.2008 15.01.2008 03.10.2007 30.11.2007 03.10.2007 PO-025-1-X-07 PO-030-X-07 Rp. 1.705.254.000,00 075/PG0330/2008-S7 US$ 455,000.00 Reference List Page 2 of 7 PT. FARREL INTERNUSA PRATAMA Name Location Completion No Postal Address of Client Commencement Date Project PO Number Contract Value REFERENCE LIST OF PIPELINE SUPPLY & SERVICES Remarks Description of Works Jakarta 12740 Oyong Project LOBP Unit Indonesia Produksi Pelumas PT. Pertamina 14 PT. PGN (Persero) Tbk. On-line Cleaning pigging Cleaning Pigging Pagardewa to 30.04.08 Includes pig materials Jl. Zainol Arifin No. 20 32" x 167 KM Jalur Pipa Transmisi Terbangibesar supply Jakarta Gas Bumi Sumatera - Jawa, Segmen Pagardewa Terbangi Besar 15 NOV Tuboscope Pipeline Caliper Pig Survey Intellegent Pig Sumbagsel 22.08.08 Scope : Services Gas Pipeline 22" x 17 km Gas Pipeline PERTAGAS (Simpang-Y, Plaju - Caliper Pig Survey Antrobus House, 18 College Gas Pipeline 24" x 17 km Sumbagsel P. Layang) - Final Report Street Petersfield, Hampshire , Project No. 20181.01 GU31 4AD, ENGLAND 16 PT. McConnel Dowel HDD Subsea Pipeline Indonesia - 2 Line x 6" 850 M HDD Subsea Tanjung Priok 30.01.09 Parama Building 1st Floor - 1 Line x 8" 850 M Pipeline Jakarta Jl. KH Achmad Dahlan - 1 Line x 10" 850 M No. 69 A-B Jakarta - 3 Line x 14" 850 M - 2 Line x 16" 850 M Scope : Cleaning, Pigging, Hydrostatic Test, Dewatering 17 PT. Pertagas Jasa Pemeriksaan dan PT. Pertagas Cambay 30.12.2008 Gedung oil Centre Lt. 2 & 3 Inspeksi dengan meng- Cambay Sumbagsel Jl. MH Thamrin No.55 gunakan Long Range Jakarta Guide Wave Ultrasonic 18 PT. Citra Panji Manunggal Pre-commissioning Kambuna onshore P. Brandan 23.02.2009 Pondok Pinang Center Gas Pipeline 14" x 15.5km Pipeline and Modu- Sumatera Utara Jl. Kebayoran Lama le-1 ORF Installation Jakarta Project 19 PetroChina International Upgrading Cathodic Upgrading Cathodic Kasim Marine 21.03.2009 (Bermuda) Ltd System, Off-shore : System Terminal, PAPUA Menara Kuningan 17-27th Fl - Fire Water Pump Patform Jakarta - Marine Wharf North Beach - South Beach Loading Pier 20 PT. Citra Panji Manunggal Drying and N2 Purging Jambi-Merang Jambi 30.04.2009 Pondok Pinang Center Gas Pipeline JOB Pertamina Jl. Kebayoran Lama - 8" x 98 km HESS Jakarta - 12" x 14 km 15.01.2009 119-PB-969 07.01.2008 259 07.01.2008 000100.P/913/TSJ/2008 06.11.2008 SPMP No. 2 9 4 9 0 4 2 9 24.08.2008 22.12.2008 309/CPM-JB/XII/08 21.11.2008 PC-477-CA 1191/PG0330/2008-S7 US $ 90,000.00 Reference List Page 3 of 7 PT. FARREL INTERNUSA PRATAMA Name Location Completion No Postal Address of Client Commencement Date Project PO Number Contract Value REFERENCE LIST OF PIPELINE SUPPLY & SERVICES Remarks Description of Works 21 CV. Bahana Cipta Internusa Caliper Pig Survey for MOL Pipeline Total Indonesie 03.06.2009 Scope : Komplek Balikpapan Baru Dual-Diameter Pipeline 20" X 24" X 20" Senipah - Handil - Cleaning Pig Winsor IB / 15 20"-120M x 24"-8400M x East Kalimantan - Caliper Pig Balikpapan 76114 20" - 8200M - Final Report Kal-Tim 22 PT. Rekayasa Industri Pre-commissioning work Oyong Phase 2 WHP - Grati Pa- 03.07.2009 Scope : Jl. Kalibata Timur I No.36 EPCI Offshore Pipeline Project Suruan - Cleaning Pigging Jakarta Oyong Phase 2 Project Santos East Java - Gauging Pig - Cleaning (Sampang) Pty - Hydrotest - Hydrostatic Test - Dewatering/Swabbing - Super Air Drying : -15 0 C - Super Air Drying - Packing N2 Purging - Packing N2 Purging 23 PT. Hafar Daya Samudra Pre-commissioning work TTU-Tuban dan WHP - Grati Pa- 17.07.2009 Scope : Wisma Aldiron Suite 36B Offshore Pipeline : Pipanisasi Jawa Suruan - Cleaning Pigging Jl. Gatot Subroto Kav.72 -1 Line 32" x 6.3 km Timur East Java - Gauging Pig Jakarta -3 Line 18" x 3.2 km - Hydrotest - Dewatering/Swabbing 24 Chevron Indonesia Company Intelligent Pigging Services Intelligent Pigging 20-03-2011 Scope : Pasir Ridge Balikpapan offshore pipeline Services Kalimantan - Cleaning Pig 18" x 69000ft (Oil) Attaka-Santan - EGP Caliper Pig 18" x 68700ft (gas) Attaka-Santan - MFL 12" x 153363ft (Oil) Serang-Santan - Final Report 12" x 153363ft (gas) Serang-Santan 16" x 80500ft (gas) Attaka-Santan 12" x 39160ft (Oil) Yakin-Jumlai 12" x 62450ft (gas) Lawe-Refinery 25 PT. Mitra Energy Gas On-Line Cleaning Cleaning Pigging Gn Megang 01.01.2010 Scope : Sumatera 10" x 17.5 km Services Muara Enim - Material Pig - On-line cleaning work - On site Training 26 SANTOS (Sampang) Pty Ltd On-Line Cleaning Pigging Operation WHP Oyong - 01.01.2010 Scope : Ratu Plaza Office Lt.4 14" x 56 km Services Grati - Material Pig Jl. Jend. Sudirman Kav.9 - On-line cleaning work Jakarta - On site Training 27 Darma Empat Lima Abadi Caliper Pig Survey 28" Relocation Gas Porong Sidoarjo 08.01.2010 Scope : Jln.Teratai No.32D Pipeline 28" x 15km Surabaya - Cleaning Pig Cirebon, Jawa Barat Porong - Sidoarjo East Java - Caliper Pig 06.01.2010 20.03.2009 17.03.2009 SO-00008/HDS- 17.12.09 PROJECT/0502/III/09 19.02.2009 BCI-021 / 2009 03.03.2009 9800-10-CV-CT-529 21.12.09 010/MEGS/XII/09 Rp. 2.700.000.000,00 Rp. 1.750.000.000,00 CW-606533 US $ 1,490,000.00 017/SPK/DELA/PRG/ XII/09 US$ 90,000.00 Rp.60.000.000,00 901352 Reference List Page 4 of 7 PT. FARREL INTERNUSA PRATAMA Name Location Completion No Postal Address of Client Commencement Date Project PO Number Contract Value REFERENCE LIST OF PIPELINE SUPPLY & SERVICES Remarks Description of Works - Final Report 28 PT. Petrowood Bangun TGI / Intelligent Pig Grissik - Duri 26-Aug-10 Scope : Mandiri 28" x 704 km Grissik - Singapore - Cleaning Pig Jl. Utan Kayu Raya No.88C - Deformation Jakarta 13120 - MFL Inspection - Final Report 29 PT. Pertamina Gas Intelligent Pig Pkln. Brandan - 21-Jan-11 Scope : Oil Center Bulding 18" x 52 km Wampu, - Cleaning Pig Jl. MH. Thamrin 55 Sout Sumatera - Caliper Pig Jakarta - MFL Inspection - Final Report 30 NDT Global CPI - Duri 30-Jul-10 Scope : - Caliper Pig 31 PT. MEGS Cleaning pigging Gunung Megang 31-Oct-10 Scope : Energy Building, 10" x 14.5 km to Singa - Material Pig Jl. Sudirman Kav. 58 Jakarta - On-line cleaning pigging - On-site Training 32 Total E&P Indonesia 5 Line x 12" Dia. Handil 10-Dec-12 Scope : Jl. Yos Sudarso Balikpapan - Cleaning - Caliper Survey - UT Inspection 33 PT. Trimulya Gemilang Total E&P 20/09/2011 Scope : Crown Palace C-25 Indonesie - Cleaning Jl. Prof.Dr.Soepomo Kalimantan - Caliper Survey Jakarta - MFL Inspection 34 28" x 369,7 Km East Java 17 April 2012 Scope : Oil Center Bulding 28" x 55,4 Km Indonesia - Cleaning Jl. MH. Thamrin 55 - Caliper Survey Jakarta - MFL Inspection - Maping - Kajian 10-Nov-11 PO#3900130519 US$ 2,238,000.00 PT.Pertamina Gas Jasa Kajian & Inspeksi Pipa Transmisi Gas dgn IP jalur 28" x 369,7 Km CPP Pagerungan - ORF Porong & 28" x 55,4 Km ORF Porong - Stasiun GRE 8-Jul-10 SO# 001/SO/Megs/VII 2010 Provision of Intelligent Pigging Services 2009 - 2011 using GE-PII Tool Technology 21/09/2010 PO-10315.FIP US$ 1,419,600.00 Cleaning Pigging services Rp. 27.500.000,00 1-Nov-10 4600002686 Pelaksanaan Intelligent Pig pada Pipa Gas Dia. 18" - 52 km Ruas P. Brandan - Wampu Caliper Survey 12" x 57km 11-May-10 PO# 0131007 US $ 43,500.00 US$ 1,100,000.00 Handil Gathering Line Intelligent Pigging Services 15-Mar-10 003/PBM/SPK/III/10 Pekerjaan MFL and Deformation Pigging Services, 28" x 1000 km ZH-01, R/A 13, P.O.Box 261 651 Jebel Ali, Dubai-UAE 20-Sep-10 SP-349/PG0330/2010- S0 (39000) US $ 283,500.00 Reference List Page 5 of 7 PT. FARREL INTERNUSA PRATAMA Name Location Completion No Postal Address of Client Commencement Date Project PO Number Contract Value REFERENCE LIST OF PIPELINE SUPPLY & SERVICES Remarks Description of Works 35 Total E&P Indonesia Total E&P 31-Dec-14 Scope : Jl. Yos Sudarso Balikpapan Indonesie - Cleaning Kalimantan - Caliper Survey - MFL Inspection 36 PT. Hafar Daya Konstruksi Provosion Of 6"" HESS Project Ujung Pangkah 11-Jan-12 Scope : Wisma Aldiron Lantai Dasar, Gas Lift Repair Pipeline Surabaya - Cleaning Pigging Suite 036-B, Jl. Gatot Subroto - Filling Water Kav.72, Pancoran Kota - Hydrotest Jakarta Selatan 12780 - Dewatering - Swabbing - Drying - N2 Purging - N2 Packing 37 Work Service for Pig Cleaning NOLI Project MM 2100 24-Dec-12 Scope : Jl. T.B Simatupang 7-B Work With Two (2) Types; Bekasi Fajar - Cleaning Pigging Jakarta 12430 Pig Dry Work and Pig Batching Oil Industrial Estate Indonesia Work for NOLI Project 38 KONSORSIUM WIKA - RABANA Pembangunan Pipa Minyak Mentah Pekerjaan Pengadaan Tempino - Plaju Scope : Gedung Wika Lt. 6 Tempino - Plaju Pig Receiver dan Fabrikasi Launcher & Receiver Jl. D.I Panjaitan Kav. 9 Pig Launcher Jakarta, Indonesia 39 Pre-commissioing Work SSWJ package 3A Bojonagara-Cikande Scope : Pondok Pinang Center SSWJ Package 3A Bojonegara - Cikande - Cleaning Pigging Jakarta 32" x 32 km, Bojonagara - Bitung - Hydrotest Indonesia - Dewatering - Caliper Pig - Drying - Purging N2 Packing 40 Pre-commissioing Work LTRO Conoco Project Conoco Philip Jambi 30-Sep-12 Scope : Pondok Pinang Center 12" x 44 km Conoco Philip Grissik - Cleaning Pigging Jakarta 6" x 11 km - Hydrotest Indonesia - Dewatering PT. CPM 9 Agustus 2012 LRO-I-SO-230-PM-D Rp 5.390,000,000 Intelligent Pigging Services 2012-2014 (Package- 3) 1-Jan-12 OA # 4600003103 US$ 1,218,778.00 PT. JGC Indonesia 13-Dec-11 JIND/FIP-0-0595-00-0000-07 Rp 569,600,000 3-Nov-11 00113 Rp 775,000,000 PT. CPM 1-Mar-12 137-SO-JKT-0058 Rp 7.931,000,000 17-Apr-12 KWRT-PTP/DAN/SPB/007/I/2012 Reference List Page 6 of 7 PT. FARREL INTERNUSA PRATAMA Name Location Completion No Postal Address of Client Commencement Date Project PO Number Contract Value REFERENCE LIST OF PIPELINE SUPPLY & SERVICES Remarks Description of Works 41 Pre-commissioing Work LTRO Conoco Project Conoco Philip Jambi 30-Sep-12 Scope : Pondok Pinang Center 10" x 11 km Conoco Philip Grissik - Cleaning Pigging Jakarta - Hydrotest Indonesia - Dewatering 42 Grissik-Sakernan- 30-Dec-12 Scope : Belilas - Weld Sleeve Jakarta - Epoxy Grouth Indonesia - Clock Spring - Install 43 Belilas - Duri 30-Dec-12 Scope : - Weld Sleeve Jakarta - Epoxy Grouth Indonesia - Clock Spring - Install Jakarta, 26 Juni 2012 PT.FARREL INTERNUSA PRATAMA TARJA SUPRIYANTO President Director USD 244,750.00 PT. Transportasi Gas Indonesia Pekerjaan Pipeline repair of metal loss at RO1 and RO2 Pekerjaan Pipeline repair of metal loss at RO1 and RO2 PT. Transportasi Gas Indonesia Pekerjaan Pipeline repair of metal loss at RO3 Pekerjaan Pipeline repair of metal loss at RO3 15 Agustus 2012 181/LOG-TGI/JKT/08.12 USD 244,750.00 PT. CPM 9 Agustus 2012 LRO-I-SO-230-PM-D-ADD Rp 1.590,000,000 15 Agustus 2012 180/LOG-TGI/JKT/08.12 Reference List Page 7 of 7