Anda di halaman 1dari 6

PROJECT: STEEL BUILDING DESIGN CASE STUDY

SUBJECT: LOAD TAKEOFF

SHEET 8

SEISMIC LOAD ANALYSIS PER UBC-97 - EQUIVALENT LATERAL FORCE METHOD


Notation:
V - total design lateral force or shear at the base of the building
Cs - seismic response coefficient
W - total gravity load of the building located or assigned to Levels
Seismic Zone Factor - Zone 3 Z=0.3 (see UBC-97 Table 16-I)
R - response modification factor (see UBC-97 Table 16N)
I - occupancy importance factor (see UBC-97 Table 16-K)
Ca - Seismic Coefficient Represents site-dependent effective peak acceleration at grade (see UBC-97 Table 16Q)
Cv - Seismic Coefficient Represents acceleration response at 1.0 sec period (see UBC -97 Table 16R)
T - approximate fundamental period (see UBC-97 Section 1630.2.2)
CT = building period coefficient (see ASCE 7-98 Section 9.5.3.3)
Cu - coefficient for upper limit on calculated period (see ASCE 7-98 Table 9.5.3.3)
hn - height in feet (meters) above the base to the highest level of the building
Cvx - vertical distribution factor
Wx, Wi - the portion of the total gravity load of the building (W) located or assigned to level I or x
hx - the height (feet or m) from the base level I or x
Fx - the portion of the seismic base shear, V, induced at level x

Analysis:
Assume Soil Profile D ---> Stiff Soil - UBC-97 Table 16J
Occupancy Category IV (UBC -97 Table 16K)
For T<Ts
V = 2.5CaI W

For T>Ts
V = CvI W

Check Constraints
V(min)=0.11CaIW

UBC-97 Sec 1630.2.1

For Z=0.3 and Soil Profile D


Ca=
0.36
Table 16Q
Table 16R

Cv=

T = CT * hn3/4

Ts =

CT =
hn =
T=
T=
Ts= 0.6

Cv

R=

8.5

0.54

0.035
52
0.678
0.678

T>Ts

For I:
V=

Seismic Use Group IV (UBC -97 Table 16K)


a
I=
1
0.0937 W
Vmin
0.0396 W

W vigas=50*2*(36+30)/36/30
Wcol=4*6.5*150/36/30

6.111111 50*12(36+30)/(108/90)
3.611111 16*13*150/108/90

a -- refer to Notation list above to find location of table for value

4.074074
3.209877
Red font indicates user input

PROJECT: STEEL BUILDING DESIGN CASE STUDY


SUBJECT: LOAD TAKEOFF

SHEET 14

SEISMIC LOAD ANALYSIS - CONT.


For W:
D. load

Partitions

Mech. Load

Exterior walls

Total (Kips)

W penthouse =

35*(36*30)

50*(36+30)*2*1.5

42.3

W roof =

32*(108*90)

100*(36*30)

50*[(108+90)*2*1.5+(36+30)*2*13]

515

W3 =

70*(108*90)

20*(108*90)

50*(108+90)*2*13*.6

942

W2 =

70*(108*90)

20*(108*90)

50*(108+90)*2*13*.6

942

V=
Fx =(V-Ft)

W=
229

2441.3 k
k

Wx * hx
SWi * hi
if T < 0.7sec ---> Ft = 0.0
if T > 0.7sec ---> Ft = 0.07TV

a -- refer to Notation list on sheet 12 to find location of table for value

Level
Roof
4
3
2

Wx
42.3
515
942
942

hx
52
39
26
13

hxK
Wx*hxK
52.0
2199.6
39.0
20085
26.0
24492
13.0
12246
S = 59022.6

Red font indicates user input

Cvx
0.037
0.340
0.415
0.207
1.00

Fx
8.5
77.9
95.0
47.5
228.8

k
k
k
k
k

8.5
77.9
95.0
47.5

Red font indicates user input

47.7
534540

D. load

Partitions

Mech. Load

W penthouse =

31.92

9.9

W roof =

287.28

106.4

115.5

W3 =

670.32

191.52

154.44

W2 =

670.32

191.52

154.44

V=

Level
Roof
4
3
2

Wx
41.82
509.18
1016.28
1016.28

hx
52
39
26
13

Exterior walls

242.1713897

hxK
52.0
39.0
26.0
13.0

Wx*hxK
2174.64
19858.02
26423.28
13211.64
S = 61667.58

Cvx
0.035
0.322
0.428
0.214
1.000

Exterior walls

Total (kips)

9.9

41.82

115.5

509.18

154.44

1016.28

154.44

1016.28
2583.56

Fx
8.5
78.0
103.8
51.9
242.2

Anda mungkin juga menyukai