Anda di halaman 1dari 4

(revised 4/08)

Client: Designed: Date:


County: Checked: Date:
#NUM!
CONCRETE BOX INLET TOEWALL DESIGN (# 5 REBAR)

Freeboard= 0.4
Required Q= CFS CAPACITY = #NUM! CFS
input F = input W= BUTTRESS = 0
input H = input B = WALL = 8 INCHES
S= 1.0 = 0.667 FEET
Toewall Depth = FEET Toewall Width = FEET
STEEL SCHEDULE - #5 BARS
MARK QUAN LENGTH A B TOTAL FT

1 2 0.33 0.33 - 0.66


2 0 1.45 1.32 0.13 0.00
3 1 1.67 1.67 - 1.67
4 0 1.32 0.00 1.32 0.00
5 2 1.32 0.00 1.32 2.64
6 0 1.99 0.67 1.32 0.00
7 0 2.64 1.32 1.32 0.00
8 2 0.67 0.67 - 1.34
9 0 0.67 0.67 - 0.00
10 0 0.00 0.00 0.00 0.00
11 0 0.00 0.00 0.00 0.00
12 0 0.00 0.00 0.00 0.00
13 0 0.00 0.00 - 0.00

TOTAL #5 (5/8 INCH DIAMETER) RE-BARS 6.31 LIN. FT.


= 6.6 POUNDS

VOLUME OF CONCRETE:
TOEWALL: 0.0 CUBIC FEET
HEADWALL: 1.0 CUBIC FEET
BOX: 0.7 CUBIC FEET
BUTTRESS: 0.0 CUBIC FEET

TOTAL 1.7 CUBIC FEET = 0.1 CU. YDS.

PLUS 10% = 0.1 CU. YDS.

4 IN. DRAIN TUBING: 8 LIN. FT


PLUS 10 LIN. FT. 4 IN. PVC & 2 INTERNAL COUPLERS

VOLUME OF RIPRAP:
AROUND WEIR - 12" WIDE X 8" DEEP = 0.1 CU. YDS.
DS CHANNEL-10 FEET, W WIDE,
F HIGH, 1' DEEP, SS=2:1 = 0.0 CU. YDS.

EARTHWORK:
NORMAL EXCAVATION= 1 CU. YDS.
TOEWALL TRENCH = 2 LIN. FT.
NORMAL BACKFILL = 1 CU. YDS.
NORMAL DIKE FILL = 0 CU. YDS.
(revised 4/08)

Client: Designed: Date:


County: Checked: Date:

CONCRETE BOX INLET TOEWALL DESIGN (# 4 REBAR)

Freeboard= 0.4
Required Q= CFS CAPACITY = #NUM! CFS
F= 0.0 W= 0.0 BUTTRESS = 0
H= 0.0 B= 0.0 WALL = 8 INCHES
S= 1.0 = 0.667 FEET
Toewall Depth = 0.0 FEET Toewall Width = 0.0 FEET
STEEL SCHEDULE - #4 BARS
MARK QUAN LENGTH A B TOTAL FT

1 4 0.33 0.33 - 1.32


2 0 1.26 1.13 0.13 0.00
3 2 1.67 1.67 - 3.34
4 0 1.13 0.00 1.13 0.00
5 2 1.13 0.00 1.13 2.26
6 0 1.80 0.67 1.13 0.00
7 0 2.26 1.13 1.13 0.00
8 2 0.67 0.67 - 1.34
9 0 0.67 0.67 - 0.00
10 0 0.00 0.00 0.00 0.00
11 0 0.00 0.00 0.00 0.00
12 0 0.00 0.00 0.00 0.00
13 0 0.00 0.00 - 0.00

TOTAL #4 (1/2 INCH DIAMETER) RE-BARS 8.26 LIN. FT.


= 5.5 POUNDS

VOLUME OF CONCRETE:
TOEWALL: 0.0 CUBIC FEET
HEADWALL: 1.0 CUBIC FEET
BOX: 0.7 CUBIC FEET
BUTTRESS: 0.0 CUBIC FEET

TOTAL 1.7 CUBIC FEET = 0.1 CU. YDS.

PLUS 10% = 0.1 CU. YDS.

4 IN. DRAIN TUBING: 8 LIN. FT


PLUS 10 LIN. FT. 4 IN. PVC & 2 INTERNAL COUPLERS

VOLUME OF RIPRAP:
AROUND WEIR - 12 WIDE X 8 DEEP = 0.1 CU. YDS.
DS CHANNEL-10 FEET, W WIDE, F HI,
1' DEEP, SS=2:1 = 0.0 CU. YDS.

EARTHWORK:
NORMAL EXCAVATION= 1 CU. YDS.
TOEWALL TRENCH = 2 LIN. FT.
NORMAL BACKFILL = 1 CU. YDS.
NORMAL DIKE FILL = 0 CU. YDS.
Date Revision Notes
2/28/2008 Revised spreadsheet to allow user to input a value for reduction in capacity due to "freeboard", or the elevation of t
emergency in relation to the top of headwall. Researched the validity of using a weir coefficient of 2.72. The straig
value of 3.1 from the EFH Ch. 3 is not valid for drop box structures. The Hydraulics Formulas drop box structure ca
uses a varying coefficient based on h/w and b/w correction factors and is dependent on the size of structure. It ran
between 2.6 and 2.9 for typical size structures.
4/9/2008 Corrected values for number of bar #1 calculated for #4 size rebar. Added 9" floor thickness for cell E17 value and
equivalent for #4 rebar chart. Changed value in F18 to reduce for edge clearance. Freeboard cell unlocked and c
#4 rebar table for reference on printouts.
Rev. By
oard", or the elevation of the B. Clarizia
ficient of 2.72. The straight weir
ulas drop box structure calculation
he size of structure. It ranges

ess for cell E17 value and B. Clarizia


board cell unlocked and copied to

Anda mungkin juga menyukai