N
INFORM THE ARCHITECTS BEFORE ANY WORK STARTS IF
THIS DRAWING EXCEEDS THE QUANTITIES IN ANY WAY
The Mall
Key:
Demolished element
116
112
113
111
New masonry wall
C
B
F
No.16 No.15 No.14 No.13
Notes:
(plant) Demolished elements described in brackets
115 B1 115
Kitchen/Prep + Wash-Up
B2 Corridor
B6
Corridor Corridor
Linen Pantry Store Store
B35 B34
B43 ramp up
B24 B17 B10
Corridor Corridor
Storage Storage Storage Storage B25 B16
19 18 17 1615 14 13 12
Store below
riser 11 riser
Lift 2 Stair 2 10
2a 2b Lobby
Staff Lift Kitchen Store Store
Stores B23
B18 B11
1 2 3 4 5 6 7 8 9 B33
riser
1b
Corridor Store
B36 B37 riser 3b
up
Staff Corridor Store
Laundry riser Lift 1 Main Lift 3
WC Change B15 Staff
B44 1a Family Lift Corridor Stair 7
B31 (male) Corridor Bathroom Lift 4 Hall
C.2
Staff Staff B19
B32 B26 B12 E 241007 Stair 3 terminated at lower ground floor level
Bathroom Bathroom
Corridor B41 B38 and staff dayroom added with link through to
B42 riser 3a No.14. Main lift 3 doors repositioned to open
Store service riser vertical datum A
Staff
4 into new lobby.
Staff Bedroom
WC Bathroom
Change B13
B29 B20 D 221007 Pre-application submission for listed building consent
Laundry (female)
D up D
B45 B30
114 Staff Staff 114
Core 13 & 15 ammended to client requirements
C 121007
Bedroom Bedroom
Staff dayroom Corridor
B40 B39
B22 B14 Revisions following recent client changes and
Porter B 101007 interior designers comments up to 031007
Secretary Lobby B21
(shower)
B28 B27 Revisions following recent client changes and
A 011007 interior designers comments up to 260907
up up
Rev.No. Date By Amendment
(plant)
C.1
up up up up
Delivery Porters Service
Corridor up
Refuse Entrance Entrance
B47
B46 B59 B60 B61
WELDON WALSHE
(plant)
B48
Refuse &
Plant Meters Corridor Pump Room Boilers
Refuse & Recycling
B58 Bedroom1 V8 V11 V13 V16
Recycling V22
B49
V5
Bedroom 2
E.D.F
V1
Corridor
Corridor
V19 PRELIMINARY
Corridor B50
V3
B55
Plant Water Tank Water Tank
Pump Room
B57 Water Tank Water Tank V14 V23
V17
Bathroom V6 V9
B51
Corridor
V12
13-16 Carlton House Terrace
Plant
Corridor
B54
Corridor
V20
Water Tank
London SW1Y 5AH
Fire Doors London Electricity Chillers Chillers
B56 Plant up Water Tank
shower
Board Water Tank V24
B52 V10 V15 V18
V2 V7
Plant
B53 V4 Corridor
V21
Basement Plan
as proposed
5
4
111
113
B
A
F
E
metres
0 0.5 1 2 3 4 5
0
metres