SOCIEDAD MINERA CERRO VERDE

CERRO VERDE PRODUCTION UNIT EXPANSION


PROJECT NO. A6CV


GENERAL SITE CONDITIONS
DESIGN CRITERIA

DOCUMENT NO. 240K-C2-DC-10-002
REV. 1

27 SEPTEMBER 2011






Sociedad Minera Cerro Verde Document No. 240K-C2-DC-10-002
Cerro Verde Production Unit Expansion Revision 1
Project No. A6CV



GENERAL SITE CONDITIONS DESIGN CRITERIA
Z:\103_PROJ _ADMIN\109_ENG DOCS\109.3R_DC\10-CIVIL\240K-C2-DC-10-002_GNRLSITECONDTS\240K-C2-DC-10-002-1.DOC Page 2 of 7





This page is intentionally blank.

Sociedad Minera Cerro Verde Document No. 240K-C2-DC-10-002
Cerro Verde Production Unit Expansion Revision 1
Project No. A6CV



GENERAL SITE CONDITIONS DESIGN CRITERIA
Z:\103_PROJ _ADMIN\109_ENG DOCS\109.3R_DC\10-CIVIL\240K-C2-DC-10-002_GNRLSITECONDTS\240K-C2-DC-10-002-1.DOC Page 3 of 7
TABLE OF CONTENTS

1. GENERAL...................................................................................................................................................... 5
2. PROJECT LOCATION.................................................................................................................................. 5
3. SITE ACCESS............................................................................................................................................... 5
4. SITE CONDITIONS ....................................................................................................................................... 5
4.1 Existing Conditions...........................................................................................................................5
4.2 Environmental Requirements...........................................................................................................5
5. UTILITIES...................................................................................................................................................... 7
6. ATTACHMENTS............................................................................................................................................ 7


Sociedad Minera Cerro Verde Document No. 240K-C2-DC-10-002
Cerro Verde Production Unit Expansion Revision 1
Project No. A6CV



GENERAL SITE CONDITIONS DESIGN CRITERIA
Z:\103_PROJ _ADMIN\109_ENG DOCS\109.3R_DC\10-CIVIL\240K-C2-DC-10-002_GNRLSITECONDTS\240K-C2-DC-10-002-1.DOC Page 4 of 7





This page is intentionally blank.

Sociedad Minera Cerro Verde Document No. 240K-C2-DC-10-002
Cerro Verde Production Unit Expansion Revision 1
Project No. A6CV



GENERAL SITE CONDITIONS DESIGN CRITERIA
Z:\103_PROJ _ADMIN\109_ENG DOCS\109.3R_DC\10-CIVIL\240K-C2-DC-10-002_GNRLSITECONDTS\240K-C2-DC-10-002-1.DOC Page 5 of 7
1. GENERAL
This specification includes the general information to be considered by a Bidder while preparing a proposal.
2. PROJECT LOCATION
The Cerro Verde mine is situated 30 km south of Arequipa, capital of the Province of Arequipa and second
largest city in Peru.
Project elevation: 2770 m (9090 ft) above mean sea level
Project latitude: 16 30 south
Project longitude: 71 36 west
3. SITE ACCESS
The mine is connected by paved roads to:
Arequipa, a distance of 30 km
Pacific port of Matarani, a distance of 100 km
Lima, the countrys capital, approximately a distance of 1100 km
The Southern Railway of Peru from Matarani to Arequipa passes within 12 km of the mine site.
4. SITE CONDITIONS
4.1 Existing Conditions
A 40 000 t/d heap leach, SX/EW facility and a 120,000 t/d sulphide concentrator are presently
operating at the site.
4.2 Environmental Requirements
A. Air Temperatures
Average annual maximum temperature 24.7C
Average annual minimum temperature 3.7C
Average daily variation 16.6C
Design maximum temperature 30C
Design minimum temperature 0C (Short occurrences only)
B. Humidity
Maximum average monthly humidity 88.1% (rainy season)
Minimum average monthly humidity 43.6% (rainy season)
Maximum average monthly humidity 72.5% (dry season)
Minimum average monthly humidity 34.9% (dry season)
C. Barometric Pressure
Average annual barometric pressure 74.0 kPa
Sociedad Minera Cerro Verde Document No. 240K-C2-DC-10-002
Cerro Verde Production Unit Expansion Revision 1
Project No. A6CV



GENERAL SITE CONDITIONS DESIGN CRITERIA
Z:\103_PROJ _ADMIN\109_ENG DOCS\109.3R_DC\10-CIVIL\240K-C2-DC-10-002_GNRLSITECONDTS\240K-C2-DC-10-002-1.DOC Page 6 of 7
D. Solar Radiation
Average annual solar radiation 6.27 kW/m
2

E. Wind
Maximum gust 100 km/h
Prevailing winds Southwesterly
Winds are frequently laden with fine volcanic ash.
F. Precipitation
Average annual precipitation 40.7 mm
10 year, 24 hour rainfall 44.9 mm (from EIA)
100 year, 24 hour rainfall 81.5 mm (from EIA)
G. Evaporation
Average daily evaporation 6.1 mm
H. Earthquake
1. Earthquake loads are defined as the static horizontal and vertical forces equivalent in their
design effect to the dynamic loads induced by ground motion during an earthquake.
2. All buildings, structures, and components shall be designed for earthquake forces
according to International Building Code (IBC) and the following factors (per Seismic
Hazard Analysis Report prepared by URS Corporation dated August 23, 2011- Site-
Specific Seismic Hazard Evaluation for the Linga Valley Tailing Storage Facility for the
Cerro Verde Production Unit, page 6-1, Table 5 and Figure 30):
PGA =0.85g (MCE peak ground acceleration) Ss =1.89g (MCE spectral acceleration for
0.2 sec.period)
S
1
=0.63g (MCE spectral acceleration for 1.0 sec. period)
To =0.07 sec
Ts =0.33 sec
T
L
=4.0 sec
F
a
=1 ( Site coefficient defined in Table 1613.5.3 (1)
F
V
=1 ( Site coefficient defined in Table 1613.5.3 (2)
Site class =B (IBC Table 1613.5.2)
3. Seismic design for circular storage tanks at grade shall be according to Appendix E of
American Petroleum Institute (API) Standard 650.
4. Seismic dead load is the total dead or the dead load plus the equipment and process
operating loads, whichever is worse, and applicable portion of other loads as defined in
ASCE 12.7.2. The effectiveweight of materials on conveyor belts shall be taken as 80% of
LLn.
See Structural Design Criteria Specification 240K-C2-DC-15-001
Sociedad Minera Cerro Verde Document No. 240K-C2-DC-10-002
Cerro Verde Production Unit Expansion Revision 1
Project No. A6CV



GENERAL SITE CONDITIONS DESIGN CRITERIA
Z:\103_PROJ _ADMIN\109_ENG DOCS\109.3R_DC\10-CIVIL\240K-C2-DC-10-002_GNRLSITECONDTS\240K-C2-DC-10-002-1.DOC Page 7 of 7
5. UTILITIES
Pressure (kPag) Temperature (Degrees Celsius)
Plant Air (min/norm/max) 580 / 620 / 862 Ambient
Instrument Air (min/norm/max) 580 / 620 / 862 Ambient
Process Water (min/norm/max) 390 / 415 / 440 Ambient
@ 2806 m plant elev.