N.B: 1.

. Broken back retaining wall section to be adopted at construction site for ease of construction with undressed stone boulder.
2. Construction of retaining wall with broken back provides stepped construction , speedy ,economical & quality can be achieved
3. Height of the wall is kept from 1.8m-2.0m to cater minor variation in Ground level.
4. For variation of GL up to 500mm, the top section with 600mm width can be raised without altering foundation depth.
5. Brick solling is optional, may not be require as site soil condition as said in estimate is hard & dense nature
6. Weep Hole must be provided preferably at 3m horiz.spacing & at least 300mm above GL to relieve the structure off hydrostatic pressure.
7. For arriving the at the structural dimensions, ref. has been made to "Analysis & design of substructures" by SWAMI SARAN & relevant IRC Code.
8. Cross-sectional area of retaining wall is 1.8 sq.m & 1.9 sq.m respectively for battered slope & one with broken back for stem-part.
9. Base-slab is consider in PCC M10 concrete, which can be keyed to stem-wall by providing key at junction.
10. At every 30m length of wall expansion joint with 40mm gap can be provided. Gap to be filled up with suitable unbonded material if required .
11. At every corner & junction i.e., where wall orients to other direction to be left un-jointed .
12. For future Superstructure Boundary wall construction, vertical reinf. @ 3m interval can be inserted on top 1m wall.
150 150
250
100
500
850
1300
1500
1300
1500
2000
1800
2000
Stone Masonary(RRM) in CM 1:3
PCC M10 (1:3:6)
75mm thk. flat brick solling
BACK FILL
FINISH LVL.
NGL.
Varying GL.
300
weep hole @ 3000 mm
horizontal spacing
C/SECTION OF GRAVITY
RETAINING WALLL
EQUIVALENT BROKEN BACK SECTION
OF GRAVITY RETAINING WALLL
450
600
200
200
150
150
Cost Computation:
DATA:
1. Cross-sectional Area of R.R. Masonry Wall = 1.90 sq.m
2. Cross-sectional Area of Base-slab = 0.33 sq.m
3. Total length of wall = 770.45 m
4. Width of brick-solling = 1.50 m
5. Cross-sectional Area of earth-work in excavation = 2.25 sq.m
Sl. No
Ref. to
SOR Item
Unit Qty. Rate Amount Remark
2 1.1 (b) cu.m 1734.75 82.03 142301.5
3 4.1.1 sq.m 1155.68 286.37 330951.5
4 2.1.1 cu.m 250.40 3733.63 934889.4
5 4.2.1 cu.m 1464.00 2083.07 3049614
6 18.1.1 t 1.50 4746.44 7119.66
7 LS nos. 257.00 60 15420
Total= 4480297
say, 45 Lakh
54 Lakh
5840.74 Rs.1781
7008.89 Rs.2137
Cost of labour can be taken as 25% -30% on total cost
Item
Earthwork in excavation
Flat Brick solling
PCC in base Slab
RR masonry for stem-wall
rate per meter without escalation=
rate per meter with escalation=
rate per r. feet=
rate per r. feet=
Reinf. For boundary wall
Weep hole construction
A
s

p
e
r

S
O
R

2
0
1
0
-
1
1

O
f

A
s
s
a
m

P
W
D

B
l
d
g
.
Considering 20% escalation=