C - Excavation and Earth Works

Excavation
1) Excavation for column footings up to 5'0" deep commencing from existing ground level including
levelling and ramming bottom, part return and fill, dewatering and removal of surplus excavated
material as directed.
'- Ditto- for staircase footings
- Ditto - for wall foundations
2) Excavation in compacted fill for plinth beams commencing from final fill level including levelling
and ramming the bottom, disposal of excavated materials.
3) Excavation for column footings up to 5'0" deep commencing from existing ground level including
levelling and ramming bottom, part return and fill, and removal of surplus excavated material as
directed.
-Ditto- but the depth between 5'-0" to 10'-0".
-Ditto- but the depth between 10'-0" to 15'-0".
4) Excavation for column pits not exceeding 1.8 m deep from reduced level except rock requiring
blasting with part return fill in and rammed surplus disposed as directed.
5) Excavating in trenches in any material except rock requiring blasting width not exceeding 10,
not exceeding 50 deep.
6) Excavating trenches exceeding 1.0 m not exceeding 2.00 m deep backfilled into excavation and
remove surplus materials on site, including shoring and keeping excavation free from ground
water and surface water generally.
7) Excavation in any material with except rock requiring blasting in retaining wall base ,staircase
Foundations, etc
Filling
1) Approved quality imported hard earth filling under floors well rammed and consolidated in
layers
2) Filling to make up levels with selected imported earth under floors, off site.
3) Filling under floors with approved quality earth available from item B1 including spreading,
watering and compacting using vibrating roller/plate compactor.
4) Imported earth filling laid and compacted to specified thickness
i. To excavation
ii. To formation of levels
iii. Under floor slab
iv. Excavated selected earth filling laid and compacted to specified thickness to formation
of levels



5) Back filling with available earth including compaction as per the specification.
6) Approved earth filling with imported earth in 150 mm layers under floors and well rammed and
consolidated in layer
Earthwork supports
1) Earthwork supports (Planking and Strutting) total depth exceeding 1.00 m but not exceeding
2.00 m and distance between vertical sides (Opposing faces) of excavation net exceeding 2.0 m.
2) Earthwork supports (Planking and Strutting) to vertical sides of pits, total depth not exceeding
80.
Surface treatment
1) Anti termite treatment shall be carried out by an approved specialized sub contractor (Pinlay or
equivalent) for the area of construction and shall be to the approval of the consultant.
2) Anti termite treatment Biflex or approved equivalent on excavated foundations & compacted
soil under floor shall be accordance with the manufactures specifications by an approved
specialist pest control contractor and pest control contractor shall submit a guarantee for a
minimum of 10 years from the date of handing over the project.
D - Concrete works
1) 2" thick lean concrete 1:3:6 (1") mix under column footings, staircase footings, wall foundations
and plinth beams
2) Reinforced Cement Concrete 1: 2: 4 (3/4") mix in the following
i. Column footings
ii. Staircase footing and shaft
iii. Columns
iv. Plinth beams
3" thick ground floor concrete slab in 1:3:6 (3/4") concrete mixes
Ground Floor Level to First Floor Level
i. Columns
ii. 5" thick first floor slab
iii. Beams at first floor slab level
iv. Steps and waist of staircase including landing slab
3) Ordinary ,plain
In situ mass concrete (15 N/mm
2
- 25mm) foundation screed ,poured in to excavated face.
i. 50 mm thick under column bases including staircase foundation
ii. 50 mm thick underground beams
iii. 75 mm thick under rubble foundation
iv. 75 mm thick under lift foundation
50 mm thick, in situ mass concrete (20 N/mm
2
- 20mm) screed ,poured in to damp proof
membrane.



i. Terrace at Kitchen floor level
i. At roof slab
Ordinary, reinforced
In situ reinforced concrete (20 N/mm
2
- 20mm) concrete floor.
ii. In ground floor on ground
In situ reinforced concrete (20 N/mm
2
- 20mm) foundation poured into formwork.
iii. Ground beams
iv. Column footings
In situ reinforced concrete (20 N/mm
2
- 20mm)Columns,
i. Ground floor level to banquet floor level
In situ reinforced concrete (20 N/mm
2
- 20mm) stiffener Columns,
i. Ground floor level to banquet floor level
In situ reinforced concrete (20 N/mm
2
- 20mm)beams
i. Kitchen floor level
ii. Roof level

4) Lean Concrete
Lean concrete 1:3:6(40mm) aggregate in the following.
i. 75 mm thick under column footings
ii. 75 mm thick under staircase footings
Mass concrete 1:3:6 (40 mm) in the following
i. 150 mm thick wall foundation
Reinforced Concrete
Reinforced cement concrete Grade C 25 in the following.
ii. In column footings
iii. In column shaft
iv. In plinth beam







Form Work
1) Works upto Ground Floor Level

Formwork to sides of column footings
'-Ditto- to sides of columns
'-Ditto- to the sides of staircase footings and shaft

Ground Floor Level to First Floor Level
Formwork to sides of columns
'-Ditto- to soffit of the landing and sloping soffits of staircase
'-Ditto- to the soffits of 5" thick first floor slab
'-Ditto- to sides and soffits of beams at first floor slab level
2) Sides of foundation, height exceeding 300 mm, left in ,basic finish
i. Ground beams
ii. Column footings including staircase footings
Soffits of slabs, horizontal, height not exceeding 120, basic finish, left in
i. Kitchen floor level
ii. Roof slab level
Soffits of stair flights, horizontal, height not exceeding 10basic finish, left in
i. Ground floor level to first floor level staircase
ii. First floor level to second floor level
Sides and soffits of beams, attached, square or rectangular
iii. Kitchen floor level
iv. Roof slab level
Reinforcement
1) Works up to Ground Floor Level
i. Reinforcement in Column footings
ii. '-Ditto- staircase footings
iii. '-Ditto- in plinth beams
iv. '-Ditto- in columns

Ground Floor Level to First Floor Level
i. Reinforcement in columns



ii. '-Ditto- in first floor slab
iii. '-Ditto-in beams at first floor slab level
iv. '-Ditto- in staircases

2) Up to Ground floor
High yield steel
i. In Column bases
ii. In Column shafts
iii. In Plinth beam
Mild steel
i. In Plinth Beams
ii. In Column shafts
iii.
Ground Floor to 1
st
Floor level
High Yield Steel
i. In Column shafts
ii. In stair Cases
iii. In 1
st
Floor Slab
iv. In 1
st
Floor Beams
Mild steel
i. In Column shaft
ii. In 1
st
Floor Beams
3) Steel reinforcement bars in foundations
i. Ground beams
ii. Column footings including staircase footings
iii. Column shaft up to DPC including stair case foundation
Steel reinforcement bars in beds and slabs
i. Ground floor level
Steel reinforcement bars in suspended slabs, hoods and sunshades
ii. Kitchen floor level
iii. Roof slab level
Steel reinforcement bars in Columns and piers
i. Ground floor level to banquet floor level
ii. Banquet floor level to roof level



Precast Concrete Works
1) Lintols
Ground Floor to 1
st
Floor level
i. In 225x150 mm lintels over Windows
ii. In 225x75 mm tie beams & cill beams
1
st
Floor level to Roof
i. In 225x150 mm lintels over doors and balcony walls
ii. Stiffner columns in all floors

2) 6" x 6" lintols in ground floor
'-Ditto- in first floor
3) Supply and fix pre-cast concrete columns

E - Masonry works
Rubble Work

1) 9" x 6" random rubble masonry work in cement and sand 1:5 in foundations.
2) Random rubble work set in cement and sand mortar 1:5 in wall foundation
3) Walls in rubble masonry 30 mm thick, vertical externally finished fair faced with selected rubble
set in 1:5 cement and sand mortar.
Brick work/Block Works
1) Walls in common bricks 9 thick, vertical, solid walls, English bond set in 1:5 cement and sand
mortar.
i. Ground floor level to first floor level
ii. First floor level to second floor level
Walls in common bricks 4 thick, vertical, solid walls, stretcher bond set in 1:5 cement and
sand mortar.
i. First floor level to second floor level
ii. Ground floor level to first floor level
2) 225 mm thick, brick work in vertical, solid walls, English bond set in 1:5 cement and sand mortar.
iii. Ground floor level to first floor level
iv. First floor level to second floor level
3) 6" thick block work in cement and sand 1:5 to walls in ground floor.
i. '-Ditto- in first floor
4" thick block work in cement and sand 1:5 to walls in ground floor.



i. '-Ditto- in first floor
Damp Proof Course
1) Damp Proof Course 3/4" thick in cement and sand 1:2 finished with the application of two coats
of hot tar and blinded with sand.
2) Damp Proof Course out of 20 mm thick 1:2 cement mortar finished with two coats of hot
bitumen.
ASPHALT WORK
Damp Proof Membrane
1) 1000 gauge Polythene sheet as horizontal damp proof membrane under ground floor concrete
slab. Rate shall include for up stands to sides and corners not exceeding 6" in height.
2) Damp proof membrane under floor slab out of 1000 gauge Polythene.
i. At ground floor level
ii. Terrace at kitchen floor level
Water Proofing Membrane
1) Provide approved vertical water proofing membrane up to 7'-0" height to the shower areas of
Ground floor toilet by a specialized water proofing contractor.
2) Provide approved horizontal water proofing membrane to Ground floor toilet floors including 6"
wide dressing into the wall by a specialized water proofing contractor.
3) Provide approved horizontal water proofing membrane to first floor Terrace & balcony including
6" wide dressing into the wall by a specialized water proofing contractor.
4) Provide approved horizontal water proofing membrane to the water tank slab by a specialized
water proofing contractor.
5) Prepare surface & apply cementitious waterproofing system by an approved specialist sub
contractor and waterproofing application strictly in accordance with the manufactures
specifications.
i. To toilet floor in ground floor
ii. To balcony at upper floor level

G - ROOF COVERING AND ROOF PLUMBING
Roof Frame
1) 50x150 mm rafters (m)
100x125 mm wall Plate (m)
50x50 mm batterns (m)
25x100 mm valance board /Barge Board (m)






Roof Covering
1) Corrugated asbestoses sheet roof on reinforced concrete portal, steel frame work all complete
as per the drawing.
Half round clay tiles two layers laying over asbestoses roofing sheets match with existing roof
and as drawings
Two way reinforced double sided Aluminum foil with tape joints laid over and including 50x50
mm GI mesh
Calicut pattern grade 1 clay ridge/hip cover fixed with 1:3 cement sand mortar.

2) Sloping asbestos sheet roofing above second floor laid on and including timber framework of 3"
x 4" wall plates, 4"x3" rafters @ 2'-0" centers, 2"x1" batterns complete with felt layer and 3 mm
thick both side laminated "MC" foil insulation layer to the Architects approval. Rate shall include
for polished exposed rafters type
3) Roofing profile Glamet G5 A40 or approved equivalent with top skin, Zn/Al coated colour
bonded steel with 0.35 mm base metal thickness and bottom skin Zn/Al coated colour bonded
steel with 0.32 mm base metal thickness including 50 mm thick insulation, Polyrethane with
40Kg/m3 density on steel framework all complete as per drawing.
Roof Plumbing
1) 2250 mm (approximate) girth custom made colour bonded Zinc- Aluminum coated gutter
with all accessories, brackets, GI reverts all complete to working order.
2) 9 wide asbestos cement gutter painted with one coat of acrylic filler and two coats of
whether shield emulsion paint with necessary brackets