Anda di halaman 1dari 4

G325: A2 Advanced Portfolio 2014-2015

9
th
June-27
th
June
Preliminary activities

9th June-13th June
Introduction to continuity activity and basics of shot composition
Storyboard continuity activity
Film continuity sequence
Edit continuity sequence
Complete lip synching task-lip sych first 30 seconds of chosen song. All
students to complete.
Edit lip synching task.

16th June-27
th
June
Storyboard first 60 seconds of chosen song.
Assign group roles-director, camera person, sound, band.
Organise all instruments and outfits.
Begin filming.
Complete all filming.
Begin editing (in groups edit the same footage).

30th June-11
th
July:
Complete editing.
Begin research and planning for September.

28
th
August 19
th
December 2013.
It is vital that blogs are kept up to date and that progress is posted regularly.
Screen grabs of the creative process or other updates (evidence of students
creating the work) must be included as work is being completed.

Thursday 28
th
August Friday 5th September
Carrying out research and planning.
To include:
Submit detailed analysis of music videos (at least 3) including
conventions and genre categories e.g. illustration, amplification and
disjuncture. (this was set as summer homework). Any students not
completing work to be place on intervention list.
Decide on genre/song of music video
Preparation of a 25 word pitch to include:
Mood boards (e.g. animoto)
Decide on band/artist name and create biography
Post photos of band members alongside existing bands/ artists as
exemplars
Examples of other texts
Audience profile and conduct market research (use uktribes.co.uk)
Set up twitter feed for your fictitious band
Teachers to regularly check and leave comments on blogs as part of rough
draft marking of R&P.

Monday 8
th
September Friday 12
th
September
Lessons to pitch idea to class and receive feedback
Evaluate class feedback (will be essential for your evaluation)
Refine idea and submit to teacher for feedback
Teachers to regularly check and leave comments on blogs as part of rough
draft marking of R&P.

Monday 15
th
September Friday 26th September
Comprehensive storyboard of your music video
Construct and post animatic onto blog
Schedule list
Consider representations in your music video (who/what, why,
where, how)
Apply relevant narrative theorists to your music video
Post shots of prospective video locations
Write risk assessment
No Filming until all above elements have been completed and signed
off by teachers.
Friday 26th September = MUSIC VIDEO Research and Planning MUST BE
COMPLETED. Marks will be deducted for late submission.

Monday 29
th
September Friday 17
th
October
All filming of music videos to take place outside of lesson time
Teacher introduces digipak/ advert (generic conventions, part of the
campaign etc.)
Research CD covers, magazine adverts detailed annotation/analysis
Produce mock ups of ancillary products e.g. photos, drawings, collage,
colour palette etc
Friday 17th October DRAFT DEADLINE for digipak and magazine advert.
Work to be submitted with name(s) and candidate(s) numbers to English
office. Marks will be deducted for late submission.


Mon 27th October Friday 31st October
Complete 1
st
draft of music video including filming and editing.
Screen shots of ongoing editing process essential for full marks.
Friday 31
st
October DRAFT DEADLINE - 3:10PM ENGLISH OFFICE
Work to be posted on blog by 3:10 pm and acknowledgement of
completion sheet signed in H2.
Draft video must be posted on blog. Students to be placed on intervention
list if work not completed. Marks will be deducted for late submission.

Monday 4
th
November Friday 8
th
November
Feedback on digipak and magazine advert to be returned to all students.
Make necessary improvements and complete final versions.

Friday 8
th
November 3:10PM work to be submitted with name(s) and
candidate(s) numbers to
English office. Marks will be deducted for late submission.


Monday 10
th
November Friday 28
th
November
Teachers to have returned first draft marks/comments for music
videos
Update blogs with 1
st
draft teacher feedback (will be essential for
your evaluation)
Make plan of action for necessary improvements
Make improvements to music video
Finish filming/editing final copy of music video
Screen shots of ongoing editing process essential for full marks.
Peer assessment and evaluate feedback. Update blog with feedback
(will be essential for your evaluation).

FINAL CUT OF MUSIC VIDEO MUST BE COMPLETED BY FRIDAY 28
th

NOVEMBER - work to be posted on blog by 3:10PM and acknowledgement
of completion sheet signed in H2.
Marks will be deducted for late submission.




Monday 1st December Friday 5
th
December

Evaluation questions introduced and taught. Examples shown.
All lessons devoted to completion of evaluation. Written essay
format for each question to be completed this week and posted on
blog.

Monday 8
th
December Wednesday 10
th
December

Plan and agree creative ways to present final version of evaluation.

Wednesday 10
th
December Friday 19
th
December

Answer all evaluation activities individually using a different creative
media for each.


FINAL EVALUATION DEADLINE FRIDAY 19
th
DEC WORK TO BE POSTED ONTO
BLOG AND acknowledgement of completion sheet signed in H2. Marks will be
deducted for late submission.

ALL COURSEWORK to be marked and marks submitted to NEF by Friday 23
rd

JANUARY 2014

Anda mungkin juga menyukai