Date: 05 Jan 2013 Day: Sat Project Name: 062 - 016 Location: Chemical Store - Fertil 2

Group No: Technician Names: 1 Nizamu Uddien 3 Manjur Alam 5


Supervisor: Alam 2 Mohammad Jony 4 6
7 OliAllah 8 9
Cutting of Thread Bars 6 Threading Machine Big pc= 1 Small pc= -
Drilled Holes in slab/ceiling for Thread Bars 20 Grinder Big pc= - Small pc= -
Fastening the Hangging clamp-clamp for Pipe support 20 Pipe Wrench Big pc= - Small pc= -
Ladder Big pc= 1 Medium pc= - Small pc=
Cutting of Main/Riser Service Pipes/pc Hilti Drill pc= 0 Chissel pc=
8" pc= - 6" pc= - 4" pc= - 3" pc= - Grooving Machine pc= 1 Tape Meter pc=
Grooving of Main/Riser Service Pipe Welding Machine pc= 0 Allen Key Set pc=
8" pc= - 6" pc= - 4" pc= - 3" pc= - Spanner Size - pc= 2 Halk Saw Frame pc=
Cutting of Sprinkler Service Pipes Black Spanner pc= 1 Halk Saw Blade pc=
2" pc= - 1" pc= 20 1" pc= - 1" pc= - Level Gauge pc= 0 Chipping Tool pc=
Threading of Sprinkler Service Pipes Flat Screw Driver (-) pc= 0 Sprinkler Spanner pc=
2" pc= - 1" pc= 20 1" pc= - 1" pc= - Philip Screw Driver (+) pc= 0 Test Pen pc=
Electric Fan pc= 0 Hammer pc=
Installed Main/Riser Pipe per Branches w/ Fittings
Risers pc= 2 pc=
Location Underground8" pc= - 6" pc= - 4" pc= 3 3" pc= - pc= pc=
Location 8" pc= - 6" pc= - 4" pc= - 3" pc= - pc= pc=
Main Line / Branches pc= pc=
Location Underground8" pc= 5 6" pc= - 4" pc= - 3" pc= -
Location 8" pc= - 6" pc= - 4" pc= - 3" pc= -
Installed Sprinkler Pipe Branches w/ Fittings
Risers / Main Line / Branches
Location High Level 6" pc= - 4" pc= - 3" pc= - 2" pc= -
Location Low level 6" pc= - 4" pc= - 3" pc= - 2" pc= -
Main Line / Branches
Location High Level 2" pc= - 1" pc= 20 1" pc= - 1" pc= -
Location Low Level 2" pc= - 1" pc= - 1" pc= - 1" pc= -
Installation of Fire Hose Cabinet & Breaching Inlet
Mounting of Fire Hose Cabinet pc= -
Installation of Fire Hose Reels pc= - with nozzle? pc= -
Breaching Inlet pc= -
Pressure Red Valve pc= - w/ lockshield pc= - w/ Landing V. pc= -
D Powder Fire Ext. pc= - Co2 Fire Ext. pc= -
Sprinkler Drops pc= -
Upright Sprinkler pc= - Pendent Sprinkler pc= -
Recessed Sprinkler pc= - Extended Coverage pc= -
Zone Control Valve Station pc= - Drain Valve pc= - Prepared By:
Non-Rising Stem Gate Valve pc= - Air release Valve pc= -
Pressure Reducing Valve Station pc= - Non-Return Valve pc= - Name: Ahmed I. AbuRadi
OS & Y Gate Valve pc= - w/ Supervisory Switch? pc= - Date: 05 Jan 2013
Covering openings by stop plugs before Pressure Test pc= -
Preparation of (Manual) Pump and Pressure Gauge x
Applied pressure x Taken Readings on time intervals x Approved By:
Mounting Electrical Pump pc= - Diesel pc= - Jockey pc= - Name:
Tested Fire Pump Set x Diesel x Jockey x Date:
Interconnecting Pump Set to Sprinkler Network x
Installation of FirePump Set
Follow Ups for Materials etc: (Optional)
Installation of Valves
Pressure Test for Sprinkler Network
Installation of Sprinkler Heads
Cause of Delays/ Emergencies: (optional)
R E M A R K S : (optional)
Installation of Service Pipes for Sprinkler System
2- 22mm Spanner 6
3- 18 mm Spanner 7
4 8
Cutting, Threading Grooving of Pipes
Installation of Service Pipes for Wet System
others tools/equipments not mention above: (optional)
1- Hitachi Drill 5
DAILY ACTIVITY ACCOMPLISHMENTS and MATERIALS MONITORING SHEET FOR FIRE FIGHTING
" CHECK the box with () if made; put Number of Material/Tools for (pc=) ; put Size e.g, 2" x 1" for (size) ; leave blank if not applicable"
Installation of Pipe Support and Thread Bars Tools & Equipments Used for the day:
-
0
2
0
0
0
0
0
0
1
Follow Ups for Materials etc: (Optional)
Cause of Delays/ Emergencies: (optional)
R E M A R K S : (optional)
others tools/equipments not mention above: (optional)
DAILY ACTIVITY ACCOMPLISHMENTS and MATERIALS MONITORING SHEET FOR FIRE FIGHTING
" CHECK the box with () if made; put Number of Material/Tools for (pc=) ; put Size e.g, 2" x 1" for (size) ; leave blank if not applicable"
Tools & Equipments Used for the day:
Date: 05 /JAN /2013 Day: Project Name: 62 - 12 Location: Chemical Store
Group No: Technician Names: 1 Nizamu Uddien 4 Manjur Alam
Supervisor: BADIUL ALAM 2 Mohammad Jony 5
3 OliAllah 6
Cutting of Thread Bars pc= 6 Threading Machine Big pc= 1 Small pc= 0
Drilled Holes in slab/ceiling for Thread Bars pc= 20 Grinder Big pc= 0 Small pc= 0
Fastening the Hangging-clamp for Pipe support pc= 20 Pipe Wrench Big pc= 0 Small pc= 0
Ladder Big pc= 1 Medium pc= 0 Small pc=
Cutting of Main/Riser Service Pipes/pc Hilti Drill pc= 0 Chissel pc=
8" pc= 0 6" pc= 0 4" pc= 0 3" pc= 0 Grooving Machine pc= 1 Tape Meter pc=
Grooving of Main/Riser Service Pipe Welding Machine pc= 0 Allen Key Set pc=
8" pc= 0 6" pc= 0 4" pc= 0 3" pc= 0 Spanner Size - pc= 2 Halk Saw Frame pc=
Cutting of Sprinkler Service Pipes Black Spanner pc= 1 Halk Saw Blade pc=
2" pc= 0 1" pc= 20 1" pc= 0 1" pc= 0 Level Gauge pc= 0 Chipping Tool pc=
Threading of Sprinkler Service Pipes Flat Screw Driver (-) pc= 0 Sprinkler Spanner pc=
2" pc= 0 1" pc= 20 1" pc= 0 1" pc= 0 Philip Screw Driver (+) pc= 0 Test Pen pc=
Electric Fan pc= 0 Hammer pc=
Installed Main/Riser Pipe per Branches w/ Fittings
Pipes 8" pc= 0 6" pc= 0 4" pc= 0 3" pc= 0 pc= 1 pc=
Elbows 8" pc= 0 6" pc= 0 4" pc= 0 3" pc= 0 pc= 2 pc=
Tee 8" pc= 0 6" pc= 0 4" pc= 0 3" pc= 0 pc= 2 pc=
Coupling 8" pc= 0 6" pc= 0 4" pc= 2 3" pc= 0 pc= pc=
Reducer Tee Size 0 X 0 pc= 0 ;Size 0 X 0 pc= 0
Reducer Coupling Size 0 X 0 pc= 0 ;Size 0 X 0 pc= 0
Mechanical Tee Size 0 X 0 pc= 0 ;Size 4" X 1" pc= 8
Installed Sprinkler Pipe Branches w/ Fittings
Pipes 2" pc= 0 1" pc= 20 1" pc= 0 1" pc= 0
Elbows 2" pc= 0 1" pc= 5 1" pc= 0 1" pc= 0
Tee 2" pc= 0 1" pc= 0 1" pc= 0 1" pc= 0
Coupling 2" 0 1" pc= 0 1" pc= 0 1" pc= 0
Reducer Tee Size 1" X 1" pc= 20 ;Size 0 X 0 pc= 0
Reducer Coupling Size 0 X 0 pc= 0 ;Size 0 X 0 pc= 0
Reducer Bush Size 1" X 1" pc= 20 ;Size 0 X 0 pc= 0
Mounting of Fire Hose Cabinet pc= 0
Installation of Fire Hose Reels pc= 0 with nozzle? pc= 0
Breaching Inlet pc= 0
Pressure Red Valve pc= 0 w/ lockshield pc= 0 w/ Landing V. pc= 0
D Powder Fire Ext. pc= 0 Co2 Fire Ext. pc= 0
Upright Sprinkler pc= 0 Pendent Sprinkler pc= 0
Recessed Sprinkler pc= 0 Extended Coverage pc= 0
Zone Control Valve Station pc= 0 Drain Valve pc= 0 Prepared By:
Non-Rising Stem Gate Valve pc= 0 Air release Valve pc= 0
Pressure Reducing Valve Station pc= 0 Non-Return Valve pc= 0 Name: AHMED I. ABURADI
OS & Y Gate Valve pc= 0 w/ Supervisory Switch? pc= 0 Date: 05 /01 /2013
Covering openings by stop plugs before Pressure Test pc= 0
Preparation of (Manual) Pump and Pressure Gauge x
Applied pressure x Taken Readings on time intervals x Approved By:
Mounting Electrical Pump pc= 0 Diesel pc= 0 Jockey pc= 0 Name:
Tested Fire Pump Set x Diesel x Jockey x Date:
Interconnecting Pump Set to Sprinkler Network x
Installation of Fire Hose Cabinet & Breaching Inlet
Installation of Valves
Installation of Sprinkler Service Pipes
Pressure Test for Sprinkler Network
Installation of FirePump Set
Installation of Sprinkler Heads
Follow Ups for Materials etc: (Optional)
Cause of Delays/ Emergencies: (optional)
R E M A R K S : (optional)
others tools/equipments not mention above: (optional)
1- Hitachi Drill
2- 22mm Spanner
3- 18 mm Spanner 7
DAILY ACTIVITY ACCOMPLISHMENTS and MATERIALS MONITORING SHEET FOR FIRE FIGHTING
Installation of Pipe Support and Thread Bars Tools & Equipments Used for the day:
6
5
" CHECK the box with () if made; put Number of Material/Tools for (pc=) ; put Size e.g, 2" x 1" for (size) ; leave blank if not applicable"
Installation of Main/Riser Service Pipes
Cutting, Threading Grooving of Pipes
4 8
0
0
2
0
0
0
0
0
0
1
Follow Ups for Materials etc: (Optional)
Cause of Delays/ Emergencies: (optional)
R E M A R K S : (optional)
others tools/equipments not mention above: (optional)
DAILY ACTIVITY ACCOMPLISHMENTS and MATERIALS MONITORING SHEET FOR FIRE FIGHTING
Tools & Equipments Used for the day:
" CHECK the box with () if made; put Number of Material/Tools for (pc=) ; put Size e.g, 2" x 1" for (size) ; leave blank if not applicable"

Anda mungkin juga menyukai