Date: 05 Jan 2013 Day: Sat Project Name: 062 - 016 Location: Chemical Store - Fertil 2
Group No: Technician Names: 1 Nizamu Uddien 3 Manjur Alam 5
Supervisor: Alam 2 Mohammad Jony 4 6 7 OliAllah 8 9 Cutting of Thread Bars 6 Threading Machine Big pc= 1 Small pc= - Drilled Holes in slab/ceiling for Thread Bars 20 Grinder Big pc= - Small pc= - Fastening the Hangging clamp-clamp for Pipe support 20 Pipe Wrench Big pc= - Small pc= - Ladder Big pc= 1 Medium pc= - Small pc= Cutting of Main/Riser Service Pipes/pc Hilti Drill pc= 0 Chissel pc= 8" pc= - 6" pc= - 4" pc= - 3" pc= - Grooving Machine pc= 1 Tape Meter pc= Grooving of Main/Riser Service Pipe Welding Machine pc= 0 Allen Key Set pc= 8" pc= - 6" pc= - 4" pc= - 3" pc= - Spanner Size - pc= 2 Halk Saw Frame pc= Cutting of Sprinkler Service Pipes Black Spanner pc= 1 Halk Saw Blade pc= 2" pc= - 1" pc= 20 1" pc= - 1" pc= - Level Gauge pc= 0 Chipping Tool pc= Threading of Sprinkler Service Pipes Flat Screw Driver (-) pc= 0 Sprinkler Spanner pc= 2" pc= - 1" pc= 20 1" pc= - 1" pc= - Philip Screw Driver (+) pc= 0 Test Pen pc= Electric Fan pc= 0 Hammer pc= Installed Main/Riser Pipe per Branches w/ Fittings Risers pc= 2 pc= Location Underground8" pc= - 6" pc= - 4" pc= 3 3" pc= - pc= pc= Location 8" pc= - 6" pc= - 4" pc= - 3" pc= - pc= pc= Main Line / Branches pc= pc= Location Underground8" pc= 5 6" pc= - 4" pc= - 3" pc= - Location 8" pc= - 6" pc= - 4" pc= - 3" pc= - Installed Sprinkler Pipe Branches w/ Fittings Risers / Main Line / Branches Location High Level 6" pc= - 4" pc= - 3" pc= - 2" pc= - Location Low level 6" pc= - 4" pc= - 3" pc= - 2" pc= - Main Line / Branches Location High Level 2" pc= - 1" pc= 20 1" pc= - 1" pc= - Location Low Level 2" pc= - 1" pc= - 1" pc= - 1" pc= - Installation of Fire Hose Cabinet & Breaching Inlet Mounting of Fire Hose Cabinet pc= - Installation of Fire Hose Reels pc= - with nozzle? pc= - Breaching Inlet pc= - Pressure Red Valve pc= - w/ lockshield pc= - w/ Landing V. pc= - D Powder Fire Ext. pc= - Co2 Fire Ext. pc= - Sprinkler Drops pc= - Upright Sprinkler pc= - Pendent Sprinkler pc= - Recessed Sprinkler pc= - Extended Coverage pc= - Zone Control Valve Station pc= - Drain Valve pc= - Prepared By: Non-Rising Stem Gate Valve pc= - Air release Valve pc= - Pressure Reducing Valve Station pc= - Non-Return Valve pc= - Name: Ahmed I. AbuRadi OS & Y Gate Valve pc= - w/ Supervisory Switch? pc= - Date: 05 Jan 2013 Covering openings by stop plugs before Pressure Test pc= - Preparation of (Manual) Pump and Pressure Gauge x Applied pressure x Taken Readings on time intervals x Approved By: Mounting Electrical Pump pc= - Diesel pc= - Jockey pc= - Name: Tested Fire Pump Set x Diesel x Jockey x Date: Interconnecting Pump Set to Sprinkler Network x Installation of FirePump Set Follow Ups for Materials etc: (Optional) Installation of Valves Pressure Test for Sprinkler Network Installation of Sprinkler Heads Cause of Delays/ Emergencies: (optional) R E M A R K S : (optional) Installation of Service Pipes for Sprinkler System 2- 22mm Spanner 6 3- 18 mm Spanner 7 4 8 Cutting, Threading Grooving of Pipes Installation of Service Pipes for Wet System others tools/equipments not mention above: (optional) 1- Hitachi Drill 5 DAILY ACTIVITY ACCOMPLISHMENTS and MATERIALS MONITORING SHEET FOR FIRE FIGHTING " CHECK the box with () if made; put Number of Material/Tools for (pc=) ; put Size e.g, 2" x 1" for (size) ; leave blank if not applicable" Installation of Pipe Support and Thread Bars Tools & Equipments Used for the day: - 0 2 0 0 0 0 0 0 1 Follow Ups for Materials etc: (Optional) Cause of Delays/ Emergencies: (optional) R E M A R K S : (optional) others tools/equipments not mention above: (optional) DAILY ACTIVITY ACCOMPLISHMENTS and MATERIALS MONITORING SHEET FOR FIRE FIGHTING " CHECK the box with () if made; put Number of Material/Tools for (pc=) ; put Size e.g, 2" x 1" for (size) ; leave blank if not applicable" Tools & Equipments Used for the day: Date: 05 /JAN /2013 Day: Project Name: 62 - 12 Location: Chemical Store Group No: Technician Names: 1 Nizamu Uddien 4 Manjur Alam Supervisor: BADIUL ALAM 2 Mohammad Jony 5 3 OliAllah 6 Cutting of Thread Bars pc= 6 Threading Machine Big pc= 1 Small pc= 0 Drilled Holes in slab/ceiling for Thread Bars pc= 20 Grinder Big pc= 0 Small pc= 0 Fastening the Hangging-clamp for Pipe support pc= 20 Pipe Wrench Big pc= 0 Small pc= 0 Ladder Big pc= 1 Medium pc= 0 Small pc= Cutting of Main/Riser Service Pipes/pc Hilti Drill pc= 0 Chissel pc= 8" pc= 0 6" pc= 0 4" pc= 0 3" pc= 0 Grooving Machine pc= 1 Tape Meter pc= Grooving of Main/Riser Service Pipe Welding Machine pc= 0 Allen Key Set pc= 8" pc= 0 6" pc= 0 4" pc= 0 3" pc= 0 Spanner Size - pc= 2 Halk Saw Frame pc= Cutting of Sprinkler Service Pipes Black Spanner pc= 1 Halk Saw Blade pc= 2" pc= 0 1" pc= 20 1" pc= 0 1" pc= 0 Level Gauge pc= 0 Chipping Tool pc= Threading of Sprinkler Service Pipes Flat Screw Driver (-) pc= 0 Sprinkler Spanner pc= 2" pc= 0 1" pc= 20 1" pc= 0 1" pc= 0 Philip Screw Driver (+) pc= 0 Test Pen pc= Electric Fan pc= 0 Hammer pc= Installed Main/Riser Pipe per Branches w/ Fittings Pipes 8" pc= 0 6" pc= 0 4" pc= 0 3" pc= 0 pc= 1 pc= Elbows 8" pc= 0 6" pc= 0 4" pc= 0 3" pc= 0 pc= 2 pc= Tee 8" pc= 0 6" pc= 0 4" pc= 0 3" pc= 0 pc= 2 pc= Coupling 8" pc= 0 6" pc= 0 4" pc= 2 3" pc= 0 pc= pc= Reducer Tee Size 0 X 0 pc= 0 ;Size 0 X 0 pc= 0 Reducer Coupling Size 0 X 0 pc= 0 ;Size 0 X 0 pc= 0 Mechanical Tee Size 0 X 0 pc= 0 ;Size 4" X 1" pc= 8 Installed Sprinkler Pipe Branches w/ Fittings Pipes 2" pc= 0 1" pc= 20 1" pc= 0 1" pc= 0 Elbows 2" pc= 0 1" pc= 5 1" pc= 0 1" pc= 0 Tee 2" pc= 0 1" pc= 0 1" pc= 0 1" pc= 0 Coupling 2" 0 1" pc= 0 1" pc= 0 1" pc= 0 Reducer Tee Size 1" X 1" pc= 20 ;Size 0 X 0 pc= 0 Reducer Coupling Size 0 X 0 pc= 0 ;Size 0 X 0 pc= 0 Reducer Bush Size 1" X 1" pc= 20 ;Size 0 X 0 pc= 0 Mounting of Fire Hose Cabinet pc= 0 Installation of Fire Hose Reels pc= 0 with nozzle? pc= 0 Breaching Inlet pc= 0 Pressure Red Valve pc= 0 w/ lockshield pc= 0 w/ Landing V. pc= 0 D Powder Fire Ext. pc= 0 Co2 Fire Ext. pc= 0 Upright Sprinkler pc= 0 Pendent Sprinkler pc= 0 Recessed Sprinkler pc= 0 Extended Coverage pc= 0 Zone Control Valve Station pc= 0 Drain Valve pc= 0 Prepared By: Non-Rising Stem Gate Valve pc= 0 Air release Valve pc= 0 Pressure Reducing Valve Station pc= 0 Non-Return Valve pc= 0 Name: AHMED I. ABURADI OS & Y Gate Valve pc= 0 w/ Supervisory Switch? pc= 0 Date: 05 /01 /2013 Covering openings by stop plugs before Pressure Test pc= 0 Preparation of (Manual) Pump and Pressure Gauge x Applied pressure x Taken Readings on time intervals x Approved By: Mounting Electrical Pump pc= 0 Diesel pc= 0 Jockey pc= 0 Name: Tested Fire Pump Set x Diesel x Jockey x Date: Interconnecting Pump Set to Sprinkler Network x Installation of Fire Hose Cabinet & Breaching Inlet Installation of Valves Installation of Sprinkler Service Pipes Pressure Test for Sprinkler Network Installation of FirePump Set Installation of Sprinkler Heads Follow Ups for Materials etc: (Optional) Cause of Delays/ Emergencies: (optional) R E M A R K S : (optional) others tools/equipments not mention above: (optional) 1- Hitachi Drill 2- 22mm Spanner 3- 18 mm Spanner 7 DAILY ACTIVITY ACCOMPLISHMENTS and MATERIALS MONITORING SHEET FOR FIRE FIGHTING Installation of Pipe Support and Thread Bars Tools & Equipments Used for the day: 6 5 " CHECK the box with () if made; put Number of Material/Tools for (pc=) ; put Size e.g, 2" x 1" for (size) ; leave blank if not applicable" Installation of Main/Riser Service Pipes Cutting, Threading Grooving of Pipes 4 8 0 0 2 0 0 0 0 0 0 1 Follow Ups for Materials etc: (Optional) Cause of Delays/ Emergencies: (optional) R E M A R K S : (optional) others tools/equipments not mention above: (optional) DAILY ACTIVITY ACCOMPLISHMENTS and MATERIALS MONITORING SHEET FOR FIRE FIGHTING Tools & Equipments Used for the day: " CHECK the box with () if made; put Number of Material/Tools for (pc=) ; put Size e.g, 2" x 1" for (size) ; leave blank if not applicable"