PEKERJAAN : Pembangunan Jalan poros Desa Sebuku Kawasan Sebuku Kab. Nunukan MINGGU KE.

: I
INSTANSI : Dinas Pekerjaan Umum Propinsi Kalimantan Timur KONTRAKTOR PELAKSANA : PT. HASANAH JAYA
PEKERJAAN : Peningkatan Badan Jalan NILAI KONTRAK : Rp. 3.022.322.000,-
TAHUN ANGGARAN : 2013 JANGKA WAKTU (ADDENDUM) : 180 HARI
SUMBER DANA : APBN KONSULTAN SUPERVISI : CV. LUNDAYEH BORNEO CONSULTANT
HARGA JUMLAH BOBOT
SATUAN HARGA ( % ) MINGGU LALU MINGGU INI S/D MINGGU INI
(Rp.) (Rp.) BOBOT (%) BOBOT (%) BOBOT (%)
I DEVISI I - UMUM
1.1 1.00 Ls 2,500,000.00 2,500,000.00 0.0910 - 0.0455 0.0455 Rp. 1,250,000.00
2.1 1.00 Ls 51,500,000.00 51,500,000.00 1.8744 - - - -
3.1 11,306.36 M2 5,963.59 67,426,495.43 2.4540 - - - -
II
1.2 2,261.26 M3 50,025.36 113,120,345.55 4.1171 - - - -
2.2 1,072.10 M3 961,390.76 1,030,707,033.80 37.5134 - - - -
3.2 5,261.18 M2 26,965.37 141,869,665.34 5.1635 - - - -
-
III
1.3 706.65 M3 826,715.91 584,198,797.80 21.2624 - -
2.3 1,413.30 M3 489,673.88 692,056,094.60 25.1879 - - - -
3.3 423.99 M3 113,065.32 47,938,565.03 1.7448 - - - -
-
IV.
1.4 12.00 M2 8,000.00 96,000.00 0.0035 - -
2.4 1.80 M3 1,942,661.93 3,496,791.47 0.1273 - - - -
3.4 405.08 Kg 31,250.00 12,658,750.00 0.4607 - - - -
JUMLAH 22,865.72 2,747,568,539.02 100.00 0.0455 0.0455 Rp. 1,250,000.00
Diperiksa Oleh Diajukan RENCANA (%)
Disetujui Oleh Konsultan Supervisi Kontraktor Pelaksana REALISASI (%)
Pejabat Pembuat Komitmen, CV. LUNDAYEH BORNEO CONSULTANT PT. HASANAH JAYA SELISIH (%)
Ir. DWI HADI JUNAIDI SULASMAN ODE, S.T
NIP. 19590528 198502 1 062 Site Engineer Site manager
0.000
0.045
0.045
PROGRES SAMPAI DENGAN MINGGU INI
TAHAP KEMAJUAN PEKERJAAN
KETERANGAN
M. DAHLAN S.Sos, S.T
Pek. Galian untuk selokan drainase dan
DEVISI II - PEKERJAAN DRAINASE
BOBOT KEMAJUAN PEKERJAAN MINGGUAN
Penyiapan Badan Jalan
Mobilisasi Dan Demobilisasi
Pengulkuran Dan Pematokan
SAT VOLUME NO. URAIAN PEKERJAAN
Lap. Pondasi Bawah Telford T = 20 cm
Lap. Pondasi Agregat Kls B T = 10 cm
DEVISI III - PEKERJAAN PERKERASAN BERBUTIR
Pek. Plesteran Cam 1:3 T = 15 mm
Pek. Pasangan Batu + Adukan (Mekanis)
DEVISI IV - PEKERJAAN JEMBATAN
Plastik Bond Breaker
Beton Campuran 1 PC : 2 Psr : 3 Kr
Baja Tulangan
Urugan tanah pilihan
PEKERJAAN : Pembangunan Jalan poros Desa Sebuku Kawasan Sebuku Kab. Nunukan MINGGU KE. : II
INSTANSI : Dinas Pekerjaan Umum Propinsi Kalimantan Timur KONTRAKTOR PELAKSANA : PT. HASANAH JAYA
PEKERJAAN : Peningkatan Badan Jalan NILAI KONTRAK : Rp. 3.022.322.000,-
TAHUN ANGGARAN : 2013 JANGKA WAKTU (ADDENDUM) : 180 HARI
SUMBER DANA : APBN KONSULTAN SUPERVISI : CV. LUNDAYEH BORNEO CONSULTANT
HARGA JUMLAH BOBOT
SATUAN HARGA ( % ) MINGGU LALU MINGGU INI S/D MINGGU INI
(Rp.) (Rp.) BOBOT (%) BOBOT (%) BOBOT (%)
I DEVISI I - UMUM
1.1 1.00 Ls 2,500,000.00 2,500,000.00 0.0910 0.045 0.0455 0.0910 Rp. 2,500,000.00
2.1 1.00 Ls 51,500,000.00 51,500,000.00 1.8744 - 0.4570 0.4570 Rp. 12,556,675.59
3.1 11,306.36 M2 5,963.59 67,426,495.43 2.4540 - - - -
-
II -
1.2 2,261.26 M3 50,025.36 113,120,345.55 4.1171 - - - -
2.2 1,072.10 M3 961,390.76 1,030,707,033.80 37.5134 - - - -
3.2 5,261.18 M2 26,965.37 141,869,665.34 5.1635 - - - -
-
III -
1.3 706.65 M3 826,715.91 584,198,797.80 21.2624 - - -
2.3 1,413.30 M3 489,673.88 692,056,094.60 25.1879 - - - -
3.3 423.99 M3 113,065.32 47,938,565.03 1.7448 - - - -
-
IV. -
1.4 12.00 M2 8,000.00 96,000.00 0.0035 - - -
2.4 1.80 M3 1,942,661.93 3,496,791.47 0.1273 - - - -
3.4 405.08 Kg 31,250.00 12,658,750.00 0.4607 - - - -
JUMLAH 22,865.72 2,747,568,539.02 100.00 0.5025 0.5480 Rp. 15,056,675.59
Diperiksa Oleh Diajukan RENCANA (%)
Disetujui Oleh Konsultan Supervisi Kontraktor Pelaksana REALISASI (%)
Pejabat Pembuat Komitmen, CV. LUNDAYEH BORNEO CONSULTANT PT. HASANAH JAYA SELISIH (%)
Ir. DWI HADI JUNAIDI SULASMAN ODE, S.T
NIP. 19590528 198502 1 062 Site Engineer Site manager
-0.012
Pek. Plesteran Cam 1:3 T = 15 mm
DEVISI III - PEKERJAAN PERKERASAN BERBUTIR
Lap. Pondasi Agregat Kls B T = 10 cm
Lap. Pondasi Bawah Telford T = 20 cm
Urugan tanah pilihan
DEVISI IV - PEKERJAAN JEMBATAN
BOBOT KEMAJUAN PEKERJAAN MINGGUAN
KETERANGAN
PROGRES SAMPAI DENGAN MINGGU INI
0.560
0.548
Pek. Pasangan Batu + Adukan (Mekanis)
NO. URAIAN PEKERJAAN
TAHAP KEMAJUAN PEKERJAAN
Pengulkuran Dan Pematokan
Mobilisasi Dan Demobilisasi
Penyiapan Badan Jalan
DEVISI II - PEKERJAAN DRAINASE
Pek. Galian untuk selokan drainase dan
VOLUME SAT
Plastik Bond Breaker
Beton Campuran 1 PC : 2 Psr : 3 Kr
Baja Tulangan
M. DAHLAN S.Sos, S.T
PEKERJAAN : Pembangunan Jalan poros Desa Sebuku Kawasan Sebuku Kab. Nunukan MINGGU KE. : III
INSTANSI : Dinas Pekerjaan Umum Propinsi Kalimantan Timur KONTRAKTOR PELAKSANA : PT. HASANAH JAYA
PEKERJAAN : Peningkatan Badan Jalan NILAI KONTRAK : Rp. 3.022.322.000,-
TAHUN ANGGARAN : 2013 JANGKA WAKTU (ADDENDUM) : 180 HARI
SUMBER DANA : APBN KONSULTAN SUPERVISI : CV. LUNDAYEH BORNEO CONSULTANT
HARGA JUMLAH BOBOT
SATUAN HARGA ( % ) MINGGU LALU MINGGU INI S/D MINGGU INI
(Rp.) (Rp.) BOBOT (%) BOBOT (%) BOBOT (%)
I DEVISI I - UMUM
1.1 1.00 Ls 2,500,000.00 2,500,000.00 0.0910 0.091 - 0.0910 Rp. 2,500,000.00
2.1 1.00 Ls 51,500,000.00 51,500,000.00 1.8744 0.457 0.5130 0.9700 Rp. 26,651,702.20
3.1 11,306.36 M2 5,963.59 67,426,495.43 2.4540 - - - -
-
II -
1.2 2,261.26 M3 50,025.36 113,120,345.55 4.1171 - - - -
2.2 1,072.10 M3 961,390.76 1,030,707,033.80 37.5134 - - - -
3.2 5,261.18 M2 26,965.37 141,869,665.34 5.1635 - - - -
-
III -
1.3 706.65 M3 826,715.91 584,198,797.80 21.2624 - - -
2.3 1,413.30 M3 489,673.88 692,056,094.60 25.1879 - - - -
3.3 423.99 M3 113,065.32 47,938,565.03 1.7448 - - - -
-
IV. -
1.4 12.00 M2 8,000.00 96,000.00 0.0035 - - -
2.4 1.80 M3 1,942,661.93 3,496,791.47 0.1273 - - - -
3.4 405.08 Kg 31,250.00 12,658,750.00 0.4607 - - - -
JUMLAH 22,865.72 2,747,568,539.02 100.00 0.5480 0.5130 1.0610 Rp. 29,151,702.20
Diperiksa Oleh Diajukan RENCANA (%)
Disetujui Oleh Konsultan Supervisi Kontraktor Pelaksana REALISASI (%)
Pejabat Pembuat Komitmen, CV. LUNDAYEH BORNEO CONSULTANT PT. HASANAH JAYA SELISIH (%)
Ir. DWI HADI JUNAIDI SULASMAN ODE, S.T
NIP. 19590528 198502 1 062 Site Engineer Site manager
0.033
Pek. Plesteran Cam 1:3 T = 15 mm
DEVISI III - PEKERJAAN PERKERASAN BERBUTIR
Lap. Pondasi Agregat Kls B T = 10 cm
Lap. Pondasi Bawah Telford T = 20 cm
Urugan tanah pilihan
DEVISI IV - PEKERJAAN JEMBATAN
BOBOT KEMAJUAN PEKERJAAN MINGGUAN
KETERANGAN
PROGRES SAMPAI DENGAN MINGGU INI
1.028
1.061
Pek. Pasangan Batu + Adukan (Mekanis)
NO. URAIAN PEKERJAAN
TAHAP KEMAJUAN PEKERJAAN
Pengulkuran Dan Pematokan
Mobilisasi Dan Demobilisasi
Penyiapan Badan Jalan
DEVISI II - PEKERJAAN DRAINASE
Pek. Galian untuk selokan drainase dan
VOLUME SAT
Plastik Bond Breaker
Beton Campuran 1 PC : 2 Psr : 3 Kr
Baja Tulangan
M. DAHLAN S.Sos, S.T
PEKERJAAN : Pembangunan Jalan poros Desa Sebuku Kawasan Sebuku Kab. Nunukan MINGGU KE. : IV
INSTANSI : Dinas Pekerjaan Umum Propinsi Kalimantan Timur KONTRAKTOR PELAKSANA : PT. HASANAH JAYA
PEKERJAAN : Peningkatan Badan Jalan NILAI KONTRAK : Rp. 3.022.322.000,-
TAHUN ANGGARAN : 2013 JANGKA WAKTU (ADDENDUM) : 180 HARI
SUMBER DANA : APBN KONSULTAN SUPERVISI : CV. LUNDAYEH BORNEO CONSULTANT
HARGA JUMLAH BOBOT
SATUAN HARGA ( % ) MINGGU LALU MINGGU INI S/D MINGGU INI
(Rp.) (Rp.) BOBOT (%) BOBOT (%) BOBOT (%)
I DEVISI I - UMUM
1.1 1.00 Ls 2,500,000.00 2,500,000.00 0.0910 0.091 - 0.0910 Rp. 2,500,000.00
2.1 1.00 Ls 51,500,000.00 51,500,000.00 1.8744 0.970 0.4480 1.4180 Rp. 38,960,809.25
3.1 11,306.36 M2 5,963.59 67,426,495.43 2.4540 - - - -
-
II -
1.2 2,261.26 M3 50,025.36 113,120,345.55 4.1171 - 0.0760 0.0760 2,088,152.09
2.2 1,072.10 M3 961,390.76 1,030,707,033.80 37.5134 - - - -
3.2 5,261.18 M2 26,965.37 141,869,665.34 5.1635 - - - -
-
III -
1.3 706.65 M3 826,715.91 584,198,797.80 21.2624 - - -
2.3 1,413.30 M3 489,673.88 692,056,094.60 25.1879 - - - -
3.3 423.99 M3 113,065.32 47,938,565.03 1.7448 - - - -
-
IV. -
1.4 12.00 M2 8,000.00 96,000.00 0.0035 - - -
2.4 1.80 M3 1,942,661.93 3,496,791.47 0.1273 - - - -
3.4 405.08 Kg 31,250.00 12,658,750.00 0.4607 - - - -
JUMLAH 22,865.72 2,747,568,539.02 100.00 1.0610 0.5240 1.5850 Rp. 43,548,961.34
Diperiksa Oleh Diajukan RENCANA (%)
Disetujui Oleh Konsultan Supervisi Kontraktor Pelaksana REALISASI (%)
Pejabat Pembuat Komitmen, CV. LUNDAYEH BORNEO CONSULTANT PT. HASANAH JAYA SELISIH (%)
Ir. DWI HADI JUNAIDI SULASMAN ODE, S.T
NIP. 19590528 198502 1 062 Site Engineer Site manager
BOBOT KEMAJUAN PEKERJAAN MINGGUAN
NO. URAIAN PEKERJAAN VOLUME SAT
TAHAP KEMAJUAN PEKERJAAN
KETERANGAN
DEVISI IV - PEKERJAAN JEMBATAN
Pengulkuran Dan Pematokan
Mobilisasi Dan Demobilisasi
Penyiapan Badan Jalan
DEVISI II - PEKERJAAN DRAINASE
Pek. Galian untuk selokan drainase dan
Pek. Pasangan Batu + Adukan (Mekanis)
Pek. Plesteran Cam 1:3 T = 15 mm
DEVISI III - PEKERJAAN PERKERASAN BERBUTIR
Lap. Pondasi Agregat Kls B T = 10 cm
Lap. Pondasi Bawah Telford T = 20 cm
Urugan tanah pilihan
Plastik Bond Breaker
Beton Campuran 1 PC : 2 Psr : 3 Kr
Baja Tulangan
PROGRES SAMPAI DENGAN MINGGU INI
1.726
1.585
-0.141
M. DAHLAN S.Sos, S.T
PEKERJAAN : Pembangunan Jalan poros Desa Sebuku Kawasan Sebuku Kab. Nunukan MINGGU KE. : V
INSTANSI : Dinas Pekerjaan Umum Propinsi Kalimantan Timur KONTRAKTOR PELAKSANA : PT. HASANAH JAYA
PEKERJAAN : Peningkatan Badan Jalan NILAI KONTRAK : Rp. 3.022.322.000,-
TAHUN ANGGARAN : 2013 JANGKA WAKTU (ADDENDUM) : 180 HARI
SUMBER DANA : APBN KONSULTAN SUPERVISI : CV. LUNDAYEH BORNEO CONSULTANT
HARGA JUMLAH BOBOT
SATUAN HARGA ( % ) MINGGU LALU MINGGU INI S/D MINGGU INI
(Rp.) (Rp.) BOBOT (%) BOBOT (%) BOBOT (%)
I DEVISI I - UMUM
1.1 1.00 Ls 2,500,000.00 2,500,000.00 0.0910 0.091 - 0.0910 Rp. 2,500,000.00
2.1 1.00 Ls 51,500,000.00 51,500,000.00 1.8744 1.418 - 1.4180 Rp. 38,960,809.25
3.1 11,306.36 M2 5,963.59 67,426,495.43 2.4540 - - - -
-
II -
1.2 2,261.26 M3 50,025.36 113,120,345.55 4.1171 0.076 0.3510 0.4270 Rp. 11,732,117.66
2.2 1,072.10 M3 961,390.76 1,030,707,033.80 37.5134 - - - -
3.2 5,261.18 M2 26,965.37 141,869,665.34 5.1635 - - - -
-
III -
1.3 706.65 M3 826,715.91 584,198,797.80 21.2624 - - -
2.3 1,413.30 M3 489,673.88 692,056,094.60 25.1879 - - - -
3.3 423.99 M3 113,065.32 47,938,565.03 1.7448 - - - -
-
IV. -
1.4 12.00 M2 8,000.00 96,000.00 0.0035 - - -
2.4 1.80 M3 1,942,661.93 3,496,791.47 0.1273 - - - -
3.4 405.08 Kg 31,250.00 12,658,750.00 0.4607 - - - -
JUMLAH 22,865.72 2,747,568,539.02 100.00 1.5850 0.3510 1.9360 Rp. 53,192,926.92
Diperiksa Oleh Diajukan RENCANA (%)
Disetujui Oleh Konsultan Supervisi Kontraktor Pelaksana REALISASI (%)
Pejabat Pembuat Komitmen, CV. LUNDAYEH BORNEO CONSULTANT PT. HASANAH JAYA SELISIH (%)
Ir. DWI HADI JUNAIDI SULASMAN ODE, S.T
NIP. 19590528 198502 1 062 Site Engineer Site manager
BOBOT KEMAJUAN PEKERJAAN MINGGUAN
NO. URAIAN PEKERJAAN VOLUME SAT
TAHAP KEMAJUAN PEKERJAAN
KETERANGAN
DEVISI IV - PEKERJAAN JEMBATAN
Pengulkuran Dan Pematokan
Mobilisasi Dan Demobilisasi
Penyiapan Badan Jalan
DEVISI II - PEKERJAAN DRAINASE
Pek. Galian untuk selokan drainase dan
Pek. Pasangan Batu + Adukan (Mekanis)
Pek. Plesteran Cam 1:3 T = 15 mm
DEVISI III - PEKERJAAN PERKERASAN BERBUTIR
Lap. Pondasi Agregat Kls B T = 10 cm
Lap. Pondasi Bawah Telford T = 20 cm
Urugan tanah pilihan
Plastik Bond Breaker
Beton Campuran 1 PC : 2 Psr : 3 Kr
Baja Tulangan
PROGRES SAMPAI DENGAN MINGGU INI
1.954
1.936
-0.018
M. DAHLAN S.Sos, S.T
PEKERJAAN : Pembangunan Jalan poros Desa Sebuku Kawasan Sebuku Kab. Nunukan BULAN : JULI
INSTANSI : Dinas Pekerjaan Umum Propinsi Kalimantan Timur KONTRAKTOR PELAKSANA : PT. HASANAH JAYA
PEKERJAAN : Peningkatan Badan Jalan NILAI KONTRAK : Rp. 3.022.322.000,-
TAHUN ANGGARAN : 2013 JANGKA WAKTU (ADDENDUM) : 180 HARI
SUMBER DANA : APBN KONSULTAN SUPERVISI : CV. LUNDAYEH BORNEO CONSULTANT
HARGA JUMLAH BOBOT
SATUAN HARGA ( % ) MINGGU LALU MINGGU INI S/D MINGGU INI
(Rp.) (Rp.) BOBOT (%) BOBOT (%) BOBOT (%)
I DEVISI I - UMUM
1.1 1.00 Ls 2,500,000.00 2,500,000.00 0.0910 0.091 - 0.0910 Rp. 2,500,000.00
2.1 1.00 Ls 51,500,000.00 51,500,000.00 1.8744 1.418 - 1.4180 Rp. 38,960,809.25
3.1 11,306.36 M2 5,963.59 67,426,495.43 2.4540 - - - -
-
II -
1.2 2,261.26 M3 50,025.36 113,120,345.55 4.1171 0.076 0.3510 0.4270 Rp. 11,732,117.66
2.2 1,072.10 M3 961,390.76 1,030,707,033.80 37.5134 - - - -
3.2 5,261.18 M2 26,965.37 141,869,665.34 5.1635 - - - -
-
III -
1.3 706.65 M3 826,715.91 584,198,797.80 21.2624 - - -
2.3 1,413.30 M3 489,673.88 692,056,094.60 25.1879 - - - -
3.3 423.99 M3 113,065.32 47,938,565.03 1.7448 - - - -
-
IV. -
1.4 12.00 M2 8,000.00 96,000.00 0.0035 - - -
2.4 1.80 M3 1,942,661.93 3,496,791.47 0.1273 - - - -
3.4 405.08 Kg 31,250.00 12,658,750.00 0.4607 - - - -
JUMLAH 22,865.72 2,747,568,539.02 100.00 1.5850 0.3510 1.9360 Rp. 53,192,926.92
Diperiksa Oleh Diajukan RENCANA (%)
Disetujui Oleh Konsultan Supervisi Kontraktor Pelaksana REALISASI (%)
Pejabat Pembuat Komitmen, CV. LUNDAYEH BORNEO CONSULTANT PT. HASANAH JAYA SELISIH (%)
Ir. DWI HADI JUNAIDI SULASMAN ODE, S.T
NIP. 19590528 198502 1 062 Site Engineer Site manager
PROGRES SAMPAI DENGAN MINGGU INI
0.045
1.936
1.891
VOLUME
DEVISI II - PEKERJAAN DRAINASE
Pek. Galian untuk selokan drainase dan
Penyiapan Badan Jalan
M. DAHLAN S.Sos, S.T
Pek. Pasangan Batu + Adukan (Mekanis)
Pengulkuran Dan Pematokan
Mobilisasi Dan Demobilisasi
NO. URAIAN PEKERJAAN
BOBOT KEMAJUAN PEKERJAAN BULANAN
KETERANGAN
Pek. Plesteran Cam 1:3 T = 15 mm
DEVISI III - PEKERJAAN PERKERASAN BERBUTIR
Lap. Pondasi Agregat Kls B T = 10 cm
Lap. Pondasi Bawah Telford T = 20 cm
Urugan tanah pilihan
DEVISI IV - PEKERJAAN JEMBATAN
Plastik Bond Breaker
Beton Campuran 1 PC : 2 Psr : 3 Kr
Baja Tulangan
SAT
TAHAP KEMAJUAN PEKERJAAN
PEKERJAAN : PEMBANGUNAN JALAN POROS DESA SEBUKU KAWASAN SEBUKU KAB. NUNUKAN NILAI KONTRAK : Rp. 3.022.286.000,00
SUMBER DANA : APBN NO. KONTRAK : 915/SPK.15/SEBUKU/PK-PP-DESA/2013
PROPINSI : KALIMANTAN TIMUR KONTRAKTIR PELAKSANA : PT. HASANAH JAYA
TAHUN ANGGARAN : 2013 KONSULTAN SUPERVISI : CV. LUNDAYEH BORNEO CONSULTANT
JUNI
27 - 30 1 - 7 8 - 14 15 - 21 22 - 31 1 - 7 8 - 14 15 - 21 22 - 31 1 - 7 8 - 14 15 - 21 22 - 30 1 - 7 8 - 14 15 - 21 22 - 31 1 - 7 8 - 14 15 - 21 22 - 31 1 - 7 8 - 14 15 - 21 22 - 31
I.
UMUM
1.1 1.00 Ls 2,500,000.00 2,500,000.00 0.091 0.045 0.045
1.2 1.00 Ls 51,500,000.00 51,500,000.00 1.874 0.469 0.469 0.469 0.469
1.3 11,306.36 M2 5,963.59 67,426,495.43 2.454 0.307 0.307 0.307 0.307 0.307 0.307 0.307 0.307
121,426,495.43 4.419
II.
PEKERJAAN DRAINASE
1.1 2,261.26 M3 50,025.36 113,120,345.55 4.117 0.229 0.229 0.229 0.229 0.229 0.229 0.229 0.229 0.229 0.229 0.229 0.229 0.229 0.229 0.229 0.229 0.229 0.229
1.2 1,072.10 M3 961,390.76 1,030,707,033.80 37.513 2.501 2.501 2.501 2.501 2.501 2.501 2.501 2.501 2.501 2.501 2.501 2.501 2.501 2.501 2.501
1.3 5,261.18 M2 26,965.37 141,869,665.34 5.163 0.469 0.469 0.469 0.469 0.469 0.469 0.469 0.469 0.469 0.469 0.469
1,285,697,044.69 46.794
III.
PEKERJAAN PERKERASAN BERBUTIR
1.1 706.65 M3 826,715.91 584,198,797.80 21.262 3.037 3.037 3.037 3.037 3.037 3.037 3.037
1.2 1,413.30 M3 489,673.88 692,056,094.60 25.188 3.148 3.148 3.148 3.148 3.148 3.148 3.148 3.148
1.3 423.99 M3 113,065.32 47,938,565.03 1.745 0.582 0.582 0.582
Sub Total Biaya Umum 1,324,193,457.43 48.195
IV.
PEKERJAAN JEMBATAN
1.1 12.00 M2 8,000.00 96,000.00 0.003 0.002 0.002 0.002
1.2 1.80 M3 1,942,661.93 3,496,791.47 0.127 0.064 0.064 0.064
1.3 405.08 Kg 31,250.00 12,658,750.00 0.461 0.230 0.230 0.230
16,251,541.47 0.591
A. 2,747,568,539.02 100
B. PAJAK PERTAMBAHAN NILAI (10%) 274,756,853.90
C. JUMLAH HARGA 3,022,325,392.93
D. DIBULATKAN 3,022,286,000.00
RENCANA 0.045 0.514 0.469 0.697 0.229 0.535 0.535 0.535 0.535 6.185 6.185 6.185 6.185 6.348 6.348 6.348 6.348 6.237 6.237 6.237 6.237 6.885 6.885 6.885 0.469
KUMULATIF 0 0.045 0.560 1.028 1.726 1.954 2.490 3.025 3.561 4.096 10.281 16.466 22.651 28.836 35.183 41.531 47.878 54.226 60.462 66.699 72.935 79.172 86.057 92.942 99.827 #####
REALISASI 0 0.045 0.503 0.513 0.524 0.351 1.215 1.320 1.520 0.440 5.953
KUMULATIF 0 0.045 0.548 1.061 1.585 1.936 3.151 4.471 5.991 6.431 12.384
DEVIASI
Sub Total Biaya Umum
JUMLAH HARGA FISIK
PROGRES (%)
PROGRES PELAKSANAAN KEGIATAN BULAN JULI 2013
Lap. Pondasi Bawah Telford T = 20 cm
Urugan tanah pilihan
DEVISI IV
Plastik Bond Breaker
Beton Campuran 1 PC : 2 Psr : 3 Kr
Baja Tulangan
Pek. Galian untuk selokan drainase dan
Pek. Pasangan Batu + Adukan (Mekanis)
Pek. Plesteran Cam 1:3 T = 15 mm
Sub Total Biaya Umum
DEVISI III
Lap. Pondasi Agregat Kls B T = 10 cm
DEVISI II
AGUSTUS SEPTEMBER OKTOBER NOVEMBER
DEVISI I
Pengulkuran Dan Pematokan
Mobilisasi Dan Demobilisasi
Penyiapan Badan Jalan
Sub Total Biaya Umum
DESEMBER NO. URAIAN PEKERJAAN
PERKIRAAN
KWANTITAS
SAT
HARGA SATUAN
(Rp)
JUMLAH (Rp)
BOBOT
(%)
WAKTU PELAKSANAAN 180 HARI KALENDER
JULI
0.50
0.503 0.513 0.524 0.351 1.215 1.320 1.520 0.440
1,189.00
1,189.00 =
123
118,251,063.48
4.303843992
0.091 0.091
1.874 1.874
2.454 2.454
0.000 4.419
0.000 0.000
4.117 4.117
37.513 37.513
5.163 5.163
0.000 46.794
0.000 0.000
21.262 21.262
25.188 25.188
1.745 1.745
0.000 48.195
0.000 0.000
0.005 0.003
0.191 0.127
0.691 0.461
0.000 0.591
PEKERJAAN : Pembangunan Jalan poros Desa Sebuku Kawasan Sebuku Kab. Nunukan MINGGU KE. : VI
INSTANSI : Dinas Pekerjaan Umum Propinsi Kalimantan Timur KONTRAKTOR PELAKSANA : PT. HASANAH JAYA
PEKERJAAN : Peningkatan Badan Jalan NILAI KONTRAK : Rp. 3.022.322.000,-
TAHUN ANGGARAN : 2013 JANGKA WAKTU (ADDENDUM) : 180 HARI
SUMBER DANA : APBN KONSULTAN SUPERVISI : CV. LUNDAYEH BORNEO CONSULTANT
HARGA JUMLAH BOBOT
SATUAN HARGA ( % ) MINGGU LALU MINGGU INI S/D MINGGU INI
(Rp.) (Rp.) BOBOT (%) BOBOT (%) BOBOT (%)
I DEVISI I - UMUM
1.1 1.00 Ls 2,500,000.00 2,500,000.00 0.0910 0.091 - 0.0910 Rp. 2,500,000.00
2.1 1.00 Ls 51,500,000.00 51,500,000.00 1.8744 1.418 - 1.4180 Rp. 38,960,809.25
3.1 11,306.36 M2 5,963.59 67,426,495.43 2.4540 - - - -
-
II -
1.2 2,261.26 M3 50,025.36 113,120,345.55 4.1171 0.427 1.2150 1.6420 Rp. 45,115,075.41
2.2 1,072.10 M3 961,390.76 1,030,707,033.80 37.5134 - - - -
3.2 5,261.18 M2 26,965.37 141,869,665.34 5.1635 - - - -
-
III -
1.3 706.65 M3 826,715.91 584,198,797.80 21.2624 - - -
2.3 1,413.30 M3 489,673.88 692,056,094.60 25.1879 - - - -
3.3 423.99 M3 113,065.32 47,938,565.03 1.7448 - - - -
-
IV. -
1.4 12.00 M2 8,000.00 96,000.00 0.0035 - - -
2.4 1.80 M3 1,942,661.93 3,496,791.47 0.1273 - - - -
3.4 405.08 Kg 31,250.00 12,658,750.00 0.4607 - - - -
JUMLAH 22,865.72 2,747,568,539.02 100.00 1.9360 1.2150 3.1510 Rp. 86,575,884.66
Diperiksa Oleh Diajukan RENCANA (%)
Disetujui Oleh Konsultan Supervisi Kontraktor Pelaksana REALISASI (%)
Pejabat Pembuat Komitmen, CV. LUNDAYEH BORNEO CONSULTANT PT. HASANAH JAYA SELISIH (%)
Ir. DWI HADI JUNAIDI SULASMAN ODE, S.T
NIP. 19590528 198502 1 062 Site Engineer Site manager
Plastik Bond Breaker
Beton Campuran 1 PC : 2 Psr : 3 Kr
Baja Tulangan
PROGRES SAMPAI DENGAN MINGGU INI
2.490
3.151
0.661
M. DAHLAN S.Sos, S.T
DEVISI IV - PEKERJAAN JEMBATAN
Pengulkuran Dan Pematokan
Mobilisasi Dan Demobilisasi
Penyiapan Badan Jalan
DEVISI II - PEKERJAAN DRAINASE
Pek. Galian untuk selokan drainase dan
Pek. Pasangan Batu + Adukan (Mekanis)
Pek. Plesteran Cam 1:3 T = 15 mm
DEVISI III - PEKERJAAN PERKERASAN BERBUTIR
Lap. Pondasi Agregat Kls B T = 10 cm
Lap. Pondasi Bawah Telford T = 20 cm
Urugan tanah pilihan
BOBOT KEMAJUAN PEKERJAAN MINGGUAN
NO. URAIAN PEKERJAAN VOLUME SAT
TAHAP KEMAJUAN PEKERJAAN
KETERANGAN
PEKERJAAN : Pembangunan Jalan poros Desa Sebuku Kawasan Sebuku Kab. Nunukan MINGGU KE. : VII
INSTANSI : Dinas Pekerjaan Umum Propinsi Kalimantan Timur KONTRAKTOR PELAKSANA : PT. HASANAH JAYA
PEKERJAAN : Peningkatan Badan Jalan NILAI KONTRAK : Rp. 3.022.322.000,-
TAHUN ANGGARAN : 2013 JANGKA WAKTU (ADDENDUM) : 180 HARI
SUMBER DANA : APBN KONSULTAN SUPERVISI : CV. LUNDAYEH BORNEO CONSULTANT
HARGA JUMLAH BOBOT
SATUAN HARGA ( % ) MINGGU LALU MINGGU INI S/D MINGGU INI
(Rp.) (Rp.) BOBOT (%) BOBOT (%) BOBOT (%)
I DEVISI I - UMUM
1.1 1.00 Ls 2,500,000.00 2,500,000.00 0.0910 0.091 - 0.0910 Rp. 2,500,000.00
2.1 1.00 Ls 51,500,000.00 51,500,000.00 1.8744 1.418 - 1.4180 Rp. 38,960,809.25
3.1 11,306.36 M2 5,963.59 67,426,495.43 2.4540 - 0.2750 0.2750 Rp. 7,555,813.48
-
II -
1.2 2,261.26 M3 50,025.36 113,120,345.55 4.1171 1.642 1.0450 2.6870 Rp. 73,827,166.64
2.2 1,072.10 M3 961,390.76 1,030,707,033.80 37.5134 - - - -
3.2 5,261.18 M2 26,965.37 141,869,665.34 5.1635 - - - -
-
III -
1.3 706.65 M3 826,715.91 584,198,797.80 21.2624 - - -
2.3 1,413.30 M3 489,673.88 692,056,094.60 25.1879 - - - -
3.3 423.99 M3 113,065.32 47,938,565.03 1.7448 - - - -
-
IV. -
1.4 12.00 M2 8,000.00 96,000.00 0.0035 - - -
2.4 1.80 M3 1,942,661.93 3,496,791.47 0.1273 - - - -
3.4 405.08 Kg 31,250.00 12,658,750.00 0.4607 - - - -
JUMLAH 22,865.72 2,747,568,539.02 100.00 3.1510 1.3200 4.4710 Rp. 122,843,789.38
Diperiksa Oleh Diajukan RENCANA (%)
Disetujui Oleh Konsultan Supervisi Kontraktor Pelaksana REALISASI (%)
Pejabat Pembuat Komitmen, CV. LUNDAYEH BORNEO CONSULTANT PT. HASANAH JAYA SELISIH (%)
Ir. DWI HADI JUNAIDI SULASMAN ODE, S.T
NIP. 19590528 198502 1 062 Site Engineer Site manager
Plastik Bond Breaker
Beton Campuran 1 PC : 2 Psr : 3 Kr
Baja Tulangan
PROGRES SAMPAI DENGAN MINGGU INI
3.025
4.471
1.446
M. DAHLAN S.Sos, S.T
DEVISI IV - PEKERJAAN JEMBATAN
Pengulkuran Dan Pematokan
Mobilisasi Dan Demobilisasi
Penyiapan Badan Jalan
DEVISI II - PEKERJAAN DRAINASE
Pek. Galian untuk selokan drainase dan
Pek. Pasangan Batu + Adukan (Mekanis)
Pek. Plesteran Cam 1:3 T = 15 mm
DEVISI III - PEKERJAAN PERKERASAN BERBUTIR
Lap. Pondasi Agregat Kls B T = 10 cm
Lap. Pondasi Bawah Telford T = 20 cm
Urugan tanah pilihan
BOBOT KEMAJUAN PEKERJAAN MINGGUAN
NO. URAIAN PEKERJAAN VOLUME SAT
TAHAP KEMAJUAN PEKERJAAN
KETERANGAN
PEKERJAAN : Pembangunan Jalan poros Desa Sebuku Kawasan Sebuku Kab. Nunukan MINGGU KE. : VIII
INSTANSI : Dinas Pekerjaan Umum Propinsi Kalimantan Timur KONTRAKTOR PELAKSANA : PT. HASANAH JAYA
PEKERJAAN : Peningkatan Badan Jalan NILAI KONTRAK : Rp. 3.022.322.000,-
TAHUN ANGGARAN : 2013 JANGKA WAKTU (ADDENDUM) : 180 HARI
SUMBER DANA : APBN KONSULTAN SUPERVISI : CV. LUNDAYEH BORNEO CONSULTANT
HARGA JUMLAH BOBOT
SATUAN HARGA ( % ) MINGGU LALU MINGGU INI S/D MINGGU INI
(Rp.) (Rp.) BOBOT (%) BOBOT (%) BOBOT (%)
I DEVISI I - UMUM
1.1 1.00 Ls 2,500,000.00 2,500,000.00 0.0910 0.091 - 0.0910 Rp. 2,500,000.00
2.1 1.00 Ls 51,500,000.00 51,500,000.00 1.8744 1.418 - 1.4180 Rp. 38,960,809.25
3.1 11,306.36 M2 5,963.59 67,426,495.43 2.4540 0.275 0.3000 0.5750 Rp. 15,798,519.10
-
II -
1.2 2,261.26 M3 50,025.36 113,120,345.55 4.1171 2.687 1.2200 3.9070 Rp. 107,347,502.82
2.2 1,072.10 M3 961,390.76 1,030,707,033.80 37.5134 - - - -
3.2 5,261.18 M2 26,965.37 141,869,665.34 5.1635 - - - -
-
III -
1.3 706.65 M3 826,715.91 584,198,797.80 21.2624 - - -
2.3 1,413.30 M3 489,673.88 692,056,094.60 25.1879 - - - -
3.3 423.99 M3 113,065.32 47,938,565.03 1.7448 - - - -
-
IV. -
1.4 12.00 M2 8,000.00 96,000.00 0.0035 - - -
2.4 1.80 M3 1,942,661.93 3,496,791.47 0.1273 - - - -
3.4 405.08 Kg 31,250.00 12,658,750.00 0.4607 - - - -
JUMLAH 22,865.72 2,747,568,539.02 100.00 4.4710 1.5200 5.9910 Rp. 164,606,831.17
Diperiksa Oleh Diajukan RENCANA (%)
Disetujui Oleh Konsultan Supervisi Kontraktor Pelaksana REALISASI (%)
Pejabat Pembuat Komitmen, CV. LUNDAYEH BORNEO CONSULTANT PT. HASANAH JAYA SELISIH (%)
Ir. DWI HADI JUNAIDI SULASMAN ODE, S.T
NIP. 19590528 198502 1 062 Site Engineer Site manager
Plastik Bond Breaker
Beton Campuran 1 PC : 2 Psr : 3 Kr
Baja Tulangan
PROGRES SAMPAI DENGAN MINGGU INI
3.561
5.991
2.430
M. DAHLAN S.Sos, S.T
DEVISI IV - PEKERJAAN JEMBATAN
Pengulkuran Dan Pematokan
Mobilisasi Dan Demobilisasi
Penyiapan Badan Jalan
DEVISI II - PEKERJAAN DRAINASE
Pek. Galian untuk selokan drainase dan
Pek. Pasangan Batu + Adukan (Mekanis)
Pek. Plesteran Cam 1:3 T = 15 mm
DEVISI III - PEKERJAAN PERKERASAN BERBUTIR
Lap. Pondasi Agregat Kls B T = 10 cm
Lap. Pondasi Bawah Telford T = 20 cm
Urugan tanah pilihan
BOBOT KEMAJUAN PEKERJAAN MINGGUAN
NO. URAIAN PEKERJAAN VOLUME SAT
TAHAP KEMAJUAN PEKERJAAN
KETERANGAN
PEKERJAAN : Pembangunan Jalan poros Desa Sebuku Kawasan Sebuku Kab. Nunukan MINGGU KE. : IX
INSTANSI : Dinas Pekerjaan Umum Propinsi Kalimantan Timur KONTRAKTOR PELAKSANA : PT. HASANAH JAYA
PEKERJAAN : Peningkatan Badan Jalan NILAI KONTRAK : Rp. 3.022.322.000,-
TAHUN ANGGARAN : 2013 JANGKA WAKTU (ADDENDUM) : 180 HARI
SUMBER DANA : APBN KONSULTAN SUPERVISI : CV. LUNDAYEH BORNEO CONSULTANT
HARGA JUMLAH BOBOT
SATUAN HARGA ( % ) MINGGU LALU MINGGU INI S/D MINGGU INI
(Rp.) (Rp.) BOBOT (%) BOBOT (%) BOBOT (%)
I DEVISI I - UMUM
1.1 1.00 Ls 2,500,000.00 2,500,000.00 0.0910 0.091 - 0.0910 Rp. 2,500,000.00
2.1 1.00 Ls 51,500,000.00 51,500,000.00 1.8744 1.418 - 1.4180 Rp. 38,960,809.25
3.1 11,306.36 M2 5,963.59 67,426,495.43 2.4540 0.575 0.2300 0.8050 Rp. 22,117,926.74
-
II -
1.2 2,261.26 M3 50,025.36 113,120,345.55 4.1171 3.907 0.2101 4.1171 Rp. 113,120,345.55
2.2 1,072.10 M3 961,390.76 1,030,707,033.80 37.5134 - - - -
3.2 5,261.18 M2 26,965.37 141,869,665.34 5.1635 - - - -
-
III -
1.3 706.65 M3 826,715.91 584,198,797.80 21.2624 - - -
2.3 1,413.30 M3 489,673.88 692,056,094.60 25.1879 - - - -
3.3 423.99 M3 113,065.32 47,938,565.03 1.7448 - - - -
-
IV. -
1.4 12.00 M2 8,000.00 96,000.00 0.0035 - - -
2.4 1.80 M3 1,942,661.93 3,496,791.47 0.1273 - - - -
3.4 405.08 Kg 31,250.00 12,658,750.00 0.4607 - - - -
JUMLAH 22,865.72 2,747,568,539.02 100.00 5.9910 0.4401 6.4311 Rp. 176,699,081.55
Diperiksa Oleh Diajukan RENCANA (%)
Disetujui Oleh Konsultan Supervisi Kontraktor Pelaksana REALISASI (%)
Pejabat Pembuat Komitmen, CV. LUNDAYEH BORNEO CONSULTANT PT. HASANAH JAYA SELISIH (%)
Ir. DWI HADI JUNAIDI SULASMAN ODE, S.T
NIP. 19590528 198502 1 062 Site Engineer Site manager
Plastik Bond Breaker
Beton Campuran 1 PC : 2 Psr : 3 Kr
Baja Tulangan
PROGRES SAMPAI DENGAN MINGGU INI
4.096
6.431
2.335
M. DAHLAN S.Sos, S.T
DEVISI IV - PEKERJAAN JEMBATAN
Pengulkuran Dan Pematokan
Mobilisasi Dan Demobilisasi
Penyiapan Badan Jalan
DEVISI II - PEKERJAAN DRAINASE
Pek. Galian untuk selokan drainase dan
Pek. Pasangan Batu + Adukan (Mekanis)
Pek. Plesteran Cam 1:3 T = 15 mm
DEVISI III - PEKERJAAN PERKERASAN BERBUTIR
Lap. Pondasi Agregat Kls B T = 10 cm
Lap. Pondasi Bawah Telford T = 20 cm
Urugan tanah pilihan
BOBOT KEMAJUAN PEKERJAAN MINGGUAN
NO. URAIAN PEKERJAAN VOLUME SAT
TAHAP KEMAJUAN PEKERJAAN
KETERANGAN
PEKERJAAN : Pembangunan Jalan poros Desa Sebuku Kawasan Sebuku Kab. Nunukan BULAN : AGUSTUS
INSTANSI : Dinas Pekerjaan Umum Propinsi Kalimantan Timur KONTRAKTOR PELAKSANA : PT. HASANAH JAYA
PEKERJAAN : Peningkatan Badan Jalan NILAI KONTRAK : Rp. 3.022.322.000,-
TAHUN ANGGARAN : 2013 JANGKA WAKTU (ADDENDUM) : 180 HARI
SUMBER DANA : APBN KONSULTAN SUPERVISI : CV. LUNDAYEH BORNEO CONSULTANT
HARGA JUMLAH BOBOT
SATUAN HARGA ( % ) MINGGU LALU MINGGU INI S/D MINGGU INI
(Rp.) (Rp.) BOBOT (%) BOBOT (%) BOBOT (%)
I DEVISI I - UMUM
1.1 1.00 Ls 2,500,000.00 2,500,000.00 0.0910 0.091 - 0.0910 Rp. 2,500,000.00
2.1 1.00 Ls 51,500,000.00 51,500,000.00 1.8744 1.418 - 1.4180 Rp. 38,960,809.25
3.1 11,306.36 M2 5,963.59 67,426,495.43 2.4540 0.575 0.2300 0.8050 Rp. 22,117,926.74
-
II -
1.2 2,261.26 M3 50,025.36 113,120,345.55 4.1171 3.907 0.2101 4.1171 Rp. 113,120,345.55
2.2 1,072.10 M3 961,390.76 1,030,707,033.80 37.5134 - - - -
3.2 5,261.18 M2 26,965.37 141,869,665.34 5.1635 - - - -
-
III -
1.3 706.65 M3 826,715.91 584,198,797.80 21.2624 - - -
2.3 1,413.30 M3 489,673.88 692,056,094.60 25.1879 - - - -
3.3 423.99 M3 113,065.32 47,938,565.03 1.7448 - - - -
-
IV. -
1.4 12.00 M2 8,000.00 96,000.00 0.0035 - - -
2.4 1.80 M3 1,942,661.93 3,496,791.47 0.1273 - - - -
3.4 405.08 Kg 31,250.00 12,658,750.00 0.4607 - - - -
JUMLAH 22,865.72 2,747,568,539.02 100.00 5.9910 0.4401 6.4311 Rp. 176,699,081.55
Diperiksa Oleh Diajukan RENCANA (%)
Disetujui Oleh Konsultan Supervisi Kontraktor Pelaksana REALISASI (%)
Pejabat Pembuat Komitmen, CV. LUNDAYEH BORNEO CONSULTANT PT. HASANAH JAYA SELISIH (%)
Ir. DWI HADI JUNAIDI SULASMAN ODE, S.T
NIP. 19590528 198502 1 062 Site Engineer Site manager
BOBOT KEMAJUAN PEKERJAAN BULAN AGUSTUS
NO. URAIAN PEKERJAAN VOLUME SAT
TAHAP KEMAJUAN PEKERJAAN
KETERANGAN
DEVISI IV - PEKERJAAN JEMBATAN
Pengulkuran Dan Pematokan
Mobilisasi Dan Demobilisasi
Penyiapan Badan Jalan
DEVISI II - PEKERJAAN DRAINASE
Pek. Galian untuk selokan drainase dan
Pek. Pasangan Batu + Adukan (Mekanis)
Pek. Plesteran Cam 1:3 T = 15 mm
DEVISI III - PEKERJAAN PERKERASAN BERBUTIR
Lap. Pondasi Agregat Kls B T = 10 cm
Lap. Pondasi Bawah Telford T = 20 cm
Urugan tanah pilihan
Plastik Bond Breaker
Beton Campuran 1 PC : 2 Psr : 3 Kr
Baja Tulangan
PROGRES SAMPAI DENGAN MINGGU INI
0.045
6.431
6.386
M. DAHLAN S.Sos, S.T
PEKERJAAN : PEMBANGUNAN JALAN POROS DESA SEBUKU KAWASAN SEBUKU KAB. NUNUKAN NILAI KONTRAK : Rp. 3.022.286.000,00
SUMBER DANA : APBN NO. KONTRAK : 915/SPK.15/SEBUKU/PK-PP-DESA/2013
PROPINSI : KALIMANTAN TIMUR KONTRAKTIR PELAKSANA : PT. HASANAH JAYA
TAHUN ANGGARAN : 2013 KONSULTAN SUPERVISI : CV. LUNDAYEH BORNEO CONSULTANT
JUNI
27 - 30 1 - 7 8 - 14 15 - 21 22 - 31 1 - 7 8 - 14 15 - 21 22 - 31 1 - 7 8 - 14 15 - 21 22 - 30 1 - 7 8 - 14 15 - 21 22 - 31 1 - 7 8 - 14 15 - 21 22 - 31 1 - 7 8 - 14 15 - 21 22 - 31
I.
UMUM
1.1 1.00 Ls 2,500,000.00 2,500,000.00 0.091 0.045 0.045
1.2 1.00 Ls 51,500,000.00 51,500,000.00 1.874 0.469 0.469 0.469 0.469
1.3 11,306.36 M2 5,963.59 67,426,495.43 2.454 0.307 0.307 0.307 0.307 0.307 0.307 0.307 0.307
121,426,495.43 4.419
II.
PEKERJAAN DRAINASE
1.1 2,261.26 M3 50,025.36 113,120,345.55 4.117 0.229 0.229 0.229 0.229 0.229 0.229 0.229 0.229 0.229 0.229 0.229 0.229 0.229 0.229 0.229 0.229 0.229 0.229
1.2 1,072.10 M3 961,390.76 1,030,707,033.80 37.513 2.501 2.501 2.501 2.501 2.501 2.501 2.501 2.501 2.501 2.501 2.501 2.501 2.501 2.501 2.501
1.3 5,261.18 M2 26,965.37 141,869,665.34 5.163 0.469 0.469 0.469 0.469 0.469 0.469 0.469 0.469 0.469 0.469 0.469
1,285,697,044.69 46.794
III.
PEKERJAAN PERKERASAN BERBUTIR
1.1 706.65 M3 826,715.91 584,198,797.80 21.262 3.037 3.037 3.037 3.037 3.037 3.037 3.037
1.2 1,413.30 M3 489,673.88 692,056,094.60 25.188 3.148 3.148 3.148 3.148 3.148 3.148 3.148 3.148
1.3 423.99 M3 113,065.32 47,938,565.03 1.745 0.582 0.582 0.582
Sub Total Biaya Umum 1,324,193,457.43 48.195
IV.
PEKERJAAN JEMBATAN
1.1 12.00 M2 8,000.00 96,000.00 0.003 0.002 0.002 0.002
1.2 1.80 M3 1,942,661.93 3,496,791.47 0.127 0.064 0.064 0.064
1.3 405.08 Kg 31,250.00 12,658,750.00 0.461 0.230 0.230 0.230
16,251,541.47 0.591
A. 2,747,568,539.02 100
B. PAJAK PERTAMBAHAN NILAI (10%) 274,756,853.90
C. JUMLAH HARGA 3,022,325,392.93
D. DIBULATKAN 3,022,286,000.00
RENCANA 0.045 0.514 0.469 0.697 0.229 0.535 0.535 0.535 0.535 6.185 6.185 6.185 6.185 6.348 6.348 6.348 6.348 6.237 6.237 6.237 6.237 6.885 6.885 6.885 0.469
KUMULATIF 0 0.045 0.560 1.028 1.726 1.954 2.490 3.025 3.561 4.096 10.281 16.466 22.651 28.836 35.183 41.531 47.878 54.226 60.462 66.699 72.935 79.172 86.057 92.942 99.827 #####
REALISASI 0 0.045 0.503 0.513 0.524 0.351 1.215 1.320 1.520 0.440 5.953
KUMULATIF 0 0.045 0.548 1.061 1.585 1.936 3.151 4.471 5.991 6.431 12.384
DEVIASI
DESEMBER
PROGRES PELAKSANAAN KEGIATAN BULAN AGUSTUS 2013
NO. URAIAN PEKERJAAN
PERKIRAAN
KWANTITAS
SAT
HARGA SATUAN
(Rp)
JUMLAH (Rp)
BOBOT
(%)
WAKTU PELAKSANAAN 180 HARI KALENDER
JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER
DEVISI III
DEVISI I
Pengulkuran Dan Pematokan
Mobilisasi Dan Demobilisasi
Penyiapan Badan Jalan
Sub Total Biaya Umum
DEVISI II
Pek. Galian untuk selokan drainase dan
Pek. Pasangan Batu + Adukan (Mekanis)
Pek. Plesteran Cam 1:3 T = 15 mm
Sub Total Biaya Umum
Baja Tulangan
Sub Total Biaya Umum
JUMLAH HARGA FISIK
PROGRES (%)
Lap. Pondasi Agregat Kls B T = 10 cm
Lap. Pondasi Bawah Telford T = 20 cm
Urugan tanah pilihan
DEVISI IV
Plastik Bond Breaker
Beton Campuran 1 PC : 2 Psr : 3 Kr
0.50
0.503 0.513 0.524 0.351 1.215 1.320 1.520 0.440
1,189.00
1,189.00 =
123
118,251,063.48
4.303843992
0.091 0.091
1.874 1.874
2.454 2.454
0.000 4.419
0.000 0.000
4.117 4.117
37.513 37.513
5.163 5.163
0.000 46.794
0.000 0.000
21.262 21.262
25.188 25.188
1.745 1.745
0.000 48.195
0.000 0.000
0.005 0.003
0.191 0.127
0.691 0.461
0.000 0.591
PEKERJAAN : Pembangunan Jalan poros Desa Sebuku Kawasan Sebuku Kab. Nunukan MINGGU KE. : X
INSTANSI : Dinas Pekerjaan Umum Propinsi Kalimantan Timur KONTRAKTOR PELAKSANA : PT. HASANAH JAYA
PEKERJAAN : Peningkatan Badan Jalan NILAI KONTRAK : Rp. 3.022.322.000,-
TAHUN ANGGARAN : 2013 JANGKA WAKTU (ADDENDUM) : 180 HARI
SUMBER DANA : APBN KONSULTAN SUPERVISI : CV. LUNDAYEH BORNEO CONSULTANT
HARGA JUMLAH BOBOT
SATUAN HARGA ( % ) MINGGU LALU MINGGU INI S/D MINGGU INI
(Rp.) (Rp.) BOBOT (%) BOBOT (%) BOBOT (%)
I DEVISI I - UMUM
1.1 1.00 Ls 2,500,000.00 2,500,000.00 0.0910 0.091 - 0.0910 Rp. 2,500,000.00
2.1 1.00 Ls 51,500,000.00 51,500,000.00 1.8744 1.418 - 1.4180 Rp. 38,960,809.25
3.1 11,306.36 M2 5,963.59 67,426,495.43 2.4540 0.805 1.6490 2.4540 Rp. 67,426,495.43
-
II -
1.2 2,261.26 M3 50,025.36 113,120,345.55 4.1171 4.117 - 4.1171 Rp. 113,120,345.55
2.2 1,072.10 M3 961,390.76 1,030,707,033.80 37.5134 - 4.3038 4.3038 Rp. 118,251,063.48
3.2 5,261.18 M2 26,965.37 141,869,665.34 5.1635 - - - -
-
III -
1.3 706.65 M3 826,715.91 584,198,797.80 21.2624 - - - -
2.3 1,413.30 M3 489,673.88 692,056,094.60 25.1879 - - - -
3.3 423.99 M3 113,065.32 47,938,565.03 1.7448 - - - -
-
IV. -
1.4 12.00 M2 8,000.00 96,000.00 0.0035 - - -
2.4 1.80 M3 1,942,661.93 3,496,791.47 0.1273 - - - -
3.4 405.08 Kg 31,250.00 12,658,750.00 0.4607 - - - -
JUMLAH 22,865.72 2,747,568,539.02 100.00 6.4311 5.9529 12.3840 Rp. 340,258,713.72
Diperiksa Oleh Diajukan RENCANA (%)
Disetujui Oleh Konsultan Supervisi Kontraktor Pelaksana REALISASI (%)
Pejabat Pembuat Komitmen, CV. LUNDAYEH BORNEO CONSULTANT PT. HASANAH JAYA SELISIH (%)
Ir. DWI HADI JUNAIDI SULASMAN ODE, S.T
NIP. 19590528 198502 1 062 Site Engineer Site manager
Plastik Bond Breaker
Beton Campuran 1 PC : 2 Psr : 3 Kr
Baja Tulangan
PROGRES SAMPAI DENGAN MINGGU INI
10.281
12.384
2.103
M. DAHLAN S.Sos, S.T
DEVISI IV - PEKERJAAN JEMBATAN
Pengulkuran Dan Pematokan
Mobilisasi Dan Demobilisasi
Penyiapan Badan Jalan
DEVISI II - PEKERJAAN DRAINASE
Pek. Galian untuk selokan drainase dan
Pek. Pasangan Batu + Adukan (Mekanis)
Pek. Plesteran Cam 1:3 T = 15 mm
DEVISI III - PEKERJAAN PERKERASAN BERBUTIR
Lap. Pondasi Agregat Kls B T = 10 cm
Lap. Pondasi Bawah Telford T = 20 cm
Urugan tanah pilihan
BOBOT KEMAJUAN PEKERJAAN MINGGUAN
NO. URAIAN PEKERJAAN VOLUME SAT
TAHAP KEMAJUAN PEKERJAAN
KETERANGAN
PEKERJAAN : Pembangunan Jalan poros Desa Sebuku Kawasan Sebuku Kab. Nunukan MINGGU KE. : XI
INSTANSI : Dinas Pekerjaan Umum Propinsi Kalimantan Timur KONTRAKTOR PELAKSANA : PT. HASANAH JAYA
PEKERJAAN : Peningkatan Badan Jalan NILAI KONTRAK : Rp. 3.022.322.000,-
TAHUN ANGGARAN : 2013 JANGKA WAKTU (ADDENDUM) : 180 HARI
SUMBER DANA : APBN KONSULTAN SUPERVISI : CV. LUNDAYEH BORNEO CONSULTANT
HARGA JUMLAH BOBOT
SATUAN HARGA ( % ) MINGGU LALU MINGGU INI S/D MINGGU INI
(Rp.) (Rp.) BOBOT (%) BOBOT (%) BOBOT (%)
I DEVISI I - UMUM
1.1 1.00 Ls 2,500,000.00 2,500,000.00 0.0910 0.091 - 0.0910 Rp. 2,500,000.00
2.1 1.00 Ls 51,500,000.00 51,500,000.00 1.8744 1.418 - 1.4180 Rp. 38,960,809.25
3.1 11,306.36 M2 5,963.59 67,426,495.43 2.4540 0.805 1.6490 2.4540 Rp. 67,426,495.43
-
II -
1.2 2,261.26 M3 50,025.36 113,120,345.55 4.1171 4.117 - 4.1171 Rp. 113,120,345.55
2.2 1,072.10 M3 961,390.76 1,030,707,033.80 37.5134 - 4.3038 4.3038 Rp. 118,251,063.48
3.2 5,261.18 M2 26,965.37 141,869,665.34 5.1635 - - - -
-
III -
1.3 706.65 M3 826,715.91 584,198,797.80 21.2624 - - - -
2.3 1,413.30 M3 489,673.88 692,056,094.60 25.1879 - - - -
3.3 423.99 M3 113,065.32 47,938,565.03 1.7448 - - - -
-
IV. -
1.4 12.00 M2 8,000.00 96,000.00 0.0035 - - -
2.4 1.80 M3 1,942,661.93 3,496,791.47 0.1273 - - - -
3.4 405.08 Kg 31,250.00 12,658,750.00 0.4607 - - - -
JUMLAH 22,865.72 2,747,568,539.02 100.00 6.4311 5.9529 12.3840 Rp. 340,258,713.72
Diperiksa Oleh Diajukan RENCANA (%)
Disetujui Oleh Konsultan Supervisi Kontraktor Pelaksana REALISASI (%)
Pejabat Pembuat Komitmen, CV. LUNDAYEH BORNEO CONSULTANT PT. HASANAH JAYA SELISIH (%)
Ir. DWI HADI JUNAIDI SULASMAN ODE, S.T
NIP. 19590528 198502 1 062 Site Engineer Site manager
BOBOT KEMAJUAN PEKERJAAN MINGGUAN
NO. URAIAN PEKERJAAN VOLUME SAT
TAHAP KEMAJUAN PEKERJAAN
KETERANGAN
DEVISI IV - PEKERJAAN JEMBATAN
Pengulkuran Dan Pematokan
Mobilisasi Dan Demobilisasi
Penyiapan Badan Jalan
DEVISI II - PEKERJAAN DRAINASE
Pek. Galian untuk selokan drainase dan
Pek. Pasangan Batu + Adukan (Mekanis)
Pek. Plesteran Cam 1:3 T = 15 mm
DEVISI III - PEKERJAAN PERKERASAN BERBUTIR
Lap. Pondasi Agregat Kls B T = 10 cm
Lap. Pondasi Bawah Telford T = 20 cm
Urugan tanah pilihan
Plastik Bond Breaker
Beton Campuran 1 PC : 2 Psr : 3 Kr
Baja Tulangan
PROGRES SAMPAI DENGAN MINGGU INI
10.281
12.384
2.103
M. DAHLAN S.Sos, S.T
PEKERJAAN : Pembangunan Jalan poros Desa Sebuku Kawasan Sebuku Kab. Nunukan MINGGU KE. : XII
INSTANSI : Dinas Pekerjaan Umum Propinsi Kalimantan Timur KONTRAKTOR PELAKSANA : PT. HASANAH JAYA
PEKERJAAN : Peningkatan Badan Jalan NILAI KONTRAK : Rp. 3.022.322.000,-
TAHUN ANGGARAN : 2013 JANGKA WAKTU (ADDENDUM) : 180 HARI
SUMBER DANA : APBN KONSULTAN SUPERVISI : CV. LUNDAYEH BORNEO CONSULTANT
HARGA JUMLAH BOBOT
SATUAN HARGA ( % ) MINGGU LALU MINGGU INI S/D MINGGU INI
(Rp.) (Rp.) BOBOT (%) BOBOT (%) BOBOT (%)
I DEVISI I - UMUM
1.1 1.00 Ls 2,500,000.00 2,500,000.00 0.0910 0.091 - 0.0910 Rp. 2,500,000.00
2.1 1.00 Ls 51,500,000.00 51,500,000.00 1.8744 1.418 - 1.4180 Rp. 38,960,809.25
3.1 11,306.36 M2 5,963.59 67,426,495.43 2.4540 2.454 - 2.4540 Rp. 67,426,495.43
-
II -
1.2 2,261.26 M3 50,025.36 113,120,345.55 4.1171 4.117 - 4.1171 Rp. 113,120,345.55
2.2 1,072.10 M3 961,390.76 1,030,707,033.80 37.5134 4.304 2.6810 6.9848 Rp. 191,913,376.01
3.2 5,261.18 M2 26,965.37 141,869,665.34 5.1635 - - - -
-
III -
1.3 706.65 M3 826,715.91 584,198,797.80 21.2624 - - - -
2.3 1,413.30 M3 489,673.88 692,056,094.60 25.1879 - 0.1780 0.1780 4,890,672.00
3.3 423.99 M3 113,065.32 47,938,565.03 1.7448 - - - -
-
IV. -
1.4 12.00 M2 8,000.00 96,000.00 0.0035 - - -
2.4 1.80 M3 1,942,661.93 3,496,791.47 0.1273 - - - -
3.4 405.08 Kg 31,250.00 12,658,750.00 0.4607 - - - -
JUMLAH 22,865.72 2,747,568,539.02 100.00 12.3840 2.8590 15.2430 Rp. 418,811,698.25
Diperiksa Oleh Diajukan RENCANA (%)
Disetujui Oleh Konsultan Supervisi Kontraktor Pelaksana REALISASI (%)
Pejabat Pembuat Komitmen, CV. LUNDAYEH BORNEO CONSULTANT PT. HASANAH JAYA SELISIH (%)
Ir. DWI HADI JUNAIDI SULASMAN ODE, S.T
NIP. 19590528 198502 1 062 Site Engineer Site manager
BOBOT KEMAJUAN PEKERJAAN MINGGUAN
NO. URAIAN PEKERJAAN VOLUME SAT
TAHAP KEMAJUAN PEKERJAAN
KETERANGAN
DEVISI IV - PEKERJAAN JEMBATAN
Pengulkuran Dan Pematokan
Mobilisasi Dan Demobilisasi
Penyiapan Badan Jalan
DEVISI II - PEKERJAAN DRAINASE
Pek. Galian untuk selokan drainase dan
Pek. Pasangan Batu + Adukan (Mekanis)
Pek. Plesteran Cam 1:3 T = 15 mm
DEVISI III - PEKERJAAN PERKERASAN BERBUTIR
Lap. Pondasi Agregat Kls B T = 10 cm
Lap. Pondasi Bawah Telford T = 20 cm
Urugan tanah pilihan
Plastik Bond Breaker
Beton Campuran 1 PC : 2 Psr : 3 Kr
Baja Tulangan
PROGRES SAMPAI DENGAN MINGGU INI
22.651
15.243
-7.408
M. DAHLAN S.Sos, S.T
PEKERJAAN : Pembangunan Jalan poros Desa Sebuku Kawasan Sebuku Kab. Nunukan
INSTANSI : Dinas Pekerjaan Umum Propinsi Kalimantan Timur
PEKERJAAN : Peningkatan Badan Jalan
TAHUN ANGGARAN : 2013
SUMBER DANA : APBN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
I DEVISI I - UMUM
1.1 1.00 Ls 2,500,000.00 2,500,000.00
2.1 1.00 Ls 51,500,000.00 51,500,000.00
3.1 11,306.36 M2 5,963.59 67,426,495.43
II
1.2 2,261.26 M3 50,025.36 113,120,345.55
2.2 1,072.10 M3 961,390.76 1,030,707,033.80
3.2 5,261.18 M2 26,965.37 141,869,665.34
III
1.3 706.65 M3 826,715.91 584,198,797.80
2.3 1,413.30 M3 489,673.88 692,056,094.60
3.3 423.99 M3 113,065.32 47,938,565.03
IV.
1.4 12.00 M2 8,000.00 96,000.00
2.4 1.80 M3 1,942,661.93 3,496,791.47
3.4 405.08 Kg 31,250.00 12,658,750.00
JUMLAH 22,865.72 2,747,568,539.02
Diperiksa Oleh
Disetujui Oleh Konsultan Supervisi
Pejabat Pembuat Komitmen, CV. LUNDAYEH BORNEO CONSULTANT
Ir. DWI HADI JUNAIDI
NIP. 19590528 198502 1 062 Site Engineer
Plastik Bond Breaker
Beton Campuran 1 PC : 2 Psr : 3 Kr
Baja Tulangan
M. DAHLAN S.Sos, S.T
DEVISI IV - PEKERJAAN JEMBATAN
Pengulkuran Dan Pematokan
Mobilisasi Dan Demobilisasi
Penyiapan Badan Jalan
DEVISI II - PEKERJAAN DRAINASE
Pek. Galian untuk selokan drainase dan
Pek. Pasangan Batu + Adukan (Mekanis)
Pek. Plesteran Cam 1:3 T = 15 mm
DEVISI III - PEKERJAAN PERKERASAN BERBUTIR
Lap. Pondasi Agregat Kls B T = 10 cm
Lap. Pondasi Bawah Telford T = 20 cm
Urugan tanah pilihan
BOBOT KEMAJUAN PEKERJAAN MINGGUAN
NO. URAIAN PEKERJAAN VOLUME SAT
MINGGU KE. : XIII
KONTRAKTOR PELAKSANA : PT. HASANAH JAYA
NILAI KONTRAK : Rp. 3.022.322.000,-
JANGKA WAKTU (ADDENDUM) : 180 HARI
KONSULTAN SUPERVISI : CV. LUNDAYEH BORNEO CONSULTANT
BOBOT
( % ) MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT (%) BOBOT (%) BOBOT (%)
0.0910 0.091 - 0.0910 Rp. 2,500,000.00
1.8744 1.418 - 1.4180 Rp. 38,960,809.25
2.4540 2.454 - 2.4540 Rp. 67,426,495.43
-
-
4.1171 4.117 - 4.1171 Rp. 113,120,345.55
37.5134 6.985 2.5820 9.5668 Rp. 262,855,595.69
5.1635 - - - -
-
-
21.2624 - - - -
25.1879 0.178 3.2760 3.4540 94,901,017.34
1.7448 - - - -
-
-
0.0035 - - - -
0.1273 - - - -
0.4607 - - - -
100.00 15.2430 5.8580 21.1010 Rp. 579,764,263.27
Diajukan RENCANA (%)
Kontraktor Pelaksana REALISASI (%)
PT. HASANAH JAYA SELISIH (%)
SULASMAN ODE, S.T
Site manager
PROGRES SAMPAI DENGAN MINGGU INI
22.651
21.101
-1.550
BOBOT KEMAJUAN PEKERJAAN MINGGUAN
TAHAP KEMAJUAN PEKERJAAN
KETERANGAN
PEKERJAAN : PEMBANGUNAN JALAN POROS DESA SEBUKU KAWASAN SEBUKU KAB. NUNUKAN NILAI KONTRAK : 3.022.322.000
SUMBER DANA : APBN NO. KONTRAK : 915/SPK.15/SEBUKU/PK-PP-DESA/2013
PROPINSI : KALIMANTAN TIMUR KONTRAKTIR PELAKSANA : PT. HASANAH JAYA
TAHUN ANGGARAN : 2013 1,189.00 KONSULTAN SUPERVISI : CV. LUNDAYEH BORNEO CONSULTANT
JUNI
27 - 30 1 - 7 8 - 14 15 - 21 22 - 31 1 - 7 8 - 14 15 - 21 22 - 31 1 - 7 8 - 14 15 - 21 22 - 30 1 - 7 8 - 14 15 - 21 22 - 31 1 - 7 8 - 14 15 - 21 22 - 31 1 - 7 8 - 14 15 - 21 22 - 31
I.
1.1 1.00 Ls 2,500,000.00 2,500,000.00 0.091 0.045 0.045
1.2 1.00 Ls 51,500,000.00 51,500,000.00 1.874 0.469 0.469 0.469 0.469
1.3 11,306.36 M2 5,963.59 67,426,495.43 2.454 0.307 0.307 0.307 0.307 0.307 0.307 0.307 0.307
121,426,495.43 4.419
II.
1.1 2,261.26 M3 50,025.36 113,120,345.55 4.117 0.229 0.229 0.229 0.229 0.229 0.229 0.229 0.229 0.229 0.229 0.229 0.229 0.229 0.229 0.229 0.229 0.229 0.229
1.2 1,072.10 M3 961,390.76 1,030,707,033.80 37.513 2.501 2.501 2.501 2.501 2.501 2.501 2.501 2.501 2.501 2.501 2.501 2.501 2.501 2.501 2.501
1.3 5,261.18 M2 26,965.37 141,869,665.34 5.163 0.469 0.469 0.469 0.469 0.469 0.469 0.469 0.469 0.469 0.469 0.469
1,285,697,044.69 46.794
III.
1.1 706.65 M3 826,715.91 584,198,797.80 21.262 3.037 3.037 3.037 3.037 3.037 3.037 3.037
1.2 1,413.30 M3 489,673.88 692,056,094.60 25.188 3.148 3.148 3.148 3.148 3.148 3.148 3.148 3.148
1.3 423.99 M3 113,065.32 47,938,565.03 1.745 0.582 0.582 0.582
IV.
1.1 12.00 M2 8,000.00 96,000.00 0.003 0.002 0.002 0.002
1.2 1.80 M3 1,942,661.93 3,496,791.47 0.127 0.064 0.064 0.064
1.3 405.08 Kg 31,250.00 12,658,750.00 0.461 0.230 0.230 0.230
A. 2,747,568,539.02 100
B. PAJAK PERTAMBAHAN NILAI (10%) 274,756,853.90
C. JUMLAH HARGA 3,022,325,392.93
RENCANA 0.045 0.514 0.469 0.697 0.229 0.535 0.535 0.535 0.535 6.185 6.185 6.185 6.185 6.348 6.348 6.348 6.348 6.237 6.237 6.237 6.237 6.885 6.885 6.885 0.469
KUMULATIF 0 0.045 0.560 1.028 1.726 1.954 2.490 3.025 3.561 4.096 10.281 16.466 22.651 28.836 35.183 41.531 47.878 54.226 60.462 66.699 72.935 79.172 86.057 92.942 99.827 100.30
REALISASI 0 0.045 0.503 0.513 0.524 0.351 1.215 1.320 1.520 0.440 5.953 2.859 5.858 9.955 8.095
KUMULATIF 0 0.045 0.548 1.061 1.585 1.936 3.151 4.471 5.991 6.431 12.384 12.384 15.243 21.101 31.056 39.151
DEVIASI
PEKERJAAN JEMBATAN
PROGRES PELAKSANAAN KEGIATAN BULAN JULI 2013
JUMLAH HARGA FISIK
DEVISI II - PEKERJAAN DRAINASE
AGUSTUS SEPTEMBER OKTOBER NOVEMBER
DEVISI I - UMUM
Pengulkuran Dan Pematokan
Mobilisasi Dan Demobilisasi
Penyiapan Badan Jalan
Sub Total Biaya Umum
DESEMBER
PROGRES (%)
Baja Tulangan
Pek. Galian untuk selokan drainase dan
Pek. Pasangan Batu + Adukan (Mekanis)
Pek. Plesteran Cam 1:3 T = 15 mm
Sub Total Biaya Umum
DEVISI III
Lap. Pondasi Agregat Kls B T = 10 cm
Lap. Pondasi Bawah Telford T = 20 cm
Urugan tanah pilihan
DEVISI IV
Plastik Bond Breaker
Beton Campuran 1 PC : 2 Psr : 3 Kr
PEKERJAAN PERKERASAN BERBUTIR
NO. URAIAN PEKERJAAN
PERKIRAAN
KWANTITAS
SAT.
HARGA SAT.
(Rp)
JUMLAH (Rp)
BOBOT
(%)
WAKTU PELAKSANAAN 180 HARI KALENDER
JULI
PEKERJAAN : Pembangunan Jalan poros Desa Sebuku Kawasan Sebuku Kab. Nunukan MINGGU KE. : XIV
INSTANSI : Dinas Pekerjaan Umum Propinsi Kalimantan Timur KONTRAKTOR PELAKSANA : PT. HASANAH JAYA
PEKERJAAN : Peningkatan Badan Jalan NILAI KONTRAK : Rp. 3.022.322.000,-
TAHUN ANGGARAN : 2013 JANGKA WAKTU (ADDENDUM) : 180 HARI
SUMBER DANA : APBN KONSULTAN SUPERVISI : CV. LUNDAYEH BORNEO CONSULTANT
HARGA JUMLAH BOBOT
SATUAN HARGA ( % ) MINGGU LALU MINGGU INI S/D MINGGU INI
(Rp.) (Rp.) BOBOT (%) BOBOT (%) BOBOT (%)
I DEVISI I - UMUM
1.1 1.00 Ls 2,500,000.00 2,500,000.00 0.0910 0.091 - 0.0910 Rp. 2,500,000.00
2.1 1.00 Ls 51,500,000.00 51,500,000.00 1.8744 1.418 - 1.4180 Rp. 38,960,809.25
3.1 11,306.36 M2 5,963.59 67,426,495.43 2.4540 2.454 - 2.4540 Rp. 67,426,495.43
-
II -
1.2 2,261.26 M3 50,025.36 113,120,345.55 4.1171 4.117 - 4.1171 Rp. 113,120,345.55
2.2 1,072.10 M3 961,390.76 1,030,707,033.80 37.5134 9.567 3.8010 13.3678 Rp. 367,290,675.86
3.2 5,261.18 M2 26,965.37 141,869,665.34 5.1635 - 1.8137 1.8137 49,832,650.59
-
III -
1.3 706.65 M3 826,715.91 584,198,797.80 21.2624 - - - -
2.3 1,413.30 M3 489,673.88 692,056,094.60 25.1879 3.454 4.3402 7.7942 214,150,987.07
3.3 423.99 M3 113,065.32 47,938,565.03 1.7448 - - - -
-
IV. -
1.4 12.00 M2 8,000.00 96,000.00 0.0035 - - - -
2.4 1.80 M3 1,942,661.93 3,496,791.47 0.1273 - - - -
3.4 405.08 Kg 31,250.00 12,658,750.00 0.4607 - - - -
JUMLAH 22,865.72 2,747,568,539.02 100.00 21.1010 9.9549 31.0559 Rp. 853,281,963.76
Diperiksa Oleh Diajukan RENCANA (%)
Disetujui Oleh Konsultan Supervisi Kontraktor Pelaksana REALISASI (%)
Pejabat Pembuat Komitmen, CV. LUNDAYEH BORNEO CONSULTANT PT. HASANAH JAYA SELISIH (%)
Ir. DWI HADI JUNAIDI SULASMAN ODE, S.T
NIP. 19590528 198502 1 062 Site Engineer Site manager
Plastik Bond Breaker
Beton Campuran 1 PC : 2 Psr : 3 Kr
Baja Tulangan
PROGRES SAMPAI DENGAN MINGGU INI
35.183
31.056
-4.127
M. DAHLAN S.Sos, S.T
DEVISI IV - PEKERJAAN JEMBATAN
Pengulkuran Dan Pematokan
Mobilisasi Dan Demobilisasi
Penyiapan Badan Jalan
DEVISI II - PEKERJAAN DRAINASE
Pek. Galian untuk selokan drainase dan
Pek. Pasangan Batu + Adukan (Mekanis)
Pek. Plesteran Cam 1:3 T = 15 mm
DEVISI III - PEKERJAAN PERKERASAN BERBUTIR
Lap. Pondasi Agregat Kls B T = 10 cm
Lap. Pondasi Bawah Telford T = 20 cm
Urugan tanah pilihan
BOBOT KEMAJUAN PEKERJAAN MINGGUAN
NO. URAIAN PEKERJAAN VOLUME SAT
TAHAP KEMAJUAN PEKERJAAN
KETERANGAN
PEKERJAAN : Pembangunan Jalan poros Desa Sebuku Kawasan Sebuku Kab. Nunukan MINGGU KE. : XIV
INSTANSI : Dinas Pekerjaan Umum Propinsi Kalimantan Timur KONTRAKTOR PELAKSANA : PT. HASANAH JAYA
PEKERJAAN : Peningkatan Badan Jalan NILAI KONTRAK : Rp. 3.022.322.000,-
TAHUN ANGGARAN : 2013 JANGKA WAKTU (ADDENDUM) : 180 HARI
SUMBER DANA : APBN KONSULTAN SUPERVISI : CV. LUNDAYEH BORNEO CONSULTANT
HARGA JUMLAH BOBOT
SATUAN HARGA ( % ) MINGGU LALU MINGGU INI S/D MINGGU INI
(Rp.) (Rp.) BOBOT (%) BOBOT (%) BOBOT (%)
I DEVISI I - UMUM
1.1 1.00 Ls 2,500,000.00 2,500,000.00 0.0910 0.091 - 0.0910 Rp. 2,500,000.00
2.1 1.00 Ls 51,500,000.00 51,500,000.00 1.8744 1.418 - 1.4180 Rp. 38,960,809.25
3.1 11,306.36 M2 5,963.59 67,426,495.43 2.4540 2.454 - 2.4540 Rp. 67,426,495.43
-
II -
1.2 2,261.26 M3 50,025.36 113,120,345.55 4.1171 4.117 - 4.1171 Rp. 113,120,345.55
2.2 1,072.10 M3 961,390.76 1,030,707,033.80 37.5134 13.368 2.8820 16.2498 Rp. 446,475,601.15
3.2 5,261.18 M2 26,965.37 141,869,665.34 5.1635 1.814 1.9500 3.7637 103,410,237.10
-
III -
1.3 706.65 M3 826,715.91 584,198,797.80 21.2624 - - - -
2.3 1,413.30 M3 489,673.88 692,056,094.60 25.1879 7.794 3.2630 11.0572 303,804,148.50
3.3 423.99 M3 113,065.32 47,938,565.03 1.7448 - - - -
-
IV. -
1.4 12.00 M2 8,000.00 96,000.00 0.0035 - - - -
2.4 1.80 M3 1,942,661.93 3,496,791.47 0.1273 - - - -
3.4 405.08 Kg 31,250.00 12,658,750.00 0.4607 - - - -
JUMLAH 22,865.72 2,747,568,539.02 100.00 31.0559 8.0950 39.1509 Rp. 1,075,697,636.99
Diperiksa Oleh Diajukan RENCANA (%)
Disetujui Oleh Konsultan Supervisi Kontraktor Pelaksana REALISASI (%)
Pejabat Pembuat Komitmen, CV. LUNDAYEH BORNEO CONSULTANT PT. HASANAH JAYA SELISIH (%)
Ir. DWI HADI JUNAIDI SULASMAN ODE, S.T
NIP. 19590528 198502 1 062 Site Engineer Site manager
Plastik Bond Breaker
Beton Campuran 1 PC : 2 Psr : 3 Kr
Baja Tulangan
PROGRES SAMPAI DENGAN MINGGU INI
41.531
39.151
-2.380
M. DAHLAN S.Sos, S.T
DEVISI IV - PEKERJAAN JEMBATAN
Pengulkuran Dan Pematokan
Mobilisasi Dan Demobilisasi
Penyiapan Badan Jalan
DEVISI II - PEKERJAAN DRAINASE
Pek. Galian untuk selokan drainase dan
Pek. Pasangan Batu + Adukan (Mekanis)
Pek. Plesteran Cam 1:3 T = 15 mm
DEVISI III - PEKERJAAN PERKERASAN BERBUTIR
Lap. Pondasi Agregat Kls B T = 10 cm
Lap. Pondasi Bawah Telford T = 20 cm
Urugan tanah pilihan
BOBOT KEMAJUAN PEKERJAAN MINGGUAN
NO. URAIAN PEKERJAAN VOLUME SAT
TAHAP KEMAJUAN PEKERJAAN
KETERANGAN
PEKERJAAN : Pembangunan Jalan poros Desa Sebuku Kawasan Sebuku Kab. Nunukan
INSTANSI : Dinas Pekerjaan Umum Propinsi Kalimantan Timur
PEKERJAAN : Peningkatan Badan Jalan
TAHUN ANGGARAN : 2013
SUMBER DANA : APBN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
I DEVISI I - UMUM
1.1 1.00 Ls 2,500,000.00 2,500,000.00
2.1 1.00 Ls 51,500,000.00 51,500,000.00
3.1 11,306.36 M2 5,963.59 67,426,495.43
II
1.2 2,261.26 M3 50,025.36 113,120,345.55
2.2 1,072.10 M3 961,390.76 1,030,707,033.80
3.2 5,261.18 M2 26,965.37 141,869,665.34
III
1.3 706.65 M3 826,715.91 584,198,797.80
2.3 1,413.30 M3 489,673.88 692,056,094.60
3.3 423.99 M3 113,065.32 47,938,565.03
IV.
1.4 12.00 M2 8,000.00 96,000.00
2.4 1.80 M3 1,942,661.93 3,496,791.47
3.4 405.08 Kg 31,250.00 12,658,750.00
JUMLAH 22,865.72 2,747,568,539.02
Diperiksa Oleh
Disetujui Oleh Konsultan Supervisi
Pejabat Pembuat Komitmen, CV. LUNDAYEH BORNEO CONSULTANT
Ir. DWI HADI JUNAIDI
NIP. 19590528 198502 1 062 Site Engineer
BOBOT KEMAJUAN PEKERJAAN MINGGUAN
NO. URAIAN PEKERJAAN VOLUME SAT
DEVISI IV - PEKERJAAN JEMBATAN
Pengulkuran Dan Pematokan
Mobilisasi Dan Demobilisasi
Penyiapan Badan Jalan
DEVISI II - PEKERJAAN DRAINASE
Pek. Galian untuk selokan drainase dan
Pek. Pasangan Batu + Adukan (Mekanis)
Pek. Plesteran Cam 1:3 T = 15 mm
DEVISI III - PEKERJAAN PERKERASAN BERBUTIR
Lap. Pondasi Agregat Kls B T = 10 cm
Lap. Pondasi Bawah Telford T = 20 cm
Urugan tanah pilihan
Plastik Bond Breaker
Beton Campuran 1 PC : 2 Psr : 3 Kr
Baja Tulangan
M. DAHLAN S.Sos, S.T
MINGGU KE. : XIV
KONTRAKTOR PELAKSANA : PT. HASANAH JAYA
NILAI KONTRAK : Rp. 3.022.322.000,-
JANGKA WAKTU (ADDENDUM) : 180 HARI
KONSULTAN SUPERVISI : CV. LUNDAYEH BORNEO CONSULTANT
BOBOT
( % ) MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT (%) BOBOT (%) BOBOT (%)
0.0910 0.091 - 0.0910 Rp. 2,500,000.00
1.8744 1.418 - 1.4180 Rp. 38,960,809.25
2.4540 2.454 - 2.4540 Rp. 67,426,495.43
-
-
4.1171 4.117 - 4.1171 Rp. 113,120,345.55
37.5134 16.250 3.0100 19.2598 Rp. 529,177,414.18
5.1635 3.764 1.5000 5.2637 144,623,765.19
-
-
21.2624 - - - -
25.1879 11.057 6.9780 18.0352 495,529,481.15
1.7448 - - - -
-
-
0.0035 - - - -
0.1273 - - - -
0.4607 - - - -
100.00 39.1509 11.4880 50.6389 Rp. 1,391,338,310.76
Diajukan RENCANA (%)
Kontraktor Pelaksana REALISASI (%)
PT. HASANAH JAYA SELISIH (%)
SULASMAN ODE, S.T
Site manager
BOBOT KEMAJUAN PEKERJAAN MINGGUAN
TAHAP KEMAJUAN PEKERJAAN
KETERANGAN
PROGRES SAMPAI DENGAN MINGGU INI
47.878
50.639
2.761
PEKERJAAN : Pembangunan Jalan poros Desa Sebuku Kawasan Sebuku Kab. Nunukan
INSTANSI : Dinas Pekerjaan Umum Propinsi Kalimantan Timur
PEKERJAAN : Peningkatan Badan Jalan
TAHUN ANGGARAN : 2013
SUMBER DANA : APBN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
I DEVISI I - UMUM
1.1 1.00 Ls 2,500,000.00 2,500,000.00
2.1 1.00 Ls 51,500,000.00 51,500,000.00
3.1 11,306.36 M2 5,963.59 67,426,495.43
II
1.2 2,261.26 M3 50,025.36 113,120,345.55
2.2 1,072.10 M3 961,390.76 1,030,707,033.80
3.2 5,261.18 M2 26,965.37 141,869,665.34
III
1.3 706.65 M3 826,715.91 584,198,797.80
2.3 1,413.30 M3 489,673.88 692,056,094.60
3.3 423.99 M3 113,065.32 47,938,565.03
IV.
1.4 12.00 M2 8,000.00 96,000.00
2.4 1.80 M3 1,942,661.93 3,496,791.47
3.4 405.08 Kg 31,250.00 12,658,750.00
JUMLAH 22,865.72 2,747,568,539.02
Diperiksa Oleh
Disetujui Oleh Konsultan Supervisi
Pejabat Pembuat Komitmen, CV. LUNDAYEH BORNEO CONSULTANT
Ir. DWI HADI JUNAIDI
NIP. 19590528 198502 1 062 Site Engineer
BOBOT KEMAJUAN PEKERJAAN MINGGUAN
NO. URAIAN PEKERJAAN VOLUME SAT
DEVISI IV - PEKERJAAN JEMBATAN
Pengulkuran Dan Pematokan
Mobilisasi Dan Demobilisasi
Penyiapan Badan Jalan
DEVISI II - PEKERJAAN DRAINASE
Pek. Galian untuk selokan drainase dan
Pek. Pasangan Batu + Adukan (Mekanis)
Pek. Plesteran Cam 1:3 T = 15 mm
DEVISI III - PEKERJAAN PERKERASAN BERBUTIR
Lap. Pondasi Agregat Kls B T = 10 cm
Lap. Pondasi Bawah Telford T = 20 cm
Urugan tanah pilihan
Plastik Bond Breaker
Beton Campuran 1 PC : 2 Psr : 3 Kr
Baja Tulangan
M. DAHLAN S.Sos, S.T
MINGGU KE. : XV
KONTRAKTOR PELAKSANA : PT. HASANAH JAYA
NILAI KONTRAK : Rp. 3.022.322.000,-
JANGKA WAKTU (ADDENDUM) : 180 HARI
KONSULTAN SUPERVISI : CV. LUNDAYEH BORNEO CONSULTANT
BOBOT
( % ) MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT (%) BOBOT (%) BOBOT (%)
0.0910 0.091 - 0.0910 Rp. 2,500,000.00
1.8744 1.418 - 1.4180 Rp. 38,960,809.25
2.4540 2.454 - 2.4540 Rp. 67,426,495.43
-
-
4.1171 4.117 - 4.1171 Rp. 113,120,345.55
37.5134 19.260 1.2140 20.4738 Rp. 562,532,896.24
5.1635 5.264 1.2450 6.5087 178,830,993.50
-
-
21.2624 - - - -
25.1879 18.035 7.1527 25.1879 692,056,094.60
1.7448 - - - -
-
-
0.0035 - - - -
0.1273 - - - -
0.4607 - - - -
100.00 50.6389 9.6117 60.2506 Rp. 1,655,427,634.58
Diajukan RENCANA (%)
Kontraktor Pelaksana REALISASI (%)
PT. HASANAH JAYA SELISIH (%)
SULASMAN ODE, S.T
Site manager
BOBOT KEMAJUAN PEKERJAAN MINGGUAN
TAHAP KEMAJUAN PEKERJAAN
KETERANGAN
PROGRES SAMPAI DENGAN MINGGU INI
54.226
60.251
6.025
PEKERJAAN : PEMBANGUNAN JALAN POROS DESA SEBUKU KAWASAN SEBUKU KAB. NUNUKAN
SUMBER DANA : APBN
PROPINSI : KALIMANTAN TIMUR
TAHUN ANGGARAN : 2013 1,189.00
JUNI
27 - 30 1 - 7 8 - 14 15 - 21 22 - 31
I.
1.1 1.00 Ls 2,500,000.00 2,500,000.00 0.091 0.045 0.045
1.2 1.00 Ls 51,500,000.00 51,500,000.00 1.874 0.469 0.469 0.469
1.3 11,306.36 M2 5,963.59 67,426,495.43 2.454
121,426,495.43 4.419
II.
1.1 2,261.26 M3 50,025.36 113,120,345.55 4.117 0.229 0.229
0.076 0.351
1.2 1,072.10 M3 961,390.76 1,030,707,033.80 37.513
1.3 5,261.18 M2 26,965.37 141,869,665.34 5.163
1,285,697,044.69 46.794
III.
1.1 706.65 M3 826,715.91 584,198,797.80 21.262
1.2 1,413.30 M3 489,673.88 692,056,094.60 25.188
1.3 423.99 M3 113,065.32 47,938,565.03 1.745
Sub Total Biaya Umum 1,324,193,457.43 48.195
IV.
1.1 12.00 M2 8,000.00 96,000.00 0.003
1.2 1.80 M3 1,942,661.93 3,496,791.47 0.127
1.3 405.08 Kg 31,250.00 12,658,750.00 0.461
16,251,541.47 0.591
A. 2,747,568,539.02 100
B. PAJAK PERTAMBAHAN NILAI (10%) 274,756,853.90
C. JUMLAH HARGA 3,022,325,392.93
RENCANA 0.045 0.514 0.469 0.697 0.229
KUMULATIF 0 0.045 0.560 1.028 1.726 1.954
REALISASI 0 0.045 0.503 0.513 0.524 0.351
KUMULATIF 0 0.045 0.548 1.061 1.585 1.936
DEVIASI
0.50
0.503 0.513 0.524 0.351
1,189.00 =
123
118,251,063.48
4.303843992
102.5
PROGRES PELAKSANAAN KEGIATAN BULAN JULI 2013
NO. URAIAN PEKERJAAN
PERKIRAAN
KWANTITAS
SAT.
HARGA SAT.
(Rp)
JUMLAH (Rp)
BOBOT
(%)
WAKTU PELAKSANAAN 180 HARI KALENDER
JULI
DEVISI II - PEKERJAAN DRAINASE
DEVISI I - UMUM
Pengulkuran Dan Pematokan
Mobilisasi Dan Demobilisasi
Penyiapan Badan Jalan
Sub Total Biaya Umum
Plastik Bond Breaker
Pek. Galian untuk selokan drainase dan
Pek. Pasangan Batu + Adukan (Mekanis)
Pek. Plesteran Cam 1:3 T = 15 mm
Sub Total Biaya Umum
DEVISI III
PEKERJAAN PERKERASAN BERBUTIR
Lap. Pondasi Agregat Kls B T = 10 cm
Lap. Pondasi Bawah Telford T = 20 cm
Urugan tanah pilihan
DEVISI IV
PEKERJAAN JEMBATAN
Beton Campuran 1 PC : 2 Psr : 3 Kr
Baja Tulangan
Sub Total Biaya Umum
JUMLAH HARGA FISIK
PROGRES (%)
50,191,572.70
1.826763263
NILAI KONTRAK : 3.022.322.000
NO. KONTRAK : 915/SPK.15/SEBUKU/PK-PP-DESA/2013
KONTRAKTIR PELAKSANA : PT. HASANAH JAYA
KONSULTAN SUPERVISI : CV. LUNDAYEH BORNEO CONSULTANT
1 - 7 8 - 14 15 - 21 22 - 31 1 - 7 8 - 14 15 - 21 22 - 30 1 - 7 8 - 14 15 - 21 22 - 31 1 - 7 8 - 14 15 - 21 22 - 31 1 - 7 8 - 14 15 - 21 22 - 31
0.469
0.307 0.307 0.307 0.307 0.307 0.307 0.307 0.307
0.229 0.229 0.229 0.229 0.229 0.229 0.229 0.229 0.229 0.229 0.229 0.229 0.229 0.229 0.229 0.229
1.215 1.045 1.220 0.210
2.501 2.501 2.501 2.501 2.501 2.501 2.501 2.501 2.501 2.501 2.501 2.501 2.501 2.501 2.501
4.304 2.681 2.582 3.801 2.882 3.010 1.214 2.110 1.560 3.401
0.469 0.469 0.469 0.469 0.469 0.469 0.469 0.469 0.469 0.469 0.469
1.814 1.950 1.500 1.245 0.572 0.323 0.853
3.037 3.037 3.037 3.037 3.037 3.037 3.037
2.400 2.020 1.674
3.148 3.148 3.148 3.148 3.148 3.148 3.148 3.148
0.178 3.276 4.340 3.263 6.978 7.153
0.582 0.582 0.582
0.002 0.002 0.002
0.064 0.064 0.064
0.230 0.230 0.230
0.535 0.535 0.535 0.535 6.185 6.185 6.185 6.185 6.348 6.348 6.348 6.348 6.237 6.237 6.237 6.237 6.885 6.885 6.885 0.469
2.490 3.025 3.561 4.096 10.281 16.466 22.651 28.836 35.183 41.531 47.878 54.226 60.462 66.699 72.935 79.172 86.057 92.942 99.827 100.30
1.215 1.320 1.520 0.440 5.953 2.859 5.858 9.955 8.095 11.488 9.612 5.082 3.903 5.928
3.151 4.471 5.991 6.431 12.384 12.384 15.243 21.101 31.056 39.151 50.639 60.251 65.333 69.236 75.164
1.215 1.320 1.520 0.440
10
DESEMBER
PROGRES PELAKSANAAN KEGIATAN BULAN JULI 2013
WAKTU PELAKSANAAN 180 HARI KALENDER
AGUSTUS SEPTEMBER OKTOBER NOVEMBER
0.17822081
4,896,738.80
0.091 0.091
1.874 1.874
2.454 2.454
0.000 4.419
0.000 0.000
4.117 4.117
4.117 0.000
37.513 37.513
27.545 0.000
5.163 5.163
8.257 0.000
0.000 46.794
0.000 0.000
21.262 21.262
6.094 0.000
25.188 25.188
25.188 0.000
1.745 1.745
0.000 48.195
0.000 0.000
0.005 0.003
0.191 0.127
0.691 0.461
0.000 0.591
PEKERJAAN : Pembangunan Jalan poros Desa Sebuku Kawasan Sebuku Kab. Nunukan
INSTANSI : Dinas Pekerjaan Umum Propinsi Kalimantan Timur
PEKERJAAN : Peningkatan Badan Jalan
TAHUN ANGGARAN : 2013
SUMBER DANA : APBN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
I DEVISI I - UMUM
1.1 1.00 Ls 2,500,000.00 2,500,000.00
2.1 1.00 Ls 51,500,000.00 51,500,000.00
3.1 11,306.36 M2 5,963.59 67,426,495.43
II
1.2 2,261.26 M3 50,025.36 113,120,345.55
2.2 1,072.10 M3 961,390.76 1,030,707,033.80
3.2 5,261.18 M2 26,965.37 141,869,665.34
III
1.3 706.65 M3 826,715.91 584,198,797.80
2.3 1,413.30 M3 489,673.88 692,056,094.60
3.3 423.99 M3 113,065.32 47,938,565.03
IV.
1.4 12.00 M2 8,000.00 96,000.00
2.4 1.80 M3 1,942,661.93 3,496,791.47
3.4 405.08 Kg 31,250.00 12,658,750.00
JUMLAH 22,865.72 2,747,568,539.02
Diperiksa Oleh
Disetujui Oleh Konsultan Supervisi
Pejabat Pembuat Komitmen, CV. LUNDAYEH BORNEO CONSULTANT
Ir. DWI HADI JUNAIDI
NIP. 19590528 198502 1 062 Site Engineer
BOBOT KEMAJUAN PEKERJAAN MINGGUAN
NO. URAIAN PEKERJAAN VOLUME SAT
DEVISI IV - PEKERJAAN JEMBATAN
Pengulkuran Dan Pematokan
Mobilisasi Dan Demobilisasi
Penyiapan Badan Jalan
DEVISI II - PEKERJAAN DRAINASE
Pek. Galian untuk selokan drainase dan
Pek. Pasangan Batu + Adukan (Mekanis)
Pek. Plesteran Cam 1:3 T = 15 mm
DEVISI III - PEKERJAAN PERKERASAN BERBUTIR
Lap. Pondasi Agregat Kls B T = 10 cm
Lap. Pondasi Bawah Telford T = 20 cm
Urugan tanah pilihan
Plastik Bond Breaker
Beton Campuran 1 PC : 2 Psr : 3 Kr
Baja Tulangan
M. DAHLAN S.Sos, S.T
MINGGU KE. : XV
KONTRAKTOR PELAKSANA : PT. HASANAH JAYA
NILAI KONTRAK : Rp. 3.022.322.000,-
JANGKA WAKTU (ADDENDUM) : 180 HARI
KONSULTAN SUPERVISI : CV. LUNDAYEH BORNEO CONSULTANT
BOBOT
( % ) MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT (%) BOBOT (%) BOBOT (%)
0.0910 0.091 - 0.0910 Rp. 2,500,000.00
1.8744 1.418 - 1.4180 Rp. 38,960,809.25
2.4540 2.454 - 2.4540 Rp. 67,426,495.43
-
-
4.1171 4.117 - 4.1171 Rp. 113,120,345.55
37.5134 20.474 2.1100 22.5838 Rp. 620,506,592.41
5.1635 6.509 0.5720 7.0807 194,547,085.54
-
-
21.2624 - 2.4000 2.4000 65,941,644.94
25.1879 25.188 - 25.1879 692,056,094.60
1.7448 - - - -
-
-
0.0035 - - - -
0.1273 - - - -
0.4607 - - - -
100.00 60.2506 5.0820 65.3326 Rp. 1,795,059,067.74
Diajukan RENCANA (%)
Kontraktor Pelaksana REALISASI (%)
PT. HASANAH JAYA SELISIH (%)
SULASMAN ODE, S.T
Site manager
BOBOT KEMAJUAN PEKERJAAN MINGGUAN
TAHAP KEMAJUAN PEKERJAAN
KETERANGAN
PROGRES SAMPAI DENGAN MINGGU INI
60.462
65.333
4.870
PEKERJAAN : Pembangunan Jalan poros Desa Sebuku Kawasan Sebuku Kab. Nunukan
INSTANSI : Dinas Pekerjaan Umum Propinsi Kalimantan Timur
PEKERJAAN : Peningkatan Badan Jalan
TAHUN ANGGARAN : 2013
SUMBER DANA : APBN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
I DEVISI I - UMUM
1.1 1.00 Ls 2,500,000.00 2,500,000.00
2.1 1.00 Ls 51,500,000.00 51,500,000.00
3.1 11,306.36 M2 5,963.59 67,426,495.43
II
1.2 2,261.26 M3 50,025.36 113,120,345.55
2.2 1,072.10 M3 961,390.76 1,030,707,033.80
3.2 5,261.18 M2 26,965.37 141,869,665.34
III
1.3 706.65 M3 826,715.91 584,198,797.80
2.3 1,413.30 M3 489,673.88 692,056,094.60
3.3 423.99 M3 113,065.32 47,938,565.03
IV.
1.4 12.00 M2 8,000.00 96,000.00
2.4 1.80 M3 1,942,661.93 3,496,791.47
3.4 405.08 Kg 31,250.00 12,658,750.00
JUMLAH 22,865.72 2,747,568,539.02
Diperiksa Oleh
Disetujui Oleh Konsultan Supervisi
Pejabat Pembuat Komitmen, CV. LUNDAYEH BORNEO CONSULTANT
Ir. DWI HADI JUNAIDI
NIP. 19590528 198502 1 062 Site Engineer
BOBOT KEMAJUAN PEKERJAAN MINGGUAN
NO. URAIAN PEKERJAAN VOLUME SAT
DEVISI IV - PEKERJAAN JEMBATAN
Pengulkuran Dan Pematokan
Mobilisasi Dan Demobilisasi
Penyiapan Badan Jalan
DEVISI II - PEKERJAAN DRAINASE
Pek. Galian untuk selokan drainase dan
Pek. Pasangan Batu + Adukan (Mekanis)
Pek. Plesteran Cam 1:3 T = 15 mm
DEVISI III - PEKERJAAN PERKERASAN BERBUTIR
Lap. Pondasi Agregat Kls B T = 10 cm
Lap. Pondasi Bawah Telford T = 20 cm
Urugan tanah pilihan
Plastik Bond Breaker
Beton Campuran 1 PC : 2 Psr : 3 Kr
Baja Tulangan
M. DAHLAN S.Sos, S.T
MINGGU KE. : XV
KONTRAKTOR PELAKSANA : PT. HASANAH JAYA
NILAI KONTRAK : Rp. 3.022.322.000,-
JANGKA WAKTU (ADDENDUM) : 180 HARI
KONSULTAN SUPERVISI : CV. LUNDAYEH BORNEO CONSULTANT
BOBOT
( % ) MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT (%) BOBOT (%) BOBOT (%)
0.0910 0.091 - 0.0910 Rp. 2,500,000.00
1.8744 1.418 - 1.4180 Rp. 38,960,809.25
2.4540 2.454 - 2.4540 Rp. 67,426,495.43
-
-
4.1171 4.117 - 4.1171 Rp. 113,120,345.55
37.5134 22.584 1.5600 24.1438 Rp. 663,368,661.62
5.1635 7.081 0.3230 7.4037 203,421,731.92
-
-
21.2624 2.400 2.0200 4.4200 121,442,529.42
25.1879 25.188 - 25.1879 692,056,094.60
1.7448 - - - -
-
-
0.0035 - - - -
0.1273 - - - -
0.4607 - - - -
100.00 65.3326 3.9030 69.2356 Rp. 1,902,296,667.82
Diajukan RENCANA (%)
Kontraktor Pelaksana REALISASI (%)
PT. HASANAH JAYA SELISIH (%)
SULASMAN ODE, S.T
Site manager
BOBOT KEMAJUAN PEKERJAAN MINGGUAN
TAHAP KEMAJUAN PEKERJAAN
KETERANGAN
PROGRES SAMPAI DENGAN MINGGU INI
60.462
69.236
8.773
PEKERJAAN : Pembangunan Jalan poros Desa Sebuku Kawasan Sebuku Kab. Nunukan
INSTANSI : Dinas Pekerjaan Umum Propinsi Kalimantan Timur
PEKERJAAN : Peningkatan Badan Jalan
TAHUN ANGGARAN : 2013
SUMBER DANA : APBN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
I DEVISI I - UMUM
1.1 1.00 Ls 2,500,000.00 2,500,000.00
2.1 1.00 Ls 51,500,000.00 51,500,000.00
3.1 11,306.36 M2 5,963.59 67,426,495.43
II
1.2 2,261.26 M3 50,025.36 113,120,345.55
2.2 1,072.10 M3 961,390.76 1,030,707,033.80
3.2 5,261.18 M2 26,965.37 141,869,665.34
III
1.3 706.65 M3 826,715.91 584,198,797.80
2.3 1,413.30 M3 489,673.88 692,056,094.60
3.3 423.99 M3 113,065.32 47,938,565.03
IV.
1.4 12.00 M2 8,000.00 96,000.00
2.4 1.80 M3 1,942,661.93 3,496,791.47
3.4 405.08 Kg 31,250.00 12,658,750.00
JUMLAH 22,865.72 2,747,568,539.02
Diperiksa Oleh
Disetujui Oleh Konsultan Supervisi
Pejabat Pembuat Komitmen, CV. LUNDAYEH BORNEO CONSULTANT
Ir. DWI HADI JUNAIDI
NIP. 19590528 198502 1 062 Site Engineer
BOBOT KEMAJUAN PEKERJAAN MINGGUAN
NO. URAIAN PEKERJAAN VOLUME SAT
DEVISI IV - PEKERJAAN JEMBATAN
Pengulkuran Dan Pematokan
Mobilisasi Dan Demobilisasi
Penyiapan Badan Jalan
DEVISI II - PEKERJAAN DRAINASE
Pek. Galian untuk selokan drainase dan
Pek. Pasangan Batu + Adukan (Mekanis)
Pek. Plesteran Cam 1:3 T = 15 mm
DEVISI III - PEKERJAAN PERKERASAN BERBUTIR
Lap. Pondasi Agregat Kls B T = 10 cm
Lap. Pondasi Bawah Telford T = 20 cm
Urugan tanah pilihan
Plastik Bond Breaker
Beton Campuran 1 PC : 2 Psr : 3 Kr
Baja Tulangan
M. DAHLAN S.Sos, S.T
MINGGU KE. : XV
KONTRAKTOR PELAKSANA : PT. HASANAH JAYA
NILAI KONTRAK : Rp. 3.022.322.000,-
JANGKA WAKTU (ADDENDUM) : 180 HARI
KONSULTAN SUPERVISI : CV. LUNDAYEH BORNEO CONSULTANT
BOBOT
( % ) MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT (%) BOBOT (%) BOBOT (%)
0.0910 0.091 - 0.0910 Rp. 2,500,000.00
1.8744 1.418 - 1.4180 Rp. 38,960,809.25
2.4540 2.454 - 2.4540 Rp. 67,426,495.43
-
-
4.1171 4.117 - 4.1171 Rp. 113,120,345.55
37.5134 24.144 3.4012 27.5450 Rp. 756,818,962.77
5.1635 7.404 0.8530 8.2567 226,858,491.56
-
-
21.2624 4.420 1.6740 6.0940 167,436,826.77
25.1879 25.188 - 25.1879 692,056,094.60
1.7448 - - - -
-
-
0.0035 - - - -
0.1273 - - - -
0.4607 - - - -
100.00 69.2356 5.9282 75.1638 Rp. 2,065,178,025.95
Diajukan RENCANA (%)
Kontraktor Pelaksana REALISASI (%)
PT. HASANAH JAYA SELISIH (%)
SULASMAN ODE, S.T
Site manager
BOBOT KEMAJUAN PEKERJAAN MINGGUAN
TAHAP KEMAJUAN PEKERJAAN
KETERANGAN
PROGRES SAMPAI DENGAN MINGGU INI
60.462
75.164
14.702