By
Base on the construction stage 2D space management
result to create 3D model. (1. Total Spend MH is about
2000 MH (all disciplines MH), 2. The Electrical &
Instrument Trays are included)
Model Review
Unit1
CTCI Review
Model Review
Unit 1 ()
By
Model Review