Anda di halaman 1dari 6

Revit

Project No. Project Name


08E7460A AN&MMA
09E0001A No.6 NAPHTHA CRACKER
10C0447A
Corning Display Technologies
Taiwan Taichung Phase 5
Expansion Project
10E0523B
Kimanis Power Project 300MW
Combined Cycle Power Plant
11E0789A
11E0570A PTEC _
11E0686A OPTC
11E0789A LINKOU
12E0888A QAPCO ETHYLENE TANK
12E0966A HSBC
12E1000A TALIN POWER PLANT
13E1235A/
13C1235A
Corning L50X
13E1336B LR2 EPSCC
Building Name Total Bldg
MAIN SUBSTATION / NO1 SUBSTATION / MAIN MCC &
CONTROL BUILDING / OFFICE BUILDING
4
CCB / MCC 2
Phase 5 Melting Building/Phase 5 Finishing Building 2
CCB & EDG / Administration Building / Workshop and Store
Building / Guard House (South) / Guard House (North) /
Guard House (East) / Public Relation Building / Switchyard
Control Building / Electrical Equipment Building Block I /
Electrical Equipment Building Block II /Electrical Equipment
Building Block III / Parking Shelter / Water Treatment Plant
Building & Chemical Lab / Fire Fighting and Town Water
Pumps House / Diesel Unloading Pumps House / Diesel
Forwarding Pumps House / Waste Water Treatment Plant
Building / Chemical and Lube Oil Store Building / Electro-
chlorination Plant Building / Steam Turbine Building / Air
Compressor Building / Shelter for fuel gas / Boiler feed
water pumps house Block I / Boiler feed water pumps
house Block II /Boiler feed water pumps house Block III
25
CCB / DWTP/MEB 12 / AQCS 12/RW & FW pump house / ST
1 / Boil H 1 / H2 bottle room
8
PHB / CVD / MSB / PEB / NCB / WTC / SSB / SHB 8
PAC House No.1 /PAC House No.2 / PAC Substation /
Hydrogen Unit Package Shelter / Main Control Room /
Weight Scale Room / Gate House / Main Substation /
Switchgear & Rack Room / Guard House / Workshop /
Spare Parts Store & Material Warehouse
12
CCB/ MEB / AQCS-Alstom / AQCS-PRS / AQCS-Elev Tower /
DWTP / RW / CEDG
6
Substation SS22.9 1
/ / Center Subs / Finishing
Building / IWTS Building / Maintenance Building / Chemical
Storage / Crushing Building
9
MEEB / AQCS / DWTP / WWT / Sea Water Electrolysis
House / COMP+EDG / Fire & Raw Water Pump House
7
Finish Building-2 Lines 1
Main Subs / Utilities Subs / U77 Substation / Process Subs-
01 / Process Sub-02
5
Note
test

By
Base on the construction stage 2D space management
result to create 3D model. (1. Total Spend MH is about
2000 MH (all disciplines MH), 2. The Electrical &
Instrument Trays are included)
Model Review
Unit1
CTCI Review

Model Review
Unit 1 ()

By

Model Review

1. site (a. Total Spend MH is about 1000


MH (Design stage, all discipline MH), b. The Electrical &
Instrument Trays are included)
2. The Construction stage has the clash check. (Model be
provided by all vendors)
3. The support and bracing are shown on the
construction stage model.
Model Review
By CCC

Anda mungkin juga menyukai