Previous GATE questions with solutions on Operating Systems
(CPU Scheduling) - CS/IT
GATE-1995
1. Which scheduling policy is most suitable for a time-shared operating
systems?
(a) Shortest Job First (b) Round Robin
(c) First Come First Server (d) Elevator
Ans: option (b)
Explanation:
In order to schedule processes fairly, a round-robin scheduler generally
employs time-sharing, giving each job a time slot or quantum (its allowance
of CPU time), and interrupting the job if it is not completed by then. It is
designed especially for time-sharing systems.
GATE-2001
2. Consider a set of n tasks with known runtimes r1, r2, rn to be run on a
uniprocessor machine. Which of the following processor scheduling
algorithms will result in the maximum throughput?
(a) Round-Robin (b) Shortest-Job-First
(c) Highest-Response-Ratio-Next (d) First-Come-First-Served
Ans: option (b)
Explanation:
Throughput means total number of tasks executed per unit time. Shortest
Job First has maximum throughput because in this scheduling technique
shortest jobs are executed first hence maximum number of tasks are
completed.
Note: Highest-Response-Ratio-Next policy favors shorter jobs, but it also
limits the waiting time of longer jobs.
GATE-2002
3. Which of the following scheduling algorithms is non-preemptive?
(a) Round-Robin (b) First In First Out
(c) Multilevel Queue Scheduling (d) Multilevel Queue Scheduling with
Feedback
Ans: option (b)
GATE-2006
4. Consider three CPU-intensive processes, which require 10, 20 and 30 time
units and arrive at times 0, 2 and 6, respectively. How many context
switches are needed if the operating system implements a shortest
remaining time first scheduling algorithm? Do not count the context
switches at time zero and at the end.
(a) 1 (b) 2 (c) 3 (d) 4
Ans: option(b)
Explanation:
-------------------
SOCIAL PROFILES

136 people like this. Like
LABELS
GATE (22) PHP (22) Computer
Networks (10) C Programming (5) GATE
questions on Computer Networks (4) GATE
questions on DBMS (4) TOC (4)
POPULAR POSTS
GATE Questions - OS - CPU Scheduling
GATE Questions - DBMS - Normalization
GATE Questions-Data Structures-Trees
GATE-Computer Networks-TCP/IP
GATE questions on Computer Networks -
Sliding Window Protocol
GATE Questions - C Programming
GATE Questions - OS - Synchronization
GATE - OS - Process Concepts
GATE Questions-DBMS-Functional
Dependency
GATE-Digital Logic-Number System
FOLLOW BY EMAIL
CATEGORIES
C Programming (5)
CakePHP (3)
Computer Networks (10)
Digital Electronics (2)
GATE (22)
GATE questions on
Computer Networks (4)
PHP (22)
TOC (4)
CakePHP (3)
GATE questions on Operating Systems (3) GATE-
Data Structures (3) TOC-Finite Automata (3)
Digital Electronics (2) MySQL (2) Aj ax (1) Formul as
(1) GATE questi ons on Di gi tal Logi c (1) Maths (1) TOC-
Regul ar Expressi ons (1) Web Devel opment (1)
Email address... Submit
HOME CONTACT
4/27/2014 GATE Questions - OS - CPU Scheduling ~ BtechOnline.Org
http://www.btechonline.org/2013/01/gate-questions-os-cpu-scheduling.html 2/7
PNo AT BT
-------------------
A 0 10
B 2 20
C 6 30
-------------------
Time 0: Process A arrives and its the only available process so it runs.
Time 2: Process B arrives, but A has the shortest remaining time (8), so it
continues.
Time 6: Process C arrives, but A has the shortest remaining time (2), so it
continues.
Time 10: Process A is completed and context switching takes place. B is
scheduled as it is the shortest remaining time process.
Time 30: Process B is completed and context switching takes place. Now C
is scheduled.
GATE-2007
5. Group 1 contains some CPU scheduling algorithms and Group 2 contains
some applications. Match entries in Group 1 to entries in Group 2.
Group I Group II
(P) Gang Scheduling (1) Guaranteed Scheduling
(Q) Rate Monotonic Scheduling (2) Real-time Scheduling
(R) Fair Share Scheduling (3) Thread Scheduling
(a) P 3 Q 2 R 1
(b) P 1 Q 2 R 3
(c) P 2 Q 3 R 1
(d) P 1 Q 3 R 2
Ans: option (a)
Explanation:
Gang scheduling is a scheduling algorithm for parallel systems that schedules
related threads or processes to run simultaneously on different processors.
CLICK TO KNOW MORE
Rate monotonic scheduling is a scheduling algorithm used in real-time
operating systems with a static-priority scheduling class. CLICK TO KNOW
MORE
Fair Share Scheduling is a scheduling strategy in which the CPU usage is
equally distributed among system users or groups, as opposed to equal
distribution among processes. It is also known as Guaranteed
scheduling.CLICK TO KNOW MORE
GATE-1993
6. Assume that the following jobs are to be executed on a single processor
system
-----------------------
Job-Id CPU-BurstTime
-----------------------
p 4
q 1
r 8
s 1
t 2
-----------------------
The jobs are assumed to have arrived at time 0 and in the order p, q, r, s,
t. Calculate the departure time (completion time) for job p if scheduling is
round robin with time slice 1.
(a) 4 (b) 10 (c) 11 (d) 12
WEB HOSTING SERVICES
THEORY OF COMPUTATION
BtechOnline.Org will publish detailed notes on
finite automata, context-free grammars, Turing
machines, undecidable problems, and
intractable problems.
4/27/2014 GATE Questions - OS - CPU Scheduling ~ BtechOnline.Org
http://www.btechonline.org/2013/01/gate-questions-os-cpu-scheduling.html 3/7
Ans: option (c)
Explanation:
Execution steps are plotted below
P Q R S T P R T P R P R
1 2 3 4 5 6 7 8 9 10 11 16
GATE-1995
7. The sequence is an optimal non-preemptive scheduling sequence
for the following jobs which leaves the CPU idle for unit(s) of
time.
----------------------------
Job Arrival_Time Burst_Time
----------------------------
1 0.0 9
2 0.6 5
3 1.0 1
----------------------------
(a) {3,2,1),1 (b) (2,1,3},0
(c) {3,2,1),0 (d) {1,2,3},5
Ans: option (a)
Explanation:
Shortest Job First is an optimal solution for non-preemptive scheduling.
Hence the sequence should be 3,2,1. For that sequence to occur the CPU
should wait for 1 units of time.
GATE-1996
8. Four jobs to be executed on a single processor system arrive at time 0 in
the order A, B, C, D. their burst CPU time requirements are 4, 1, 8, 1 time
units respectively. The completion time of A under round robin scheduling
with time
slice of one time unit is
(a) 10 (b) 4 (c) 8 (d) 9
Ans: option (d)
GATE-2003
9. A uni-processor computer system only has two processes, both of which
alternate 10 ms CPU bursts with 90 ms I/O bursts. Both the processes were
created at nearly the same time. The I/O of both processes can proceed in
parallel. Which of the following scheduling strategies will result in the least
CPU utilization (over a long period of time) for this system?
(a) First come first served scheduling
(b) Shortest remaining time first scheduling
(c) Static priority scheduling with different priorities for the two processes
(d) Round robin scheduling with a time quantum of 5 ms
Ans: option (a)
GATE-2004
10. Consider the following set of processes, with the arrival times and the
CPU burst times given in milliseconds.
-------------------------------------
Process Arrival-Time Burst-Time
-------------------------------------
P1 0 5
P2 1 3
P3 2 3
P4 4 1
-------------------------------------
What is the average turnaround time for these processes with the
preemptive shortest remaining processing time first (SROT) algorithm?
4/27/2014 GATE Questions - OS - CPU Scheduling ~ BtechOnline.Org
http://www.btechonline.org/2013/01/gate-questions-os-cpu-scheduling.html 4/7
(a) 5.50 (b) 5.75 (c) 6.00 (d) 6.25
Ans: option (a)
Explanation:
Execution chart is shown below:
P1 P2 P4 P3 P1
1 4 5 8 12
Calculate the Turn Around Time (TAT) for each process as shown in the
table below.
TAT = Completion Time - Arrival Time
-------------------------------------
Pro AT BT CT TAT(CT-AT)
-------------------------------------
P1 0 5 12 12
P2 1 3 4 3
P3 2 3 8 6
P4 4 1 5 1
-------------------------------------
Avg TAT = (12+3+6+1)/4 = 5.50
GATE-2006
11. Consider three processes (process id 0, 1, 2 respectively) with compute
time bursts 2, 4 and 8 time units. All processes arrive at time zero. Consider
the longest remaining time first (LRTF) scheduling algorithm. In LRTF ties are
broken by giving priority to the process with the lowest process id. The
average turn around time is:
(a) 13 units (b) 14 units (c) 15 units (d) 16 units
Ans: option (a)
Explanation:
Execution chart is shown below:
P2 P1 P2 P1 P2 P0 P1 P2 P0 P1 P2
4 5 6 7 8 9 10 11 12 13 14
Calculate the Turn Around Time (TAT) for each process as shown in the
table below.
TAT = Completion Time - Arrival Time
-------------------------------------
Pro AT BT CT TAT(CT-AT)
-------------------------------------
P1 0 2 12 12
P2 0 4 13 13
P3 0 8 14 14
-------------------------------------
Avg TAT = (12+13+14)/3 = 13
GATE-2006
12. Consider three processes, all arriving at time zero, with total execution
time of 10, 20 and 30 units, respectively. Each process spends the first 20%
of execution time doing I/O, the next 70% of time doing computation, and
the last 10% of time doing I/O again. The operating system uses a shortest
remaining compute time first scheduling algorithm and schedules a new
process either when the running process gets blocked on I/O or when the
running process finishes its compute burst. Assume that all I/O operations
can be overlapped as much as possible. For what percentage of time does
the CPU remain idle?
(a) 0% (b) 10.6% (c) 30.0% (d) 89.4%
Ans: option (b)
Explanation:
--------------------------
4/27/2014 GATE Questions - OS - CPU Scheduling ~ BtechOnline.Org
http://www.btechonline.org/2013/01/gate-questions-os-cpu-scheduling.html 5/7
Pro AT IO BT IO
--------------------------
P1 0 2 7 1
P2 0 4 14 2
P3 0 6 21 3
--------------------------
Execution chart is shown below:
P1 P2 P3
2 9 23 44 47
Total Execution Time = 47
CPU Idle Time = 2 + 3 = 5
Percentage of Idle Time = 5/47 = 10.6%
GATE-2007
13. An operating system uses Shortest Remaining Time first (SRT) process sch
eduling algorithm. Consider the arrival times and execution times for the foll
owing processes:
-------------------------------------
Process Execution time Arrival time
-------------------------------------
P1 20 0
P2 25 15
P3 10 30
P4 15 45
-------------------------------------
What is the total waiting time for process P2?
(a) 5 (b) 15 (c) 40 (d) 55
Ans: option (b)
Explanation:
Execution chart is shown below:
P1 P2 P3 P2 P4
20 30 40 55 70
Waiting Time = Completion Time - Arrival Time - Execution Time
Waiting Time = 55 - 15 - 25 = 15
GATE-2011
14. Consider the following table of arrival time and burst time for three
processes P0, P1 and P2.
-----------------------------------
Process Arrival time Burst Time
-----------------------------------
P0 0 ms 9 ms
P1 1 ms 4 ms
P2 2 ms 9 ms
-----------------------------------
The pre-emptive shortest job first scheduling algorithm is used. Scheduling
is carried out only at arrival or completion of processes. What is the average
waiting time for the three processes?
(a) 5.0 ms (b) 4.33 ms (c) 6.33 ms (d) 7.33 ms
Ans: option (a)
Explanation:
Execution chart is shown below:
P0 P1 P0 P2
1 5 13 22
Waiting Time = Completion Time - Arrival Time - Execution Time
4/27/2014 GATE Questions - OS - CPU Scheduling ~ BtechOnline.Org
http://www.btechonline.org/2013/01/gate-questions-os-cpu-scheduling.html 6/7
<< Previous Page Next Page >>
-----------------------------------
Pro AT BT CT WT
-----------------------------------
P0 0 9 13 4
P1 1 4 5 0
P2 2 9 22 11
-----------------------------------
Average Waiting Time = (4+0+11)/3 = 5ms
GATE-2012
15. Consider the 3 processes, P1, P2 and P3 shown in the table
----------------------------------------------
Process Arrival time Time unit required
----------------------------------------------
P1 0 5
P2 1 7
P3 3 4
----------------------------------------------
The completion order of the 3 processes under the policies FCFS and RRS
(round robin scheduling with CPU quantum of 2 time units) are
(a) FCFS: P1, P2, P3 RR2: P1, P2, P3
(b) FCFS: P1, P3, P2 RR2: P1, P3, P2
(c) FCFS: P1, P2, P3 RR2: P1, P3, P2
(d) FCFS: P1, P3, P2 RR2: P1, P2, P3
Ans: option (c)
Home
11 comments:
+1 Recommend this on Google
Anonymous May 6, 2013 at 10:09 PM
awesome work man !!
Thanks
Reply
Anonymous May 8, 2013 at 11:18 AM
Great work yaar...
Thank you....
Reply
Anonymous June 11, 2013 at 2:47 PM
So nice of u...thank u
Reply
Anonymous June 25, 2013 at 6:17 PM
thanx buddy ...it was helpful :)
Reply
Anonymous July 29, 2013 at 3:41 PM
good job buddy
Reply
Anonymous September 13, 2013 at 3:18 PM
4/27/2014 GATE Questions - OS - CPU Scheduling ~ BtechOnline.Org
http://www.btechonline.org/2013/01/gate-questions-os-cpu-scheduling.html 7/7
Enter your comment...
Comment as:
Google Account
Publish

Preview
Subscribe to: Post Comments (Atom)

Copyright 2014 BtechOnline.Org | Powered by Blogger
Design by FThemes | Blogger Theme by Lasantha - Free Blogger Themes | NewBloggerThemes.com
helpful
Reply
Anonymous September 26, 2013 at 4:33 PM
thank
Reply
rathna rekha September 26, 2013 at 6:31 PM
very helpful
Reply
Anonymous September 30, 2013 at 1:01 PM
GREAT!!! thnks.
Reply
Amritesh Singh October 1, 2013 at 2:38 AM
thanks
Reply
Anonymous November 1, 2013 at 7:46 PM
thnxs buddy :)
Reply

Anda mungkin juga menyukai