This proposal to propose our scope of services for Achitectural, Civil and Structural design work for Further Processing
Extension Project which are separated drawings as 2 options for selection :
Option 1 : CDA. Provide conceptual design only (without calculation), or
Option 2 : CDA. Provide conceptual design & detail structural for cost estimation work (with calculation)
Option 1 Option 2
EARTH WORK DRAWING
1 Spot level plan / Cut & Fill detail (1) P P
2 Spot level plan / Cut & Fill detail (2) P P
3 Pavement layout plant P P
4 Pavement detail P P
5 Under groundfacility site plan (full plan) P P
6 Under groundfacility site plan (partail 1) P P
7 Under groundfacility site plan (partail 2) P P
8 Under groundfacility site plan (partail 3) P P
ARCHITECTURE DRAWING
9 Finishing schedule (1) P P
10 Finishing schedule (2) P P
11 Typical detail for wall/ceiling/floor sections P P
12 Typical detail for ceiling support/floor gutter P P
13 Typical detail for roof/gutter & PIR penetrations P P
14 Under ground floor plan (full plan) P P
15 Under ground floor plan (partail 1) P P
16 Under ground floor plan (partail 2) P P
17 Under ground floor plan (partail 3) P P
18 Ground floor plan (full plan) P P
19 Ground floor plan (partail 1) P P
20 Ground floor plan (partail 2) P P
21 Ground floor plan (partail 3) P P
22 2nd. floor plan (full plan) P P
23 2nd. floor plan (partail 1) P P
24 2nd. floor plan (partail 2) P P
25 2nd. floor plan (partail 3) P P
26 Roof plan P P
27 Elevation E, F, D-D P P
28 Elevation A P P
29 Elevation B, D P P
30 Elevation H, I P P
31 Elevation C P P
32 Section A P P
33 Section B, C P P
34 Section H, I P P
35 Doors & Windows schedule P P
36 Doors & Windows schedule P P
37 Doors & Windows schedule P P
No.
Drawing Title
DWG No.
1/3
Project works description and scope of work
Option 1 Option 2
38 Doors & Windows schedule P P
39 Insulation Doors & Windows schedule P P
40 Insulation Doors & Windows schedule P P
41 Insulation Doors & Windows schedule P P
42 Insulation Doors & Windows schedule P P
STRUCTURE DRAWING
43 Overall piling plan P P
44 Piling plan (1/3) P P
45 Piling plan (2/3) P P
46 Piling plan (3/3) P P
47 Footing & Column plan (1/3) P P
48 Footing & Column plan (2/3) P P
49 Footing & Column plan (3/3) P P
50 Under ground beam plan -0.80 (1/3) P P
51 Under ground beam plan -0.80 (2/3) P P
52 Under ground beam plan -0.80 (3/3) P P
53 Ground beam & Slab plan (1/3) P P
54 Ground beam & Slab plan (2/3) P P
55 Ground beam & Slab plan (3/3) P P
56 2nd. beam & slab plan (1/3) P P
57 2nd. beam & slab plan (2/3) P P
58 2nd. beam & slab plan (3/3) P P
59 Deck & Roof beam & Slab plan (1/3) P P
60 Deck & Roof beam & Slab plan (2/3) P P
61 Deck & Roof beam & Slab plan (3/3) P P
62 Roof framing plan (1/3) P P
63 Roof framing plan (2/3) P P
64 Roof framing plan (3/3) P P
65 Topping concrete floor plan P P
66 Framing elevation (1/3) P P
67 Framing elevation (2/3) P P
68 Framing elevation (3/3) P P
69 Roof framing plan P P
70 Detail of footing (1) O P
71 Detail of footing (2) O P
72 Detail of footing (3) O P
73 Detail of footing (4) O P
74 Detail of footing (5) O P
75 Detail of RC.Column (1) O P
76 Detail of RC.Column (2) O P
77 Detail of RC. Beam (1) O P
78 Detail of RC. Beam (2) O P
79 Detail of RC. Beam (3) O P
80 Detail of RC. Beam (4) O P
81 Detail of RC. Beam (5) O P
No.
Drawing Title
DWG No.
2/3
Project works description and scope of work
Option 1 Option 2
82 Detail of RC. Beam (6) O P
83 Detail of RC. Beam (7) O P
84 Detail of RC. Beam (8) O P
85 Detail of flat slab FS-01 O P
86 Detail of flat slab FS-02 O P
87 Detail of flat slab FS-03 O P
88 Detail of RC.Slab O P
89 Detail of Steel Slab/walkways O P
90 Detail of truss T1, T1A, & T1B
91 Detail of truss T1C, T1D, T1E, T1FA
92 Detail of truss T1F, T1G, T1H & T1I
93 Detail of truss T1J, T1k & T1L Shape only Shape & Sizing
94 Detail of truss T1M, T1N & T1O
95 Detail of truss T2, T2A, T2B, T2C, T2CA, T2D, T2E & T2F
Detail of truss T3, T3A, T4, T4A, T5, T5A, TT1, TT1A, TT2, TT2A & TT2B
Detail of truss TR1, TR2, TR2A, TN1 & TN2
96 Section A, C for Ice bank P P
97 Section B, B for Ice bank P P
98 Detail of canopy Shape only Shape & Sizing
Remark : All service fee is excluding V.A.T. 7%
Drawing 600,000.- THB 800,000.- THB
Engineering - 600,000.- THB
Total Service fee
600,000.- THB 1,400,000.- THB
- Submit all drawing for 2 months after contract signing
First payment 30% - Upon contract signing
Final payment 70% - Upon submission all drawing
No.
Drawing Title
DWG No.
Schedule of Work
Term of Payment