Anda di halaman 1dari 11

Length

Tested Accepted Rejected Accepted Rejected


(mm) (A) (R) (A) (R)
1 560 A
2 560 A
3 560 A
4 560 A

5 560 A

6 560 A

7 1,240 A

8 1,240 A

9 1,240 A








Witnessed By:
No Relevant Indication
Performed / Evaluated By: Authorized Signatory:
No Relevant Indication
No Relevant Indication
No Relevant Indication


AHU room
Manufacturing / Brand
Connection Grid Line 38/E
Grid Line 36/A
Penetrant
Developer Type
Cleaner Type
SKL-SP1 / Visible Dye
SKD-S2 / Non Aqueous
AHU Base Plate-Column
AHU Base Plate-Column
AHU Base Plate-Column

N / A




AHU Beam Connection
No Relevant Indication

Connection Grid Line 38/A
Connection Grid Line 38/B
Connection Grid Line 38/C
AHU Base Plate-Column No Relevant Indication
****Nothing Follows****
Laboratory No.
Acceptance Code
INSPECTION PROCESS
Item
No.
NDT Procedure No.
Clean / Smooth
Ambient
Dwell Time
Identification
15.8mm, 8mm, 11mm, 7mm
SKC-S / Solvent Removable
Sta Rosa Laguna
XWELL-LPT-2009-01
H-way 54 Plaza Mandaluyong City
2013-11-PT-003M
2013-11-030M
LIQUID PENETRANT TESTING REPORT
Address
Drwng. Ref. No.
Carbon Steel
Location / Site
ASME V
Tested Item / Part
Sta.Clara International Corporation
Beam, Column
Sample Card No.
Material Specification
Material Thickness
Client
Project Name
Date of Inspection
Inspection
Part Type
Inspection Procedure AWS D1.1
Sponegbob Project
November 26, 2013
Spot
Weld
Visible
Surface Condition
Method Technique
Surface Temperature
10 - 15 mins.

NDT Level II SCIC/CEZA
No Relevant Indication



For and On-Behalf of X'Well Testing Services Inc.
Laboratory Manager/NDT Supervisor
No Relevant Indication
Magnaflux

Yes
Total Length Tested = 7,080 mm
Grid Line 36/B
AHU Beam Connection
Grid Line 36/C
AHU Base Plate-Column
AHU Beam Connection
No Relevant Indication
Examination Result
Part No. / Weld Joint
AHU Base Plate-Column
Findings / Defect Type & Size
Repair
Post Cleaning
Connection Grid Line 38/D
Connection Grid Line 38/F
Emul Time
Edgar A. Aragon Mark A. Belo/Renato Bergola Edison Walit
X'WELL Form Rev.1 Page 1 of 11
SCE
SCE



Accepted
Rejected
Witnessed By:
NDT Level II SCIC/CEZA
Performed / Evaluated By: Authorized Signatory:
Edgar A. Aragon Mark A. Belo/Renato Bergola Edison Walit
Laboratory Manager/NDT Supervisor
For and On-Behalf of X'Well Testing Services Inc.
Sketch Detail / Part / Joint Location
LEGEND:
LIQUID PENETRANT TESTING REPORT
GRID LINE 38/A
TESTED LOCATION
F
L
A
N
G
E

WEB
TESTED LOCATION
X'WELL Form Rev.1 Page 2 of 11
SCE
SCE


Accepted
Rejected
Witnessed By:
Sketch Detail / Part / Joint Location
LIQUID PENETRANT TESTING REPORT
Performed / Evaluated By: Authorized Signatory:
Edgar A. Aragon Mark A. Belo/Renato Bergola Edison Walit
LEGEND:
NDT Level II SCIC/CEZA
Laboratory Manager/NDT Supervisor
For and On-Behalf of X'Well Testing Services Inc.
GRID LINE 38/B
TESTED LOCATION
F
L
A
N
G
E

WEB
TESTED LOCATION
X'WELL Form Rev.1 Page 3 of 11
SCE
SCE


Accepted
Rejected
Witnessed By:
Sketch Detail / Part / Joint Location
LIQUID PENETRANT TESTING REPORT
Performed / Evaluated By: Authorized Signatory:
Edgar A. Aragon Mark A. Belo/Renato Bergola Edison Walit
LEGEND:
NDT Level II SCIC/CEZA
Laboratory Manager/NDT Supervisor
For and On-Behalf of X'Well Testing Services Inc.
GRID LINE 38/C
TESTED LOCATION
F
L
A
N
G
E

WEB
TESTED LOCATION
X'WELL Form Rev.1 Page 4 of 11
SCE
SCE


Accepted
Rejected
Witnessed By:
Sketch Detail / Part / Joint Location
LIQUID PENETRANT TESTING REPORT
Performed / Evaluated By: Authorized Signatory:
Edgar A. Aragon Mark A. Belo/Renato Bergola Edison Walit
LEGEND:
NDT Level II SCIC/CEZA
Laboratory Manager/NDT Supervisor
For and On-Behalf of X'Well Testing Services Inc.
GRID LINE 38/D
TESTED LOCATION
F
L
A
N
G
E

WEB
TESTED LOCATION
X'WELL Form Rev.1 Page 5 of 11
SCE
SCE


Accepted
Rejected
Witnessed By:
Sketch Detail / Part / Joint Location
LIQUID PENETRANT TESTING REPORT
Performed / Evaluated By: Authorized Signatory:
Edgar A. Aragon Mark A. Belo/Renato Bergola Edison Walit
LEGEND:
NDT Level II SCIC/CEZA
Laboratory Manager/NDT Supervisor
For and On-Behalf of X'Well Testing Services Inc.
GRID LINE 38/E
TESTED LOCATION
F
L
A
N
G
E

WEB
TESTED LOCATION
X'WELL Form Rev.1 Page 6 of 11
SCE
SCE


Accepted
Rejected
Witnessed By:
Sketch Detail / Part / Joint Location
LIQUID PENETRANT TESTING REPORT
Performed / Evaluated By: Authorized Signatory:
Edgar A. Aragon Mark A. Belo/Renato Bergola Edison Walit
LEGEND:
NDT Level II SCIC/CEZA
Laboratory Manager/NDT Supervisor
For and On-Behalf of X'Well Testing Services Inc.
GRID LINE 38/F
TESTED LOCATION
F
L
A
N
G
E

WEB
TESTED LOCATION
X'WELL Form Rev.1 Page 7 of 11
SCE
SCE


Accepted
Rejected
Witnessed By:
NDT Level II SCIC/CEZA
Laboratory Manager/NDT Supervisor
For and On-Behalf of X'Well Testing Services Inc.
Performed / Evaluated By: Authorized Signatory:
Edgar A. Aragon Mark A. Belo/Renato Bergola Edison Walit
LEGEND:
Sketch Detail / Part / Joint Location
LIQUID PENETRANT TESTING REPORT
W
E
B

GRID LINE 36/A
JC1 TESTED LOCATION
TESTED LOCATION
J
C
2
CONNECTION DETAIL
J
C
1
FLANGE
W
E
B

JC2 TESTED LOCATION
FLANGE
X'WELL Form Rev.1 Page 8 of 11
SCE
SCE


Accepted
Rejected
Witnessed By:
Sketch Detail / Part / Joint Location
LIQUID PENETRANT TESTING REPORT
Performed / Evaluated By: Authorized Signatory:
Edgar A. Aragon Mark A. Belo/Renato Bergola Edison Walit
LEGEND:
NDT Level II SCIC/CEZA
Laboratory Manager/NDT Supervisor
For and On-Behalf of X'Well Testing Services Inc.
W
E
B

GRID LINE 36/B
JC1 TESTED LOCATION
TESTED LOCATION
J
C
2
CONNECTION DETAIL
J
C
1
FLANGE
W
E
B

JC2 TESTED LOCATION
FLANGE
X'WELL Form Rev.1 Page 9 of 11

SCE
SCE


Accepted
Rejected
Witnessed By:
NDT Level II SCIC/CEZA
Laboratory Manager/NDT Supervisor
For and On-Behalf of X'Well Testing Services Inc.
Performed / Evaluated By: Authorized Signatory:
Edgar A. Aragon Mark A. Belo/Renato Bergola Edison Walit
LEGEND:
Sketch Detail / Part / Joint Location
LIQUID PENETRANT TESTING REPORT
W
E
B

GRID LINE 36/C
JC1 TESTED LOCATION
TESTED LOCATION
J
C
2
CONNECTION DETAIL
J
C
1
FLANGE
W
E
B

JC2 TESTED LOCATION
X'WELL Form Rev.1 Page 10 of 11
SCE
SCE
Accepted
Rejected
Witnessed By:
LIQUID PENETRANT TESTING REPORT
Sketch Detail / Part / Joint Location


Authorized Signatory:
Edgar A. Aragon Mark A. Belo/Renato Bergola Edison Walit
LEGEND:
Performed / Evaluated By:
Laboratory Manager/NDT Supervisor
For and On-Behalf of X'Well Testing Services Inc.
NDT Level II SCIC/CEZA
AHU ROOM SECOND FLOOR FRAMING PLAN
X'WELL Form Rev.1 Page 11 of 11