The River Sharda originates in the region of higher Himalayas, from the Glacier
of Zaskara range, at about 5250 meter !n the u""er reaches, in the hills, it is
called #ahakali The river emerges into "lains at $harahrmadeov, 5 %m
u"stream of Tanak"ur and is called Sharda The river is among the ma&or rivers
of !ndia and has a large hydro "otential
The Tanak"ur 'o(er Station is located on the right bank of the river Sharda in
the state of )ttaranchal !t is a run*of*the river "o(er station The 'ro&ect
com"rises a +i, $arrage for diverting Sharda river (aters into the "o(er channel
+ii, a surface "o(er house (ith a total installed ca"acity of -.2 #/ +derated
from original rating of 020 #/ due to a com"romise that had to be made on the
designed head,, near the $anbassa $arrage, for utili1ing the available head for
"o(er generation2 +iii, about 005 %m long tail race channel for discharging back
the (ater from the generating machines in to the Sharda River 2 +iv, 220 %3 4052
%3 s(itching station ad&acent to the "o(er house and +v, 220%3 double circuit
transmission line to $areilly 6 $ Gan&, 052%3 single circuit transmission line to
#ahender 7agar +7e"al, for evacuation of "o(er
The 'o(er Station has 5 %a"lan turbines of 50. #/ each The +%a"lan ty"e,
Hydro turbines for the Tanak"ur 'o(er Station have been su""lied by #4s $H89
The turbine and generating e:ui"ment (ere manufactured against our "urchase
order in ;ctober 0-<5 The turbine is designed for direct cou"ling (ith three
"hase 50 cycles4sec generators The Generators are of the Semi )mbrella ty"e
(hich are also su""lied by #4s $H89
The elements of (ater "ath of turbine vi1 s"iral casing, stay ring, guide
a""aratus, runner and draft tube have been (orked out to get minimum overall
dimensions of the unit, (ith high efficiency and good anti cavitation "ro"erties
#ain attention in designing the machines (as focused to obtain high hydraulic
and o"erational :ualities efficiency of the e:ui"ment and its com"lete reliability
The "ro&ect area falls under Zone . +High damage risk 1one, on Richter=s scale
and is not seismically activeof seismic division of our country #onsoons are
heavy and s"read over the months of >uly to ;ctober, (inter season e?tends u"
to @ebruary and summer from #arch to >une The mean ma? and min
tem"eratures are .0
0
6 and 0.
0
6 res"ectively Average annual rainfall is 0500
mm
Buring monsoon, in order to have silt*free (ater for the "o(er house, a silt
e?cluder device is "rovided in the under sluice "ortion of the barrage and silt
e&ector is "rovided on the "o(er channel
SALIENT FEATURES
************************
LOCATION
State in (hich located )ttaranchal
Bistrict 6ham"a(at
River Sharda
$arrage A""ro? 2 %m B4S of the to(n Tanak"ur
'o(er House A""ro? 02 %m )4S of e?isting Sharda $arrage
HYDROLOGY
6atchment area 05,000 S:km
Besign flood 0--00 6umec
#ean annual rainfall 0500 mm
BARRAGE
Total length .C55 m
S"ill(ay $ays length 2C-5 m
6rest 9evel )nder sluice*25C5 m, S"ill(ay*25<0m
7o of bays 22 +)nder sluice D -, S"ill(ay D 05,
#a? discharge ca"acity 0--00 6umec
#a? barrage "ond level 2.EC m
Silt 8?cluder Tunnels E no si1e 22 m F 52 m
Guide $und +Bo(nstream, 9eft $ank D0CC m, Right $ank *0CC m
Afflu? $und +)"stream, 9eft $ank* 22 %m, Right $ank* 22 %m
SPILLWAY
7o of s"ill(ays
05
Si1e of s"ill(ay gates 0<5m? <-m
/eight of each gate E-2C0 #T
6rest level of s"ill(ay bay 25<0m
SLUICES
7o of sluices -
Si1e of under sluice gates 0<5 m?-5 m
/eight of under sluice gate C5E<C #T
HEAD REGULATOR
9ocation
9ength
Right bank of the river
C<.5 m
7oG Si1e of gate 4(t E 7os, 002 m ? 55 m each, 5E0<C #T
Bischarge ca"acity E<0 cumec
8nergy Bissi"ation
Arrangement
Stilling basin (ith blocks
SILT EJECTOR
7o G Ty"e .<, Ho""er ty"e
Si1e of desilting basin -0 mF020 m
7o of flushing tunnels . nos
POWER CHANNEL
9ength E. %m+from head regulator to forebay,
#a? discharge ca"acity 5EE cumec
Sha"e Tra"e1oidal
Be"th E*- m
FOREBAY
Si1e E.2 mF-00 m
$ed level 25000 m
BYPASS SPILLWAY
7o and si1e of bay 5 nos of -5 m each
#a? discharge ca"acity 5EE cumec
9ength of s"ill(ay 5-5 m
6rest level 2.52 m
PENSTOCK
7umber 5 7os
Biameter E5 m
9ength 5.2 m
Si1e of intake gates 50 m F C00 m
6enter line of intake 25.-55 m
TAIL RACE CHANNEL
9ength 0050 m
POWER HOUSE
Ty"e Surface
Besign head 2.25 m
!nstalled ca"acity -.2 #/
+5 units of 50. #/ each D Berated ca"acity,
Bimensions 00250 m ? .520 m ? .CC0 m
)nit design discharge
0<<EC cumecs
EOT
7umber 2 7os
6a"acity 025450 4 Tonne
TURBINE
Ty"e of turbine %a"lan
Rated net head 2.25 m
Rated out"ut 52 #/ +Berated from rated out"ut of .05.
#/,
Rated discharge for rated out
"ut G head
0<<EC #
5
4sec
Rated s"eed 05E. r"m
Rated average efficiency -22H
Bischarge dia of runner E200 mm
Runa(ay s"eed on cam 2<0 r"m
Runa(ay s"eed off cam 5C5 r"m
Birection of rotation 6lock(ise + vie(ed from to",
'' Set delivery "ressure .0 %g4cm2
#a?imum hydraulic thrust 480 T
7o of guide vanes
2.
GENERATOR
Ty"e
)mbrella
Rated out "ut +at 0- "f
lagging,
.5 #3A
Rated voltage
00 %3
@re:uency 50 H1
7o of "oles ..
Stator 6onnection Star
Rated 6urrent 25E0< Am"
8?citation at rated load -00 -00 Am"
Sli" ring brushes
Total 2. + 02 "er ring,
Thrust $earing Ty"e S"ring #attress + 00 "ads2 -0 s"rings "er "ad,
Air ga"
0. mm
BUS DUCT
Ty"e designation !solated 'hase $us Buct
Rated voltage 00 k3
Highest voltage for e:ui"ment
+)m,
02 k3
Rated fre:uency 50 H1
#ain bus 5000 Am"
GENERATOR TRANSFORMER
Rated voltage 220 + I00H, %3
Rated #3A .-5 #3A
7o of Transformers 5 7os
Ty"e of cooling ;@/@
!nsulation class A
H !m"edance
+at "rinci"al ta", 0252 H
3ector grou" J7d00
SWITCH YARD
3oltage level
220%3 4 052 %3
7o of bays
C
9ine bays 5 +K9ine*!4!!+220 k3, G 7e"al 9ine+052 k3,L
$us cou"ler bay 0
Ty"e of breaker
S@E +Single "ole o"eration, "neumatic
o"ening*s"ring closing,
Si1e of s(itch yard 0E< m F 000 m
)nit bays 5
9ine bays 5 +K9ine*!4!!+220 %v, G 7e"al 9ine+052 %v,L
$us cou"ler bay 0
Ty"e of breaker S@E +Single "ole o"eration,"neumatic closing*s"ring
tri""ing,
Si1e of s(itch yard 0E< # F 000 #
ALLOCATION OF POWER GENERATED FROM TANAKPUR POWER
STATION
S.No. State MW Share % Share
0 6handigarh 0 05
2 Belhi 02 02<
5 Haryana E E.
. H' . 5<
5 >G% C CC
E 'un&ab 0C 0C-
C Ra&asthan 00 005
< )' 20 22E
- )ttaranchal 05 05-
7oteMThe "o(er allocation for different states (ill be "ro*rata +Hshare, of net "o(er
transmitted by T'S after deduction of "o(er transmitted to 7e"al
SCHEDULE OF POWER TO BE TRANSMITTED TO NEPAL MONTH!WISE"
SL.NO. MONTH
ENERGY TO BE SUPPLIED MU" PEAK LOAD MW"
SCHEDULE SCHEDULE
0 >anuary .5000 0200
2 @ebruary .0000 0200
TRANSMISSION LINE
Tanak"ur to $areilly 220 %3 k3 Bouble 6kt 9ine
9ength of the line 00E %m
Tanak"ur to 7e"al 052 %k3 sSingle 6kt line
9ength of the line 05 %m
DESIGN ENERGY .520- #)
COMMISSIONING DATES
)nit*! + 50050--2, ,
)nit*!! +0.0.0--2,,
)nit*!!! +0.0.0--2,
5 #arch .5000 0200
. A"ril 50000 0.00
5 #ay E0000 0E00
E >une E5000 0E00
C >uly C0000 0E00
< August C0000 0E00
- Se"tember C0000 0E00
00 ;ctober C0000 0.00
00 7ovember E0000 0200
02 Becember 55000 0200
TOTAL #$.$$$$ %&'.$$$$
DESIGN ENERGY MONTH WISE" FOR TANAKPUR POWER STATION
S.NO MONTH DESIGN ENERGY MU"
0 A"ril 0-C0
2 #ay 2<-.
5 >une .22-
. >uly EE5-
5 August EE5-
E Se"tember E...
C ;ctober 50-2
< 7ovember 5002
- Becember 2.05
00 >anuary 2025
00 @ebruary 0C02
02 #arch 0<0-
Total
()*.%+MU"
ELE,ATIONS IN POWER HOUSE
*************************************
S.NO. ELEVATION DESCRIPTION
1 EL 247.5 M ROAD FORMATION LEVEL
32 EL 246.4 M BYE-PASS GATE OPERATION
43 EL 246.0-246.2 M NORMAL FOREBAY LEVEL FOR OPERATION OF
UNITS
4 EL 245.48 M FULL SUPPLY EAD OF PO!ER "ANNEL
5 EL 243.2 M "REST LEVEL OF BYEPASS SPILL!AY
6 EL 234.#33 "ENTRELINE OF PENSTO"$ INTA$E
7 EL 231.10 BED LEVEL OF FOREBAY
8. EL 234.0M ROOF TOP OF PO!ER OUSE %1
ST
FLOOR&
# EL 227.7 M MA"INE FLOOR
10 EL 223.30 M MA' TR" !ATER LEVEL
11 EL 222.0 M MIN TR" !ATER LEVEL
12 EL 218.853 M BED LEVEL OF TR" AT ENTRY
13 EL 218.848 M BED LEVEL OF TR" AT REGULATOR SIDE
14 EL 222.0 M TURBINE FLOOR
15 EL 217.5 M "ENTERLINE OF S"ROLL "ASING
16 EL 215.56 M "ENTRE LINE OF RUNNER
17 EL 211.25 M "OOLING !ATER FLOOR
18. EL 210.5 M DRAFT TUBE GALLERY
1# EL 210.5 M DRAINAGE(DE!ATERING FLOOR
20 EL 202.5 M DE!ATERING EADER
21 EL 200.5 M DE!ATERING PIT FLOOR
22 EL 200.0 M DRAINAGE PIT FLOOR
23 EL 1#8.80 M DEEPEST FOUNDATION LEVEL
E-UIPMENTS AT ,ARIOUS ELE,ATIONS
******************************************
1) E-UIPMENTS AT EL **#.# M MACHINE HALL ELE,ATION"
S.No. Lo.at/o0
Equipments
0 #achine Hall !nstrument 'anel, Alarm 'anel, )nit Relay 'anel*
0G2, Tem"erature G #easurement 'anel, )nit
6ontrol G !ndication 'anel, Thyristor $ridge, A3R
cabinet, @ield $reaker cabinet, @ield @lashing
cabinet, Governor System +8lectrical 6abinet G
Hydromechancial cabinet,
2 6ontrol Room @ire alarm control "anel, fire annunciation "anel,
'966 'anel 7e"al +A$$ #ake,, '966 6$ gGan&
lines +')76;# #ake,, Remote ;9T6 G cooler
control cubical +7e"al 9ine, 220%34052%3,
50#3A auto transformer, 052%3 7e"al feeder,
Time synchroni1er "anel, 8vent logger "anel,
Bisturbance recorder "anel, Auto synchroni1er,
2203 B6 distribution board, 6#R "anel, control
desk, $us cou"ler "anel, 6$ gGan& line 0G2
"anel, Synchroni1er "anel , 3ibration monitoring
system
5 Transformer Jard Generator Transformer N 0,2G5,
SST N0G2, )AT N0,2G5,Gantry crane
. 'um" House +@ire
@ighting,
#ain fire "um"s N0G2, ;ne &ockey "um", /ater
Storage Tank
5 9T 'anel Room SS$ N0G2, 220 3 @loat charger and $oost
charger, .<3 @loat charger and $oost charger,
Halon system for control room fire fighting
system
E 3entilation room $lo(ers+5 7o,
C $attery Room 220 3 $attery $ank +;ld47e(,, .< 3 $attery
$ank
Note: See Annex-1&Annex-2 for sce!"t#c $r"%#n&.
2) E-UIPMENTS AT EL ***.$ M TURBINE FLOOR"
S.No. Lo.at/o0 E12/34e0t5
0 Turbine @loor $rake dust collector system,!nter"ad cooler
system, 9A3T 6ubicle,7G Transformer cubicle,
8?citation transformer,6G9S system, $raking
G>acking system
2 6om"ressor Room H' 6om"ressors +T(o,, 9' 6om"ressor+T(o,,H'
Air Receiver, H' to 9' Air Receiver,9' Air Receiver
5 #echanical
/orksho"
H#T milling machine +@75),, $#6 sha"ing
machine, H#T 9T#20 lathe machine, $#6 sa(
machine, Grinder +%ulkarni,, H#T drilling machine
. 'anels SS$ "anel , )A$ N0to5
5 ;') ;il "ressure unit +;'), receiver, T(o ;') "um"s
E 6o;2
System+System
+@ire @ighting,
6o;2 cylinder bank 0G2, 6o;2 fire e?tinguishing
control "anel, smoke alarm system "anel
C ;ther Systems 6able s"reading room, cable gallery, medium
velocity (ater fire e?tinguishing system
Note: See Annex-' for sce!"t#c $r"%#n&.
') E-UIPMENTS AT EL *%%.*) M COOLING WATER FLOOR"
S.No. Lo.at/o0 E12/34e0t5
0 6ooling floor T(o 6ooling "um"s for each unit, ;ne oil leakage
"um" for each unit
2 'anels 6ooling (ater "um"s control "anel
TANAKPUR HYDROPOWER STATION6BANBASA
DAILY 7SHIFT 8WISE CHECK LIST
B!S6HARG8M OOOOOOOOcumec BAT8M
OOOOOOOO
@;R8$AJ 98389M OOOOOOO T!#8 ;@ 6H86%!7GO
/H8ATH8R 6;7B!T!;7M OOOOO
S.NO DESCRIPTION OF
E-UIPMENT
UNIT9% UNIT9* UNIT9: REMARKS
1 L)*+ ), -./ 0*1.2,/3 2, M!
2 "),+2-2), )4 D(T 5*66/78
EL210.5
3 L/*9*5/ 47)0 D(T 0*,.)6/
%47),- *,+ :*19&
COOLIN( )ATER *LOOR EL 211.2+,
1 "))62,5 ;*-/7 <=0< >1
2 "))62,5 ;*-/7 <=0< >2
3 O.L.U ;)792,5 2,
AUTO(MANUAL
4 "),+2-2), )4 +=<6/? 3-7*2,/7>1
5 "),+2-2), )4 +=<6/? 3-7*2,/7>1
6 P7/33=7/ *- -./ 2,6/- )4 3-7*2,/7
7 P7/33=7/ *- -./ )=-6/- )4 3-7*2,/7
8 D7*4- -=:/ <7/33=7/
# "))62,5 ;*-/7 ./*+/7 <7/33=7/
10 "),+2-2), )4 D(T @*6@/ <2- <=0<
11 "),+2-2), )4 0)-)72A/+ @*6@/ 2,
1))62,5 ;*-/7 1271=2-
T-R.INE PIT EL 21/.01 ,
1 "),+2-2), )4 -)< 1)@/7 +7*2,*5/
<=0<
2 S.*4- 3/*6 ;*-/7 <7/33=7/
3 GV 3./*7 <2, *27 <7/33=7/
4 O26 6/*9*5/ 47)0 TGB
S.NO DESCRIPTION O*
E2-IP,ENT
-NIT31 -NIT32 -NIT3' RE,AR4S
1 G)@/7,)7 3/7@)0)-)7 )</,2,5
<7/33=7/
2 G)@/7,)7 3/7@)0)-)7 16)32,5
<7/33=7/
3 !*-/7 <7/33=7/ (@*11=0@*1==0
:/6); -)< 1)@/7
4 !*-/7 <7/33=7/ :/6); -)< 1)@/7
GAUGE >1
5 !*-/7 <7/33=7/ :/6); -)< 1)@/7
GAUGE >2
6 !*-/7 <7/33=7/ :/6); -)< 1)@/7
GAUGE >3
7 !*-/7 <7/33=7/ 2, 3<27*6 1*32,5
8 /*6-.2,/33 )4 PP 3/- 0)-)7 >1
# /*6-.2,/33 )4 PP 3/- 0)-)7 >2
10 P7/33=7/ 2, -./ *11=0=6*-)7
11 O26 6/@/6 2, -./ *11=0=6*-)7
12 O26 6/@/6 2, -./ 3=0<
13 L/*9*5/ 47)0 2+/*6/7 @*6@/ >1
14 L/*9*5/ 47)0 2+/*6/7 @*6@/ >2
15 /*6-.2,/33 )4 S 6=:/ <=0<
16 /*6-.2,/33 )4 "GLS
17 F6); 0/-/7 2, -./ *27 1))6/7
18 F6); 0/-/7 2, -./ )26 1))6/7
1# A27 <7/33=7/ 2, :7/*92,5 383-/0
20 !*-/7 6/*9*5/ 47)0 *,8 @*6@/
%G2@/ 6)1*-2),&
21 /*6-.2,/33 )4 L.P 1)0<7/33)7
>1
22 /*6-.2,/33 )4 L.P 1)0<7/33)7
>2
23 LP *27 -*,9 <7/33=7/
24 /*6-.2,/33 )4 .P 1)0<7/33)7
>1
25 /*6-.2,/33 )4 .P 1)0<7/33)7
>2
26 .P *27 <7/33=7/
27 "),+2-2), )4 M! 383-/0 2,
1*:6/ 4)7 *,8 6/*9*5/ /-1.
28 "./19 ET 4)7 *,8 *:,)70*6
3)=,+
2# "),+2-2), )4 5/,/7*-)7 :*77/6
+))7
30 "),+2-2), )4 UAT :7/*9/7.
31 "),+2-2), )4 ESV
S.NO DESCRIPTION O*
E2-IP,ENT
-NIT31 -NIT32 -NIT3' RE,AR4S
,AC5INE *LOOR EL 220.01,
1 )- *27 -/0<.
2 ")6+ *27 -/0<.
3 T.7=3- :/*72,5 <*+ -/0</7*-=7/
4 G/,/7*-)7 5=2+/ :/*72,5 %GGB&
<*+ -/0</7*-=7/
5 G/,/7*-)7 5=2+/ :/*72,5 %GGB& )26
-/0</7*-=7/
6 T=7:2,/ 5=2+/ :/*72,5 %TGB& <*+
-/0</7*-=7/
7 T=7:2,/ 5=2+/ :/*72,5 %TGB& )26
-/0</7*-=7/
8 "))62,5 ;*-/7 2,6/- -/0</7*-=7/
# "))62,5 ;*-/7 )=-6/- -/0</7*-=7/
10 D7*4- -=:/ <7/33=7/
11 PP 3/- <7/33=7/
12 S<27*6 1*32,5 <7/33=7/
13 S.*4- 56*,+ 23)6*-2,5 3/*6 *27
<7/33=7/
14 S.*4- 3/*6 1))62,5 ;*-/7 <7/33=7/
15 G)@/7,)7 <7/33=7/ ), EG
1*:2,/-
16 B*6*,1/ <)32-2),
17 B72+5/ 1=77/,- 2, AVR <*,/6 %*&
18 B72+5/ 1=77/,- 2, AVR <*,/6 %:&
1# B72+5/ 1=77/,- 2, AVR <*,/6%1&
20 P7/33=7/ )4 7=,,/7 3/7@)0)-)7
)</,2,5
21 P7/33=7/ )4 7=,,/7 3/7@)0)-)7
16)32,5
22 A,8 3<*792,5 ), 362< 72,5 :7=3./3
23 /*+ 625.- 56);2,5
24 "./19 *,8 *6*70 2, U"B <*,/6
25 /*6-.2,/33 )4 :6);/7 >1
26 /*6-.2,/33 )4 :6);/7 >2
27 /*6-.2,/33 )4 :6);/7 >3
28 /*6-.2,/33 )4 3<72,96/7 2, 1))62,5
<),+
2# !*-/7 6/@/6 2, 1))62,5 <),+
S.NO DESCRIPTION O*
E2-IP,ENT
-NIT31 -NIT32 -NIT3' RE,AR4S
TRANS*OR,ER DEC4 6EL 220.01 ,)
1 N) )4 1))6/73 ;)792,5
2 /*6-.2,/33 )4 )26
1271=6*-2), -/0</7*-=7/
3 T7*,34)70/7 ;2,+2,5
-/0</7*-=7/
4 T7*,34)70/7 )26
-/0</7*-=7/
5 =002,5 3)=,+ 47)0
-/0</7*-=7/
6 "./19 4)7 *,8 3<*792,5 )7
./*-2,5 )4 -7*,34)70/7
B=0</73
7 A,8 ;*-/7 6/*9*5/ 47)0
*,8 <)2,-
8 A,8 )26 6/*9*5/ 47)0 *,8
<)2,-
CONTROL ROO,
1 R/5=6*7 1./192,5 )4
1),-7)6 +/39 *,+ 1),-7)6
<*,/63
2 I,+21*-2), )4 A,,=,12*-2),
<*,/6
3 /*6-.2,/33 )4 7/6*8
P*,/63.
4 "6/*,62,/33 )4 1),-7)6
+/39.
5 "6/*,62,/33 )4 7/6*83.
6 /*6-.2,/33 )4 PL"" )4
62,/ >1
7 /*6-.2,/33 )4 PL"" )4
62,/ >2
8 /*6-.2,/33 )4 PL"" )4
N/<*6 62,/
# /*6-.2,/33 )4 A"
10 /*6-.2,/33 )4 L23-
LT ROO,
1 B*--/78 1.*75/7 2,
F6)*-(B))3- 0)+/.
2 /*6-.2,/33 )4 SST>1
1271=2- :7/*9/7
3 /*6-.2,/33 )4 SST>2
1271=2- :7/*9/7
4 /*6-.2,/33 )4 ALON
383-/0
S.NO DESCRIPTION O*
E2-IP,ENT
-NIT31 -NIT32 -NIT3' RE,AR4S
5EALT5INESS O* P-,PS 66EL 211.71 ,)
1 #0 P VT D/;*-/72,5 <=0< >1
2 #0 P VT D/;*-/72,5 <=0< >2
3 #0 P VT D/;*-/72,5 <=0< >3
4 #0 P VT D/;*-/72,5 <=0< >4
5 #0 P VT D7*2,*5/ <=0< >2
6 #0 P VT D7*2,*5/ <=0< >1
7 35 P 3=:0/732:6/ <=0<
>1%D7*2,*5/ <2-&
8 35 P 3=:0/732:6/ <=0<
>2%D7*2,*5/ <2-&
# 35 P 3=:0/732:6/ <=0<
>3%D7*2,*5/ <2-&
OT5ERS ISS-ES8C5EC4IN(
1 I66=02,*-2), *- +244/7/,- 46))73
2 O</,2,5 )4 *,8 .*-1. 1)@/7
3 G/,/7*6 16/*,62,/33
PRESTART CHECK LIST
;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;
0 7o (ork "ermit should be outstanding
2 Genschedule should be a""roved from 7R9B6
5 ;il level in TG$4GG$ should be normal
. All relevant oil4air4(ater lines should be charged and cooling (ater
header "ressure should be normal
5 B6 control circuit voltage check relay healthy
E Gov ;il "ressure and level should be normal
C #aster sto" relay reset46ontrolled action shutdo(n relay
reset48mergency shutdo(n relay reset 8lectrical lockout relay=s
reset
< 8S3 ckt should be healthy
- To" cover "um" A6 su""ly should be normal
00 HS "um" A6 su""ly ;7
00 B6 su""ly to all 'rotection4controlled relay "anel should be normal
02 $rake air "ressure normal and brakes in released "osition
05 Guide vanes in closed "osition (ith lock disengaged
0. 'enstock G Braft tube gates are o"en
05 Air "ressure to shaft gland isolating seal released
0E 'enstock drain valve should be closed
0C @ire fighting system should be healthy
0< 7o alarm4annunciation is "resent
0- Transformer oil flo(4 oil "ressure normal
20 Generator H3 circuit breaker o"en
20 Generator @ield breaker o"en
22 'restart check indication Punit ready to startQ*;7
25 @or auto start from control room
0 Gov G e?citer should be in autoauto mode
2 )nit selection in local mode
CHECKS BEFORE STARTING OF THE GENERATING UNIT!SYSTEM WISE
AFTER LONG OUTAGE7SHUTDOWN7MAINTENANCE WORK"
The follo(ing checks are to be made before starting of machineM
Ge0era< Che.=5>
0, 3erify from the shut do(n register that no (ork "ermit is outstanding
2, 8nsure that load schedule is a""roved from 7R9B6
5, 8nsure that the machine is free from any fault and can be run on load
., 6heck that "enstock drain valve G BT de(atering valve is closedAirclosed Air
release valve of s"iral casing is o"ened and also check that Guide 3anes are
closed and unlocked
(ENERATOR:
@irst make a general check of all the e:ui"ment 8nsure that tools, tackles,
ladders, "latforms are removed from inside and around the com"onent4
e:ui"ment 8nsure all the manhole covers eg s"iral casing, draft tube,
generator barrel doors are closed and securely fastened 8nsure that no body is
inside the generator barrel
6heck that oil levels in bearings are normal as "er level indicators
8nsure normal (ater flo( to generator air coolers
8nsure that sli" rings and carbon brushes are secured to their res"ective
"ositions This (ill avoid s"arking etc 8nsure that brake "ads are in released
condition
CO22 S9STE,:
8nsure that the 6;
22 cylinder banks in the system are in auto mode Also check
that no annunciation is a""earing on 6;2 control "anel
T5R-ST .EARIN(:
6heck the oil level of the chamber !n case the oil level is lo(, check for leakage
and then to" u" the oil to desired level
6heck the inlet and outlet valve of the unit for their o"en "osition
8nsure (ater su""ly to TG$4GG$ is normal
.RA4E AND :AC4:
8nsure correct air "ressure +5*E kg4cm
2
, in the system
C(LS S9STE,:
6heck the availability of the su""ly on the "anel 6harge the main "i"e line u" to
re:uired "ressure of 050 kg4cm
2
G check for any leakage in
distributerdistributor4feeders
COOLIN( )ATER S9STE,:
8nsure that all the cooling (ater valves of the unit su""lying (ater to the stator
air cooler, generator guide bearings, thrust bearings, #ain transformers, shaft
seal are o"en Also ensure that the outlet valves of the res"ective cooling (ater
circuits are o"en 6heck that the "ressure of 5*E%g4cm2 is available at Turbine
floor !n case of reduction in "ressure at any of the su""ly "oints, corrective
measures should be taken after finding the reason so as to avoid rise in
tem"erature
DE)ATERIN( & DRAINA(E S9STE,C
Be(atering G drainage system should (ork on Rauto= mode 8nsure the "um"s
are on RAuto= mode !f the system is o"erated manually, ensure the "ro"er
o"eration of the "um" so that flooding doesn=t take "lace
5P CO,PRESSED AIR S9STE,:
8nsure the settings of the com"ressor to o"erate at defined start and tri" values
of .00 kg4cm
2
and ..0 kg4cm
2
8nsure the safety valve functions "ro"erly
#oisture should be drained from the com"ressor air receiver in each shift
Selector s(itch should be on RAuto= mode
LP CO,PRESSED AIR S9STE,:
8nsure the settings of the com"ressor to o"erate at defined start and tri" values
+!f in auto mode,!f in manual mode the receiver "ressure should be monitored at
regular intervals 8nsure the safety valve functions "ro"erly #oisture should be
drained from the com"ressor air receiver Selector s(itch should be on RAuto=
mode
PROTECTION S9STE,:
All relay flag should be reset and there should not be any flag4alarm indication
CO,,-NICATION S9STE,:
6ommunication +'966 etc, system should be in order
DRA*T T-.E (ATES:
Braft tube gates should be o"en
PENSTOC4:
'enstock should be initially filled slo(ly (ith "enstock by "ass arrangement in
order to avoid sudden rush of (ater inside the "enstock
PENSTOC4 (ATES:
'enstock gates should be o"en
S)ITC59ARD:
8nsure .053 su""ly to the breaker4isolator motors in the s(itchyard 6heck S@E
"ressure in all the S@E breakers 6heck for satisfactory functioning of the
isolators from control room and locally (ith the concerned breaker in o"en
"osition Then the control s(itch may be "ut back on remote control Bo not
o"erate the breakers locally 6heck that closing s"ring of the breakers is in
charged "osition
T-R.INE:
6heck that all shear "ins of guide vanes are intact 8nsure that the oil level in
TG$ is normal !n case of higher oil level check for the (ater content in oil due to
leakage from oil coolers 6heck for the o"en "osition of valves su""lying clean
(ater to turbine shaft seal 8nsure that the sto""er for servomechanism is
disengaged
OIL LEA4A(E -NIT:
6heck that the control gear of the ;9) of turbine is in RAuto= mode
LEVEL & PREES-RE IN OP-:
8nsure that the control s(itches of the control "anel for ;') are ke"t in auto
mode thereby indicating that out of the t(o oil "um"s one (ill act as duty "um"
and other as standby
Te fo;;o%#n& <";<es so=;$ >e #n ?OPEN@ con$#t#on.
#ain valve connecting oil "ressure unit to the governing system
The valves of the oil "i"e line connecting both the "um"s and air oil accumulator
The valve of the "i"e line connecting governor slide valve and main oil tank
All the four valves in the servomotor
3alve of oil "i"e line connecting servomotors and oil leakage unit
The valve connecting the "ressure relay of the air oil accumulator
Te fo;;o%#n& <";<es so=;$ >e #n ?CLOSED@ con$#t#on.
The valves connecting the ;') oil tank to "i"e lines of oil handling system
The valve connecting the ;') oil tank to "i"e line for oil sam"ling
The drain valve of the ;') oil tank
(OVERNOR:
8nsure the control knob of the governor initially at the manual mode
#ain oil valve connecting ;') to governing system is o"en and oil "ressure in
the cabinet is normal !f the "ressure is less, check for rated "ressure in of
.0kg4cm
2
in ;') !f need be, take necessary measures and bring "ressure at
.0kg4 cm
2
G oil level at normal 6lean the filters in the mechanical cabinet of the
governor
STATIC EACITATION S9STE,:
8nsure for 2203 B6 su""ly from battery bank to the e?citation "anel for
e?citation build u" during black starting of the machine 6heck B6 su""ly for its
control and "rotection circuit 8nsure the field breaker is R;@@= 8nsure that all
the "rotections of 8?citation system are in reset condition
AC S-PPL9 *OR P-,PS OPERATION:
!t should be ensured that A6 su""ly to the control "anel of ;') is available from
9T control "anel
COOLIN( *OR (ENERATOR (-IDE .EARIN(:
6heck for the cooling (ater su""ly to the oil coolers and ensure 5*E kg4cm
2
"ressure at the inlet of oil cooler
OIL LEVEL IN (-IDE .EARIN(:
6heck the oil level in guide bearing To" u", if re:uired
.RA4E AND :AC4 S9STE,:
Rotor should not be in &acked "osition $rake must be released
E,ER(ENC9 SLIDE VALVE:
8S3 should be reset
,AINTENANCE S5A*T SEAL POSITION:
#aintenance shaft seal should be in deflated condition
S5A*T SEAL )ATER PRESS-RE:
8nsure that the (ater su""ly at 2*5kg4cm
2
is maintained to the shaft seal
TOP COVER DRAINA(E P-,P:
6heck that the drainage of to" cover (ater through submersible "um"s is
functional
TRANS*OR,ER:
6heck the cooling (ater su""ly to the Generator Transformer
The fire fighting system +s"rinkler, of the GT should be in healthy condition
Transformer cooling oil "um"s should be R;7=
$uchhol1 Relay 6onnection should be intact
;il level in conservator should be normal
6olor of silica gel in breather should be blue to ensure that it is moisture free
!nsulation resistance of (inding and core should be checked
$B3 of oil should be taken The value should be as "er "rescribed limits
S*7 C4T .REA4ER:
6heck that S@E "ressure is normal E kg4cm
2
at +20