3.800 m 1.80 m Select Head Type 10.77 m 12.57 m 7.83 m Number of heads included in level calculation 22.68 m 30.5 m Total Vol. Retention Time Retention Time From LALL Between Level Between Level m m m % m % m hours Minutes Low low 0.310 1.59 1.272 10.1 6.84 22.4 - 0.013 0.76 Low 0.550 1.35 2.951 23.5 10.08 33.0 1.7 0.017 1.01 Normal 1.000 0.90 6.717 53.4 15.90 52.1 5.4 0.038 2.26 High 1.350 0.55 9.619 76.5 20.43 67.0 8.3 0.029 1.74 High High 1.590 0.31 11.297 89.9 23.67 77.6 10.0 0.017 1.01 Overflow 1.900 0.00 12.570 100.0 30.51 100.0 11.3 0.013 0.76 0.126 7.54 6.67 m BETWEEN LLL AND HLL (LV ON/OFF ACTION) 53.0 % 100.00 m 3 /hr 5.01 minutes Oke For accomodating surge and hold up 5.00 minutes Overflow = 1900 mm High high level = 1590 mm High level = 1350 mm Normal level = 1000 mm Low level = 550 mm Low low level = 310 mm (L/ID) = 2 Utilisation : Internal Diameter : Tan-Tan Length : Flowrate : ID = 1900 mm Volume Levels Vapour Working Volume : Residence Time : Volume Volume of two heads : Shell Volume : Total Volume : Heads SA : Shell SA : Surface Area : Level Setting L = 3800 mm Residence Time Specified by Client : Refer to specification (process design basis) Total Residence Time : Wetted Area Wetted Area j:\Bongkot-phase 3C\process and safety\process\calculation\010-H2S Scav Storage Drum\238131117.xls.ms_office Page1