Anda di halaman 1dari 7

CV/Resume : I r.

Zul kar nai n Bi n Dahal an




Name : I r. Zu l ka rnai n Bi n Dahal an
P rof es s i on : P rof es s i onal E l ec t r i c al E ngi neer
Ye ars Of E xperi ence : 1 3 years
Nat i ona l i t y: Mal a ys i an
Members hi p : Board OF E ngi neers , Mal a ys i a 1 41 45( E l ec t ri c al )
I ns t i t ut e Of E ngi neers , Mal a ys i a 38690( Corporat e Member)
Mari t a l St at us : Marri ed wi t h 3 c hi l dren
Cont ac t No : +601 2 3442 802
E mai l : z ul ka rnai n07@gmai l . c om
Addres s : No. 8 Sol o k Hamzah Al ang 81 A, Ta man Kapar Set i a, 42 2 00 Kapar
Sel angor

CAREER OBJECTI VES

To purs ue a grow i n what I l o ve t o do and be i t rewardi ng.

EDUCATI ON DETAI LS

MSc. i n Te l ec ommuni c at i on & I nf ormat i on E ngi neeri ng , UI TM Mal ays i a
B. E ng. ( Hons ) i n E l ec t ri c al E ngi neeri ng , Un i vers i t y Of Sout h Aus t ra l i a, 2 000

CAREER SUMMARY

An E l ec t r i c al E ngi neer wi t h e xper i ences f or proj ec t s i n ke y s ec t ors s uc h as Power P l ant s , Subs t at i ons ,
Dat a Cent res , Hos pi t al s , Res i dent i a l Hous i ng, I ndus t r i al Fac t or i es , Commerc i al Of f i ce Bui l di ngs , Shoppi ng
Mal l & Cent res , School s , Road Tu nnel s , Ai rpor t s and I nf ras t ruc t ure De vel opment P roj ec t s f or go vernment
and pri vat e s ec t or c l i ent s .

Cros s - di s c i p l i nes engi neer i ng expos ure i n mec hani c al , c i vi l & s t ruc t ure and va l ue engi neeri ng.

E xt ens i ve hands - on des i gn i n vol vement f or Low Vol t age and Medi um Vo l t age el ec t ri c al s ys t em des i gn.

E xt ens i ve hands - on t he QA /QC handl i ng and pro vi s i ons of document s .

Keepi ng dat abas e f rom previ ous pro j ec t s document s and ref erenc es f or f u t ure undert a ki ng gui del i nes.

Good c ommuni c at i on s ki l l s and am exper i enc ed i n c ommuni cat i ng at a l l l e vel s ( c l i ent s , c ont rac t ors , proj ec t
d i rec t ors , management i nc l udi ng s harehol ders ) on c ondi t i ons of c ont rac t s ( FI DI C- M&E. )

As s i gnment s l oc at i on e xper i ences : Mal a ys i a , F i n l and, Saudi Arab i a and Qat ar.







Personal Opi ni on:
I am a good t eam pl a yer f i t t i ng ver y wel l i n a hard wor ki ng and f oc us ed t eam. I am
energet i c , f l e xi b l e, ent hus i as t i c , capabl e of l eadi ng a des i gn t eam and c onf i dent i n mos t s i t uat i ons. I am a
d ynami c s el f -s t art er wi t h a s t rong s ens e of res pons i bi l i t y and a pos i t i ve can do at t i t ude, a c reat i ve
prob l em-s ol ve r f rom bot h t he t ec hni c al and bus i nes s pers pec t i ves. I have e xcel l ent c l i ent f ac i ng s ki l l s .

SKI LLS

Sof t ware Compet ency on a s cal e of 1 - 1 0
Aut oCAD 7/1 0
Mi c ros of t Word 8/1 0
Mi c ros of t E xc el 8/1 0
Mi c ros of t P ower Poi n t s 8/1 0
Si mari s 6. 0 7/1 0
Mel Short2 7/1 0
Ec odi a l 7/1 0
Amt ec h 8. 0 7/1 0

COMMUNI CATI ON SKI LLS

Language Spoken Wr i t t en
Mal a y F l uent Good
E ngl i s h F l uent Good
Arabi c I n t ermedi at e Bas i c
Frenc h I n t ermedi at e Bas i c

CAREER TRACKS

No Company Durat i on Posi t i on Descr i pt i on
1 . 0 P roj as s
E ngi neeri ng
Aug 1 996 t o Feb 1 997 As s i s t ant Engi neer( M&E ) Power P l ant 500MW
Combi ned Cyc l e
2 . 0 P roj as s
E ngi neeri ng
Aug 1 998 t o Feb 1 999 E l ec t r i cal E ngi neer( M&E ) Power P l ant 500MW
Combi ned Cyc l e
3. 0 CSA( M) Berhad Mar 1 999 t o Mar 2 001 Sys t em Engi neer( M&E ) Dat a Cent res , I nf ra
Bac kbone Ser vers
4. 0 I ngeni eur Keme Jun 2 001 t o Jun 2 002 E l ec t r i cal E ngi neer( M&E ) M&E Cons ul t anc y Ser vi c es
5. 0 Es s ent i al c orp
SdnBhd
Ju l 2 002 t o Jun 2 006 Seni or E l ec t r i c al E ngi neer( M&E ) E l ec t r i cal Cont rac t or
E qui pment Suppl i er
6. 0 BR Cons ul t Jun 2 006 t o No v 2 009 Seni or E l ec t r i cal E ngi neer( M&E ) M&E Cons ul t anc y Ser vi c es
7. 0 Perundi ng E agl es Jan 2 01 0 t i l l now As s oc i at e ( Seni or E l ec t ri c al
E ngi neer) ( M&E )
M&E Cons ul t anc y Ser vi c es

SUPPORTI NG PEERS

No Name Descr i pt i on Cont act / Emai l
1 I r. Hj . Shu kur Ah yat P rof es s i onal Mec hani c al
E ngi neer( Member) - BR Cons ul t
As k Appl i c ant For
Permi s s i on
2 I r. Mas Wi ra P rof es s i onal E l ec t r i c al
E ngi neer( Member) - Perundi ng
Has hi m & Neh
As k Appl i c ant For
Permi s s i on
3 I r. Hj . Wan Mahmood P rof es s i onal Ci vi l
E ngi neer( Fel l ow) - BR Cons ul t
As k Appl i c ant For
Permi s s i on
4 I r. Nas i r Jon P rof es s i onal Ci vi l
E ngi neer( Member) - BR Cons ul t
As k Appl i c ant For
Permi s s i on

EXPECTED SAL ARY
Negot i abl e ( )




Ir. Zulkarnains Part 2 of 2

Details Of Work Experiences

Duties & Responsibilities:

Project Management / Supervision Of Mechanical & Electrical Works
-Coordination Of M&E Design
-Construction Supervision
-Attendance to Site-Meetings
-Material On-Site Inspections
-Approval Of Shop Drawings and Sample Submittals
-Installation Inspections
-Testing and Commisioning Activities
-Update project progress and resources as per Resident Engineer

Contract Administration
-QA/QC Handling For Documentations And Approvals
-Assisting approval in payment certificates
-Site Instructions
-Variation Orders
-Certificate Of Compliance
-Certificate Of Making Good Defects
-Certificate Of Completion
-Site and Project Handover

Client-Trainings
-On-site client training
-As-Built Drawings Clearance
-Operation and Maintenance Manual Clearance

Designs
-Ensuring installation are conformance to the designs and to the standards
-Carrying arithmetical checks and independent design review on engineers designs

Staff-Supervision
-Undertaking periodic performance M&E reviews with M&E Engineers
-Ensuring coordination between M&E Engineers, Architects, Structural Engineers, Suppliers and other disciplines

Business Acumen
-Knowledge of projects business quality,output,technology and cost
-Familiarity On Risk Assessment & Feasibility Study For Facilities Maintenance And Operation Maintenances
-Phasing and Scheduling Master Work Programmes and Cost Model For M&E Works
-Keeping list of record selection for reliable and quality M&E services provider and suppliers
-Keeping list of record selection for reliable M&E materials and equipments

TurnOver Team Strategy
A-Lifecycle (A-Z)
-Analysis (Team & Checklist)
-Design (Team & Checklist)
-Implementation (Team & Checklist)
-Construction (Team & Checklist)
-Testing (Team & Checklist)
-Handover (Team & Checklist)

B-Gant-Chart (Communication)
-Create Task List
-Link Task Together
-Set Start And End Dates For Tasks
-Add Some Milestones
-Add Some Resource To Tasks

C-Reporting (Internal & External)
-Keeping List Of Superiors Report/Instructions
-Keeping List Of Progress Report
-Keeping List Of Changes & Issues Management
-Keeping List QA/QC Documents Submittals And Re-Submittals
-Keeping List Of Minutes Of Meetings












Summary Of Total Involvement In Man-Hours Percentage

M&E Services Mixed Timeframe
Of Involvement
Designing,Specifying
and
BOQ
Contract
Administration
Site Exposure Testing,Commisioning &
Handover
Health Care
Centres/Hospitals
4 years

50% 30% 10% 10%
Commercial Offices 4 years 50% 30% 10% 10%
Institutions/Schools 2 years 30% 20% 40% 10%
Residential Housing
Development
2 years 25% 25% 20% 30%
Industrial Complex 2 years 30% 20% 30% 20%
Shopping
Complexes/Malls
2 years 30% 20% 20% 30%
Infra Road Tunnel 3 years 30% 20% 30% 20%
Infra-Airport 2 years 30% 20% 30% 20%
Infra-
Telecommunication
2 years 30% 20% 30% 20%





















































List Of Projects Involvements

Engineering & Consultancy Services For Rehabilitation & Modernization Of 58 Makkah Tunnel
Location: Makkah, Kingdom Of Saudi Arabia
Employer:Perunding Eagles Engineers Sdn Bhd

Engineering & Consultancy Services For The CP Package Of New Doha International Airport
Location: Doha, Qatar
Employer:Perunding Eagles Engineers Sdn Bhd

Engneering & Consultancy Services For Touch N Go Front End Assessments
Location: All States, Malaysia
Employer: Perunding Eagles Engineers Sdn Bhd

Engineering & Consultancy Services For Intelligent Transport Information System(IT IS) For DBKL
Location: Wilayah Persekutuan, Malaysia
Employer: Perunding Eagles Engineers Sdn Bhd

Engineering & Consultancy Services For The Proposed Design,Construction And Completion Of Government Office Buildings Consisting Of Office
Tower For F1 and F2 Podium Parking and External Works at Package 2, Parcel F, Precint 1, Pusat Pentadbiran Wilayah Persekutuan
Location: Putrajaya, Malaysia
Employer : SN Akmida Sdn Bhd

Engineering & Consultancy Services For The Proposed Mixed Development Of BSL 3 Laboratory Stride Phase 2 For Jabatan Kerja Raya
Location: Kajang, Malaysia
Employer: BR Consult

Engneering & Consultancy Services For The Proposed Development Of New Hospital Slim River Perak For Jabatan Kerja Raya
Location: Slim River, Malaysia
Employer: BR Consult

Engineering & Consultancy Services For The Proposed Development Of Sek Keb Seri Perak For Kementerian Pelajaran Malaysia
Location: Sentul, Malaysia
Employer: BR Consult

Engineering & Consultancy Services For The Proposed Development Of JPJ Quarters And Facilities For
Jabatan Pengangkutan Jalan
Location: Alor Setar, Malaysia
Employer: BR Consult

Engineering & Consultancy Services For The Proposed Development of 24 Unit Semi-D Houses at Lot 2759 Jalan Dusun Mukim Kapar Daerah Klang
Location: Selangor, Malaysia
Employer: BR Consult

Engineering & Consultancy Services For The Proposed Development Of 704 Units Apartments Inclusive Of 4 storeys Podium Car Park And Related
Facilities For Selangor State Development Corporation At Lot 10244 Kg. Banjar Batu Caves Selangor
Location: Selangor, Malaysia
Employer: BR Consult

Engineering & Consultancy Services For The Proposed Development Of 55 Units Apartments, 1 Unit Hall, 1 Unit Kindergarten, 1 Unit TNB Substation
And Related Facilities At Lot 53364 & 53365 Kg. Permai Bt. 14 Puchong Mukim Puchong Daerah Petaling For Selangor State Development
Corporation
Location: Selangor, Malaysia
Employer: BR Consult

Engineering & Consultancy Services For The Proposed Developments Of 40 Units Apartments At Lot 163A & 163B Jalan Raja Uda &
Jalan Raja Mahmud Kg. Baru Kuala Lumpur For Mr. Mohamed Meranum
Location: Kuala Lumpur, Malaysia
Employer: BR Consult

Engineering & Consultancy Services For Proposed Development Of 119 Units Double Storey Bungalows at PT 22.1 Laman Cempaka
Kota Seriemas Bandar Kota Sri Mas Daerah Seremban Negeri Sembilan
Location: Kota Seriemas, Negeri Sembilan
Employer: BR Consult





Engineering & Consultancy Services For Proposed Upgrading Pusat Latihan Angkat Berat Kebangsaan Di Kg. Kolam
Mukim Rompin, Pahang Darul Makmur
Location: Rompin, Pahang
Employer: BR Consult

Engineering & Consultancy Services For Proposed Upgrading Works For Community College Alor Gajah, Jasin Selandar
Dan Ledang For Kementerian Pelajaran Malaysia
Location: Malaysia
Employer: BR Consult

Engineering Services For Arc Protection at TNB Applications
Location: TNB Malaysia
Employer: Essentialcorp Sdn Bhd

Engineering Services For Load Profile Management System For TNB Applications
Location: TNB Malaysia
Employer: Essentialcorp Sdn Bhd


Engineering Services For GITN Backbone IT Infrastructure And Unix Servers
Location: GITN, Putrajaya
Employer: CSA(M) Berhad

Engineering Services For Electrical Instrumentation Erection Package For EPCC Sultan Salahuddin Power Station
Phase III 500MW
Location: Kapar, Malaysia
Employer: Projass Engineering Sdn Bhd . Nekad Engineering Development Sdn Bhd

Anda mungkin juga menyukai