Anda di halaman 1dari 43

1

MEI 2014
2
PT. PP (Persero) merupakan perusahaan BUMN yang
berdiri sejak 26 Agustus 1953.
Pada tgl 9 Februari 2010, PT. PP (BUMN) resmi
menjadi Perusahaan Tbk.
Pada tgl 26 Agustus 2013, PT.PP,Tbk genap berusia
60
th
.
3
CONSTRUCTION
INVESTMENT
( INFRASTRUCTURE SECTOR)
PROPERTY AND REALTY
4
PT. PP (Persero)Tbk BERHASIL MERAIH RIBUAN PRESTASI
BERKAT JAMINAN KERJA TEPAT WAKTU DAN KUALITAS NOMER
SATU DALAM MELAKSANAKAN SETIAP PROJECT YANG
DITANGGANI
2013 :
BUMN INOVATION AWARDS
PELOPOR GREEN CONTRACTOR AWARD
PENGEMBANGAN SDM AWARD
5
Proyek PT.PP (Persero) Tbk telah tersebar si seluruh
penjuru kota di Indonesia, meliputi :
Aceh- Medan Padang Bengkulu - Lampung- Palembang - Pekanbaru- Jakarta-
Bandung-Yogyakarta- Surabaya- Denpasar- Balikpapan-Makasar- Samarinda- Ambon-
dan kota-kota besar lainnya
6
7
KONSEP FASAD GEDUNG
8
Architect : DDG
(USA)
9
We Bring Everything Closer..
Where you can conveniently connect with others while
having a fun daily routinity. To be entertained, eat great
food, and live a healthy life. To live closer to work and
play. Where you can have more time with the people
you love and to do things you love.
10
MASTER PLAN
11
12
LOCATION
INTERCONNECTION
BUS WAY TRACK
ELEVATED
FREEWAY
MONORAIL TRACK
BUSWAY STATION
MONORAIL
STATION
13
5 MENIT KE BUNDARAN SATELIT KOTA BEKASI
5 MENIT DARI EXIT TOL BEKASI BARAT
5 MENIT KE PINTU TOL Jakarta Cikampek
1 MENIT DARI PERENCANAAN FLYOVER DAN MONORAIL
20 MENIT DARI BANDARA
DEKAT DENGAN SEKOLAH, RUMAHSAKIT, PUSAT BISNIS & PERKANTORAN SERTA GEDUNG PEMERINTAHAN.
14
PERSPECTIVE
15
EXPERIENCES
16
MENAWARKAN HARGA YANG REASONABLE DENGAN STANDART
SPESIFIKASI MENDEKATI SPESIFIKASI HI-END PRODUCT
MEMBERIKAN INVESTOR LINGKUP UNTUK KENAIKAN HARGA YANG
SIGNIFIKAN
17
PT.PP memberikan jaminan tepat waktu dalam pelaksanaan pembangunan dan kualitas
terbaik dalam setiap proyeknya, yang akan memberikan keuntungan lebih bagi investor
maupun customer.
Tidak diragukan lagi mengapa para developer besar menggandeng PT.PP dalam
merealisasikan proyek- proyek besar di seluruh Nusantara.
18
1. STRATEGIC LOCATION WITH MANY ACCESS FOR ANY LOCATION
2. AFFORDABLE PRICE WITH HIGH SPECIFICATION
3. COMPANY WITH HIGH COMMITMENT
4. MIXUSED DEVELOPMENT WITH HARMONY ENVIRONMENT CONCEPT ( Green
Building, Green Concept, Green Environment, Green Development )
19
TIMELINE
PRE-SALE NUP PILIH UNIT
20
PROJECT COMPLETION :
24 Bulan + 3 Bulan
( sejak Ground Breaking Gedung- Des 2014 )
21
LAY OUT PLAN TYPE UNIT
22
VIEW UNIT
23
MASTERPLAN PHASE 1
24
ELEVASI EMERALD NORTH
25
TYPE UNIT- EMERALD NORTH - STUDIO, 1 BR
26
Studio (26,38 m2) 1 BR. A (35,38 m2) 1 BR. B (35,38 m2)
27
2 BR. A Suite (64,72 m2)
2 BR. B (58,18 m2)
2 BR. C (52,76 m2)
TYPE UNIT- EMERALD NORTH - STUDIO, 2 BR
28
TYPE UNIT- EMERALD NORTH - STUDIO, 3 BR
3 BR (91,10 m2)
29
TECHNICAL SPECIFICATION : EMERALD NORTH
1 FLOOR : Homogeneous tile 40X40 cm
Ceramic tile for bath room
2 WALL : Interiror : brickwall ,plastered, smooth painted
Exterior : panel finish Watershield, Glass Curtain Wall, Allumunium Cladding
3 CEILING : Height ( floor to concrete ceiling) : 2.40 to 2.80 M
Finishing : gypsum ,smooth painted
4 DOOR : Timber engineering solid door apply to main door
Timber engineering door apply to internal door
5 WINDOWS : Glass with powder coating aluminium frame
6 BATHROOM AND SANITARY
FITTING
: TOTO brand or equal
7 HOT WATER : The installation for Electric Water Heater in bathroom
8 AC : The installation for Wall mounted AC in each room
9 ELECTRICITY : One bedroom : 1,300 VA
Provided by PLN Two bedrooms : 2,200 VA
Three bedrooms : 3,500 VA
Generating Set : Full Power backup
Metering : Prepaid Individual KWH meter for each unit
10 WATER SUPPLY : Treated water from PDAM
11 GAS : Treated from PGN
12 KITCHEN : Inlet and Outlet are installed
13 FEATURES :
Entertainment : Cable TV installation , Telephone installation and internet outlet, audio video intercomm, public sound system
Fire fighting system : Water sprinklers, Fire alarm, smoke detector and hydrant system
Evacuation sound system
14 LIFT : 6 Units Passenger Lift
1 unit Service Lift ,serving at all floor ( from loading dock)
15 SECURITY SYSTEM : CCTV 24 hours installed at main public entrance all floors, and every access point
16 PARKING : 1 lot per unit for 2BR and 3 BR (unreserved)
1 lot for 3 units for 1BR .
ELEVASI SOUTH
30
31
TYPE UNIT- EMERALD SOUTH - STUDIO, 1 BR
1 BR. A (36,35 m2) 1 BR. B (36,13 m2) 1 BR. C (39,56 m2)
32
TYPE UNIT- EMERALD SOUTH - STUDIO, 2 BR
2 BR. A (53,74 m2) 2 BR. A (65,68 m2)
33
TYPE UNIT- EMERALD SOUTH - STUDIO, 3 BR
3 BR (81,75 m2)
34
TECHNICAL SPECIFICATION : EMERALD SOUTH
1 FLOOR : Homogeneous tile 60x60 cm
High Quality Ceramic tile for bath room
2 WALL : Interiror : brickwall ,plastered, smooth painted
Exterior : panel finish Watershield, Glass Curtain Wall, Allumunium Cladding
3 CEILING : Height ( floor to concrete ceiling) : 2.40 to 2.80 M
Finishing : gypsum ,smooth painted
4 DOOR : Timber engineering solid door apply to main door
Timber engineering door apply to internal door
5 WINDOWS : Glass with powder coating aluminium frame
6 BATHROOM AND SANITARY
FITTING
: TOTO brand or equal
7 HOT WATER : The installation for Electric Water Heater in bathroom
8 AC : The installation for Wall mounted AC in each room
9 ELECTRICITY : One bedroom : 1,300 VA
Provided by PLN Two bedrooms : 2,200 VA
Three bedrooms : 3,500 VA
Generating Set : Full Power backup
Metering : Prepaid Individual KWH meter for each unit
10 WATER SUPPLY : Treated water from PDAM
11 GAS : Treated from PGN
12 KITCHEN : Inlet and Outlet are installed
13 FEATURES :
Entertainment : Cable TV installation , Telephone installation and internet outlet, audio video intercomm, public sound system
Fire fighting system : Water sprinklers, Fire alarm, smoke detector and hydrant system
Evacuation sound system
14 LIFT : 6 Units Passenger Lift
1 unit Service Lift ,serving at all floor ( from loading dock)
15 SECURITY SYSTEM : CCTV 24 hours installed at main public entrance all floors, and every access point
16 PARKING : 1 lot per unit for 2BR and 3 BR (unreserved)
1 lot for 3 units for 1BR .
ALUR NUP
35
START
Sudah Bayar
NUP
Setor Tunai
Credit
Card/Debit
Card di Kasir
Berkas Lengkap :
1.FC. KTP
2.Form Minat Beli
3.FC. Bukti Transfer
Sudah Lengkap &
Sudah Bayar
Agar Dilengkapi
Pengambilan
No Antrian
Verifikasi Berkas
pendaftaran
NUP
Berkas dibawa
ke Kasir
Pemberiaan
NUP oleh Kasir
SELESAI
Syarat kelengkapan berkas :
1.Formulir Minat Beli (fotocopy) diisi lengkap dan ditandatangan
2.Foto copy Bukti Transfer
3.Foto copy KTP Pemesan
36
37
HARD CASH:
Booking Fee Rp 10 juta ( North ), Rp. 15 Juta ( South )
DP 30% cicil 3x
Sisa 70 %
Installment ( In House ) 24x
Booking Fee Rp 10 juta ( North ), Rp. 15 Juta ( South )
- Cicil 24x Tanpa DP
KPA
Booking Fee Rp 10 juta ( North ), Rp. 15 Juta ( South )
DP 20% cicil 4x
30% cicil 20x
Sisa 50 % KPA
Installment ( In House ) 36X
Booking Fee Rp 10 juta ( North ), Rp. 15 Juta ( South )
DP 30% cicil 3x, Pelunasan 70% cicil 36x
38
Komisi & Proses Klaim
Komisi Per Agent :
3 unit /per bulan : 2.5 %
4 unit /per bulan : 3 %
Proses klaim komisi dilakukan bertahap :
DP 15% : cair 50%
DP 30% : cair 50%
39
Closing Fee
Studio = Rp. 500.000,-/ unit
1 BR = Rp. 1.000.000,-/ unit
2 BR = Rp. 2.000.000,-/ unit
3 BR = Rp. 3.000.000,-/ unit
Klaim closing fee dilakukan setelah pembayaran
Booking fee dan ttd SP, prosesnya +/- 2 minggu
40
BONUS
(Berlaku s/d Agustus 2014)
Untuk Marketing
(TIDAK BERLAKU KELIPATAN)
Penjualan perbulan PPn Rp. 25 M Tour ke AMERICA / RUSIA
Penjualan perbulan PPn Rp. 10 sd 25 M Tour ke EROPA / CANADA
Penjualan perbulan PPn Rp. 5 sd 10 M Tour ke JAPAN (ASIA)
41
42
MARKETING GALLERY
43
Disclaimer:
Semua informasi diatas masih bisa berubah untuk penyempurnaan dan hasil yang
lebih baik