Anda di halaman 1dari 8

Swami Keshwanand Rajasthan Agricultural University

FINANCIAL BID


Construction of Boundary wall at


Date of Download (Online Sale)
Date of Upload (Online Receipt)
Date of Opening of Financial Bid (Online)
Date of Receipt of Tender Cost and
Earnest Money and processing fee
Bid Cost
Tender Cost
Earnest Money
Completion Period
Tender Shall be received at


M/s
.
Swami Keshwanand Rajasthan Agricultural University
Bikaner (Rajasthan)
FINANCIAL BID
FOR
Construction of Boundary wall at A.R.S., Sriganganagar
Date of Download (Online Sale) : 08.7.14 to 23.7.2014 (Upto 5.00 PM
line Receipt) : 8.7.2014 (10.00 AM) to 23
Bid (Online) : 25.7.2014 (Upto 12.30 Noon
Date of Receipt of Tender Cost and -
and processing fee : 24.7.2014 (5.00 PM)
: Rs. 49.00 Lacs.
: Rs. 3000/-
Earnest Money : Rs.0.98 Lacs.(2 %)
: 5 Months
: Estate officer
Swami Keshwanand Rajasthan Agricultural
University Bikaner (Rajasthan)

.
Swami Keshwanand Rajasthan Agricultural University,
A.R.S., Sriganganagar
(Upto 5.00 PM)
) to 23.7.14 (5.00 PM)
Noon)
Swami Keshwanand Rajasthan Agricultural
Bikaner (Rajasthan)

.
Swami Keshwanand Rajasthan Agricultural University,
Bikaner (Rajasthan)
NOTICE INVITING TENDERS FOR WORK
Online Tenders are hereby invited on behalf of the Vice-Chancellor for the works of
Construction of Boundary wall at A.R.S., Sriganganagar from enlisted contractors. Contractors
of the appropriate class enlisted with the C.P.W.D., Postal, Telecom, Railway, M.E.S., other State /
Central Govt. undertaking /Organizations equivalent to AA C lass of Rajasthan are eligible after giving
prescribed earnest money to tender for works as under.
(i) Contractors equivalent Works of which cost
to B class of Rajasthan Upto 50 Lac

1. Contract documents consisting complete specifications, the schedule of the quantities of the
various classes of work to be done and the set of conditions of contract to be complied with by the
persons whose tender may be accepted which will also be found printed in the form of tenders, can be
seen at the office of Estate Office, Swami Keshwanand Rajasthan Agricultural University, Bikaner
(Rajasthan)every day except on Sunday and Public Holidays during office hours.
2. Before submitting tenders it should be ensured that all the tender papers including conditions of
contract are signed by the tenders. Eligibility to get tender form shall be with reference to the
amount mentioned in the NIT.
3. The work is to be completely finished to the satisfaction of Engineer in-charge within 5 (Five)
Months (Including rainy season) from the 10th day after the date of written order to commence the
work.
Earnest money amounting to Rs. 0.98 Lacs as per NIT must accompany each tender.
Tender for Work of Construction of Boundary wall at A.R.S., Sriganganagar and
addressed to Estate Office, Swami Keshwanand Rajasthan Agricultural University, Bikaner
(Rajasthan). Earnest money in Banker Cheque in the name of Estate Office, Swami Keshwanand
Rajasthan Agricultural University, Bikaner (Rajasthan) or Demand Draft of
Nationalized/Scheduled banks should be deposited with the cashier or authorized clerk.
4. The Security Deposit @ 10% of the gross amount of the running bill shall be deducted from
each running bill and shall be refunded as per rules on completion of the contract as per terms and
conditions. The earnest money deposited shall however be adjusted while deducting security
deposit from the first running bill of the contractor. There will be no maximum limit of security
deposit. A Contractor may, however elect to furnish Bank Guarantee or any acceptable form of
Security for an amount equal to the full amount of Security Deposit @ 10% of the work order
before or at the time of executing the agreement. In that case earnest money may be refunded only
after furnishing of the bank guarantee as above. During the execution of the work of after
completion of the work also a contractor may replace the security deposit by furnishing bank
guarantee for an equal amount, However during execution of the work if cost of the work exceeds
as shown at the time of furnishing bank guarantee, balance security deposit shall be deducted from
the Running Account Bills.
5. The acceptance of a tender will rest with the Competent Authority who does not bind itself to
accept the lowest tender and reserves to itself the authority to reject any or all of the tenders
received, without assigning any reasons.
6. The Tender form as issued from the offices mentioned must be returned with all enclosures
to the following office/offices on the date of receipt of tenders.
7. No refund of tender fee is claimable for tenders not accepted or forms returned or for tenders not
submitted.
8.The tenders for work shall remain open for acceptance for the period of 90 days from the date of
opening of financial bid.
If any tenderer withdraws his tender prior to expiry of said validity period or
mutually extended period or makes modifications in the rates terms and conditions of the tender
within the said period, which are not in the specified period / fails to execute the agreement and fails
to furnish performance guarantee the University shall, without prejudice to any other right or
remedy, be at liberty to forfeit the amount of earnest money given in any form absolutely. If any
contractor, who having submitted a tender does not execute the agreement or start the work or does
not complete the work and the work has to be put to re-tendering, Earnest Money/Security
Deposit/Performance Guarantee and shall be treated as per terms and conditions of the agreement.
9. All tenders in which any of the prescribed conditions are not fulfilled or which have been vitiated
by errors in calculations, totaling or other discrepancies or which contain overwriting in figures or
words or corrections not initialed and dated, will be liable to rejection.
10. The tender should be accompanied with Sales Tax clearance certificate from the concerned
Departmental Authorities without which the tender may not be entertained.
Estate Officer
Swami Keshwanand Rajasthan Agricultural
University, Bikaner (Rajasthan)
Swami Keshwanand Rajasthan Agricultural University,
Bikaner (Rajasthan)

SPECIAL CONDITIONS OF CONTRACT
Name of Work:- Construction of Boundary wall at A.R.S., Sriganganagar

1. The work shall include all lead and lift to complete work in all respect.
2. The Contractor shall arrange all men, material and T & P to complete the work well in time.
3. The Contractor at his own cost will arrange Electricity and Water.
4. Any damage occur to the structure shall have to rectified by the Contractor at his own cost under
direction of Engineer-in-charge.
5. Work shall carried out as per relevant specification for each item and Indian Standard Specification
assigned and specification laid down in national building code for such work.
6. Testing of material required by Engineer-in-charge shall be contractor responsibility at his cost.
7. For mixing of concrete and compacting concrete hopper mixer and vibrator shall only be used. The
mortar as required for masonry, plaster etc. shall be prepared by means of C.C. mixer only.
8. All earth work carried out by contractor from date of start to date of completion will be remeasured
for finalization after completion of work as per initial levels of ground at the time of start of work and
final levels. No extra quantities of earth work over than as arrived at the above will be admissible and
paid to the contractor.
9. The contractor shall not work after Sunset and before Sunrise without specific permission of the
Authorized Engineer
10. No equipment or personnel will be removed from site without permission of Engineer in charges.
11. The contractor shall furnish the programmers of construction for execution of the work within the
stipulated time schedule together with methodology of construction for each type of work and should
obtain the approval of the Engineer-in-charge prior to actual commencement of work.
12. If there is any typographical or clerical error in the rate/nomenclature in the G -Schedule, the
rates as given in the Current BSR of PWD, on which the G Schedule as based with its latest
corrigendum issued from time to time, shall prevail.
13. Any material not confirming to the specification collected at site shall have to be removed by the
contractor within a period of three days of the instruction issued by the Engineer in charge in
writing, failing which, such material shall be removed by the department at risk and cost of the
contractor after expiry of three days period.
14 Steel for reinforcement collected at site can be paid provisionally equal to 75% of the total cost of
the item for the quantity brought at site as per G Schedule with tender premium or 75% of cost of
steel reinforcement as per the original bill, which ever is less. The material so paid will remain under
the watch & ward of the contractor till it is fully consumed.
15. The contractor should arrange the necessary survey and Quality Control Laboratory/Equipment at
his own cost with technical personnel at work site laboratory for checking of material and to ensure
the work done by him as per specifications. All the required Q.C. Test as per standards shall be
conducted by contractor and shall maintain the complete record in prescribed forms as per direction
of Director Works.
16. Cement from Mini Cement Plant shall not be allowed, and the brand of cement is to be got
approved from the Engineer in charge before execution of work.
17. Any printing/clerical error in the agreement form of the University the rule and condition of the
standard agreement form of Govt. of Rajasthan with the upto date amendments upto the date of
issue of NIT will prevail.
18. The Labour engaged by the Contractor for carrying out the work shall be at his own risk and
he is bound to protect the interest of labour rights under labour laws and rules prevailing and
enforce.
19. The overall cleaning of site and disposal of building rubbish, surplus material etc. is to done
by contractor at his own cost as directed by Engineer-in-charge.
20. The Contractor has to submit copies of all the bills of purchase of Cement, Steel etc.
required by the Engineer-in-charge
21. Kota Stone / Marble Stone/ Granite Stone/vitrified tiles and other building stones to be used
in flooring shall be of specific size as decided by the Engineer in charge only and of uniform
colour. No extra payment is admissible for use of specific size and of uniform colour. The
Sample is to be got approved from Engineer-in-charge before procurement, drawing enclosed
with this document are conceptual drawing and modification may be done, by Engineer-in-
charge, to match with over all decor and no extra payment shall be paid to contractor on this
account.
22. Contractor shall be fully responsible for provident funds, insurance etc. for workers engaged by
him on the work.
23. The final bill shall be paid after receipt of NOC from mining department.
24. The Contractor has to submit Rate Analysis of work with tenders.
25. Defect liability period of work shall be as per the Chief Engineer PWD Rajasthan Jaipur office
order issued vide no CE(Bldg)/DLP (Bldg works)/D-980 dated 12.10.2012 with its enclosure as
Annexure-I, which shall be the part of the agreement/tender document. (Copy Enclosed)
26. Contractor shall carry out maintenance and rectifications of defects (if any) of the job at his own
cost, failing which it shall be carried out at risk & cost of the contractor and expenditure so
incurred shall be recoverable from the contractor
27. Deployment of one site engineer diploma holder (civil) with 3 year experience has to be made
by contractor at his own cost.
28. Measurement shall be recorded by site engineer in a register maintained at site and will be
made available to engineer in charge or his authorized engineer as and when called for.
29. Only 43 grade OPC cement shall be used in the work.
30. Form work shall be got approved from engineer incharge before laying of RCC work.
31. Amount according to orders No. F1(8)(1)Hkk-lk -fu./IR/2010-9568 dt. 17.05.2.010 issued by
Principal Secretary, Labour, Employment & Technical Education (Training), Government of
Rajasthan (Copy Enclosed) shall be deducted from contractors bill as Labour cess.
32. The contractor shall engage unskilled local labour from Rajasthan state preferably of the district,
for the execution of the work.
33. All the Electrical works shall be got executed from the licensee contractor.
Estate Officer
Swami Keshwanand Rajasthan Agricultural
University, Bikaner (Rajasthan)
Signature of Contractor
with Seal & Address