Page 1/3 Report Printed: 10/19/2012

Rpt #: 30, DFS: 29.63


Depth Progress: 975
Report Date: 10/18/2012
Business Unit
Latin America
Country
Colombia
State/Province
La Guajira
Surface UWI
RCH_004
ChevNo
RH_004
Current KB to Ground (ft)
25.50
Current KB to Mud Line (ft) Current KB to Csg Flange (ft) Current KB to Tubing Head (ft)
Ground Elevation (ft)
3.94
Water Depth (ft)
Well Name
Riohacha 04
Lease
Guajira Association
Field Name
Riohacha
Primary Wellbore Affected
Riohacha 04 ST
Directional Type
Build-Hold-Turn/Build
Wellbore UWI
RCH_004
Wellbore ChevNo
RCH_004
J ob Category
Drill and Complete
Primary J ob Type
Drill and Complete
Actual Start Date
9/19/2012 09:00
Actual End Date
HES Incidents
Incident Category Employee Category Sub-Category Cause Caused NPT?
Safety/Inspections
Des Safety Check Inspected By Result Com
HES ACTIVITIES Trip Drill DSM Acceptable - Kick drill and evacuation
while drilling; good answer of
every crew member and a
feedback to all people in the
master point was done by
DSM.
HES ACTIVITIES Safety Procedures HES TEAM Acceptable Pre-tours:
Second SLT meeting with
participation of a
representative of each one of
the service companies in the
location, analyzing issues
about people well-being and
OE-HES performance
improvement.
Slip and fall hazard hunt was
done and findings were
shared in order to reinforce
good practices to avoid
incidents especially in current
rain season.
Pre-tour meetings were
leaded by CVX and the topics
were: eColor IDP to exercise
the Shut-in Well Authority
during a well kick and, sharing
of findings related to slip and
fall hazard hunt tour.
PTW audit to Superiors
works related to 9 5/8 casing
inspection.
Supervision of HP's
hazardous waste delivery to
TWS certified company.
OE-HES induction to new
backhoe operator (Mi Swaco).
Daily Operations
Evacuation Time Incidents?
No
Recordable Incident?
No
Days Since Rec.
241
Days Since Lost Time Incident
241
Rig Time (hr)
24.00
Cum Rig Time (days)
29.63
Rotating Time (hr)
21.50
Head Count
100.0
Personnel Total Hours (hr)
1,176.00
Operations Summary
Drilled 12 1/4" hole section from 4,712 ft to 5,025 ft. Rig pump failure repaired. Drilled 12 1/4" hole section from
5,025 ft to 5155 ft. Pit and BOP drill executed Ok. Drilled 12 1/4" hole section from 5155 ft to 5687 ft.
Status at Reporting Time
Drilling 12-1/4"directional hole section @ 5888 ft
Projected Operations
Drill 12-1/4" directional hole section according directional plan.
Comments
Operations 00:00-0600 hrs: Drilled 12-1/4"directional hole section from 5687 ft to 5872 ft.
Avg Background Gas
1.00
Avg Connection Gas Avg Drill Gas
6.00
Avg Trip Gas
Weather Conditions
Wind Dir Wind Spd (knots) Wave Ht (ft) P Bar (mmHg) Heave (ft) Pitch () Roll ()
Mud Checks
Checked By
Halliburton
Mud/Brine Type
Water Based
Fluid Density (lb/gal)
10.90
Funnel Viscosity (s/qt)
82
PV Calc (cp)
25
YP Calc (lbf/100ft)
25
Gel 10 sec (lbf/100ft)
8.0
Gel 10 min (lbf/100ft)
22.0
Gel 30 min (lbf/100ft)
30.0
API Filtrate (cc/30min)
5.7
API Filter Cake (1/32") pH
10.0
HTHP Temperature (F) HTHP Filtrate (cc/30min) HTHP Filter Cake (1/32")
1
Sand by Volume (%)
0.20
Electric Stability (V) Low Gravity Solids (%)
2.9
Retort NAF (%) Retort Water (%) Retort Solids (%) Solids (%) High Gravity Solids (%)
8.2
Filtration Sz (m)
NAF/Water Ratio Gel 6 Sec (lbf/100ft) Mud Calcium (mg/L) Mud CL (mg/L) Excess Lime (lb/bbl) W PhaseSal (mg/L)
MBT (lb/bbl)
20.0
Calcium (mg/L)
60
Chlorides (mg/L)
1,200
Pm (mL/mL)
1.0
Pf (mL/mL)
0.45
Mf (mL/mL)
1.1
Time Log
Start
Time Dur (hr) Phase Activity Com
UE Ref
No.
UE
Time
(hr)
00:0
0
7.50 INTCSG1,
DRILL
DRLRS Drilled 12 1/4" hole section from 4,712 ft to 5,025 ft.
800 GPM, 3,100 PSI, 150 RPM, 3-6K Torque, 8-10K
WOB. Pumping weighted vis pill every 400 ft and
checking flow before every connection.
AFE/WBS Number
20276000E972
AFE Interest (%)
43.00
Total AFE Amount (Cost)
17,302,971
AFE+Sup Amt (Cost)
17,302,971
Daily Field Est Total (Cost)
135,513
Cum To Date (Cost)
7,016,326
Daily Mud Field Est (Cost)
36,732
Cum Mud Cost (Cost)
371,453
Depth Start (MD) (ftKB)
4,712
Depth End (MD) (ftKB)
5,687
Start Depth (TVD) (ftKB)
4,302.7
End Depth (TVD) (ftKB)
Target Formation
Ballena Limestone
Target Depth (MD) (ftKB)
8,549
Time Log Total Hours (hr)
24.00
Problem Time Hours (hr)
1.00
Percent Problem Time (%)
4.17
Cum Prob Time (%)
35.63
At Risk Casing Size Rot Hrs on Csg
Last Phase
INTCSG1, DRILL
Phase % Complete (%)
69.0
Days ahead/rem (days)
-0.67
J ob Days Ahead (days)
-11.58
Projected Phase End Date
10/30/2012
Projected J ob End Date
11/28/2012
Tan/Int Rpt Fld Est (Cost)
Cum Fld Est
(Cost)
12,533 991,044
Int 122,980 5,692,692
Tan 0 332,590
Safety Check Summary
Type Last Date Next Date
BOP Control
Function Test
9/23/2012 9/24/2012
Casing Pressure
Test
9/23/2012 9/24/2012
Man Down Drill 9/29/2012 9/30/2012
Safety
Procedures
10/18/201
2
10/19/201
2
Trip Drill 10/18/201
2
10/19/201
2
BBS/Safety Observations
Observation Typ #Rpts
Safe Behavior 10
Un-safe Behavior 10
Un-safe Condition 9
Daily Contacts
Contact
Edward
Collins
Title
Drill Site
Manager
Phone Office
(57)
3173633508
Contact
Rodolfo
Zambrano
Title
Drill Site
Manager
Phone Office
(57)
3173633508
Contact
Oscar A.
Arenas
Title
Drilling
Engineer
Phone Office
(57)
3173706428
Drilling Mud Volumes
Detail Total Volume (bbl)
Reserve Mud
Volume
90.0
Whole Mud 1,364.0
Hole Volume 808.0
Surface Pit Volume 466.0
Well Fluids Lost
Fluid Detail
Volume Lost
(bbl)
Cum Vol
Lost (bbl)
Fluid Lost to Hole 0.0 300.0
Daily Job Supply Summary
Supply Item Des Consumed On Loc
Rig/Unit
Rig/Unit Contractor
Helmerich & Payne
Rig/Unit #/ Name
H&P 237
Rig/Unit Start Date
9/19/2012
Rig/Unit Release Date
Rig/Unit Supervisor
Daniel Hurtado
Phone Office
(57) 3204758957
Last 5 Formations
Formation Name
Prog Top
MD (ftKB)
Drill Top MD
(ftKB)
Castilletes 0.00 0.0
Intra-Castilletes 2,831.00 2,800.0
Upper J imol 4,439.00 4,520.0
Incident Free Operations: 241 days
Page 2/3 Report Printed: 10/19/2012
Rpt #: 30, DFS: 29.63
Depth Progress: 975
Report Date: 10/18/2012
Time Log
Start
Time Dur (hr) Phase Activity Com
UE Ref
No.
UE
Time
(hr)
07:3
0
1.00 INTCSG1,
DRILL
UNITRPR Circ W/ 420 GPM, 1000 PSI, 40 RPM reciprocating
D.P. while work on mud pumps. #1 pump changed
piston.
SCR at 5,025 ft Mud Wt 10.9
#1 pump 30 stk 170 psi / 40 stk 230 psi / 50 stk 330
psi
#2 pump 30 stk 170 psi / 40 stk 225 psi / 50 stk 330
psi
13 1.00
08:3
0
2.50 INTCSG1,
DRILL
DRLSLD Drilled 12 1/4" hole section from 5,025 ft to 5,155 ft.
800 GPM, 3,100 PSI, 150 RPM, 3-6K Torque, 8-10K
WOB. Pumping weighted vis pill every 400 ft and
checking flow before every connection.
11:0
0
0.50 INTCSG1,
DRILL
HESPDRL BOP drill at 5,155 ft Crew reaction time 39 sec. All
evacuation time 56 sec.
11:3
0
6.00 INTCSG1,
DRILL
DRLSLD Drilled 12 1/4" directional hole from 5155 ft to 5468
ft with 800 gpm, 3100-3150 psi, 150 rpm, TQ: 4-6
klb-ft, WOB: 5-10 klb. Flow checking @ 5185, 5279
ft per 5 min, well static O.K. Pumped 40 bbls heavy
viscous pill ( 180 sec/qt, 12.4 ppg) @ 5278 ft.
17:3
0
1.00 INTCSG1,
DRILL
CC Circulated due max Hydrocarbons out 22% with 800
gpm, 3150 psi, 150 rpm, TQ: 4-6 klb-ft.
Reciprocated string and checked static well O.K. No
mud cut on Btm's up.
18:3
0
5.50 INTCSG1,
DRILL
DRLRS Drilled 12 1/4" directional hole from 5468 ft to 5687
ft with 800 gpm, 3100-3200 psi, 150 rpm, TQ: 4-6
klb-ft, WOB: 5-12 klb. Pumped 40 bbls heavy
viscous pill ( 200 sec/qt, 12.4 ppg) @ 5629 ft. Flow
checking @ 5563 ft, 5657 ft per 5 min, static well
O.K.
At 5,580 ft an increase of GUMBO at shakers lasted
8 - 10 minutes.
Unscheduled Event #: 13
Event Type
NPT
Unsch Maj Cat
RREQ
Unscheduled Detail
CIRSYS
Start Date
10/18/2012
Start Depth (ftKB)
5,025
End Depth (MD) (
5,025
Est Cost (Cost)
5,000
Est Lost Time (hr)
Event Description
Repaired Rig pump #1.
Accountable Party
Rig Contractor
Service Contractor
Helmerich & Payne, Rig
Contractor
Drill String/BHA
Bit Run
2
Size (in)
12 1/4
Model
FXD65R
Serial Number
11950443
IADC Bit Dull
-------
Bit Total Fluid Area (nozzles) (in)
1.38
Nozzles (1/32")
13/13/13/13/15/15/15/15
String Length (ft)
6,649.20
Weight of String in Air (1000lbf)
191
BHA ROP (ft/hr)
40.2
String Components
Security DBS FXD65R, Rotary Steerable Geo-Pilot 9600, 8" PM Collar, X-Over Sub, Convertion sub, 8" PWD, 8"
HCIM Collar 175C 25KSI, 8" SHOC, 8" Float Sub, 12 1/8" Omni Reamer, X-Over Sub (Pin 6 5/8" x Box 4 1/2", 6 1/2"
Drill Collar, X-Over Sub (Pin 4 1/2" XH x Box 4, Heavy Weight Drill Pipe, Drill Pipe, Heavy Weight Drill Pipe, 6 1/2"
Drilling J ar, Heavy Weight Drill Pipe, 6 1/2" Accelerator, Heavy Weight Drill Pipe, Drill Pipe
Jars
Item Description
6 1/2" Drilling J ar
Condition Run Starting Hours (hr)
64.00
End Hours (hr)
100.50
Last Inspection Date
9/18/2012
Days Fm. Insp. (days)
30.46
Drilling Parameters
Wellbore
Riohacha 04 ST
Depth Start (MD) (ftKB)
4,712
Depth End (MD) (ftKB)
5,687
Cum Depth Drilled (ftKB)
1,467
Drill Time (hr)
21.50
Cum Drilling Time (hr)
36.50
Interval ROP (ft/hr)
45.3
Flow Rate (gpm)
800
RPM (rpm)
150
Weight on Bit (1000lbf)
3
SPP (psi)
3,100.0
Drill Str Wt (1000lbf)
88
PU Str Wt (1000lbf)
90
SO Str Wt (1000lbf)
88
Drilling Torque
4,000.0
Off Bottom Torque
Underbalanced Parameters
Q Gas Inj (ft/min) T Inj (F) P BH Ann (psi) T BH (F) P Surf Annulus ( T Surf Annulus ( Q Liq Return (gpQ Gas Return (ft
Hydraulic Calculations
Bit Hydraulic Power (hp) HSI (hp/in) Bit J et Velocity (ft/s) Bit Pressure Drop (psi) % P @ bit (%)
Max Casing AV (ft/min) Max Open Hole AV (ft/min) Min Casing AV (ft/min) Min Open Hole AV (ft/min) ECD End (lb/gal)
Survey Data
MD (ftKB) Incl () Azm ()
Build
(/100ft) TVD (ftKB) NS (ft) EW (ft) VS (ft)
DLS
(/100ft) Depart (ft) Turn (/100ft)
5,249 55.06 264.44 0.18 4,616.71 -351.17 -1,703.28 1,615.30 1.95 1,739.11 2.37
5,342 54.67 265.08 -0.42 4,670.23 -358.12 -1,779.02 1,688.65 0.70 1,814.71 0.69
5,437 54.74 268.04 0.07 4,725.13 -362.77 -1,856.40 1,764.02 2.54 1,891.52 3.12
5,533 54.87 272.00 0.14 4,780.48 -362.74 -1,934.83 1,841.23 3.37 1,968.54 4.13
5,627 54.79 275.15 -0.09 4,834.63 -357.95 -2,011.50 1,917.56 2.74 2,043.10 3.35
Last Casing Sz
Casing Description
Surface
Set Depth (MD) (ftKB)
1,657
Set Depth (TVD) (ftKB)
1,657.0
String Nominal OD (in)
13 3/8
Top Depth (MD) (ftKB)
-6
Top Depth(TVD) (ftKB)
Last Leak Off or FIT Test
Csg Des Typ Test Date Eq. Fld Density (lb/gal) P LeakOff (psi) Fluid
Surface Formation
Integrity
10/12/2012 13.00 1,174.9 Mud
Offline Activities
Description
Offline
Start Date
10/18/2012
End Date
10/19/2012
Incident Free Operations: 241 days
Page 3/3 Report Printed: 10/19/2012
Rpt #: 30, DFS: 29.63
Depth Progress: 975
Report Date: 10/18/2012
Offline Activity Time Log
Start Date
10/18/2012
Dur (hr)
12.00
End Date
10/18/2012
Activity
OFFLOAD
Inac
N
Comment
Swaco summary:
Cutting disposal for hole and total.
- 17 : Cumm: 1040 bbls.
- 12 1/4": 0 bbls Cumm: 2590 bbls
- 12 1/4" ST: 170 bbls Cumm: 1050
bbls
Water disposal for hole and total.
- 17 : Cumm: 1290 bbls.
- 12 1/4": 0 bbls Cumm: 3300 bbls
- 12 1/4" ST: 180 bbls Cumm: 1340
bbls
Dewatering for hole and total.
- 17 : Cumm: 535 bbls.
- 12 1/4": 0 bbls Cumm: 2000 bbls
- 12 1/4" ST: 160 bbls Cumm: 1090
bbls
Start Date
10/18/2012
Dur (hr)
12.00
End Date
10/19/2012
Activity
OFFLOAD
Inac
N
Comment
- Daily water well consumption: 34 m3
(1006 m3 cumulated from pre-spud
dates).
- Performed SIMOP's meeting with
facilities supervisor.
- Superior 9-5/8"casing inspection with
120 joints ready.
- Smith truck backload with fishing
tools.
- 60 m3 of cuttings mix material arrive
to location from Macuira.
Incident Free Operations: 241 days