Harry Ferguson

Emtelle UK LImited
Nuenen project
Holland
FTTH network
Nuenen town size: 450 ha and 8000 buildings
Nuenen Nuenen Germany
Belgium
North Sea
The Netherlands
16.300.000 persons
6.800.000 house holds
Single-Dwelling Untis
Detached house 715.133 (11%) 62.186 (1%) 777.319 (11%)
Semi-detached house 726.445 (11%) 128.196 (2%) 854.641 (13%)
Corner house 484.484 (7%) 429.637 (6%) 914.121 (14%)
Terraced house 994.425 (15%) 955.428 (14%) 1.949.853 (29%)
Other 301.522 (4%) 84.377 (1%) 385.899 (6%)
Subtotal 3.222.010 (48%) 1.659.823 (25%) 4.881.833 (72,1%)
(66,0%) (34,0%) (100,0%)
Multi-Dwelling Units
Misc. 313.359 (5%) 1.574.348 (23%) 1.887.707 (28%)
Subtotal 313.359 (5%) 1.574.348 (23%) 1.887.707 (27,9%)
(16,6%) (83,4%) (100,0%)
TOTAL 3.535.369 (52%) 3.234.171 (48%) 6.769.540 (100%)
(52,2%) (47,8%) (100,0%)
Privately Owned Rented Total
Key figures for the Nuenen project:
8000 buildings
7500 to be connected in 2004
8 contractor sites
1 main contractor and 4 sub contractors
80 handhole locations
Emtelle deliveries:
1250km 2 fibre unit
125km 24DB3mm
170km 1DB3mm
4500 Tube Distribution closures
Tube connectors, optical pigtails, etc
Training, supervision, documentation
Town of van Gogh
Tube distribution closure installation
BRE
Lieshout
NED
GER
Nuenen
EEN
Eindhoven
STIP
Channel
River
Canal
Industrial area
Telecom connections
8000 conn
450 ha
The Nuenen township surroundings
road
Small
Medium
large
Schools
Sportclubs
Churches
Fire stations
Police
Detached
Semi-detached
Corner house
Multi dwelling/flats
Ethernet backbone
switch
NetworkTransition
Cabinet
ODF
FibreFlow Transition Point
FibreFlow area
Splice closures
Tube distribution closures
(TDC)
Feeder
Access outdoor
C-BOX
Tube organizer
Splice location
Blowing point
C-BOX
PoP location
Network names
Tube Distribution closure
TDC/7514
(4 x) DB 24x3/2.1mm/6788
DBmf 1x 5/2.1mm/6834
2 FU unit/7470
Nuenen project with Emtelles 3mm solution
Basic layout of the OSP network and the components
Transition closure GCO
Fibre blowing point
POP
576 SM fibre
Loose tube
cable
3x192 SM fibre
Loose tube
cable
Z-7 handhole
Tube connector 3mm straight/7312
Tube connector 6mm straight /7310
Tube connector reducer
3/2.1 to 5/2.1/7652
6way TDC
Grommet/7717
3mm Waterblock
Connector/7314
1DB 5/2.1mm connecting kit/7787B
Strech end cap and resin
Pack/7762
3mm tube end cap/7593
6mm tube end cap/7311
TDC kit + 24/3+1/6mm connectors/7745
Heatshrink end cap 4-12mm/7060
Heatshrink endcap 15-36mm/7057
Pigtail SCA 900um, 0.5m/7753
Pigtail SC 1mm, 1m/7754
Pigtail SCPC 900um, 0.5m/7773
Tube connector 5/2.1mmstraight/7742
1x192 SM
fibre
Customer box
6
2 FU bead/7318
1-compressor
2-control unit
3-blowing head
4-Fibre pan
Fibre unit blowing equipment
2/4 FU bead
code 7318a
Fibre plate
4 FU 7584
Smooth green tyres code 7032
15 bar code 7244
10 bar code 7028
Toolkit code 7338B
Airflow kit 820B code
7778
Guide Arm code 7851
Blowing unit
2004 code 7779
Dispencer 16A
code 7009
Transformer 220V-
110V code 7286
TDC installation
TDC installed for 2 houses
Watching by Van Gogh
The Transition location
24DB3 at a road crossing The organisation: ONS NET
Nuenen project in progress
From PoP location to Transition closure (Feeder network)
PoP location indoor view
HDPE duct for feeder
cables (green)
1 handhole for feeder closure
1 handhole for transition clos.
Microtube Ducts/fibre cables
Splices
Electronics
Patch cord
Organizer
3/2.1mm micro tubes
Blow-in point
Location
A
B
Pigtail-Patch cord
Back and front access needed
Optical Distribution Frame
PoP Ducting System
Minimum bending radius 30mm
Ducting available in 300, 220,
100, 100x50, 50 and 30mm
Inclusive lids for
complete cable protection
Different components such as straight ducts,
tee pieces, elbows, reducing adapters, ..
UL94VO
Halogen-free
UV Light-resistant
Trainsition point: handhole and closure
Handhole locations
are 6 months open!
24x5/3.5mm + 1x10/8mm DB
9x5/3.5mm + 1x10/8mm DB
1x 5/3.5mm DB
From Transition closure to the buildings (Access network)
Blowing from the Transition location to the houses
Blowing and splicing
at Transition location
House entrance connection
Fixing tube, CBOX and fibre unit
Coding
PoP location Cable Cable Tube bundle Tube
Nuenen 576/NEM8-03 192/NEM8-03C DB24/NEM8-03C-1 BL-2
Blowing distance 200-600m
Blowing speed 35m/min
Waiting time 6-17 min
Blowing distance 200-600m
Blowing speed 50m/min
Waiting time minimal: 4-12 min
Connections per day
Target 50
10 min per connection
People can not find the front door key
Blowing problems
Indoor installation delays
Testing, connections mistakes,etc
1. Disconnect blowing from indoor installation
2. Splicer and blower are waiting to long
1. At the customer 2-3m FU must be stored
2. More blowing heads in parallel on one compressor
Speeding-up installations