Anda di halaman 1dari 31

Chinar

Shipping &Infrastructure (India) Pvt. Ltd.


An ISO 9001:2008 Company

REGISTERED ADDRESS:
Chinar Shipping & Infrastructure (I) Pvt. Ltd.
410 Bharat Chambers, 52 Baroda Street,
Carnac Bunder, P. D' Mello Road,
Mumbai 400 009.
TELEPHONE: +91 22 4213 8130 / 21
FAX : + 91-22-4213 8131

EMAIL: info@chinarshippinginfratech.com
Website: - http://chinarshippinginfratech.com/

Regional Offices:-New Delhi
Uttar Pradesh
Bihar







Chinar Shipping and Infrastructure (I) Pvt. Ltd. Established in 2002, and incorporated in 2006,
Chinar is an ISO 9001-2008 IRQS Certified company. Our service oriented outfit is registered
with D G Shipping, Government of India (RPSL No.: RPSL-MUM-118) & registered shipping
agency in Mumbai Port Trust (Lic. No. C0282).

Chinar apart from its O & M contracts has expanded its operations in the field of Dredging
and Infrastructure developments works, and is a reputed organization in handling dredging
activities in India and overseas along with Civil construction works.

We are one of the leading O & M contractors in the field of dredging and ship management.
Our dedicated team of engineers, ex naval officers and master mariners have achieved the
goals as targeted by our esteemed clients. The executed contracts and ongoing projects
under our management is the proof of our dedication and commitments towards the
satisfaction of our clients.










Companys Profile




Chinar Shipping and Infrastructure (I) Pvt Ltd aims to be the leader in the field of dredging, civil
engineering and Infrastructure works.

We are committed to achieving consistent quality works and believe in making the extra effort to
provide superior operating results and above all, delivering on time to our customers.

We continuously upgrade, maintain and acquire equipment to the latest technology to increase
productivity and improve cost effectiveness as to satisfy the expectations of customers,
shareholders and employees.

We believe and commit fully to the highest standards of safety, health and environmental
responsibility
CORE VALUES

We ensure
compliance with
agreed
commitments
Honesty
&
Dedication
Mission
CORE VALUES







We would like to introduce our company Chinar Shipping and Infrastructure (India). Pvt. Ltd an,
ISO 9001:2008 Certified Infrastructure Company as one of the fastest growing enterprise in the
field of Dredging, Infrastructure developments and Technical management. We are proud to be
associated to some of the best known Government organization & companies in the industry. As
registered RPS License holders with D.G. Shipping we have been providing technical support to
various ship owners and ship management companies.
About Us
We have adequate number of HEME and Dredgers under our management for prompt and
efficent service.
CSD - Ravikiran Beaver 1200 CSD - ASR-3 - American 300 Survey boats, wooden boats





List of Equipment with Chinar and its sister concern


We feel proud to be associated with. Shipping corporation of India (SCI) & Oil and Natural Gas
Corporation of India (ONGC) for the past 3 Years. We have served them in their offshore
activities.
Chinar Shipping has successfully completed dredging projects as an O&M contractor for Norsea
Global Offshore Pvt Ltd.Singapore in 2010; we have operated one of the largest Cutter Suction
Dredger CSD Portofino a 3000 M3 dredger for the three years at different dredging projects in
India and Overseas.



License Awarded BOARDS UNDER WHOM CHINAR IS REGISTERED


Registered with D G
Shipping,
Government of
India
RPSL No.:
RPSL-MUM-118
Registered
Shipping
agency in
Mumbai Port
Trust
Lic. No. C0282
Awarded by
Indian
Registrar of
Quality
Systems
ISO 9001:2008
Awarded by
Small Scale
Industries
association
Memorandum
no-27232200998
DELHI JAL
BOARD,Govt of
NCT,Delhi
DJB
MAHARASHTRA
MARITIME
BOARD,Govt Of
Maharashtra
MMB
INLAND
WATERWAYS
AUTHORITY OF
INDIA, Ministry
of Shipping,GOI
IWAI










0
2000
4000
6000
8000
10000
12000
2010-11 2011-12 2012-13 2013-14 2014-15
(Projected)
In Lacs
Financial turn over




Total Achieved Dredging Quantity In River Ganga NW-01
NAME OF CSD Achieved dredging Quantity in M3
MAHANANDA 405425.55
ALAKNANDA 536406.81
JALANGI 534628.79
TAPI 602973.49
SHIPRA 309682.92













17%
23%
22%
25%
13%
Mahananda
Alaknanda
Jalangi
Tapi
Shipra
Milestone


We consider ourselves as young and budding organization, small, but abundant with talent
and enthusiasm and a desire to work other such organizations to help each other to achieve
their individual goals.

We believe in our technical skills and share this knowledge to entities, so that they stay
focused on their principal objectives and concentrate on what they are better at doing

Project Management and Execution of contract for National Waterways 1, 2 & 3 dredging
projects worth INR 63 Crores through site offices located in Guwahati & Cochin, Contract
awarded By Inland Waterways Authority of India under Ministry of Shipping, GOI.

Dredging of River Yamuna Pondage area near Wazirabad, DelhiJal Board water treatment
plant worth INR 14.96 Crores awarded by DJB, Govt of NCT Delhi.


Supervising the Infrastructure project Commercial Complex building and road projects
awarded by Gorakhpur Development Authority, Govt of UP.









Chinar is a professional and experienced organization covering the Dredging, construction,
engineering, rail, mining & Infrastructure sector.

Our consultants & Engineers are experts within their field. We know our clients and most
important understand the requirements.

Our project coordinators work round the clocks to ensure coordination with the clients and
for timely completion of every project.

There is no institute in India producing manpower for dredging industry.

With that View Company selected 12 GETs (Graduate Engineer Trainees) from different
colleges.

With the emphasis that these young Engineers are trained to maintain & operate the
dredger.

We take pride to mention that this is the 1
st
ever scheme devised by any organization in
India.


Why Chinar?




1. DREDGING

(a) Dredging & Reclamation
(b) Maintenance Dredging
(c) River Dredging
(d) Dredging & Excavation of Canals and Lakes

2. CIVIL CONSTRUCTION & INFRASTRUCTURE DEVELOPMENT

(a) Building Construction
(b) Drainage System
(c) Railways Earthwork, Blanketing & Track Linking
(d) Construction of Canals
(e) Road Construction
(f) Minor and Medium Bridges
(g) ROB (Rail Over Bridges)
(h) Excavation & Trenching

3. O&M (Operation & Maintenance) of

(a) Power Plants
(b) Dredgers
(c) Offshore supply Vessels
(d) Manning & Management of Vessels


OUR CORE BUSINESS




Ongoing Projects
The major work that is being carried out by M/s Chinar Shipping & Infrastructure (India) Pvt. Ltd.
on the National Waterways No. - 1, 2 & 3, awarded by Inland Waterways Authority of India
(Ministry of Shipping). We have been handling the total dredging operations required by IWAI.
By virtue of dredging on these National Waterways today we are one of the most experienced
organizations in India to carry out dredging work on any of the river and waterways. We have
Description Of work:
well experienced staff in dredging these rivers who understand the operations and technical
aspects of dredging in rivers.
The priority and key focus of the project on National waterways -1 (River Ganga) is to maintain
the navigational channel for cargo, and coal movement for NTPC power plants located at Farakka
(W.B.), Kahalgaon, and Barh (Bihar) to accomplish the same, Chinar has been dredging at
different locations between Haldia , Patna & Varanasi to maintain the minimum LAD for safe
navigation. The company with its skilled manpower and dedicated management team has been
able to dredge a quantity of 2.38 Million cubic meters since 2012.




IWAI : NW-01
IWAI :
NW-02
IWAI :
NW-03

Delhi Jal Board under Government of NCT has awarded M/s Chinar Shipping the contract for
dredging 7,77,000 Cubic meter of silt and sand at their water intake channel located at
Wazirabad so that water shortage problem can be resolved during summers. We were given
Wazirabad water intake area which caters water need of 30% Delhis population. The dredging
has been successfully completed before the start of the flood season. The work is extended for
another one season to maintain the required depth for the water intakes.
Chinar has completed 2 years of successful dredging operations at different captive ports and
jetties for Maharashtra Maritime Board, Mumbai.







The three WTPs located at Wazirabad, Chandrawal and Okhla are supplied with raw water from
Wazirabad intakes.
During closure of Moradnagar Conduit, raw water is also lifted for Bhagirathi and Sonia Vihar
Water Treatment Plant.
As a natural phenomenon, silt travels along with water especially during monsoon, resulting in
reduction of depth of water considerably in the pondage area.
Over a period of time large quantity of silt/sand got deposited within pondage area, thereby
reducing depth of water by over a meter.
No dredging has been done since last six years.
Deposited silt needs to be removed be mechanical means to retrieve the holding capacity of the
pondage.
Pondage acts as the buffer against the variation and release of water by Haryana in non-
monsoon period and also it takes care of the requirement for few days in emergency condition.




Background of The Scheme

AREA FOR WEED REMOVAL
AREA TO DREDGE
AREA FOR WEED REMOVAL
DETAILED SATELLITE IMAGE OF ENTIRE SITE









BATHEMETRIC CHART OF THE AREA SURVEYED PRIOR TO
THE COMMENCEMENT OF PROJECT (OCT 2013)
Depths are reduced to datum
& spot levels are with the
reference to Datum
The Bench mark value at
Yamuna East Bank to levels
+210.1 m with reference to
MSL
CD=205.47m - MSL
Bottom=201.47m - MSL
< - -1.0 M
-1.0 - -0.99 M
0.0 - 0.99 M
1.0 1.99 M
2.0 - 2.99 M
3.0 - 3.99 M
> = 4.00 M



WEED INFESTED AREA ON WAZIRABAD SIDE


WEED REMOVED/UPROOTED AREA ON WAZIRABAD SIDE
WEEDS WERE PRESENT
WEEDS WERE REMOVED


L&T WATER INTAKE BEFORE DREDGING


DREDGERS IN OPERATION
DREDGER RAVI KIRAN
IN OPERATION





The company also provides ship management, port operations, chartering services and
undertakes complete end to end operation and management contracts. We ensure every
necessary measure required to display results with zero percent hurdles and accidents, thus
providing additional comfort to the clients in the industry.

The company has maintained high standards of Key Personnel from the field of dredging, marine
and Infrastructure. We have maintained a dedicated and skilled team of Civil, Mechanical and
Electrical engineers who are permanent employee of the company.







OPEN DISCHARGE

OUR DREDGING STAFF AT WORK





The rapid growth and requirement in the infrastructure development of the country inspired
Chinar to venture and expand into different sectors. The company formed Northern Express
Infrastructure Pvt. Ltd a 100% subsidy company of Chinar. Northern has been actively involved in
construction of Government buildings, roads and irrigation projects. The company is registered
with Gorakhpur development authority (GDA) U.P.Irrigation under A class. The company
started with construction of a small building for a limited company and slowly moved with its
growth.

Chinar was awarded with work order from TATA- ALDESA JV for earth work, blanketing and
construction of minor bridges on Ch No 1090-1115 (25 KM) for the. Dedicated freight Corridor
Corporation of India (Eastern corridor) under Indian Railways. The project is underway and the
progress is to the satisfaction of the client. A dedicated team of civil engineers with vast
experience are working round the clock for timely execution of the project.







Civil Construction and I nfrastructure Work
TATA / ALDESA (J V) EASTERN DEDICATED FREIGHT CORRIDOR PROJ ECT
SKETCH OF REQUIRED BLANKETING WORK

ACTUAL SITE PHOTOGRAPHS OF TATA / ALDESA PROJ ECT




NAME OF WORK Earth Work/Blanketing of track formation for Eastern
Dedicated Freight Corridor
Formation for Heavy Axle Load for Eastern DFC including box
culverts and minor bridges.
3
DEDICATED FREIGHT
CORRIDOR NETWORK
MUMBAI
DELHI
CHENNAI
KOLKATA
LUDHIANA
VIJAYAWADA
Sanctioned projects
Unsanctioned
projects
VASCO
DELHI
LUDHIANA
MUMBAI
DELHI







COMPANY NAME OF WORK OWNER DATE OF
START
COST OF
PROJ ECT
STATUS OF
PROJ ECT
I.W.A.I NOIDA

DREDGING AT
VARIOUS STRECHES
OF RIVER GANGA
(NW1) & RIVER
(NW2)
GOVERNMENT OF INDIA

18.10.2011

INR
54,00,00,000
WORK IN
PROGRESS

I.W.A.I NOIDA

DREDGING AT
VARIOUS STRECHES
OF KOLLAM &
UDYOGMANDAL
CANALS OF NW 3
GOVERNMENT OF INDIA

Feb 2013 INR
5,18,10,672
WORK IN
PROGRESS

I.W.A.I NOIDA

MANNING,
OPERATION &
MAINTENANCE OF
SURVEY LAUNCHES
PATNA-ALLAHABAD
STRETCH NW-1
GOVERNMENT OF INDIA

Feb 2013 INR
3,39,02,569
WORK IN
PROGRESS

I.W.A.I NOIDA

MANNING,
OPERATION &
MAINTENANCE OF
SURVEY LAUNCHES
DHUBRI-PANDU
STRETCH NW - 2
GOVERNMENT OF INDIA

JUN 2013

INR
2,73,16,923
WORK IN
PROGRESS

MAHARASHTRA
MARITIME
BOARD

MANNING,
OPERATION & TECH.
MANAGEMENT OF 2
CSD AT
MAHARASHTRA
MAHARASHTRAMARITIME
BOARD

FEB2012

INR
6,00,00,000
WORK IN
PROGRESS

SCI MANNING GOVERNMENT OF INDIA

OCT
2011

INR
28,80,00,000
WORK IN
PROGRESS


SICAL / CHCC

RAS AL ZOUR,
JUBAIL K.S.A.

GOVERNMENT OF
SAUDI ARABIA

June 2008

INR
6,00,00,000
Completed July 2009


DREDGING & MANNING PROJ ECTS BY CHINAR SHIPPING





DELHI JAL BOARD



dredging of silt from
river yamuna near
intake at wazirabad
water works




DELHI JAL BOARD




Aug 2013




INR 40,00,00,000
WORK IN
PROGRESS.
(IN JV WITH ASR
DREDGING
SERVICES PVT
LTD)


SICAL / MARG


MargKaraikal Port


MARG PORT


March 2010


INR 3,50,00,000

Completed JAN 2011



TATA ALDESA
EARTHWORK
INVOLVING
BLANKETING OF
STRETCH AND
CONSTRUCTION OF
MINOR BRIDGES

DEDICATED FREIGHT
CORRIDOR,MINISTRY
OF RAILWAYS

APRIL
2014

INR
47,00,00,000

WORK IN
PROGRESS









CLIENT/COMPANY CONTACT PERSON DESIGNATION CONTACT DETAIL
INLAND WATERWAYS AUTHORITY OF
INDIA
Mr. S. Dandapat Director (P & M) +919717622733
DELHI JAL BOARD Mr. Yogendra Singh AE (Civil) 011-23681009
MAHARSHTRA MARITIME BOARD Mr. S. Shinde Chief Surveyor &
Marine Engineer
+919819239727
THE SHIPPING CORPORATION OF
INDIA
Mr. Phillip Mathews VP 022 2283 2671.
TATA/ ALDESA(JV)

Mr. Kamal Kishore
Singh
Chief Project Manager

Our Major ongoing Projects

Civil construction & Infrastructure Project by Chinar























OUR CLIENTS










EPF ESIC
Fooding
Accomodation
Travelling
Allowance
Connectivity of
communicat
ion
Bonus &
Increment
Healthy
environmen
t of Office
Office Amenities





Chinar Shipping & Infrastructure (India) Pvt Ltd, is managed by professionally efficient Board of
Directors


MANAGING DIRECTOR

















Our board of directors
Managing Director
A.K TRIPATHI

Director
R.Dubey

Director
J.P Sharma

Director
Yogesh Sharma

Executive Director
Nitish Tripathi






Mr. Vineet Agarwal-President (Technical)
An accomplished and resourceful, self-motivated professional, with masters in engineering
possessing over twenty five calendar years (more than 38 years based on man hours) of immaculate
international experience in project execution, project management, claims management, tender
preparation, tender submission, structural design, soil testing etc.

Mr. Rajeev Chawla-President (Business Development)-Masters Degree in civil engineering
Accomplished and integrity driven professional offering over 30 years of experience from national
and multinational organizations, in the field of ZERO TOLARENCE WATERPROOFINGSYSTEMS,
CONSTRUCTION CHEMICALS and MECHANICAL SPLICING. CUT N BEND OF REBARS, BBS DESIGN
CENTRE. CONSTRUCTION MANAGEMENT AND BUSINESS DEVELOPMENT, Expertise in Setting up of
CUT N BEND Plant and BBS Design Centre.


Prof Dr.S.M Mishra-(Dredging Head)
Accomplished and integrity driven professional offering over 35 years of experience from national
and multinational organizations in river conservation dredging, and preparation of DPR`S for state
Govt and other organisations

Mr. Anil Mani Tripathi Executive Director (Projects-TATA ALDESA)
Mr. Tripathi is an Executive Director (Projects-TATA ALDESA) of Chinar Shipping & Infrastructure
(India) Pvt Ltd. A results driven professional with over 23 years of wide experience in Project
Implementation mainly in Steel Plant, Cement Plant, P&O Ports, Metro Rail, Highway Projects, OFC
Projects and Energy Sector. He holds a strong track record of success in spearheading and
implementing several Projects across India.

Our team of Technocrats
Mr Vineet Aggarwal - Director (Technical) - Master's Degree in Civil Engineering
Mr Rajeev Chawla - Director (Business Development) - BE
Prof. Dr. S M Mishra - Dredging Head
Mr Anil Mani Tripathi - Executive Director (TATA ALDESA Project)









We are proud of our competent work force and their strong commitments






Capt.PK Srivastava Chief Operation Officer
Ms Reena Kanani Chief financial Officer
Mr.Ajay Tiwari DGM-Finance & Accounts
Ms Geeta Chawda GM-Human Resources
Mr.Umacharan Legal Advisor
Mr.R.S Peshwani Marine Engineering Head
Mr.R.M Shukla Chartered Accountant
Mr.Aniket Dwivedi Project Co-coordinator
Mr.Anshuman Dubey Business Development
Our Administrative Staff

Anda mungkin juga menyukai