Anda di halaman 1dari 9

Autopista:

Delegacin/Gerencia:

Quertaro-Irapuato
Quertaro

Catlogo nico CAPUFE


Clave

Unidad

Concepto

2012 Solicitado

Norma SCT

Cantidad de obra

P.U. con
nmero

Importe con
letra

Importe

I. PAVIMENTOS

M3
M3
M

Bacheo Superficial Aislado


Renivelaciones Locales en Pavimentos Asflticos
Sellado de Grietas Aisladas en Carpetas Asflticas

NCSVCAR202003/00
NCSVCAR302001/10
NCSVCAR202002/00

2,250.00
250.00
30,000.00

$3,331.66
$2,522.73
$4.81

$7,496,235.00
$630,682.50
$144,300.00

Limpieza de Alcantarillas
Mampostera de Piedra

NCSVCAR201003/01
NCTRCAR102001/00

5,160.00
317.00

$29.79
$1,249.09

$153,716.40
$395,961.53

Se requiere E.P.
Se requiere E.P.
N-CTR-CAR-1-07-015

1,000.00
5,005.24
50,000.00

$1,960.75
$388.72
$8.48

$1,960,750.00
$1,945,636.89
$424,000.00

2,400.00

$113.74

$272,976.00

2,400.00
6,000.00
8,000.00
3,315.00
65,100.00

$15.08
$188.83
$140.53
$57.51
$44.94

$36,192.00
$1,132,980.00
$1,124,200.00
$190,645.65
$2,925,594.00

II. OBRAS DE DRENAJE Y SUBDRENAJE

PZA
M3

III. DERECHO DE VIA Y ZONAS LATERALES

HA
M3
ML
PZA

Deshierbe, P.U.O.T.
Pepena y recoleccin de basura
Suministro y colocacin alambre pas
Suministro y colocacion de postes de concreto en el cercado del
derecho de via

N-CTR-CAR-1-07-015

IV. SEALAMIENTO Y DISPOSITIVOS DE SEGURIDAD

PZA
PZA
ML
ML

Limpieza de Seales Verticales


Reposicin de Indicadores de Alineamiento
Alineacin de defensa metlica
Suministro y colocacin malla antideslumbrante
Suministro y colocacion de vialetas y botones

NCSVCAR205005/01
NCSVCAR305006/02
Se requiere E.P.
Se requiere E.P.
E.P.

subtotal:

V. OTROS

$18,833,869.97

Autopista:
Delegacin/Gerencia:

Quertaro-Irapuato
Quertaro

Catlogo nico CAPUFE


Clave

Unidad

Concepto

2012 Solicitado

Norma SCT

Cantidad de obra

P.U. con
nmero

Importe con
letra

Importe

Autopista:
Delegacin/Gerencia:

Quertaro-Irapuato
Quertaro

Catlogo nico CAPUFE


Clave

Unidad

Concepto

2012 Solicitado

Norma SCT

Cantidad de obra

P.U. con
nmero

I. PAVIMENTOS

M3
M3
M

Bacheo Superficial Aislado


Renivelaciones Locales en Pavimentos Asflticos
Sellado de Grietas Aisladas en Carpetas Asflticas

NCSVCAR202003/00
NCSVCAR302001/10
NCSVCAR202002/00

2,250.00
250.00
30,000.00

$2,835.49
$1,994.25
$3.80

Limpieza de Alcantarillas
Mampostera de Piedra

NCSVCAR201003/01
NCTRCAR102001/00

5,160.00
317.00

$22.34
$987.43

Se requiere E.P.
Se requiere E.P.
N-CTR-CAR-1-07-015

1,000.00
5,005.24
50,000.00

$1,470.56
$307.29
$3.77

2,400.00

$89.91

2,400.00
6,000.00
8,000.00
3,315.00
65,100.00

$11.92
$188.83
$140.53
$53.25
$35.52

II. OBRAS DE DRENAJE Y SUBDRENAJE

PZA
M3

III. DERECHO DE VIA Y ZONAS LATERALES

HA
M3
ML
PZA

Deshierbe, P.U.O.T.
Pepena y recoleccin de basura
Suministro y colocacin alambre pas
Suministro y colocacion de postes de concreto en el cercado del
derecho de via

N-CTR-CAR-1-07-015

IV. SEALAMIENTO Y DISPOSITIVOS DE SEGURIDAD

PZA
PZA
ML
ML

Limpieza de Seales Verticales


Reposicin de Indicadores de Alineamiento
Alineacin de defensa metlica
Suministro y colocacin malla antideslumbrante
Suministro y colocacion de vialetas y botones

NCSVCAR205005/01
NCSVCAR305006/02
Se requiere E.P.
Se requiere E.P.
E.P.

subtotal:

V. OTROS

Importe con
letra

licitado
Importe

$6,379,852.50
$498,562.50
$114,000.00

$115,287.30
$313,015.31

$1,470,562.50
$1,538,060.20
$188,500.00
$215,784.00

$28,608.00
$1,132,980.00
$1,124,200.00
$176,523.75
$2,312,352.00

$15,608,288.06

Autopista:
Delegacin/Gerencia:

Quertaro-Irapuato
Quertaro
Catlogo nico CAPUFE

Clave

Unidad

Concepto

2012 Solicitado

Norma SCT

Cantidad de obra

P.U. con
nmero

Importe con
letra

Importe

I. PAVIMENTOS

M3
M3
M

Bacheo Superficial Aislado


Renivelaciones Locales en Pavimentos Asflticos
Sellado de Grietas Aisladas en Carpetas Asflticas

NCSVCAR202003/00
NCSVCAR302001/10
NCSVCAR202002/00

2,250.00
250.00
30,000.00

$2,835.49
$1,994.25
$3.80

$6,379,852.50
$498,562.50
$114,000.00

Limpieza de Alcantarillas
Mampostera de Piedra

NCSVCAR201003/01
NCTRCAR102001/00

5,160.00
317.00

$23.51
$1,130.40

$121,311.60
$358,336.80

Se requiere E.P.
Se requiere E.P.
N-CTR-CAR-1-07-015

1,000.00
5,005.24
50,000.00

$2,089.51
$307.29
$3.77

$2,089,510.00
$1,538,060.20
$188,500.00

2,400.00

$89.91

$215,784.00

2,400.00
6,000.00
8,000.00
3,315.00
65,100.00

$11.92
$234.79
$23.23
$76.76
$35.52

$28,608.00
$1,408,740.00
$185,840.00
$254,462.72
$2,312,352.00

II. OBRAS DE DRENAJE Y SUBDRENAJE

M
M3

III. DERECHO DE VIA Y ZONAS LATERALES

HA
M3
ML
PZA

Deshierbe, P.U.O.T.
Pepena y recoleccin de basura
Suministro y colocacin alambre pas
Suministro y colocacion de postes de concreto en el cercado del
derecho de via

N-CTR-CAR-1-07-015

IV. SEALAMIENTO Y DISPOSITIVOS DE SEGURIDAD

PZA
PZA
ML
ML
PZA

Limpieza de Seales Verticales


Reposicin de Indicadores de Alineamiento
Alineacin de defensa metlica
Suministro y colocacin malla antideslumbrante
Suministro y colocacion de vialetas y botones

NCSVCAR205005/01
NCSVCAR305006/02
Se requiere E.P.
Se requiere E.P.
E.P.

total a C.D. c/mano Obra:

$15,693,920.31

por subcontrato
por rectificar precio, que incrementar p/uso de perfiladora

Autopista:
Delegacin/Gerencia:

Quertaro-Irapuato
Quertaro
Catlogo nico CAPUFE

Clave

Unidad

Concepto

2012 Solicitado

Norma SCT

Cantidad de obra

P.U. con
nmero

Importe con
letra

I. PAVIMENTOS

M3
M3
M

Bacheo Superficial Aislado


Renivelaciones Locales en Pavimentos Asflticos
Sellado de Grietas Aisladas en Carpetas Asflticas

NCSVCAR202003/00
NCSVCAR302001/10
NCSVCAR202002/00

2,250.00
250.00
30,000.00

$2,772.54
$1,942.70
$3.16

Limpieza de Alcantarillas
Mampostera de Piedra

NCSVCAR201003/01
NCTRCAR102001/00

5,160.00
317.00

$1.88
$725.36

Se requiere E.P.
Se requiere E.P.
N-CTR-CAR-1-07-015

1,000.00
5,005.24
50,000.00

$1,783.48
$14.11
$2.93

2,400.00

$28.54

2,400.00
6,000.00
8,000.00
3,315.00
65,100.00

$6.90
$234.79
$3.45
$76.76
$24.76

II. OBRAS DE DRENAJE Y SUBDRENAJE

M
M3

III. DERECHO DE VIA Y ZONAS LATERALES

HA
M3
ML
PZA

Deshierbe, P.U.O.T.
Pepena y recoleccin de basura
Suministro y colocacin alambre pas
Suministro y colocacion de postes de concreto en el cercado del
derecho de via

N-CTR-CAR-1-07-015

IV. SEALAMIENTO Y DISPOSITIVOS DE SEGURIDAD

PZA
PZA
ML
ML
PZA

Limpieza de Seales Verticales


Reposicin de Indicadores de Alineamiento
Alineacin de defensa metlica
Suministro y colocacin malla antideslumbrante
Suministro y colocacion de vialetas y botones

NCSVCAR205005/01
NCSVCAR305006/02
Se requiere E.P.
Se requiere E.P.
E.P.

total a C.D. sin/mano Obra:


por subcontrato
por rectificar precio, que incrementar p/uso de perfiladora

2 Solicitado
Importe

$6,238,215.00
$485,675.00
$94,800.00

$9,700.80
$229,939.12

$1,783,480.00
$70,623.94
$146,500.00
$68,496.00

$16,560.00
$1,408,740.00
$27,600.00
$254,462.72
$1,611,876.00
$12,446,668.57

que incrementar p/uso de perfiladora

Anda mungkin juga menyukai