Anda di halaman 1dari 47

Total Water consumption

Fuel availabilty in GL
Waste collection
Basement Ground Floor 16th Floor Chiller Roof GRP Roof
FCU
Chiller 3
FAHU 1 1
FACP Panel 1
Central Battery system 1
Fire extinguisher (Co2)
Fire extinguisher (DP)
Fire Fighting Electrical pump 1
Fire Fighting Diesel Pump 1
Fire Fighting Jockey Pump 1
RCC Water Tanks 1
GRP water Tanks 2
Main DEWA valve 1
DB
DIESEL GENERATOR 1
SMDB
ATS 1
MCC 1
Control Panel
Capacitor Bank 3
Steam unit 2
Sauna unit 2
Elevators
Staircase pressurization fans 2
Basement Extract fans 4
CCTV
DAILY REPORT : HAMZA TOWER
Systems Location Ground Floor
Total Electrical consumption Readings in KWH
206
50 (Diesel Generator & Diesel Fire Pump)
2 x 2.5CBM
HVAC EQUIPMENTS
LIFE SAFETY SYSTEM
LV1 LV2 LV3
2.7
DOMESTIC WATER SYSTEM
ELECTRICAL EQUIPMENTS
ELECTRO - MECHANICAL EQUIPMENTS
ELECTRONICS EQUIPMENTS
3.1 18.1
Intercom Panel 1
Booster Pump 2
Sump Pump 2
Transfer Pump 2
Secondary Pump 4
Chiller Dosing manual 1
CHW Make up Pump 2
Sand Filter 1
Pool Pump 3
Pool Dosing Pump 1
Gate Barrier 3
Al Basit Technical services people doing renovation works
Al - Fajer people doing Faade cleaning
ACTIVITIES - 01.09.13
ACTIVITY
In 3rd Floor Garbage Room Wooden Door found not closing Properly,same rectified
Swimming Pool Backwash Drainage line work Carried Out by Al basit
In Gound Floor Ofiice Door Found not closing propery,same rctified
OK
Not OK
Partially OK
Remarks:
Date: 01-09-2013
SUB METER
7
All Floors Whole Tower
31 Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect DIB Submitted report
42 Defect DIB Submitted report
42 Defect DIB Submitted report
Defect DIB Submitted report
Defect DIB Submitted report
Defect DIB Submitted report
No Defect
2 No Defect
No Defect
12 Defect Afetr approval from NCM
Defect Afetr approval from NCM
19 Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
15 Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
3 No Defect
01no Defect Afetr approval from NCM
04nos Defect Afetr approval from NCM
13 03nos Defect Afetr approval from NCM
DAILY REPORT : HAMZA TOWER
Ground Floor Defect with date
Expected date of
completion
Remarks
206
50 (Diesel Generator & Diesel Fire Pump)
2 x 2.5CBM
HVAC EQUIPMENTS
LIFE SAFETY SYSTEM
LV3
DOMESTIC WATER SYSTEM
ELECTRICAL EQUIPMENTS
ELECTRO - MECHANICAL EQUIPMENTS
ELECTRONICS EQUIPMENTS
18.1
Defect Afetr approval from NCM
No Defect
No Defect
No Defect
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
01no Defect Afetr approval from NCM
PICTURE STATUS
Complete
Complete
Complete
In progress
In progress
Al Basit Technical services people doing renovation works
Al - Fajer people doing Faade cleaning
ACTIVITIES - 01.09.13
ACTIVITY
In 3rd Floor Garbage Room Wooden Door found not closing Properly,same rectified
Swimming Pool Backwash Drainage line work Carried Out by Al basit
In Gound Floor Ofiice Door Found not closing propery,same rctified
Total Water consumption
Fuel availabilty in GL
Waste collection
Basement Ground Floor 16th Floor Chiller Roof GRP Roof
FCU
Chiller 3
FAHU 1 1
FACP Panel 1
Central Battery system 1
Fire extinguisher (Co2)
Fire extinguisher (DP)
Fire Fighting Electrical pump 1
Fire Fighting Diesel Pump 1
Fire Fighting Jockey Pump 1
RCC Water Tanks 1
GRP water Tanks 2
Main DEWA valve 1
DB
DIESEL GENERATOR 1
SMDB
ATS 1
MCC 1
Control Panel
Capacitor Bank 3
Steam unit 2
Sauna unit 2
Elevators
Staircase pressurization fans 2
Basement Extract fans 4
CCTV
ELECTRICAL EQUIPMENTS
ELECTRO - MECHANICAL EQUIPMENTS
ELECTRONICS EQUIPMENTS
77
50 (Diesel Generator & Diesel Fire Pump)
2 x 2.5CBM
HVAC EQUIPMENTS
LIFE SAFETY SYSTEM
DOMESTIC WATER SYSTEM
Total Electrical consumption Readings in KWH
LV1 LV2 LV3
19.6 3.1 3
DAILY REPORT : HAMZA TOWER
Systems Location Ground Floor
Intercom Panel 1
Booster Pump 2
Sump Pump 2
Transfer Pump 2
Secondary Pump 4
Chiller Dosing manual 1
CHW Make up Pump 2
Sand Filter 1
Pool Pump 3
Pool Dosing Pump 1
Gate Barrier 3
In 16th Floor we found aluminium door handle broken,Same fixed
In 16th Floor Garbage room Floor Drop Block,Same cleared
UTTC People Came for Swimming Pool Maintenance Works
Al Basit Technical services people doing renovation works
Al - Fajer people doing Faade cleaning
ACTIVITIES - 02.09.13
ACTIVITY
OK
Not OK
Partially OK
Remarks:
Date: 02-09-2013
SUB METER
8.2
All Floors Whole Tower
31 Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect DIB Submitted report
42 Defect DIB Submitted report
42 Defect DIB Submitted report
Defect DIB Submitted report
Defect DIB Submitted report
Defect DIB Submitted report
No Defect
2 No Defect
No Defect
12 Defect Afetr approval from NCM
Defect Afetr approval from NCM
19 Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
15 Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
3 No Defect
01no Defect Afetr approval from NCM
04nos Defect Afetr approval from NCM
13 03nos Defect Afetr approval from NCM
ELECTRICAL EQUIPMENTS
ELECTRO - MECHANICAL EQUIPMENTS
ELECTRONICS EQUIPMENTS
77
50 (Diesel Generator & Diesel Fire Pump)
2 x 2.5CBM
HVAC EQUIPMENTS
LIFE SAFETY SYSTEM
DOMESTIC WATER SYSTEM
LV3
3
DAILY REPORT : HAMZA TOWER
Ground Floor Defect with date
Expected date of
completion
Remarks
Defect Afetr approval from NCM
No Defect
No Defect
No Defect
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
01no Defect Afetr approval from NCM
PICTURE STATUS
Complete
Complete
Complete
In progress
In progress
In 16th Floor we found aluminium door handle broken,Same fixed
In 16th Floor Garbage room Floor Drop Block,Same cleared
UTTC People Came for Swimming Pool Maintenance Works
Al Basit Technical services people doing renovation works
Al - Fajer people doing Faade cleaning
ACTIVITIES - 02.09.13
ACTIVITY
Total Water consumption
Fuel availabilty in GL
Waste collection
Basement Ground Floor 16th Floor Chiller Roof GRP Roof
FCU
Chiller 3
FAHU 1 1
FACP Panel 1
Central Battery system 1
Fire extinguisher (Co2)
Fire extinguisher (DP)
Fire Fighting Electrical pump 1
Fire Fighting Diesel Pump 1
Fire Fighting Jockey Pump 1
RCC Water Tanks 1
GRP water Tanks 2
Main DEWA valve 1
DB
DIESEL GENERATOR 1
SMDB
ATS 1
MCC 1
Control Panel
Capacitor Bank 3
Steam unit 2
Sauna unit 2
Elevators
Staircase pressurization fans 2
Basement Extract fans 4
CCTV
ELECTRICAL EQUIPMENTS
ELECTRO - MECHANICAL EQUIPMENTS
ELECTRONICS EQUIPMENTS
153
50 (Diesel Generator & Diesel Fire Pump)
2 x 2.5CBM
HVAC EQUIPMENTS
LIFE SAFETY SYSTEM
DOMESTIC WATER SYSTEM
Total Electrical consumption Readings in KWH
LV1 LV2 LV3
18.2 2.9 2.7
DAILY REPORT : HAMZA TOWER
Systems Location Ground Floor
Intercom Panel 1
Booster Pump 2
Sump Pump 2
Transfer Pump 2
Secondary Pump 4
Chiller Dosing manual 1
CHW Make up Pump 2
Sand Filter 1
Pool Pump 3
Pool Dosing Pump 1
Gate Barrier 3
In 16th Floor toilet found floor drop block,same rectified
In Basement found light not working,same replaced
In Roof swimming pool cleaning work carried out
Al Basit Technical services people doing renovation works
Al - Fajer people doing Faade cleaning
ACTIVITIES - 03.09.13
ACTIVITY
OK
Not OK
Partially OK
Remarks:
Date: 03-09-2013
SUB METER
9.4
All Floors Whole Tower
31 Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect DIB Submitted report
42 Defect DIB Submitted report
42 Defect DIB Submitted report
Defect DIB Submitted report
Defect DIB Submitted report
Defect DIB Submitted report
No Defect
2 No Defect
No Defect
12 Defect Afetr approval from NCM
Defect Afetr approval from NCM
19 Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
15 Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
3 No Defect
01no Defect Afetr approval from NCM
04nos Defect Afetr approval from NCM
13 03nos Defect Afetr approval from NCM
ELECTRICAL EQUIPMENTS
ELECTRO - MECHANICAL EQUIPMENTS
ELECTRONICS EQUIPMENTS
153
50 (Diesel Generator & Diesel Fire Pump)
2 x 2.5CBM
HVAC EQUIPMENTS
LIFE SAFETY SYSTEM
DOMESTIC WATER SYSTEM
LV3
2.7
DAILY REPORT : HAMZA TOWER
Ground Floor Defect with date
Expected date of
completion
Remarks
Defect Afetr approval from NCM
No Defect
No Defect
No Defect
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
01no Defect Afetr approval from NCM
PICTURE STATUS
Complete
Complete
Complete
In progress
In progress
In 16th Floor toilet found floor drop block,same rectified
In Basement found light not working,same replaced
In Roof swimming pool cleaning work carried out
Al Basit Technical services people doing renovation works
Al - Fajer people doing Faade cleaning
ACTIVITIES - 03.09.13
ACTIVITY
Total Water consumption
Fuel availabilty in GL
Waste collection
Basement Ground Floor 16th Floor Chiller Roof GRP Roof
FCU
Chiller 3
FAHU 1 1
FACP Panel 1
Central Battery system 1
Fire extinguisher (Co2)
Fire extinguisher (DP)
Fire Fighting Electrical pump 1
Fire Fighting Diesel Pump 1
Fire Fighting Jockey Pump 1
RCC Water Tanks 1
GRP water Tanks 2
Main DEWA valve 1
DB
DIESEL GENERATOR 1
SMDB
ATS 1
MCC 1
Control Panel
Capacitor Bank 3
Steam unit 2
Sauna unit 2
Elevators
Staircase pressurization fans 2
Basement Extract fans 4
CCTV
ELECTRICAL EQUIPMENTS
ELECTRO - MECHANICAL EQUIPMENTS
ELECTRONICS EQUIPMENTS
153
50 (Diesel Generator & Diesel Fire Pump)
2 x 2.5CBM
HVAC EQUIPMENTS
LIFE SAFETY SYSTEM
DOMESTIC WATER SYSTEM
Total Electrical consumption Readings in KWH
LV1 LV2 LV3
18.2 2.9 2.7
DAILY REPORT : HAMZA TOWER
Systems Location Ground Floor
Intercom Panel 1
Booster Pump 2
Sump Pump 2
Transfer Pump 2
Secondary Pump 4
Chiller Dosing manual 1
CHW Make up Pump 2
Sand Filter 1
Pool Pump 3
Pool Dosing Pump 1
Gate Barrier 3
In 16th Floor Diffusers cleaning Work Carried out
UTTC Company came for swimming Pool Maintenance
Bad smell comes from basement store room sewage pipe line,we found Elbow and Cab mising,same one fixed
In Ground Floor Office washbasin block,same cleared
Al Basit Technical services people doing renovation works
Al - Fajer people doing Faade cleaning
ACTIVITIES - 04.09.13
ACTIVITY
OK
Not OK
Partially OK
Remarks:
Date: 04-09-2013
SUB METER
9.4
All Floors Whole Tower
31 Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect DIB Submitted report
42 Defect DIB Submitted report
42 Defect DIB Submitted report
Defect DIB Submitted report
Defect DIB Submitted report
Defect DIB Submitted report
No Defect
2 No Defect
No Defect
12 Defect Afetr approval from NCM
Defect Afetr approval from NCM
19 Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
15 Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
3 No Defect
01no Defect Afetr approval from NCM
04nos Defect Afetr approval from NCM
13 03nos Defect Afetr approval from NCM
ELECTRICAL EQUIPMENTS
ELECTRO - MECHANICAL EQUIPMENTS
ELECTRONICS EQUIPMENTS
153
50 (Diesel Generator & Diesel Fire Pump)
2 x 2.5CBM
HVAC EQUIPMENTS
LIFE SAFETY SYSTEM
DOMESTIC WATER SYSTEM
LV3
2.7
DAILY REPORT : HAMZA TOWER
Ground Floor Defect with date
Expected date of
completion
Remarks
Defect Afetr approval from NCM
No Defect
No Defect
No Defect
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
01no Defect Afetr approval from NCM
PICTURE STATUS
Complete
Complete
Complete
Completed
In progress
In progress
In 16th Floor Diffusers cleaning Work Carried out
UTTC Company came for swimming Pool Maintenance
Bad smell comes from basement store room sewage pipe line,we found Elbow and Cab mising,same one fixed
In Ground Floor Office washbasin block,same cleared
Al Basit Technical services people doing renovation works
Al - Fajer people doing Faade cleaning
ACTIVITIES - 04.09.13
ACTIVITY
Total Water consumption
Fuel availabilty in GL
Waste collection
Basement Ground Floor 16th Floor Chiller Roof GRP Roof
FCU
Chiller 3
FAHU 1 1
FACP Panel 1
Central Battery system 1
Fire extinguisher (Co2)
Fire extinguisher (DP)
Fire Fighting Electrical pump 1
Fire Fighting Diesel Pump 1
Fire Fighting Jockey Pump 1
RCC Water Tanks 1
GRP water Tanks 2
Main DEWA valve 1
DB
DIESEL GENERATOR 1
SMDB
ATS 1
MCC 1
Control Panel
Capacitor Bank 3
Steam unit 2
Sauna unit 2
Elevators
Staircase pressurization fans 2
Basement Extract fans 4
CCTV
ELECTRICAL EQUIPMENTS
ELECTRO - MECHANICAL EQUIPMENTS
ELECTRONICS EQUIPMENTS
134
50 (Diesel Generator & Diesel Fire Pump)
2 x 2.5CBM
HVAC EQUIPMENTS
LIFE SAFETY SYSTEM
DOMESTIC WATER SYSTEM
Total Electrical consumption Readings in KWH
LV1 LV2 LV3
17.4 2.9 2.8
DAILY REPORT : HAMZA TOWER
Systems Location Ground Floor
Intercom Panel 1
Booster Pump 2
Sump Pump 2
Transfer Pump 2
Secondary Pump 4
Chiller Dosing manual 1
CHW Make up Pump 2
Sand Filter 1
Pool Pump 3
Pool Dosing Pump 1
Gate Barrier 3
In Ground floor found Barrier fall Down,same fixed
In Ground Floor Office bathroom found washbasin tape shaking,same fixed
In 15th to 9th Floor Diffusers cleaning Work Carried out
UTTC Company came for swimming Pool Maintenance
Al Basit Technical services people doing renovation works
Al - Fajer people doing Faade cleaning
ACTIVITIES - 05.09.13
ACTIVITY
OK
Not OK
Partially OK
Remarks:
Date: 05-09-2013
SUB METER
7.9
All Floors Whole Tower
31 Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect DIB Submitted report
42 Defect DIB Submitted report
42 Defect DIB Submitted report
Defect DIB Submitted report
Defect DIB Submitted report
Defect DIB Submitted report
No Defect
2 No Defect
No Defect
12 Defect Afetr approval from NCM
Defect Afetr approval from NCM
19 Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
15 Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
3 No Defect
01no Defect Afetr approval from NCM
04nos Defect Afetr approval from NCM
13 03nos Defect Afetr approval from NCM
ELECTRICAL EQUIPMENTS
ELECTRO - MECHANICAL EQUIPMENTS
ELECTRONICS EQUIPMENTS
134
50 (Diesel Generator & Diesel Fire Pump)
2 x 2.5CBM
HVAC EQUIPMENTS
LIFE SAFETY SYSTEM
DOMESTIC WATER SYSTEM
LV3
2.8
DAILY REPORT : HAMZA TOWER
Ground Floor Defect with date
Expected date of
completion
Remarks
Defect Afetr approval from NCM
No Defect
No Defect
No Defect
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
01no Defect Afetr approval from NCM
PICTURE STATUS
Complete
Complete
Complete
Completed
In progress
In progress
In Ground floor found Barrier fall Down,same fixed
In Ground Floor Office bathroom found washbasin tape shaking,same fixed
In 15th to 9th Floor Diffusers cleaning Work Carried out
UTTC Company came for swimming Pool Maintenance
Al Basit Technical services people doing renovation works
Al - Fajer people doing Faade cleaning
ACTIVITIES - 05.09.13
ACTIVITY
Total Electrical consumption Readings in KWH MDB3
Current
Previous
Consumption
Water meter reading
Current
Previous USG LITRES
Consumption 23 2000 8694
S.NO TIME
1
8.30-9.30
AM
2
10.30 -
10.30AM
3
5:00 PM
S.NO
TIME
S.NO TIME
1 8 to 11 AM
2
9 AM to 11
AM
3 2PM
General Checking of Common area, Fire alarm Panel, Gas Panel,Equipment Room, LV
room,Roof Equipments,Airconditioning Equipments.
water heater Hose problem-
ceiling leakage problem
Ac water leakage problem
Inside Apartment
NIL
Common Area
DAILY ACTIVITIES
22039
MDB1 MDB2 MDB4
1346189 2E+06 3606249 2511919
Specialist Service Provider (activity )
3820 4189 3853
3watts LED lamps replaced
1343539 2E+06 2507730 3602396
2650
DAILY REPORT : LE GRAND CHATEAU Date : 4.10.2013
ceiling water leakage in B 307. Tenent not availavle in upstair apartment 404. so,
Water meter valve closed for 404
22016
Systems Ground Floor
4 3PM
5 3PM A/C draing leakage
A/C draing leakage
C.HOUSE METER
160548
160467
8.1
Location Status REMARKS
All common
area
Completed
1. Fire alarm panel fault - common
Trouble act block C 1FCC2(Electrical
Room). Informed to vision safety- Inam.
2. Gas Panel Indication Fault- Zone
19,27.Informed to alsabbah- Sachin
A block 3 rd
floor
completed
Lamps blinking
B 404
Location Status REMARKS
Location Status REMARKS
C-308 completed
Hose changed
A311 completed
A/C drain tray cleaned and flushed.
B-109 completed
Top main line pipe broken. Rectified.
General Checking of Common area, Fire alarm Panel, Gas Panel,Equipment Room, LV
room,Roof Equipments,Airconditioning Equipments.
water heater Hose problem-
ceiling leakage problem
Ac water leakage problem
Inside Apartment
NIL
Common Area
DAILY ACTIVITIES
Remarks
Specialist Service Provider (activity )
3watts LED lamps replaced
DAILY REPORT : LE GRAND CHATEAU Date : 4.10.2013
ceiling water leakage in B 307. Tenent not availavle in upstair apartment 404. so,
Water meter valve closed for 404
Ground Floor
C-207 completed
A/C drain tray cleaned and flushed.
B-311 completed A/C drain tray cleaned and flushed. A/C draing leakage
A/C draing leakage
S.NO DESCRIPTION SCOPE STATUS REASON UPDATE
1 Painting for All Blocks A,B & C corridors power Pending
sample paint done. Quotation
sent . Waiting for SNS Approval
waiting from 23/9/2013
2 Swimming Pool Heat exchanger Repairing power Pending
Quotation sent to SNS.Waiting
for Approval Waiting from still 24/9/13
3
Lamps in Lift room to be changed from
Hologen to LED power Pending
Quotation sent to SNS.Waiting
for Approval Quotation sent on 14/9/2013
4 Gym room Ceiling water Leakage power Pending
Quotation sent to SNS.Waiting
for Approval Quotation sent on 14/9/2013
5 Swimming pool pump no : 1 water leakage power Pending
Quotation sent to SNS.Waiting
for Approval Quotation sent on 24/9/2013
6 Corridor wooden block varnishing power Pending
Quotation sent to SNS.Waiting
for Approval Quotation sent on 17/9/2013
7 Water Proofing power Pending Looking for solution Waiting from still 23/8/2013
8
Access control implementation & activation
for access doors SNS Pending In Progress Activation will be start on 2/10/2013
9
Motion sensor implementation sample work
in C block Garbage room ground floor lights Portdata Completed completed on 11/9/2013
10
Motion sensor implementation in all
common area corridor Lights. Portdata Pending waiting for Quotation Waiting from still 11/9/2013
11 PPM activation Power Completed PPM schedule sent to client started from 19/9/2013
12 Swimming pool Filter water leakage power Pending
Quotation sent to SNS.Waiting
for Approval Waiting from still 24/9/2013
13
General deep visit of specialists & checkup of
Generator,cctv,Access control,PA system &
Gate Barrier for their working Performance
power Pending need to arrange Waiting from still 19/9/2013
14
Parking lights lights energy saving in
basement power Pending Looking for solution Waiting from still 19/9/2013
15
Water entered in Pressure vessel C block -
roof. Need to change pressure vessel. Power Completed Pressure vessel changed

Anda mungkin juga menyukai