DOC NO : ANNUXURE -A REV NO : 00 DATE : 03.01.2014
I
Prepared by
Approved By :
Quality Policy and Objectives Resource Provision Monthly Plan, Daily Requireme nts from Customers Supplier selection, evaluation Provision Of Competent & Motivated Personnel Production planning Raw Material Planning &Purchasing of Materials Receipt and Issue of Materials Verification of Incoming Materials Calibration Management of Checkers, Instruments Monitoring and Measurement Of Product
Production Process (Anodizing) Tooling Management (Perishable Tools)
Despatch Customer Satisfaction Monitoring Control Of NC Product Internal Audits Analysis Of Data Corrective Action Preventive Action Management Review Customer Satisfaction Survey Document Control Record Control PLAN ACT DO CHECK Continual Improvement Installation & Commissioning, Breakdown Maintenance, Preventive Maintenance, Spares Control.
Product development / Modification, Process design & development Production Realization Change Control
Implementation of Total Productive Maintenance (TPM) With Measurement of Overall Equipment Effectiveness (OEE) and Six Big Losses in Vapour Phase Drying Oven Machines in PT. XYZ
International Journal of Innovative Science and Research Technology