Action Plan Rev. 1 23/Jul/14 Ser. Remaining Items Action by Expected closing date 1 O2E technical comment as per attached list need to be sorted out. See attached 2 Excessive Water leakage across Aft Transverse bulkhead to be dealt with,alternatively risk assessement to be conducted and submitted for review UPDATE No action done. Lengkeek stated that same will be sent on 28 July 2014. Owner concent will be required to accept Risk assessement Leenkek 18 July 2014 28 July 2014 3 O2E surveyors comment #P 20 need to be verified Yard Closed 15 July 2014 4 Shell isolating valves (Port & STB) of for the shaft seal sea water line, need to be replaced with positive closing arrangement as it found ball valve.. O2E technical comment found raised in this regards since 2012 closed ABS 5
this under owner control 6 Anchor/ mooring winch. Handle of hand brake need to be re located as the anchor chain hit the handle when in use also the liferaft in way of the chain to be protected as same will be damage due to chain whipping during lowering the anchor. UPDATE No action taken. Stated by Lengkeek that same may be completed on 30 July 2014 MHPM and lengkeek 18 July 2014 30 July 2014 7 Main Engine protection device . Over speed trip to be provided. UPDATE Not Done . MHPM will issue request to yard to install it. Expect within 5 weeks MHPM and Yard 8 Approved damage and stability calculation to be verified onboard. This is currently under review by ABS UPDATE Still under review. ABS Technical office to advise ABS 27-Aug-14 S.17(1)(d)(e) 2 of 2 Blue Nose II ABSID YY227007- Canadian Flag Action Plan Rev. 1 23/Jul/14 Ser. Remaining Items Action by Expected closing date 9 Hight of four (4) tanks vents located on main deck found less than required by ILL convention. Designer has been advised to rectify same or MTRB to be submitted UPDATE Fwd Pipes will be corrected by 30 July 2014. Aft Pipe Pending due to new steering. Owner action is required Leenkek and Yrad 30-Jul-14 10 Safety Equipment are to be provided based on the trading area and nos. of passenger. Trading area and nos. of passengers need to be confirmed by the client. UPDATE None Owner 11 Certificate of the oily water separator along with 5 PPM alarm are to be provided also the system to be tested. Oil record book to be verified. (submitted by yard on 15 J uly 2014- To be verified against the actual installation and to be tested) UPDATE Certificate submitted. OWS satisfactory tested. Operation instruction need to be posted in the vicinity of OWS. To be verified 30 July 2014 ABS Partilly Closed 15 July 2014- 12 Main Engine Certificates re IAPP and their technical file to be provided re IAPP certification. UPDATE Received from the Yard and found approved by EPA. ABS will check with TC if EPA is accepted or not ABS to consult with TC 30-Jul-14 13 Navigation lights not yet provided also no records that navigation drawing has been sent for review.(Desgner submitted approved drawing. Installation to be verified against the approved drawings UPDATE Verified 23 July 2014- Alarm need to be sound at control station (manned area). Yard will provid same by 30 July 2014 Yard 30-Jul-14 AMERICAN BUREAU OF SHIPPING INFORMATION MANAGEMENT SYSTEM ENGINEER COMMENTS REPORT 22-JUL-14 14:27:31 Page 1 of 2 2443826 Project No : LENGKEEK VESSEL ENGINEERING Submitter : P-009 P-020 S-122 S-123 S-124 Please advse location of main and emergency lighting panels and switchboards in accordance with 4- 6-3/3.7, 4-6-3/3.11.4, and 4-6-3/3.9 of the Under 90M Rules. 4-6-3/3.7 above is a typo and should read 4-6-3/13.7. To be demonstrated to the satisfaction of the attending Surveyor. Please provide flexible hose details in accordance with 4-4-1/9.19.3 of the Under 90M Rules. We note the drawing say Approved wire reinforced, please provide approval certificates to the attending Surveyor. Surveyor to verify permanent mean of weather tight closure is attached. See (Transport Canada, TP 13313 E, 5.6 Ventilators). Surveyor to verify Deck House Penetration and Removable Access Plate are weather tight. Surveyor to verify that fan plenum and riser pipe is securely attached to deckhosue structure. J09056-M01 J09056-M04 J09056-M05 J09056-M16 J09056-M16 J09056-M16 Machinery Arrangement Sea Water Cooling Diagram Fuel Transfer and Service System GALLEY VENTILATION ARRANGEMENT GALLEY VENTILATION ARRANGEMENT GALLEY VENTILATION ARRANGEMENT 638911 T1213687 774918 774918 T1213687 T1213687 T1213687 YY227007 Facility No : Technical Surveyor Technical Surveyor Surveyor Surveyor Surveyor Open Open Open Open Open Open Open Houston SED Structures - Navy & Yachts Engineering Office : 02-Mar-2011 18-Jul-2014 02-Mar-2011 05-Aug-2011 18-Jul-2014 18-Jul-2014 18-Jul-2014 WCN : 918542 Observation : Observation : Observation : Observation : Observation : Observation : Observation : Comment Number Drawing Number Drawing Title Task No Reviewer Comment Action Type Status Opened In Closed In Closed In Report : Closed In Report : Closed In Report : Closed In Report : Closed In Report : Closed In Report : Closed In Report : S.20(1) S.20(1) S.20(1) S.20(1) S.20(1) S.20(1) S.20(1) AMERICAN BUREAU OF SHIPPING INFORMATION MANAGEMENT SYSTEM ENGINEER COMMENTS REPORT 22-JUL-14 14:27:31 Page 2 of 2 3308981 2443826 Project No : Project No : LUNENBURG SHIPYARD ALLIANCE (LSA) MHPM PROJECT MANAGERS INC. Submitter : Submitter : E-076 E-077 L-011 The new motor controllers disconnect if located more than 50 feet from the motor or if not within sight of both motor and its controller, means for locking in the open position is to be provided in accordance with 4-6-3/3.13.2(b) of the SV Rules <90M. This item is to be verified to the satisfaction of the attending Surveyor. The steering gear is to be tried out on the trial trip in order to demonstrate to the Surveyors satisfaction that the requirements of the Rules have been met in accordance with 4-3-3/15.3 of the SV Rules <90M.
4 4 4. Electrical Schematic Drawing 14- 094-ES 01 01 3 4. Electrical Schematic Drawing 14- 094-ES 01 01 3 T1222075 T1222075 653963 YY227007 YY227007 Facility No : Facility No : Surveyor Surveyor Surveyor Open Open Open Houston SED Machinery - Equipment Houston SED Structures - Navy & Yachts Engineering Office : Engineering Office : 22-Jul-2014 22-Jul-2014 02-Mar-2011 WCN : WCN : 404983 330994 Observation : Observation : Observation : Comment Number Comment Number Drawing Number Drawing Number Drawing Title Drawing Title Task No Task No Reviewer Reviewer Comment Action Type Comment Action Type Status Status Opened In Opened In Closed In Closed In Closed In Report : Closed In Report : Closed In Report : S.20(1) S.20(1) S.20(1) S.17(1)(d)(e) S.17(1)(d)(e) S.17(1)(d)(e) Page 1 of 9 Comment No. Drawing No. Drawing Title Opened In Engineering Office Description S-061 `J09056-S01 Structural Midship Section 18-Feb-11 Please submit Tonnage Admeasurement. L-001 `J09056-A03 Lifesaving Plan 02-Mar-11 The symbols are to be white on a green background per IMO Resolution A.760(18). L-004 `J09056-A03 Lifesaving Plan 02-Mar-11 A battery-powered loud hailer shall be located at each embark station per 70.d.i of C.R.C. 1436. P-002 `J09056-A04 Fire Control Plan 02-Mar-11 Please update symbols in accordance with IMO Resolution A.952(23). P-024 `J09056-M03 Bilge and Fire Fighting System 02-Mar-11 We assume a vent and sounding diagram will be provided showing compliance with 4-4-4/9,4-4- 3/11, 4-4-3/13, and 4-4-4/1.9. Also see 13 of Schedule XII Part I and Schedule XV Part I Division II Sections 78 through 111 of the Marine Machinery Regulations. P-024 `J09056-M06 Potable Water System 02-Mar-11 We assume a vent and sounding diagram will be provided showing compliance with 4-4-4/9,4-4- 3/11, 4-4-3/13, and 4-4-4/1.9. Also see 13 of Schedule XII Part I and Schedule XV Part I Division II Sections 78 through 111 of the Marine Machinery Regulations. P-024 `J09056-M09 L.O. Transfer Diagram 02-Mar-11 We assume a vent and sounding diagram will be provided showing compliance with 4-4-4/9,4-4- 3/11, 4-4-3/13, and 4-4-4/1.9. Also see 13 of Schedule XII Part I and Schedule XV Part I Division II Sections 78 through 111 of the Marine Machinery Regulations. P-020 `J09056-M04 Sea Water Cooling Diagram 02-Mar-11 Please provide flexible hose details in accordance with 4-4-1/9.19.3 of the Under 90M Rules. P 020 `J09056 M04 Sea Water Cooling Diagram 05 Aug 11 We note the drawing say Approved wire reinforced, please provide approval certificates to the attending Surveyor. P 020 `J09056 M05 Fuel Transfer and Service System 05 Aug 11 We note the drawing say Approved wire reinforced, please provide approval certificates to the attending Surveyor. P-024 `J09056-M06 Potable Water System 08-Jun-11 We note your response and await updated drawing showing sounding arrangement. Vent pipe shall have a minimum area of 125% of the fill lines in accordance with 4-4-3/9.5 of the Under 90M Rules. Please advise. S-069 `J09056-S01 Structural Midship Section 15-May-12 Details of fore and main mast shrouds submitted on 18 April 2012 and approved in association with task 888109. Please submit details of deck attachments for remaining stays and runners. P-039 `N/A Fire Suppression Specification 02-May-12 We note it is your intent to provide components as listed in the manual, please provide us with a specific bill of materials for DRB120124001 Sheets 1 and 2 so we can confirm compliance. S-107 `J09056-A18 Deck Vent Arrangement 25-Jul-12 Provide details of "water excluding caps," closures on ventilation goosenecks and mushroom vents. S-107 `J09056-A18 Deck Vent Arrangement 29-Nov-12 Details of mushroom vents and closures on ventilators have been provided. Provide details of "water excluding caps" on tank vents, as referenced in General Note 6. P-024 `J09056-A07 Tank Capactiy Plan 24-May-13 Common fuel vent pipe in salon has increased to 3.5" piping to ensure 125% of fill pipe sizing has been met. Changes will be reflected on "As-Fitted" drawings. Page 2 of 9 Comment No. Drawing No. Drawing Title Opened In Engineering Office Description P-024 `J09056-M03 Bilge and Fire Fighting System 24-May-13 Common fuel vent pipe in salon has increased to 3.5" piping to ensure 125% of fill pipe sizing has been met. Changes will be reflected on "As-Fitted" drawings. P-024 `J09056-M05 Fuel Transfer and Service System 24-May-13 We note your response and await submission of the "As-Fitted" drawing. P-024 `J09056-M06 Potable Water System 16-Dec-11 Per my email to fuel oil tanks 1 and 2 (also 3 and 4) have a common 2.5 vent while each tanks is provided with its own 2 fill. P-024 `J09056-M09 L.O. Transfer Diagram 16-Dec-11 Per my email to fuel oil tanks 1 and 2 (also 3 and 4) have a common 2.5 vent while each tanks is provided with its own 2 fill. P-024 `J09056-M09 L.O. Transfer Diagram 24-May-13 We note your response and await submission of the "As-Fitted" drawing. P-024 `J09056-M10 Tank Filling, Discharge and Vent Piping Arrangement (FWD) 24-May-13 Common fuel vent pipe in salon has increased to 3.5" piping to ensure 125% of fill pipe sizing has been met. Changes will be reflected on "As-Fitted" drawings. P-024 `J09056-M10 Tank Filling, Discharge and Vent Piping Arrangement (FWD) 24-May-13 We note your response and await submission of the "As-Fitted" drawing. L-026 `J09056-M11 Ventilation Diagram 24-May-13 We note your response and await submission of J09056-M11 - Ventilation Diagram. P-055 `J09056-M03 Bilge and Fire Fighting System 18-Jul-14 We note that the notes were removed from these drawings, please note that the notes closed or prevent many comments from being made. We assume they were removed in error, please advise. P-055 `J09056-M06 Potable Water System 18-Jul-14 We note that the notes were removed from these drawings, please note that the notes closed or prevent many comments from being made. We assume they were removed in error, please advise. P-055 `J09056-M13 Oily Water Separator Diagram 18-Jul-14 We note that the notes were removed from these drawings, please note that the notes closed or prevent many comments from being made. We assume they were removed in error, please advise. P-024 `J09056-A07 Tank Capactiy Plan 18-Jul-14 We note the revised fuel drawing provides separate 2.5vents. Please revise the Tank Filling, Discharge and Vent Piping Arrangement (J09056-M10) to be in agreement. We note that details of the potable water tanks, Lube Oil tank, OWS tank, remain to be provided. P-024 `J09056-M05 Fuel Transfer and Service System 18-Jul-14 We note the revised fuel drawing provides separate 2.5vents. Please revise the Tank Filling, Discharge and Vent Piping Arrangement (J09056-M10) to be in agreement. We note that details of the potable water tanks, Lube Oil tank, OWS tank, remain to be provided. S.20(1) S.20(1) Page 3 of 9 Comment No. Drawing No. Drawing Title Opened In Engineering Office Description P-024 `J09056-M10 Tank Filling, Discharge and Vent Piping Arrangement (FWD) 18-Jul-14 We note the revised fuel drawing provides separate 2.5vents. Please revise the Tank Filling, Discharge and Vent Piping Arrangement (J09056-M10) to be in agreement. We note that details of the potable water tanks, Lube Oil tank, OWS tank, remain to be provided. S-124 `J09056-M16 GALLEY VENTILATION ARRANGEMENT 18-Jul-14 Surveyor to verify that fan plenum and riser pipe is securely attached to deckhosue structure. P-024 `J09056-M05 Fuel Transfer and Service System 08-Jun-11 We note your response and await updated drawing showing sounding arrangement. Vent pipe shall have a minimum area of 125% of the fill lines in accordance with 4-4-3/9.5 of the Under 90M Rules. Please advise. S-063 `J06056-SK18 18-Feb-11 L-006 `J09056-A04 Fire Control Plan 02-Mar-11 One 45L foam fire extinguisher is required in addition to the 9L in accordance with 46.1 1.c and 1.d of C.R.C. 1422. P-024 `J09056-M10 Tank Filling, Discharge and Vent Piping Arrangement (FWD) 08-Jun-11 Vent arrangement has been provided. -F.O. storage and domestic tank levels are indicated through senders and gauges and note has been added to revised Vent and Filling arrangement (M10). -F.O. service tanks include gauge glasses with valves as indicated on F.O transfer and service diagram (M05) -Note has been added to F.O. transfer and Service diagram (M05) to indicate ball valves to be installed inline with pressure gauges. - P-024 `J09056-A07 Tank Capactiy Plan 16-Dec-11 Per my email to fuel oil tanks 1 and 2 (also 3 and 4) have a common 2.5 vent while each tanks is provided with its own 2 fill. P-024 `J09056-M05 Fuel Transfer and Service System 16-Dec-11 Per my email to fuel oil tanks 1 and 2 (also 3 and 4) have a common 2.5 vent while each tanks is provided with its own 2 fill. S-122 `J09056-M16 GALLEY VENTILATION ARRANGEMENT 18-Jul-14 Surveyor to verify permanent mean of weather tight closure is attached. See (Transport Canada, TP 13313 E, 5.6 Ventilators). S-062 `J06056-SK18 18-Feb-11 P-024 `J09056-M03 Bilge and Fire Fighting System 08-Jun-11 We note your response and await updated drawing showing sounding arrangement. Vent pipe shall have a minimum area of 125% of the fill lines in accordance with 4-4-3/9.5 of the Under 90M Rules. Please advise. P-024 `J09056-M03 Bilge and Fire Fighting System 16-Dec-11 Per my email to fuel oil tanks 1 and 2 (also 3 and 4) have a common 2.5 vent while each tanks is provided with its own 2 fill. P-024 `J09056-M06 Potable Water System 18-Jul-14 We note the revised fuel drawing provides separate 2.5vents. Please revise the Tank Filling, Discharge and Vent Piping Arrangement (J09056-M10) to be in agreement. We note that details of the potable water tanks, Lube Oil tank, OWS tank, remain to be provided. S.20(1) S.20(1) S.20(1) S.17(1)(d)(e) S.17(1)(d)(e) S.17(1)(d)(e) S.17(1)(d)(e) Page 4 of 9 Comment No. Drawing No. Drawing Title Opened In Engineering Office Description L-003 `J09056-A03 Lifesaving Plan 02-Mar-11 11 children's lifejackets are required per 17.5.b.ii of C.R.C. 1436. P-024 `J09056-M09 L.O. Transfer Diagram 08-Jun-11 Vent arrangement has been provided. -F.O. storage and domestic tank levels are indicated through senders and gauges and note has been added to revised Vent and Filling arrangement (M10). -F.O. service tanks include gauge glasses with valves as indicated on F.O transfer and service diagram (M05) -Note has been added to F.O. transfer and Service diagram (M05) to indicate ball valves to be installed inline with pressure gauges. - P-039 `N/A Fire Suppression Specification 14-Jun-12 A bill of materials has been included on drawing DRB120124001, which has been submitted to ABS. P-053 `DRB073012001 Galley Fire Protection System Specification 30-Aug-12 Please revise sheet 2 to include the specific burner arrangement and nozzle distances in accordance with 3-3 of the Manual. P-024 `J09056-M09 L.O. Transfer Diagram 24-May-13 Common fuel vent pipe in salon has increased to 3.5" piping to ensure 125% of fill pipe sizing has been met. Changes will be reflected on "As-Fitted" drawings. P-055 `J09056-M07 Black and Grey Water System 18-Jul-14 We note that the notes were removed from these drawings, please note that the notes closed or prevent many comments from being made. We assume they were removed in error, please advise. P-009 `J09056-M01 Machinery Arrangement 18-Jul-14 4-6-3/3.7 above is a typo and should read 4-6-3/13.7. To be demonstrated to the satisfaction of the attending Surveyor. S-123 `J09056-M16 GALLEY VENTILATION ARRANGEMENT 18-Jul-14 Surveyor to verify Deck House Penetration and Removable Access Plate are weather tight. P-024 `J09056-M10 Tank Filling, Discharge and Vent Piping Arrangement (FWD) 08-Jun-11 We note your response and await updated drawing showing sounding arrangement. Vent pipe shall have a minimum area of 125% of the fill lines in accordance with 4-4-3/9.5 of the Under 90M Rules. Please advise. L-002 `J09056-A03 Lifesaving Plan 02-Mar-11 110 Lifejackets are required per 17.5.b.i of C.R.C. 1436. P-009 `J09056-M01 Machinery Arrangement 02-Mar-11 Please advse location of main and emergency lighting panels and switchboards in accordance with 4- 6-3/3.7, 4-6-3/3.11.4, and 4-6-3/3.9 of the Under 90M Rules. P-024 `J09056-A07 Tank Capactiy Plan 08-Jun-11 Vent arrangement has been provided. -F.O. storage and domestic tank levels are indicated through senders and gauges and note has been added to revised Vent and Filling arrangement (M10). -F.O. service tanks include gauge glasses with valves as indicated on F.O transfer and service diagram (M05) -Note has been added to F.O. transfer and Service diagram (M05) to indicate ball valves to be installed inline with pressure gauges. - Page 5 of 9 Comment No. Drawing No. Drawing Title Opened In Engineering Office Description P-024 `J09056-M06 Potable Water System 08-Jun-11 Vent arrangement has been provided. -F.O. storage and domestic tank levels are indicated through senders and gauges and note has been added to revised Vent and Filling arrangement (M10). -F.O. service tanks include gauge glasses with valves as indicated on F.O transfer and service diagram (M05) -Note has been added to F.O. transfer and Service diagram (M05) to indicate ball valves to be installed inline with pressure gauges. - P-024 `J09056-M10 Tank Filling, Discharge and Vent Piping Arrangement (FWD) 02-Mar-11 We assume a vent and sounding diagram will be provided showing compliance with 4-4-4/9,4-4- 3/11, 4-4-3/13, and 4-4-4/1.9. Also see 13 of Schedule XII Part I and Schedule XV Part I Division II Sections 78 through 111 of the Marine Machinery Regulations. P-020 `J09056-M05 Fuel Transfer and Service System 02-Mar-11 Please provide flexible hose details in accordance with 4-4-1/9.19.3 of the Under 90M Rules. P-024 `J09056-A07 Tank Capactiy Plan 08-Jun-11 We note your response and await updated drawing showing sounding arrangement. Vent pipe shall have a minimum area of 125% of the fill lines in accordance with 4-4-3/9.5 of the Under 90M Rules. Please advise. P-024 `J09056-M09 L.O. Transfer Diagram 08-Jun-11 We note your response and await updated drawing showing sounding arrangement. Vent pipe shall have a minimum area of 125% of the fill lines in accordance with 4-4-3/9.5 of the Under 90M Rules. Please advise. P-039 `N/A Fire Suppression Specification 14-Jun-12 We note that generally components are as listed in the manual, however The discharge nozzle part number contains xx-xxx rather than the part number, please revise. The 100 ft roll of 1/16 cable is listed as 06-118316-100 rather than 06-118316-000 as listed in the manual, we assume this is a typo, please confirm. P-039 `N/A Fire Suppression Specification 18-Jul-12 We note your response and clarification to the typo. We also understand from your response that you will supply the full model number of the discharge nozzle to ABS when it becomes known. This comment remains open pending the submittal of the model number. P-024 `J09056-A07 Tank Capactiy Plan 24-May-13 We note your response and await submission of the "As-Fitted" drawing. P-024 `J09056-M05 Fuel Transfer and Service System 24-May-13 Common fuel vent pipe in salon has increased to 3.5" piping to ensure 125% of fill pipe sizing has been met. Changes will be reflected on "As-Fitted" drawings. P-024 `J09056-M06 Potable Water System 24-May-13 We note your response and await submission of the "As-Fitted" drawing. P-024 `J09056-M10 Tank Filling, Discharge and Vent Piping Arrangement (FWD) 16-Dec-11 Per my email to fuel oil tanks 1 and 2 (also 3 and 4) have a common 2.5 vent while each tanks is provided with its own 2 fill. L-026 `J09056-M11 Ventilation Diagram 24-May-13 Change has been reflected on drawing J09056-A18. Changes will be reflected on drawing M11 when submitted as "As Fitted" drawing. S.20(1) Page 6 of 9 Comment No. Drawing No. Drawing Title Opened In Engineering Office Description Z-001 `Correspondence 17 JUNE 2013- J09056 - Bluenose II - Loadline calculation 25-Sep-13 A request has been sent to Transport Canada on 24 Sept 2013 for a Marine Technical Review Board decision regarding the use of the USCG Trim Resistivity Method to reduce the Bow Height perscribed in ICLL Regulation 39. This comment will be closed following the final desision from the MTRB. P-055 `J09056-M09 L.O. Transfer Diagram 18-Jul-14 We note that the notes were removed from these drawings, please note that the notes closed or prevent many comments from being made. We assume they were removed in error, please advise. L-006 `J09056-A04 Fire Control Plan 18-Jul-14 We note that 2 additional 2.5 gallon foam extinguishers have been added. While we would have no objections to the use of smaller fire extinguishers this is a Transport Canada requirement and requires an MTRB to resolve. Further we note that the 5 gallons added is less than half the 45L required. P-002 `J09056-A04 Fire Control Plan 18-Jul-14 We note that several symbols have been revised. The fuel oil pump remote shut-off and the remote control for fuel oil valves shall be gray not black. The right side of the fire hydrant valve shall be green. The color for the NOVEC symbols shall be brown. Please advise the location of the emergency source of power (2.35 IMO Resolution A.852(23)). P-024 `J09056-M03 Bilge and Fire Fighting System 18-Jul-14 We note the revised fuel drawing provides separate 2.5vents. Please revise the Tank Filling, Discharge and Vent Piping Arrangement (J09056-M10) to be in agreement. We note that details of the potable water tanks, Lube Oil tank, OWS tank, remain to be provided. P-024 `J09056-M09 L.O. Transfer Diagram 18-Jul-14 We note the revised fuel drawing provides separate 2.5vents. Please revise the Tank Filling, Discharge and Vent Piping Arrangement (J09056-M10) to be in agreement. We note that details of the potable water tanks, Lube Oil tank, OWS tank, remain to be provided. S-053 `J09056-S01 Structural Midship Section 18-Feb-11 Please submit Vessel Operations Manual. P-024 `J09056-M03 Bilge and Fire Fighting System 08-Jun-11 Vent arrangement has been provided. -F.O. storage and domestic tank levels are indicated through senders and gauges and note has been added to revised Vent and Filling arrangement (M10). -F.O. service tanks include gauge glasses with valves as indicated on F.O transfer and service diagram (M05) -Note has been added to F.O. transfer and Service diagram (M05) to indicate ball valves to be installed inline with pressure gauges. - P-024 `J09056-A07 Tank Capactiy Plan 02-Mar-11 We assume a vent and sounding diagram will be provided showing compliance with 4-4-4/9,4-4- 3/11, 4-4-3/13, and 4-4-4/1.9. Also see 13 of Schedule XII Part I and Schedule XV Part I Division II Sections 78 through 111 of the Marine Machinery Regulations. Page 7 of 9 Comment No. Drawing No. Drawing Title Opened In Engineering Office Description P-024 `J09056-M05 Fuel Transfer and Service System 08-Jun-11 Vent arrangement has been provided. -F.O. storage and domestic tank levels are indicated through senders and gauges and note has been added to revised Vent and Filling arrangement (M10). -F.O. service tanks include gauge glasses with valves as indicated on F.O transfer and service diagram (M05) -Note has been added to F.O. transfer and Service diagram (M05) to indicate ball valves to be installed inline with pressure gauges. - S-069 `J09056-S01 Structural Midship Section 18-Feb-11 Please submit details of chain plates and attachment points for all shrouds and stays. P-039 `N/A Fire Suppression Specification 18-Jul-12 The type and size of discharge nozzle used is dependant on the the length of piping required for the system. As such the exact nozzle that will be installed cannot be determined, until the piping for the system is installed. We will supply the full model number of the discharge nozzel to ABS when it becomes known. The model number for the 100ft roll of 1/16" cable did indeed contain a typo in the manual. The model number to be used is 06-118316-100. P-024 `J09056-M03 Bilge and Fire Fighting System 24-May-13 We note your response and await submission of the "As-Fitted" drawing. P-024 `J09056-M05 Fuel Transfer and Service System 02-Mar-11 We assume a vent and sounding diagram will be provided showing compliance with 4-4-4/9,4-4- 3/11, 4-4-3/13, and 4-4-4/1.9. Also see 13 of Schedule XII Part I and Schedule XV Part I Division II Sections 78 through 111 of the Marine Machinery Regulations. P-055 `J09056-M05 Fuel Transfer and Service System 18-Jul-14 We note that the notes were removed from these drawings, please note that the notes closed or prevent many comments from being made. We assume they were removed in error, please advise. P-024 `J09056-M06 Potable Water System 24-May-13 Common fuel vent pipe in salon has increased to 3.5" piping to ensure 125% of fill pipe sizing has been met. Changes will be reflected on "As-Fitted" drawings. L-026 `J09056-M11 Ventilation Diagram 16-Aug-12 Ventilators shall have coamings of a height of at least 900 mm above the deck in accordance with Regulation 19.1 of the International Convention on Load Lines per Part II section 15.2.f of SOR02007- 99, Load Line Regulations. Please revise in accordance with J09056-A18 and comment S-106. S-098 `SMS-BII-003-101 Deck Hatches, Companionways and Main Cabin 08-Feb-12 Please submit details contained in reserved areas on drawing. S-099 `SMS-BII-003-101 Deck Hatches, Companionways and Main Cabin 08-Feb-12 Submit details of laminated glass used for portlights and skylights: manufacturer, layer make-up and approval certificates. E-080 `4
22-Jul-14
S.17(1)(d)(e) S.17(1)(d)(e) Page 8 of 9 Comment No. Drawing No. Drawing Title Opened In Engineering Office Description E-081 `4
22-Jul-14 E-075 `4
22-Jul-14
E-076 `4
22-Jul-14
E-079 `4
22-Jul-14
E-074 `4
22-Jul-14
E-077 `4
22-Jul-14
E-078 `4
22-Jul-14
. L-011 ` 02-Mar-11
M-004 02-Mar-11 S.17(1)(d)(e) S.17(1)(d)(e) S.17(1)(d)(e) S.17(1)(d)(e) S.17(1)(d)(e) S.17(1)(d)(e) S.17(1)(d)(e) S.17(1)(d)(e) S.17(1)(d)(e) S.17(1)(d)(e) S.17(1)(d)(e) S.17(1)(d)(e) S.17(1)(d)(e) S.17(1)(d)(e) S.17(1)(d)(e) S.17(1)(d)(e) S.17(1)(d)(e) S.17(1)(d)(e) S.17(1)(d)(e) S.17(1)(d)(e) Page 9 of 9 Comment No. Drawing No. Drawing Title Opened In Engineering Office Description M-003 ` 02-Mar-11
S.17(1)(d)(e) S.17(1)(d)(e) S.17(1)(d)(e)
King Post is too high (2) (3), 3. Foremast poorly stepped (2)(4) 4. Mainmast poorly stepped (2) 5. Forward cowl vent interferes with jumbo boom and starboard anchor wire (2)(3)(4) 6. Dory chocks in wrong location (too far forward) (2)(3) 7. Stainless steel plate to go on counter around main sheet lower block (1)(3) Plate missing 8. No latches for lifting most of the deck access hatches (1)(4) 9. Supply 4 chairs for salon table (1)(3) 10. Handrails to be installed in all hatchways (1)(3)(4) 11. Guardrails installed (life lines)(Call ABS)1)(3)(4) 12. Capstan Installed Needs better fastening more fittings(1)(3)(4) 14. Signage below decks (1)(3)(4) 15. Steering gear & box (1)(3)(4) 16. Med ladder ironwork ------unknown, no trial completed as this side lays against the dock. 17. "Emergency" fair leads, needs to be assessed and anchor point provided 18. Boom chain anchor points turned 90 degrees 21. Crutch chocks on cabin house Not installed 23. Engine Room fans, excessive noise level (107db) (2)(4) Needs variable speed 25. Plugs not cut & sanded on thumb cleats P/S rail forward. 26. Stainless protection on mooring bitts 27. Steel protection on rail for anchors 29. A large number of the pins on the rails are in the wrong place. Capt marked correct placement as requested by LSA & owners last year. 30. Wooden covers on escape hatches are splitting 31. Rail split underneath aft port chalk 32. Several deck planks have the shakes and should be replaced as discussed with Wade Croft. 35. Chart table does not slide easily (or at all) 36. Finishing piece inboard of chart drawers
Aft head 37. Deck head by exhaust fan should be boxed in 38. Tiles
39. Method to secure door open 40. Deck head against tile unfinished in upper forward edge of shower space Aft alley way 41. Supply fan works, but little air from vents 42. Finish on sole in poor shape 43. No finish on sole access panel in book case 44. Skylight interior unfinished, hooks will not hook
Capt cabin 45. Wire chase cover as noted by Covey Island. This may be an ongoing project
Below Forward 46. Spurling pipe shows signs of water leakage 47. Fwd Starboard head sole caulking is pulling away from between sole and wall (for lack of a better inclusive term)
Fwd port head 48. Stainless nosing damaging door 49. Sole caulking should be examined 50. Saw breakout around lower cabinet doors, it should be filled, sanded and repainted.
Galley 54. Nosing bent on hatch outside cooks cabin, no hatch trim in hatches in galley Saloon 55. No method to secure heavy watertight doors in the open position 57. Cushions in main salon too soft, sit on wooden lip.