Anda di halaman 1dari 6

Ki r k

k pat rr i c k W

Prepare
VOS
Head Off
Distributio
Tel: +6
E-mail: en
Wi r e R
CAT
ed by : Mr.
SS (F
fice : Block 80
n Center : 40, T
65 - 6296
nquiry@vossf
Rope L
TALOG

John Lee /
F.E.) P
3 King George
Toh Guan Road
4992 F
fe.com W

Lubr i c
G 201
/ Gelsey Che
PTE L
es Ave #01-1
d East, #01-70 E
Fax: +65 -
Website: www
c at i o
11
eong
LTD
92, Singapore
Enterprise Hub,
- 6298 29
w.vossfe.com
n Sys
e 200803.
Singapore 608
12
st ems
582.
s

Page10of20

GROOVECLEANERKIT
Groove Cleaner Kits are provided in three configurations:
Right Lay, Left Lay and Smooth Bore. Groove Cleaners
act to clean the outer circumference as well as the wire
rope groove pattern of contaminants that hinder the
penetration of new coatings being applied inside the Seal
Lubrication Chamber. Non-Spin and/or Double Armor wire
ropes do not have or have little groove pattern to clean.
Therefore, the Smooth Bore Groove Cleaners are offered
to clean the outer circumference of these types of wire
rope configurations. Right and Left Lay groove Cleaners
available.
NOTE: All groove cleaners are 6-strand unless otherwise
noted.
SMOOTHBOREGROOVECLEANER2GrooveCleanerperset
SmoothBoreGrooveCleaner
PartNumber
Diameter(Inches)
Diameter
(Millimeters)
VMSBG516 5/16" 7-8 mm
VMSBG12 1/2" 12.5 mm
VMSBG916 9/16" 13-14 mm
VMSBG58 5/8" 16 mm
VMSBG34 3/4" 19 mm
VMSBG1 1" 25 mm
VMSBG118 1-1/8" 28-29 mm
VMSBG114 1-1/4" 32 mm
VMSBG1716 1-7/16" 36 mm
VMSBG112 1-1/2" 37-38 mm
VMSBG158 1-5/8" 41 mm
VMSBG134 1-3/4" 44-45 mm
VMSBG2 2" 51 mm

STANDARD/JUMBOGROOVECLEANERKIT2GrooveCleanerperset
GrooveCleaner
PartNumber
(LeftLay)
GrooveCleaner
PartNumber
(RightLay)
Diameter(Inches)
Diameter
(Millimeters)
VM516LL VM516RL 5/16" 7-8 mm
VM38LL VM38RL 3/8" 9-10 mm
VM716LL VM716RL 7/16" 11-12 mm
VM12LL VM12RL 1/2" 12.5 mm
VM916LL VM916RL 9/16" 13-14 mm
VM58LL VM58RL 5/8" 16 mm
VM34LL VM34RL 3/4" 19 mm
VM78LL VM78RL 7/8" 22-23 mm
VM12LL VM1RL 1" 25 mm
VM118LL VM118RL 1-1/8" 28-29 mm
VM114LL VM114RL 1-1/4" 32 mm
VM138LL VM138RL 1-3/8" 35-36 mm
VM112LL VM112RL 1-1/2" 37-38 mm
VM158LL VM158RL 1-5/8" 41 mm
VM134LL VM134RL 1-3/4" 44-45 mm
VM178LL VM178RL 1-7/8" 48 mm
VM2LL VM2RL 2" 51 mm
VM218LL VM218RL 2-1/8" 54 mm
VM214LL VM214RL 2-1/4" 57-58 mm
VM212LL VM212RL 2-1/2" 63-64 mm
VM234LL VM234RL 2-3/4" 70 mm
VM3LL VM3RL 3" 76 mm
VM318LL VM318RL 3-1/8" 79-80 mm
VM314LL VM314RL 3-1/4" 82-83 mm
VM312LL VM312RL 3-1/2" 89 mm
VM334LL VM334RL 3-3/4" 95 mm
VM378LL VM378RL 3-7/8" 98-99 mm
Page11of20

OPTIONALCOMPONENTSAVAILABLE

MANUALSTRIPPER
The Manual Stripper provides a rotational base for the
Groove Cleaners apart from the lubrication process.
This item allows the user the ability to surface strip a
majority of their wire rope for inspection purposes. It
can either be tied off to allow the wire rope to pass
through it or it can be pulled along the wire rope. A
Centering (Alignment) Bushing with a center hole cut
to the diameter of the wire rope is required to be
inserted in the Manual Stripper to keep it centered.
Each manual Stripper is provided with one diameter
Centering Bushing. Additional diameters are priced
separately.


MANUALSTRIPPERCENTERINGBUSHINGPARTNUMBERCHART
CenteringBushingsforVPSMSB
3/8to2WireRopePartNo.
CenteringBushingsforVPJMSB
3/8to3WireRopePartNo.
Accommodates
WireRope
Diameters:
Inches
Accommodates
WireRope
Diameters:
Millimeters
VMS38MSB VMJ 38MSB 3/8 9-10 mm
VMS12MSB VMJ 12MSB 1/2 12.5 mm
VMS916MSB VMJ 916MSB 9/16 13-14 mm
VM58MSB VMJ 58MSB 5/8 16 mm
VMS34MSB VMJ 34MSB 3/4 19 mm
VMS78MSB VMJ 78MSB 7/8 22-23 mm
VMS1MSB VMJ 1MSB 1 25 mm
VMS1-18MSB VMJ 1-18MSB 1-1/8 28-29 mm
VMS1-14MSB VMJ 1-14MSB 1-1/4 32 mm
VMS1-516MSB VMJ 1-516MSB 1-5/16 33-34 mm
VMS1-38MSB VMJ 1-38MSB 1-3/8 35-36 mm
VMS1-12MSB VMJ 1-12MSB 1-1/2 37-38 mm
VMS1-916MSB VMJ 1-916MSB 1-9/16 39-40 mm
VMS1-58MSB VMJ 1-58MSB 1-5/8 41 mm
VMS1-34MSB VMJ 1-34MSB 1-3/4 44-45 mm
VMS1-78MSB VMJ 1-78MSB 1-7/8 48 mm
VMS2MSB VMJ 2MSB 2 51 mm
N/A VMJ 2-18MSB 2-1/8 54 mm
N/A VMJ 2-14MSB 2-1/4 57-58 mm
N/A VMJ 2-38MSB 2-3/8 60 mm
N/A VMJ 2-12MSB 2-1/2 64 mm
N/A VMJ 3MSB 3 76 mm

DIGITALFLOWMETER
Provides a digital reading of the lubricant flow rate in ounces and pounds
during the lubrication process. A final total is also provided after the
maintenance project is complete. This allows the user an excellent
method to assist them in accurately evaluating the amount of coating
product required for a broad range of projects incorporating different
viscosity coatings and wire rope diameters.

Dynagar
resistanc
Kirkpatri
allowitt
also allo
missed d
protectio
protectio
environm
copperb
marineo
Copyof

Nationa
MILPRF
o
LC50Bio
o T
o T
Viscosit
Color:
Texture
SoapTy
Hydroxy
OilSepa
Penetra
Viscosit
Viscosit
Droppin
LowTem
Rusttes
SaltFog
SaltSpr
Acceler
LoadW
Adhesiv
Volatile
4Weld,
4BallW

En
rd Blue is an
ce to soften
ick Wire Rop
tostayalive
ows it to con
during the in
onagainstw
on against f
ments.Dyna
bearingalloy
organismspe
thetestdata
alStockNu
F18458C(T
MeetsorSu
oAquaticR
TestDurati
TestSpecim
ty:

e:
ype:
ystearateM
aration%(F
ation:mm,
ty,cSTat40
ty,cSTat10
ngPoint,C
mperature
st,ASTMD
gCorrosion
ray,Fed.Sta
atedWeath
WearIndex(
ve%(Sec.4
eMatter(2.
,kg.:
WearDiame
D
nvironm
n extreme pr
ing under se
pe Lubricatio
withthewi
ntinuously re
nitial lubricat
wearandsho
fling off at h
gard Blueha
ysandiscom
erformedby
aisavailable
mber
TypeI&Ty
urpassesRe
Rating,EPA
on:48hr.,
menUsed:M
MineralOil
Fed79132
(ASTMD21
0degreesC
00degrees
(F)
Flexibility(
1743
Resistance
andard791
hering(AST
ASTMD259
4.6.6.150rp
.0%Max.)
eter,mm,m
T
Dyna
mentalF
ressure unle
evere worki
on Systems
ireropeast
edistribute it
tion process
ockloads,w
high speed w
asoutstandi
mpatiblewith
independen
euponreque
peII)
equirement
A/600/490/

Mysidopsis
%:
1.1)
17):
Centigrade:
Centigrade
(Section4.4
eASTMB11
1,TM4001
TMG152,1
96)
pm@151+

max.
VO
803KingGeor
Tel:+65
E
Theinformationinthisp
Therearemanyfactorsout
agard
riendly
aded enviro
ng condition
as well as m
hestrandsm
tself to cove
s. An Unlead
hileaddition
wire rope tra
ngstructura
hconvention
nttestlabora
est.
ts.
/027
Bahia

e:
4.4,Nocrac
17
(10days)
153)
+/2deg.F)

OSS (F.E.) P
rgesAvenue#01
562964992Fa
Email:enquiry@v
publicationisbasedonour
tsideourcontrolorknowle
d Blu
WireRo
onmental wir
ns, water res
manual hand
moveduring
er any intern
ed extreme
naladditives
avel speeds,
aland chemi
nalsealmate
atorieshave
cks@6Deg
):
PTE LTD
1192Singapore2
ax:+6562982912
vossfe.com
experienceandreportsfro
edgewhichaffecttheusea
e
opeLub
re rope lubr
sistance, and
d application
loadbearing
nal strand ar
pressure ad
enhancere
and long se
icalstability.
erials.Aquat
shownitto
9
P

(O
N
B
S
L
5
1
3
3
2
1
greesC) P
P
1
P
P
3
9
1
2
0
200803
2
omcustomers.
ndperformance
bricant
icant blende
d its compa
n. Its slicknes
goperations
reas, which m
dditive provid
sistancetow
ervice in hig
.Itwontco
ictoxicityte
havesuperio
915001520
Pass
Over25,000
NLGIGrade
Blue
Smooth/Cre
Lithium12
50%Nomina
1.94%
305
320
2123
177C(350F
Pass
Pass
1,000hr./P
Pass
Pass
34.43
99.7
1.02
250
0.65
Page17o
ed for excell
atibility with
ss and visco
s.Thisattrib
may have be
des exceptio
waterwash
gh temperat
rrodesteela
estsonsensit
orLC50valu
08116
0ppm)
2
eamy
al
F)
Pass
of20
ent
h all
sity
ute
een
onal
off,
ure
and
tive
ues.

Dynagar
perform
rope str
for all K
prolongi
custome
requirem
Docume

Nationa
MILPRF
o
LC50Ac
o T
o T
Biodegr
Viscosit
Color:
Texture
FlashPo
Droppin
OilSepa
Worked
SaltSpr
Acceler
Rusttes
SaltFog
SaltSpr
Acceler
LowTem
LoadW
Adhesiv
Volatile

rd E is a
ance levels
ands. Except
Kirkpatrick W
ngthework
ers. Dynagar
ments unde
entationisav
alStockNu
F18458C(T
MeetsorSu
cuteToxicit
TestDurati
TestSpecim
radabilityR
ty:

e:
oint,ASTM
ngPoint,AS
aration%(F
dPenetratio
ray,Fed.Std
atedWeath
st,ASTMD
gCorrosion
ray,Fed.Sta
atedWeath
mperature
WearIndex(
ve%(Sec.4
eMatter
D
Environ
revolutiona
of petroleum
tional for m
Wire Rope L
kinglifeofwi
d E was t
er the Env
vailableupon
mber
TypeII)
urpassesRe
tyBioaquat
on:48Hou
menUsed:M
Rating(CEC
D92(C/F)
STMD566
Fed.Std.79
on:mm,(A
d.791,TM
hering(Fed
1743
Resistance
andard791
hering(G23
Flexibility(
ASTMD259
4.6.6.150rp

T
Dyna
nmental
ry nontoxic
mbased grea
anual applic
Lubrication
ireropewhi
he benchma
vironmentall
nrequest.
equirement
ticRating,E
urs
Mysidopsis
L33A93)

91,TM321)
STMD217)
4001
d7914001,
eASTMB11
1,TM4001
3,10days)
(Sec.4.4.4n
96)
pm@151+
VO
803KingGeor
Tel:+65
E
Theinformationinthisp
Therearemanyfactorsout
agard
lSafeW
c environme
ases in the a
cation; Dyna
System Mod
leatthesam
ark product
ly Preferab
ts
EPA/600/4
Bahia

)
:
ASTMG15
17
(10days)

nocracks@
+/2deg.F)
OSS (F.E.) P
rgesAvenue#01
562964992Fa
Email:enquiry@v
publicationisbasedonour
tsideourcontrolorknowle
d E
WireRop
entally safe
areas of fluid
gard E als
dels providi
metimemee
used in 200
le Lubrican
90/027
2,153)
@6Degrees
):
PTE LTD
1192Singapore2
ax:+6562982912
vossfe.com
experienceandreportsfro
edgewhichaffecttheusea

peLubri
wire rope
d film and co
so meets the
ng optimum
etingtheenv
02 to establi
ts program
9
P
2
9
N
S
S
3
O
1
3
P
P
P
1
P
2
sC) P
3
9
1
200803
2
omcustomers.
ndperformance
icant
lubricant t
orrosion pro
e operationa
m coating an
vironmentalc
sh MILPRF
m (NSWCCD
915001520
Pass
21,085ppm
97%
NLGIGrade
SemiClearB
Smooth/Cre
316C/601F
Over400de
1.37
301
Pass
Pass
Pass
1,000hr./P
Pass
2Dots/Pas
Pass(NoCra
35.58
99.7%
1.02%Max.
Page18o
hat meets
otection of w
al requireme
nd penetrat
concernsof
18458C Typ
D, Code 63
08143

2
Brown
eamy
egreesF
Pass
ss
acking)
of20
the
wire
ents
tion
our
e II
32).

Testi
Naval A
The wire
reducing
labor re
lubricatio
personn
ROI of a


P2 AFLO
The old
grease. A
A wire ro
grease s
cable, sa

Ex.: Kirk
Breakev


Chief of
The man
crane ca
Cost Sav


United S
Diligent
pressure
systems

All new
as part o

monials
Air Systems
e rope lubri
g material us
equired to p
on system i
el to place g
approximately
OAT Award
cable cleani
Afterwards t
ope lubricati
simultaneous
aving as tota
kpatrick Ca
ven Point: 1
f Naval Oper
nual process
ables. Utilizin
vings: $ 366
States Coas
use of press
e lubrication
manufacture
United Stat
of their stan
s
Command /
cation syste
sage and was
perform cabl
is a safer a
grease on th
y $ 135,900.
Submittal, C
ing method e
he new grea
ion system i
sly. This pro
al of 1,080 Ho
ble Lubricat
year.
rations Pilot
s required 6
ng the wire r
,356.48 Brea
st Guard Nav
sure wire rop
systems w
ed by The K
tes Coast G
ndard equip
/ Chief of Na
em evaluated
ste disposal
e cleaning
alternative th
heir gloves a
60 and a bre
Commande
employed so
ase was appl
s now used
ocess has re
ours annually
tor, USA Ar
t Ergonomic
workers and
rope lubricat
akeven Point
val Enginee
pe lubrication
ith a proven
irkpatrick Gro
Guard Buoy
ment when
aval Operati
d during the
costs. Signif
and lubrica
han the pre
and wipe the
eakeven poin
r, Naval Bas
olvents and h
lied by hand
that automa
educed work
y at a saving
rctic: 10-yea
cs Program
d 2 full days
tion system t
t: 10.5 Days.
ring Manua
n systems ca
n history of
oup, Inc., Da
and Constr
they leave t

ons Preprod
e project ap
ficant labor s
ting events.
evious metho
e crane cable
nt of .41 year
se Norfolk, S
hand scrapin
. This proces
atically remo
k time from 6
gs of nearly $
ar cost savin
Evaluation
to complete
the process

l Chapter 61
an increase
performance
allas, TX.
ruction Tend
the ship yar
duction Eva
ppears to ha
savings are p
Of equal
od used be
e. The cost
rs.
Secretary of
ng, with a w
ss was time
oves the old
6 man-hours
$43,000.00.
ngs: $652,0
2000
the cleaning
required 3 w
13
the service l
e in Coast
ders have a
rd.
aluation 200
ave significa
possible due
importance,
ecause it do
analysis sho
f the Navy 1
ire brush to
consuming a
grease and
s to 30 minu
00, Labor re
g and lubrica
workers for 4
life of wire ro
Guard appli
Kirkpatrick
Page19o
2
ant potential
e to the reduc
the wire ro
oes not requ
owed a 10-y
998
remove the
and dangero
re-applies n
utes for 450
eduction: 75
ation of a se
4 hours. Ann
ope. Wire Ro
cations inclu
k Model SU3

of20
for
ced
ope
uire
year
old
ous.
new
of
5%,
et of
nual
ope
ude
35B

Anda mungkin juga menyukai