INTRODUCTION
Management of materials and information flows are key
strategic priorities for construction firms. Sound performance in these
two areas can provide them with significant benefits and allow the
adding of value for clients.
The introduction of supply chain management in construction is
intended to integrate processes, manage interfaces between companies
in projects, reduce uncertainties and weed out inefficiency as much as
possible. The elimination of waste and inefficiency from the supply chain
builds in value in the process.
Similarly, Sir John Egan reaffirmed the aforementioned
recommendations in his report title Rethinking Construction (Egan,
1998: 16). The report identified five key drivers of change, namely:
Committed leadership;
Commitment to people.
Page 3 of 14
Subhadeep Das
Reg. No. - 211-04-11-9267-2133
SCOPE OF WORK
The project is about construction of a housing colony for an
industrial group in Western Maharashtra in a coastal belt. There are
three main aspects to be studied in the course of project namely man
power, materials and expectance of the clients. Considering the fact that
the local labors can be engaged in the field of work due to the following
facts:
A part from these as all the materials and are purchased from the
local surroundings the availability of materials can be made on demand
and there will be an assured supply of materials.
The Colony will consist of the following features: 1.
2.
3.
4.
5.
viii)
Page 4 of 14
Subhadeep Das
Reg. No. - 211-04-11-9267-2133
Page 5 of 14
Subhadeep Das
Reg. No. - 211-04-11-9267-2133
Responsible for site level planning and execution of all works in his
area
of operation and monitoring the progress.
Checking bar bending schedule for reinforcement.
Responsible for certifying contractors bills and ensure payment to
the
contractor.
Site
organization: Responsible
to liaison with Client / Consultants for his area of
operation.
Essentially Engineer
a project for getting success needs a good responsible team.
4.Planning
The team works with a goal of completing the project in time within the
specified costs and quality specifications. To achieve the aforesaid goal,
the work and responsibilities are divided within the team. The work
In-depth
study
tender
documents.
managementwillResponsible
be as per thefor
chart
showing
theofsite
organization
role
Responsible
for preparation
/ Review
of S curve
in in
team. The brief
and responsibilities
of various
personnel
involved
with Site-in-charge.
the project are asconsultation
follows.
Responsible for preparation and monitoring Overall Project
Page 76 of 14
Subhadeep Das
Reg. No. - 211-04-11-9267-2133
Responsible
for acceptance of Manufacturers Test
Certificate of bought out items and material like cement,
steel, construction chemicals.
Responsible for checking of Methodology Statement with
respect to specifications /IS codes.
Monitoring day-to day activities pertaining to quality in
consultation with Project-in-charge/ section-in-charge and
Client /Consultants.
Responsible for sample collection for testing and approvals.
Responsible for maintaining QC lab and equipment in
conforming condition.
To ensure that proper methodology and instructions are
followed in execution of various activities.
To check workmanship.
Account Officer
7.
8.
Administrative Officer
Page 8 of 14
Subhadeep Das
Reg. No. - 211-04-11-9267-2133
9.
Safety Officer
10.
Store Officer
11.
13.
Surveyor
12.
Should
be responsible for overall operations of the batching
plant.
Will report to the Quality control engineer.
Equipment Operator
Page 9 of 14
Subhadeep Das
Reg. No. - 211-04-11-9267-2133
14.
15.
Junior Engineers
16.
Supervisor
17.
Stewards
Page 10 of 14
Subhadeep Das
Reg. No. - 211-04-11-9267-2133
Hence, it is very clear from the flow chart that in the field of
construction there is no unidirectional flow of orders or
communication it is a must that a for an efficient project there is a
must that all should be knowing the happenings around them so as
that the problems can be discussed and hurdles are overcome.
MOTIVATION OF TEMPORARY EMPLOYEES
A project Manager must motivate temporarily assigned individuals by
appealing to their desires to fulfill the highest two levels. Of course,
the motivation process should not be developed by making promises
that cannot be met. A Project Manager may motivate by providing:
Subhadeep Das
Reg. No. - 211-04-11-9267-2133
1.
2.
3.
4.
5.
Understanding
MASLOWauthority relationships
Making line listen to staff
Keeping
Motives
staff informed.
Requiring
(Needs)completed staff work
Making staff work as the way of organizational life.
BEHAVIOR
CONCLUSION
Goal
The task of
organizing the information in the building field is difficult due
(Incentive)
to the nonexistence of a national classification system with a general
consensus, nor is there a national norm for the classification and
organization HERZBERG
of this information.
TYPES OF TRAINING RECRUITMENT/APPLICATION/SELECTION
As a solution to this problem, the structure of the existing (hierarchical
Training
is an
inseparable was
part approached
of staffing. There
arechoice
three was
typesmade
of for
and facets)
classifications
and the
training
namely
Induction
training,
Job
training
and
refresher
training.
the classification by facets. The structure proposed for the organization
Training
is work oriented
aimed at imparting
skills
of the knowledge
based onand
theisDocument,
Processes,specific
Elements
andfor
doing
a
particular
job.
It
is
continuous
process.
Basic Materials trees for a small building company has enabled the
Through
medium
certain
test candidates
areand
selected
for the
relation toa be
made of
among
Materials,
Services
Suppliers.
particular recruitment, these tests are namely:
A real example was used based on the quality documents obtained from
Trade test or performance test particularly for jobs where certain
one 1.
company.
skills
knowledge
expected.
Later, other and
documents
usedisby
the company may be included. This will
2.
Group
discussions
to
judge
candidates
ability to work
in a group,
allow for the registration of experiences.
The organized
and integrated
his
response
to
suggestions
or
views
from
other,
self
confidence
knowledge originated from a classification structure can work as a
etc. habilitation/updating tool, capable of integrating the
professional
3.
Medical
examination
ensure physical
fitness. it can contribute
knowledge
of the
area underto
consideration.
Moreover,
4.
Intelligence
tests
to
judge
the
candidates
mental
alertness,
to the strengthening of the technical history of the
company
and work as
reasoning
ability
and
general
level
of
intelligence.
a channel to disseminate this knowledge to its collaborators.
AUTHORITY & LEADERSHIP
RECOMMENDATIONS
Authority is the legitimate right to direct and influence the performance
of others.
speak
of authority in managerial
settings, supply
we usually
HavingWhen
statedwe
that
the non-integration
of the construction
refer tohinders
the power
of positions.
At the same time
it may
notedinthat
chain
the creation
and improvement
of value
forbe
money
the
other factors process.
such as personality,
of dealing with people,
expertise,
construction
Specificallystyle
the recommendations
are anchored
on
competence, etc
the extent
to whichThe
the recommendations
authority of a position
collaboration
andcondition
supply chain
management.
and the person occupying it is accepted by the subordinates.
include:
A person may be having authority but his subordinates are not willing to
accept it or support him / her. Leadership comes into the picture.
Ensuring
theshould
early involvement
of key project
team members
that
Persons
in authority
also have corresponding
leadership
qualities
have
expert
knowledge
so
that
an
appropriate
level
of
client
which motivate and encourage subordinates to accept them in that role.
satisfaction and value can be defined;
Establishing of subcontractor and supplier relationships by
selecting teams based on value rather than lowest price;
Making Integrating
staff work effective
pre-construction and construction activities and
Many
are involved
follows.such as ICT;
factors
adopting
common as
processes