Anda di halaman 1dari 30

Document No :

Project :
Title :

" Design

Loading Calculation For Tower Type


S (0-2) "

WIND PRESSURE CALCULATION


Code
Specification
Terrain Category
Design Wind Speed
Reference Height
Roughness Length

Vp
h
z0

Topography Factor

C0

= 38.9
= 10

m/s
m/s

= 0.05

Turbulence intensity

1/(C0 * ln (h/z0))

=1
= 0.189

Basic Wind Velocity

Vb,0

Vp/sqrt (1+7 Iv(10))

= 25.523

For OPGW
Wind Direction factor

Cdir

=1

Terrain Factor
Max height of OPGW
Mean wind velocity

kr
h
Vh (h)

= 0.189
= 26.85
= 30.323

Air Density

Check REV : 0

: EN50341-1-2012
: Tender Spec
= II

Iv(10)

Vb,0 x Cdir x C0 x kr x ln (h/z0)

m/s

m
m/s

= 1.25
2

Dynamic wind pressure

qh (h)

0.5* * Vh (h)

Turbulence intensity

Iv(h)

1/(C0 * ln (h/z0))

= 0.159

Peak wind pressure

qp (h)

[ 1+7 Iv(h)] x qh (h)

= 1214.3

2
= 574.678 N/m

N/m2

2
= 123.781 kg/m

Wind Pressure on Conductor

Wind Pressure
For Conductor
Wind Direction factor
Terrain Factor
Max height of Conductor
Mean wind velocity
Air Density

Qwe_v
Gc
Cc
Qwe_v

qp(h) x Gc xCc
For 350m Span & 27m ht

= 0.661
=1
= 81.819

Cdir

=1

kr

= 0.189
= 22.35
= 29.438

h
Vh (h)

Vb,0 x Cdir x C0 x kr x ln (h/z0)

kg/m2

m
m/s

= 1.25
2

Dynamic wind pressure

qh (h)

0.5* * Vh (h)

Turbulence intensity

Iv(h)

1/(C0 * ln (h/z0))

= 0.164

Peak wind pressure

qp (h)

[ 1+7 Iv(h)] x qh (h)

= 1163.4

2
= 541.622 N/m

N/m2

2
= 118.594 kg/m

Wind Pressure on Conductor

Wind Pressure

Qwc_v
Gc
Cc
Qwc_v

qp(h) x Gc xCc
For 350m Span & 22.5m ht

= 0.6475
=1
= 76.789

DATE

kg/m2

Document No :

Project :
Title :

Loading Calculation For Tower Type


S (0-2) "

" Design

Check REV : 0

PHASE TO PHASE/OPGW CLEARANCE CALCULATION


Phase to Phase clearance
c
k.(fmax+li) + 0.75*Dpp
Maximum Sag
fmax
length of insulator
Li
Min clearance
Dpp
Factor for all clearances
k

=
=
=
=

9.56
2.1
1.4
0.6

m
m
m

Phase to Phase clearance

= 3.099

Phase to OPGW clearance


Maximum Sag
length of insulator
Min Clearance
Factor for all clearances

c
fmax
Li
Del
k

=
=
=
=

9.56
2.1
1.2
0.6

m
m
m

Phase to OPGW clearance

= 2.949

=
=
=
=
=
=
=

m
m
kg
mm
mm
mm
kg

Wind Pressure on Conductor

(Assumed)
(Tender drawing)
(Assumed)

qp(h) x Gc xCc
For 350m Span & 22.5m ht

Wind Pressure

Qwc_v
Gc
Cc
Qwc_v

Wind Pressure on Insulator


Structural factor
Insulator drag factor

Qwins
Gins
Cins

qp(h) x Gins x Cins

Wind Pressure on Insulator

Qwins

Swing Angle Calculation 58% maximum wind


Weight to Wind Span
r
Weight of Conductor
QGc
Weight of Insulator
QGi
Wind Load on Conductor
Qwc
Wind Load on Insulator
Qwi
tan

Swing Angle

350
450
0.98
21.8
190
2100
75

Sag & Tension


Tender drg
TS - Cl.4.4.3.4(a)
TS - Cl.4.4.3.4(a)

2
= 118.594 Kg/m

qp(h)

Swing Angle

Sag & Tension


Tender drg
TS - Cl.4.4.3.4(a)
TS - Cl.4.4.3.4(a)

k.(fmax+li) + 0.75*Del

Swing Angle Calculation for Insulators


Wind Span of Conductor
Ws
Weight Span of Conductor
Wts
Self Weight of Conductor
Wc
Dia of Conductor
Dc
Dia of Insulator
Di
Length of Insulator
Li
Weight of Insulator
Wi
Peak Wind pressure

DATE

= 0.6475
=1
= 76.789

EN - Table 4.4c
TS - Cl.4.4.1.3
Kg/m2

= 1
= 1.2
= 142.312 Kg/m2

Wts/Ws
Wts x Wc
Wi
Qwc_v x Ws x Dc x 0.58
Qwins x Li x Di
(Qwc + 0.5xQwi)
(r.QGc +0.5 QGi)

=
=
=
=
=

0.75
441
75
339.82
56.78

= 0.99989
= 45

kg
kg
kg
kg

Document No :

Project :
Title :

Loading Calculation For Tower Type


S (0-2) "

Swing Angle Calculation maximum wind


Weight to Wind Span
r
Weight of Conductor
QGc
Weight of Insulator
QGi
Wind Load on Conductor
Qwc
Wind Load on Insulator
Qwi
Swing Angle

tan

Swing Angle

Wts/Ws
Wts x Wc
Wi
Qwc_v x Ws x Dc
Qwins x Li x Di
(Qwc + 0.5xQwi)
(r.QGc +0.5 QGi)

" Design

=
=
=
=
=

0.75
441
75
585.9
56.78

= 1.66813

= 59.06

DATE

Check REV : 0

kg
kg
kg
kg

X
2

Panel 6

10

11

12

13

14

16

17

19

20

22

23

25

26

Panel 5

15

Panel 4

21

18

24

Panel 3

Panel 2

27

28

29

30

31

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

-1.95
-0.6
0.6
1.95
-0.6
0.6
-3.1
-0.6
0.6
3.1
-0.6
0.6
-0.6
0.6
-3.4
-0.6
0.6
3.4
-0.6
0.6

26.85
26.85
26.85
26.85
25.65
25.65
24.45
24.45
24.45
24.45
23.15
23.15
21.85
21.85
20.65
20.65
20.65
20.65
18.7
18.7

21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38

-3.1
-0.6
0.6
3.1
-0.6
0.6
-0.761
0.761
-0.963
0.963
-1.205
1.205
-1.487
1.487
-1.648
1.648
-1.81
1.81

17.5
17.5
17.5
17.5
15.5
15.5
13.5
13.5
11
11
8
8
4.5
4.5
2.5
2.5
0.5
0.5

32

Coordinates in Slope
Y
33

34

Panel 1

35

36

37

38

Y
X

1
2
0.5
2
2
3.5
3
2.5
2

X
15.5
0
0.5
2.5
4.5
8
11
13.5
15.5

0.6
1.85
1.81
1.648
1.487
1.205
0.963
0.761
0.6

At
Total Area

Solidity ratio
Ct
Panel 2

At
Total Area

Solidity ratio
Ct
Panel 3

At
Total Area

Solidity ratio
Ct

PT1
Panel 6

PT2
1
1
2
2
2
5
5
5
7
8
5

2
5
6
5
3
6
7
9
8
9
8

1
5

4
6

5
7

6
10

Length in No. of
Width in
m
identical m
1.35
2
0.1
1.806
2
0.1
1.697
2
0.1
1.2
2
0.1
1.2
1
0.1
1.2
1
0.1
2.773
2
0.1
1.697
2
0.1
2.5
2
0.1
1.2
1
0.1
1.2
2
0.1

At
Total Area
3.9
1.2
1.2
1.2
6.2
1.2

7.5
0.598

Solidity ratio
(3.96(1-1.5SR+SR2)
Ct
Panel 5

1.824

8
8
11
13
13
13
13
15
16
8
11

9
11
13
14
15
16
17
16
17
12
14

1.2
1.3
1.3
1.2
3.046
1.2
1.697
2.8
1.2
1.769
1.769

8
13

9
14

13
15

14
18

1.2
1.2
2.6
1.2
6.8
1.2

1
2
2
2
2
2
2
2
1
2
2

0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1

At
Total Area

Solidity ratio
(3.96(1-1.5SR+SR2)
Ct
Panel 4
16
16
19
19
19
21
22
16
19
At
Total Area

0.27
0.3612
0.3394
0.24
0.12
0.12
0.5546
0.3394
0.5
0.12
0.24
4.486 40% extra for Sub Bracing

17
19
20
21
22
22
23
20
23

1.2
1.95
1.2
2.773
1.2
2.5
1.2
2.29
1.697

0.12
0.26
0.26
0.24
0.6092
0.24
0.3394
0.56
0.12
0.3538
0.3538
4.839 40% extra for Sub Bracing

7.92
0.611
1
2
1
2
2
2
1
2
2

0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1

1.809
0.12
0.39
0.12
0.5546
0.24
0.5
0.12
0.458
0.3394
3.979 40% extra for Sub Bracing

16
19

17
20

19
21

20
24

Solidity ratio
(3.96(1-1.5SR+SR2)
Ct
Panel 1
36
33
35
31
32
At
Total Area
31
37
Solidity ratio
(3.96(1-1.5SR+SR2)
Ct
Panel 2
30
28
29
27
31
At
Total Area
27
31

1.2
1.2
1.95
1.2
6.2
1.2

6.78
0.587
1.838

38
38
36
34
34

2.007
5.184
3.296
4.416
3.511

32
38

2.41
3.62
7.5

32
30
32
30
32

3.01
2.508
3.701
3.037
2.41

28
32

1.522
2.41
5.5

2
2
1
2
2

0.1
0.1
0.1
0.1
0.1

22.613
0.208
2
2
2
2
1

0.1
0.1
0.1
0.1
0.1

Panel 3

(3.96(1-1.5SR+SR2)

2.369

26
23
22
25
25

28
26
26
28
26

2.006
2
2.332
2.419
1.2

22
27
23

23
28
28

1.2
1.522
4

At
Total Area

Solidity ratio
(3.96(1-1.5SR+SR2)
Ct

2.896
0.602
0.5016
0.7402
0.6074
0.241 40% extra for Sub Bracing
3.769

10.813
0.349

Solidity ratio
Ct

0.4014
1.0368
0.3296
0.8832
0.7022
4.694 40% extra for Sub Bracing

2
2
2
2
1

0.1
0.1
0.1
0.1
0.1

0.4012
0.4
0.4664
0.4838
0.12
2.62 40% extra for Sub Bracing

5.444
0.481
2.019

Project :

Document No :

132kV DC for Liberia Eletricty Corporation


Loading Calculation For Tower Type
" S (0-2) "

Title :

Design
SSN

Check
SJL/TA

Basic Wind Velocity

Vb,0

= 25.523

Wind Direction factor

Cdir

=1

Terrain Factor

kr

= 0.189

Roughness Length

z0

= 0.05

Topography Factor

C0

=1

Air Density

Structural Factor
Turbulence intensity

Iv(h)

Mean wind velocity

Vh (h)

Dynamic wind pressure

qh (h)

Peak wind pressure


Wind Load Tower Panels
QWt

qp (h)

Panel Ht
4.25
10.75
15.5
19.075
22.55
25.65

Iv(h)
0.225
0.186
0.174
0.168
0.164
0.16

= 1.25
=1

Gt
1/(C0 * ln (h/z0))
Vb,0 x Cdir x C0 x kr x ln (h/z0) m/s
2

0.5* * Vh (h) N/m2


[ 1+7 Iv(h)] x qh (h) N/m2
qp(h) x Gt x (1+0.2 sin2 2) x Ct x At

Vh(h)
21.431
25.907
27.672
28.673
29.481
30.102

qh(h)
287.055
419.483
478.587
513.838
543.206
566.332

qp(h)
739.167
965.65
1061.506
1118.111
1166.806
1200.624

Ct
2.896
2.369
2.019
1.838
1.809
1.824

At
4.694
3.769
2.62
3.979
4.839
4.486

Qwt
2512.027
1649.961
977.5078
1351.456
1617.621
1512.052

DATE
07.02.14
REV : 0

m/s

Project :
Title :

Document No :

132kV DC for Liberia Eletricty Corporation


Loading Calculation For Tower Type
" 2NS (0-2) "

DATE
07.02.2014
Check REV : 0
SJL/TA

Design
SSN

Technical Parameters
OPGW Data:
Diameter
Weight
No. of OPGW
Tension at 15+NW
Tension at 15+FW
Tension at 15+QW
Tension at 15+HW
Tension at 15+HQW
EW Data:
Diameter
Weight
No .of EW
Tension at 15+NW
Tension at 15+FW
Tension at 15+QW
Tension at 15+HW
Tension at 15+HQW
Conductor Data:
Diameter
Weight
No. of Conductor
Tension at 15+FW
Tension at 15+FW
Tension at 15+QW
Tension at 15+HW
Tension at 15+HQW
Insulator Data:
Diameter
Weight
Length
No. of Insulator
Span
Weight Span Min
Weight Span Max
Wind Span
Wind Pressure
T.W Pressure on OPGW/EW

Wtsx
Wtsn
Ws

= 450
= 150
= 350

m
m
m

Qwev

= 802.64

N/m2

T.W Pressure on Conductor

Qwcv

= 786.25

N/m2

T.W Pressure on Insulator

Qwins

= 1396.08 N/m

Dg
Wg
Ng
Gtn
Gtf
Gtq
Gth
Gthq

=
=
=
=
=
=
=
=

13.2
6.64
1
10186
21961
19049
14702
13348

mm
N/m
Nos
N
N
N
N
N

De
We
Ne
Etn
Etf
Etq
Eth
Ethq

=
=
=
=
=
=
=
=

14
6.13
1
9433
22233
19193
14564
13078

mm
N/m
Nos
N
N
N
N
N

Dc
Wc
Nc
Ctn
Ctf
Ctq
Cth
Cthq

=
=
=
=
=
=
=
=

21.8
9.61
1
14975
33795
29272
22423
20234

mm
N/m
Nos
N
N
N
N
N

=
=
=
=

190
736
2100
1

mm
N
mm
Nos

Di
Wi
Li
Ni

(Assumed)
(Assumed)
Tender Dwg
Tender Dwg

Q.W Pressure on OPGW/EW

Qwev1

0.8*Qwev

= 642.12

N/m2

Q.W Pressure on Conductor

Qwcv1

0.8*Qwcv

= 629

N/m

Q.W Pressure on Insulator


Line Angle:
Min Line Angle
Max Line Angle

Qwins1

0.8*Qwins

= 1116.86 N/m

idmin
idmax

2
2

=0
=2

Page9

Project :
Title :
Vertical Load
Conductor
Weight of Conductor
=(Wc*Nc*Wtsx(Wtsn))
Weight of Insulator
=(Wi*Ni)
Weight of Linesmen with tool

132kV DC for Liberia Eletricty Corporation

Document No :

Loading Calculation For Tower Type


Design
" 2NS (0-2) "
SSN
Condition: Normal Working, Transverse Wind

DATE
07.02.2014
Check REV : 0
SJL/TA

Max
= 4325

Min
1442

= 736
= 981
= 6042

736
981
3159

N
N
N

Max
= 2988
= 981
= 3969

Min
996
981
1977

N
N
N

Total Vertical Load, Nvex/Nven

Max
= 2759
= 981
= 3740

Min
920
981
1901

N
N
N

= (0.0218*1*350*786.25)

= 5999

= (0.19*1*2.1*1396.08)

= 557

=(2*33795*sin(0/2))
Total Vertical Load, Ntc

=0
= 6556

N
N

OPGW
Wind of OPGW
=(Dg*Ng*Ws*Qwev)
Deviation Load
=(2*Gtf*sin(idmin/2))

= (0.0132*1*350*802.64)

= 3708

=(2*21961*sin(0/2))
Total Vertical Load, Ntg

=0
= 3708

N
N

Earth Wire
Wind of EW
=(De*Ne*Ws*Qwev)
Deviation Load
=(2*Etf*sin(idmin/2))

= (0.014*1*350*802.64)

= 3933

=(2*22233*sin(0/2))
Total Vertical Load, Nte

=0
= 3933

N
N

= (9.61*1*450(150))
= (736*1)
Total Vertical Load, Nvcx/Nvcn

OPGW
Weight of OPGW
=(Wg*Ng*Wtsx(Wtsn))
Weight of Linesmen with tool

= (6.64*1*450(150))
Total Vertical Load, Nvgx/Nvgn

Earthwire
Weight of EW
=(We*Ne*Wtsx(Wtsn))
Weight of Linesmen with tool
Transverse Load
Conductor
Wind of Conductor
=(Dc*Nc*Ws*Qwcv)
Wind of Insulator
=(Di*Ni*Li*Qwins)
Deviation Load
=(2*Ctf*sin(idmin/2))

= (6.13*1*450(150))

Page10

Project :
Title :
Vertical Load
Conductor
Weight of Conductor
=(Wc*Nc*Wtsx(Wtsn))
Weight of Insulator
=(Wi*Ni)
Weight of Linesmen with tool

132kV DC for Liberia Eletricty Corporation

Document No :

Loading Calculation For Tower Type


Design
" 2NS (0-2) "
SSN
Condition: Normal Working, Oblique Wind

DATE
07.02.2014
Check REV : 0
SJL/TA

Max
= 4325

Min
1442

= 736
= 981
= 6042

736
981
3159

N
N
N

= 2988
= 981
= 3969

996
981
1977

N
N
N

Total Vertical Load, Nvex1/Nven1

= 2759
= 981
= 3740

920
981
1901

N
N
N

= (0.0218*1*350*629)

= 4799

= (0.19*1*2.1*1116.86)

= 446

=(2*29272*sin(0/2))
Total Vertical Load, Nqtc

=0
= 5245

N
N

OPGW
Wind of OPGW
=(Dg*Ng*Ws*Qwev1)
Deviation Load
=(2*Gtq*sin(idmin/2))

= (0.0132*1*350*642.12)

= 2967

=(2*19049*sin(0/2))
Total Vertical Load, Nqtg

=0
= 2967

N
N

Earth Wire
Wind of EW
=(De*Ne*Ws*Qwev1)
Deviation Load
=(2*Etq*sin(idmin/2))

= (0.014*1*350*642.12)

= 3146

=(2*19193*sin(0/2))
Total Vertical Load, Nqte

=0
= 3146

N
N

= (9.61*1*450(150))
= (736*1)
Total Vertical Load, Nvcx1/Nvcn1

OPGW
Weight of OPGW
=(Wg*Ng*Wtsx(Wtsn))
Weight of Linesmen with tool

= (6.64*1*450(150))
Total Vertical Load, Nvgx1/Nvgn1

Earthwire
Weight of EW
=(We*Ne*Wtsx(Wtsn))
Weight of Linesmen with tool
Transverse Load
Conductor
Wind of Conductor
=(Dc*Nc*Ws*Qwcv1)
Wind of Insulator
=(Di*Ni*Li*Qwins1)
Deviation Load
=(2*Ctq*sin(idmin/2))

= (6.13*1*450(150))

Page11

Project :
Title :
Vertical Load
Conductor
Weight of Conductor
=(Wc*Nc*Wtsx(Wtsn))
Weight of Insulator
=(Wi*Ni)

132kV DC for Liberia Eletricty Corporation


Loading Calculation For Tower Type
" 2NS (0-2) "
Condition: Broken, Transverse Wind

Document No :
Design
SSN

DATE
07.02.2014
Check REV : 0
SJL/TA

= (9.61*1*450(150))

Max
= 4325

Min
1442

= (736*1)
Total Vertical Load, Bvcx/Bvcn

= 736
= 5061

736
2178

N
N

= (6.64*1*450(150))
Total Vertical Load, Bvgx/Bvgn

= 2988
= 2988

996
996

N
N

= (6.13*1*450(150))
Total Vertical Load, Bvex/Bven

= 2759
= 2759

920
920

N
N

= (0.0218*1*350*786.25)

= 5999

= (0.19*1*2.1*1396.08)

= 557

=(2*33795*sin(0/2))
Total Vertical Load, Btc

=0
= 6556

N
N

OPGW
Wind of OPGW
=(Dg*Ng*Ws*Qwev)
Deviation Load
=(2*Gtf*sin(idmin/2))

= (0.0132*1*350*802.64)

= 3708

=(2*21961*sin(0/2))
Total Vertical Load, Btg

=0
= 3708

N
N

Earth Wire
Wind of EW
=(De*Ne*Ws*Qwev)
Deviation Load
=(2*Etf*sin(idmin/2))

= (0.014*1*350*802.64)

= 3933

=(2*22233*sin(0/2))
Total Vertical Load, Bte

=0
= 3933

N
N

=(0.5*33795*cos(0/2))
Total Vertical Load, Blc

= 16898
= 16898

N
N

=(0.65*21961*cos(0/2))
Total Vertical Load, Blg

= 14275
= 14275

N
N

=(0.65*22233*cos(0/2))

= 14451

Total Vertical Load, Ble

= 14451

OPGW
Weight of OPGW
=(Wg*Ng*Wtsx(Wtsn))
Earthwire
Weight of EW
=(We*Ne*Wtsx(Wtsn))
Transverse Load
Conductor
Wind of Conductor
=(Dc*Nc*Ws*Qwcv)
Wind of Insulator
=(Di*Ni*Li*Qwins)
Deviation Load
=(2*Ctf*sin(idmin/2))

Longitudinal load
Conductor
Deviation Load
=(0.5*Ctf*cos(idmin/2))
OPGW
Deviation Load
=(0.65*Gtf*cos(idmin/2))
Earth Wire
=(0.65*Etf*cos(idmin/2))
Deviation Load

Page12

Project :
Title :
Vertical Load
Conductor
Weight of Conductor
=(Wc*Nc*Wtsx(Wtsn))
Weight of Insulator
=(Wi*Ni)

132kV DC for Liberia Eletricty Corporation


Loading Calculation For Tower Type
" 2NS (0-2) "
Condition: Broken, Oblique Wind

Document No :
Design
SSN

DATE
07.02.2014
Check REV : 0
SJL/TA

= (9.61*1*450(150))

Max
= 4325

Min
1442

= (736*1)
Total Vertical Load, Bvcx1/Bvcn1

= 736
= 5061

736
2178

N
N

= (6.64*1*450(150))
Total Vertical Load, Bvgx1/Bvgn1

= 2988
= 2988

996
996

N
N

= (6.13*1*450(150))
Total Vertical Load, Bvex1/Bven1

= 2759
= 2759

920
920

N
N

= (0.0218*1*350*629)

= 4799

= (0.19*1*2.1*1116.86)

= 446

=(2*29272*sin(0/2))
Total Vertical Load, Bqtc

=0
= 5245

N
N

OPGW
Wind of OPGW
=(Dg*Ng*Ws*Qwev1)
Deviation Load
=(2*Gtq*sin(idmin/2))

= (0.0132*1*350*642.12)

= 2967

=(2*19049*sin(0/2))
Total Vertical Load, Bqtg

=0
= 2967

N
N

Earth Wire
Wind of EW
=(De*Ne*Ws*Qwev1)
Deviation Load
=(2*Etq*sin(idmin/2))

= (0.014*1*350*642.12)

= 3146

=(2*19193*sin(0/2))
Total Vertical Load, Bqte

=0
= 3146

N
N

=(0.5*29272*cos(0/2))
Total Vertical Load, Bqlc

= 14636
= 14636

N
N

=(0.65*19049*cos(0/2))
Total Vertical Load, Bqlg

= 12382
= 12382

N
N

=(0.65*19193*cos(0/2))
Total Vertical Load, Bqle

= 12475
= 12475

N
N

OPGW
Weight of OPGW
=(Wg*Ng*Wtsx(Wtsn))
Earthwire
Weight of EW
=(We*Ne*Wtsx(Wtsn))
Transverse Load
Conductor
Wind of Conductor
=(Dc*Nc*Ws*Qwcv1)
Wind of Insulator
=(Di*Ni*Li*Qwins1)
Deviation Load
=(2*Ctq*sin(idmin/2))

Longitudinal load
Conductor
Deviation Load
=(0.5*Ctq*cos(idmin/2))
OPGW
Deviation Load
=(0.65*Gtq*cos(idmin/2))
Earth Wire
Deviation Load
=(0.65*Etq*cos(idmin/2))

Page13

Project :
Title :
Vertical Load
Conductor
Weight of Conductor
=(Wc*Nc*Wtsx(Wtsn))
Weight of Insulator
=(Wi*Ni)

132kV DC for Liberia Eletricty Corporation

Document No :

Loading Calculation For Tower Type


Design
" 2NS (0-2) "
SSN
Condition: Cascading, Transverse Wind

DATE
07.02.2014
Check REV : 0
SJL/TA

= (9.61*1*450(150))

Max
= 4325

Min
1442

= (736*1)
Total Vertical Load, Cvcx/Cvcn

= 736
= 5061

736
2178

N
N

= (6.64*1*450(150))
Total Vertical Load, Cvgx/Cvgn

= 2988
= 2988

996
996

N
N

= (6.13*1*450(150))
Total Vertical Load, Cvex/Cven

= 2759
= 2759

920
920

N
N

= (0.0218*1*350*786.25)

= 5999

= (0.19*1*2.1*1396.08)

= 557

=(2*33795*sin(0/2))
Total Vertical Load, Ctc

=0
= 6556

N
N

OPGW
Wind of OPGW
=(Dg*Ng*Ws*Qwev)
Deviation Load
=(2*Gtf*sin(idmin/2))

= (0.0132*1*350*802.64)

= 3708

=(2*21961*sin(0/2))
Total Vertical Load, Ctg

=0
= 3708

N
N

Earth Wire
Wind of EW
=(De*Ne*Ws*Qwev)
Deviation Load
=(2*Etf*sin(idmin/2))

= (0.014*1*350*802.64)

= 3933

=(2*22233*sin(0/2))
Total Vertical Load, Cte

=0
= 3933

N
N

=(0.2*33795*cos(0/2))
Total Vertical Load, Clc

= 6759
= 6759

N
N

=(0.4*21961*cos(0/2))
Total Vertical Load, Clg

= 8784
= 8784

N
N

=(0.4*22233*cos(0/2))
Total Vertical Load, Cle

= 8893
= 8893

N
N

OPGW
Weight of OPGW
=(Wg*Ng*Wtsx(Wtsn))
Earthwire
Weight of EW
=(We*Ne*Wtsx(Wtsn))
Transverse Load
Conductor
Wind of Conductor
=(Dc*Nc*Ws*Qwcv)
Wind of Insulator
=(Di*Ni*Li*Qwins)
Deviation Load
=(2*Ctf*sin(idmin/2))

Longitudinal load
Conductor
Deviation Load
=(0.2*Ctf*cos(idmin/2))
OPGW
Deviation Load
=(0.4*Gtf*cos(idmin/2))
Earth Wire
Deviation Load
=(0.4*Etf*cos(idmin/2))

Page14

Project :
Title :
Vertical Load
Conductor
Weight of Conductor
=(Wc*Nc*Wtsx(Wtsn))
Weight of Insulator
=(Wi*Ni)
Weight of Linesmen with tool

132kV DC for Liberia Eletricty Corporation


Loading Calculation For Tower Type
" 2NS (0-2) "
Condition: Cascading, Oblique Wind

Document No :
Design
SSN

DATE
07.02.2014
Check REV : 0
SJL/TA

Max
= 4325

Min
1442

= 736
= 981
= 6042

736
981
3159

N
N
N

= 2988
= 981
= 3969

996
981
1977

N
N
N

Total Vertical Load, Cvex1/Cven1

= 2759
= 981
= 3740

920
981
1901

N
N
N

= (0.0218*1*350*629)

= 4799

= (0.19*1*2.1*1116.86)

= 446

=(2*29272*sin(0/2))
Total Vertical Load, Cqtc

=0
= 5245

N
N

OPGW
Wind of OPGW
=(Dg*Ng*Ws*Qwev1)
Deviation Load
=(2*Gtq*sin(idmin/2))

= (0.0132*1*350*642.12)

= 2967

=(2*19049*sin(0/2))
Total Vertical Load, Cqtg

=0
= 2967

N
N

Earth Wire
Wind of EW
=(De*Ne*Ws*Qwev1)
Deviation Load
=(2*Etq*sin(idmin/2))

= (0.014*1*350*642.12)

= 3146

=(2*19193*sin(0/2))
Total Vertical Load, Cqte

=0
= 3146

N
N

=(0.2*29272*cos(0/2))
Total Vertical Load, Cqlc

= 5854
= 5854

N
N

=(0.4*19049*cos(0/2))
Total Vertical Load, Cqlg

= 7620
= 7620

N
N

=(0.4*19193*cos(0/2))
Total Vertical Load, Cqle

= 7677
= 7677

N
N

= (9.61*1*450(150))
= (736*1)
Total Vertical Load, Cvcx1/Cvcn1

OPGW
Weight of OPGW
=(Wg*Ng*Wtsx(Wtsn))
Weight of Linesmen with tool

= (6.64*1*450(150))
Total Vertical Load, Cvgx1/Cvgn1

Earthwire
Weight of EW
=(We*Ne*Wtsx(Wtsn))
Weight of Linesmen with tool
Transverse Load
Conductor
Wind of Conductor
=(Dc*Nc*Ws*Qwcv1)
Wind of Insulator
=(Di*Ni*Li*Qwins1)
Deviation Load
=(2*Ctq*sin(idmin/2))

Longitudinal load
Conductor
=(0.2*Ctq*cos(idmin/2))
OPGW
=(0.4*Gtq*cos(idmin/2))
Earth Wire
=(0.4*Etq*cos(idmin/2))

= (6.13*1*450(150))

Page15

Project :
Title :
Vertical Load
Conductor
Weight of Conductor
=(Wc*Nc*Wtsx(Wtsn))
Weight of Insulator
=(Wi*Ni)
Weight of Linesmen with tool

132kV DC for Liberia Eletricty Corporation


Loading Calculation For Tower Type
" 2NS (0-2) "
Condition: Erection, No Wind

= (9.61*1*450(150))
= (736*1)
Total Vertical Load, Evcx/Evcn

OPGW
Weight of OPGW
=(Wg*Ng*Wtsx(Wtsn))
Weight of Linesmen with tool

= (6.64*1*450(150))
Total Vertical Load, Evgx/Evgn

Earthwire
Weight of EW
=(We*Ne*Wtsx(Wtsn))
Weight of Linesmen with tool

= (6.13*1*450(150))
Total Vertical Load, Evex/Even

Document No :
Design
SSN

DATE
07.02.2014
Check REV : 0
SJL/TA

Max
= 4325

Min
1442

= 736
= 981
= 6042

736
981
3159

N
N
N

= 2988
= 981
= 3969

996
981
1977

N
N
N

= 2759
= 981
= 3740

920
981
1901

N
N
N

Page16

Project :
Title :
Vertical Load
Conductor
Weight of Conductor
=(Wc*Nc*Wtsx(Wtsn))
Weight of Insulator
=(Wi*Ni)

132kV DC for Liberia Eletricty Corporation

Document No :

Loading Calculation For Tower Type


Design
" 2NS (0-2) "
SSN
Condition: Erection, 50% Transverse Wind

DATE
07.02.2014
Check REV : 0
SJL/TA

Max
= 4325

Min
1442

= 736

736

Total Vertical Load, Evcx0/Evcn0

= 5061

2178

= (6.64*1*450(150))
Total Vertical Load, Evgx0/Evgn0

= 2988
= 2988

996
996

N
N

= (6.13*1*450(150))
Total Vertical Load, Evex0/Even0

= 2759
= 2759

920
920

N
N

= (0.0218*1*350*0.5*786.25)

= 3000

= 279

=(2*22423*sin(0/2))
Total Vertical Load, Etc

=0
= 3279

N
N

OPGW
Wind of OPGW
=(Dg*Ng*Ws*0.5*Qwev)
Deviation Load
=(2*Gth*sin(idmin/2))

= (0.0132*1*350*0.5*802.64)

= 1854

=(2*14702*sin(0/2))
Total Vertical Load, Etg

=0
= 1854

N
N

Earth Wire
Wind of EW
=(De*Ne*Ws*0.5*Qwev)
Deviation Load
=(2*Eth*sin(idmin/2))

= (0.014*1*350*0.5*802.64)

= 1966

=(2*14564*sin(0/2))
Total Vertical Load, Ete

=0
= 1966

N
N

OPGW
Weight of OPGW
=(Wg*Ng*Wtsx(Wtsn))
Earthwire
Weight of EW
=(We*Ne*Wtsx(Wtsn))
Transverse Load
Conductor
Wind of Conductor
=(Dc*Nc*Ws*0.5*Qwcv)
Wind of Insulator
=(Di*Ni*Li*Qwins)
Deviation Load
=(2*Cth*sin(idmin/2))

= (9.61*1*450(150))
= (736*1)

= (0.19*1*2.1*0.5*1396.08)

Page17

Project :
Title :
Vertical Load
Conductor
Weight of Conductor
=(Wc*Nc*Wtsx(Wtsn))
Weight of Insulator
=(Wi*Ni)
Weight of Linesmen with tool

132kV DC for Liberia Eletricty Corporation

Document No :

Loading Calculation For Tower Type


Design
" 2NS (0-2) "
SSN
Condition: Cascading, 50% Oblique Wind

DATE
07.02.2014
Check REV : 0
SJL/TA

Max
= 4325

Min
1442

= 736
= 981
= 6042

736
981
3159

N
N
N

= 2988
= 981
= 3969

996
981
1977

N
N
N

Total Vertical Load, Evex1/Even1

= 2759
= 981
= 3740

920
981
1901

N
N
N

= (0.0218*1*350*0.5*629)

= 2400

= (0.19*1*2.1*0.5*1116.86)

= 223

=(2*20234*sin(0/2))
Total Vertical Load, Eqtc

=0
= 2623

N
N

OPGW
Wind of OPGW
=(Dg*Ng*Ws*Qwev1)
Deviation Load
=(2*Gthq*sin(idmin/2))

= (0.0132*1*350*642.12)

= 2967

=(2*13348*sin(0/2))
Total Vertical Load, Eqtg

=0
= 2967

N
N

Earth Wire
Wind of EW
=(De*Ne*Ws*Qwev1)
Deviation Load
=(2*Ethq*sin(idmin/2))

= (0.014*1*350*642.12)

= 3146

=(2*13078*sin(0/2))
Total Vertical Load, Eqte

=0
= 3146

N
N

= (9.61*1*450(150))
= (736*1)
Total Vertical Load, Evcx1/Evcn1

OPGW
Weight of OPGW
=(Wg*Ng*Wtsx(Wtsn))
Weight of Linesmen with tool

= (6.64*1*450(150))
Total Vertical Load, Evgx1/Evgn1

Earthwire
Weight of EW
=(We*Ne*Wtsx(Wtsn))
Weight of Linesmen with tool
Transverse Load
Conductor
Wind of Conductor
=(Dc*Nc*Ws*0.5*Qwcv1)
Wind of Insulator
=(Di*Ni*Li*0.5*Qwins1)
Deviation Load
=(2*Cthq*sin(idmin/2))

= (6.13*1*450(150))

Page18

Project :

Document No :

132kV DC for Liberia Eletricty Corporation


Loading Calculation For Tower Type
" S (0-2) "

Title :

(Maximum Weight Span)


3969
0
3708
6042

(Minimum Weight Span)


1977
0

3740
0
3933

6556
6042

3159
0
6556

6556
6042
6556

3159
0

0
6556

6556
3159

0
6556

0
6556

6556

6042
0

0
3933
3159

3159
0
6556

1901

6042
0

Check
SJL/TA

3708

6042
0

Design
SSN

DATE
07.02.14
REV : 0

3159
0

0
6556

6556

Load Case:1&2
Normal Working Condition: Tranverse Wind Load
F.O.S
(Loads)
1.5
F.O.S
S.W
1.1

(Maximum Weight Span)


3969
0

0
3146

2967
6042
0
6042

3159
0
5245

0
6042

0
3159
0
3159

0
5245

Load Case:3&4
Normal Working Condition: Oblique Wind Load
F.O.S
(Loads)
1.5
F.O.S
S.W
1.1

0
5245
0
5245

5245

6042
0

3159

3159
0
5245

0
3146

5245

6042

5245

1901

2967

6042

5245

5245

(Minimum Weight Span)


1977
0

3740

3159
0

5245

0
5245

Project :
Title :

3708

6556

6556

6556

132kV DC for Liberia Eletricty Corporation


Loading Calculation For Tower Type
" S (0-2) "
(Maximum Weight Span) E1
2988
3740
14275
0
3933
6042
6042
0
0
6556
6042
6042
0
0
6556
6042
6042
0
0
6556

3708

6556

6556

6556

Document No :
Design
SSN

Check
SJL/TA

DATE
07.02.14
REV : 0

(Maximum Weight Span) C1


3969
3740
0
0
3933
5061
6042
16898
0
6556
6042
6042
0
0
6556
6042
6042
0
0
6556

Load Case:5&6
Broken Condition: Transverse Wind
F.O.S
(Loads)
1.2
F.O.S
S.W
1.1

3708

6556

6556

6556

(Maximum Weight Span) C2


3969
3740
0
0
3933
6042
6042
0
0
6556
5061
6042
16898
0
6556
6042
6042
0
0
6556

Load Case:7&8
Broken Condition: Transverse Wind
F.O.S
(Loads)
1.2
F.O.S
S.W
1.1

3708

6556

6556

6556

(Maximum Weight Span) C3


3969
3740
0
0
3933
6042
6042
0
0
6556
6042
6042
0
0
6556
5061
6042
16898
0
6556

Project :
Title :

3708

6556

6556

6556

132kV DC for Liberia Eletricty Corporation


Loading Calculation For Tower Type
" S (0-2) "
(Maximum Weight Span) E2
3969
2759
0
14451
3933
6042
6042
0
0
6556
6042
6042
0
0
6556
6042
6042
0
0
6556

3708

6556

6556

6556

Document No :
Design
SSN

Check
SJL/TA

DATE
07.02.14
REV : 0

(Maximum Weight Span) C4


3969
3740
0
0
3933
6042
5061
0
16898
6556
6042
6042
0
0
6556
6042
6042
0
0
6556

Load Case:9&10
Broken Condition: Transverse Wind
F.O.S
(Loads)
1.2
F.O.S
S.W
1.1

3708

6556

6556

6556

(Maximum Weight Span) C5


3969
3740
0
0
3933
6042
6042
0
0
6556
6042
5061
0
16898
6556
6042
6042
0
0
6556

Load Case:11&12
Broken Condition: Transverse Wind
F.O.S
(Loads)
1.2
F.O.S
S.W
1.1

3708

6556

6556

6556

(Maximum Weight Span) C6


3969
3740
0
0
3933
6042
6042
0
0
6556
6042
6042
0
0
6556
6042
5061
0
16898
6556

Project :
Title :

3708

6556

6556

6556

132kV DC for Liberia Eletricty Corporation


Loading Calculation For Tower Type
" S (0-2) "
(Minimum Weight Span) E1
996
1901
14275
0
3933
3159
3159
0
0
6556
3159
3159
0
0
6556
3159
3159
0
0
6556

3708

6556

6556

6556

Document No :
Design
SSN

Check
SJL/TA

DATE
07.02.14
REV : 0

(Minimum Weight Span) C1


1977
1901
0
0
3933
2178
3159
16898
0
6556
3159
3159
0
0
6556
3159
3159
0
0
6556

Load Case:13&14
Broken Condition: Transverse Wind
F.O.S
(Loads)
1.2
F.O.S
S.W
1.1

3708

6556

6556

6556

(Minimum Weight Span) C2


1977
1901
0
0
3933
3159
3159
0
0
6556
2178
3159
16898
0
6556
3159
3159
0
0
6556

Load Case:15&16
Broken Condition: Transverse Wind
F.O.S
(Loads)
1.2
F.O.S
S.W
1.1

3708

6556

6556

6556

(Minimum Weight Span) C3


1977
1901
0
0
3933
3159
3159
0
0
6556
3159
3159
0
0
6556
2178
3159
16898
0
6556

Project :

132kV DC for Liberia Eletricty Corporation


Loading Calculation For Tower Type
" S (0-2) "

Title :

(Minimum Weight Span) E2


1977
0

920

3708
3159

3708

0
6556

6556

0
6556

6556

0
6556

6556

3159
0

6556
3159

3159
0

6556
3159

3159
0

6556

14451
3933

Document No :
Design
SSN

Check
SJL/TA

DATE
07.02.14
REV : 0

(Minimum Weight Span) C4


1977
1901
0
0
3933
3159
2178
0
16898
6556
3159
3159
0
0
6556
3159
3159
0
0
6556

Load Case:17&18
Broken Condition: Transverse Wind
F.O.S
(Loads)
1.2
F.O.S
S.W
1.1

3708

6556

6556

6556

(Minimum Weight Span) C5


1977
1901
0
0
3933
3159
3159
0
0
6556
3159
2178
0
16898
6556
3159
3159
0
0
6556

Load Case:19&20
Broken Condition: Transverse Wind
F.O.S
(Loads)
1.2
F.O.S
S.W
1.1

3708

6556

6556

6556

(Minimum Weight Span) C6


1977
1901
0
0
3933
3159
3159
0
0
6556
3159
3159
0
0
6556
3159
2178
0
16898
6556

Project :
Title :

3708

6556

6556

6556

132kV DC for Liberia Eletricty Corporation


Loading Calculation For Tower Type
" S (0-2) "
(Maximum Weight Span) E1
2988
3740
14275
0
3933
6042
6042
0
0
6556
6042
6042
0
0
6556
6042
6042
0
0
6556

3708

6556

6556

6556

Document No :
Design
SSN

Check
SJL/TA

DATE
07.02.14
REV : 0

(Maximum Weight Span) C1


3969
3740
0
0
3933
5061
6042
16898
0
6556
6042
6042
0
0
6556
6042
6042
0
0
6556

Load Case:21&22
Broken Condition: Oblique Wind
F.O.S
(Loads)
1.2
F.O.S
S.W
1.1

3708

6556

6556

6556

(Maximum Weight Span) C2


3969
3740
0
0
3933
6042
6042
0
0
6556
5061
6042
16898
0
6556
6042
6042
0
0
6556

Load Case:23&24
Broken Condition: Oblique Wind
F.O.S
(Loads)
1.2
F.O.S
S.W
1.1

3708

6556

6556

6556

(Maximum Weight Span) C3


3969
3740
0
0
3933
6042
6042
0
0
6556
6042
6042
0
0
6556
5061
6042
16898
0
6556

Project :
Title :

3708

6556

6556

6556

132kV DC for Liberia Eletricty Corporation


Loading Calculation For Tower Type
" S (0-2) "
(Maximum Weight Span) E2
3969
2759
0
14451
3933
6042
6042
0
0
6556
6042
6042
0
0
6556
6042
6042
0
0
6556

3708

6556

6556

6556

Document No :
Design
SSN

Check
SJL/TA

DATE
07.02.14
REV : 0

(Maximum Weight Span) C4


3969
3740
0
0
3933
6042
5061
0
16898
6556
6042
6042
0
0
6556
6042
6042
0
0
6556

Load Case:25&26
Broken Condition: Oblique Wind
F.O.S
(Loads)
1.2
F.O.S
S.W
1.1

3708

6556

6556

6556

(Maximum Weight Span) C5


3969
3740
0
0
3933
6042
6042
0
0
6556
6042
5061
0
16898
6556
6042
6042
0
0
6556

Load Case:27&28
Broken Condition: Oblique Wind
F.O.S
(Loads)
1.2
F.O.S
S.W
1.1

3708

6556

6556

6556

(Maximum Weight Span) C6


3969
3740
0
0
3933
6042
6042
0
0
6556
6042
6042
0
0
6556
6042
5061
0
16898
6556

Project :
Title :

3708

6556

6556

6556

132kV DC for Liberia Eletricty Corporation


Loading Calculation For Tower Type
" S (0-2) "
(Minimum Weight Span) E1
996
1901
14275
0
3933
3159
3159
0
0
6556
3159
3159
0
0
6556
3159
3159
0
0
6556

3708

6556

6556

6556

Document No :
Design
SSN

Check
SJL/TA

DATE
07.02.14
REV : 0

(Minimum Weight Span) C1


1977
1901
0
0
3933
2178
3159
16898
0
6556
3159
3159
0
0
6556
3159
3159
0
0
6556

Load Case:29&30
Broken Condition: Oblique Wind
F.O.S
(Loads)
1.2
F.O.S
S.W
1.1

3708

6556

6556

6556

(Minimum Weight Span) C2


1977
1901
0
0
3933
3159
3159
0
0
6556
2178
3159
16898
0
6556
3159
3159
0
0
6556

Load Case:31&32
Broken Condition: Oblique Wind
F.O.S
(Loads)
1.2
F.O.S
S.W
1.1

3708

6556

6556

6556

(Minimum Weight Span) C3


1977
1901
0
0
3933
3159
3159
0
0
6556
3159
3159
0
0
6556
2178
3159
16898
0
6556

Project :

132kV DC for Liberia Eletricty Corporation


Loading Calculation For Tower Type
" S (0-2) "

Title :

(Minimum Weight Span) E2


1977
0

920

3708
3159

14451
3933

3708

0
6556

6556

0
6556

6556

0
6556

6556

3159
0

6556
3159

3159
0

6556
3159

3159
0

6556

Document No :
Design
SSN

Check
SJL/TA

DATE
07.02.14
REV : 0

(Minimum Weight Span) C4


1977
1901
0
0
3933
3159
2178
0
16898
6556
3159
3159
0
0
6556
3159
3159
0
0
6556

Load Case:33&34
Broken Condition: Oblique Wind
F.O.S
(Loads)
1.2
F.O.S
S.W
1.1

3708

6556

6556

6556

(Minimum Weight Span) C5


1977
1901
0
0
3933
3159
3159
0
0
6556
3159
2178
0
16898
6556
3159
3159
0
0
6556

Load Case:35&36
Broken Condition: Oblique Wind
F.O.S
(Loads)
1.2
F.O.S
S.W
1.1

3708

6556

6556

6556

(Minimum Weight Span) C6


1977
1901
0
0
3933
3159
3159
0
0
6556
3159
3159
0
0
6556
3159
2178
0
16898
6556

Project :

Document No :

132kV DC for Liberia Eletricty Corporation


Loading Calculation For Tower Type
" S (0-2) "

Title :

(Maximum Weight Span)


2988
8784
3708
5061

(Minimum Weight Span)


2988
8784

2759
8893
3933

6556
5061

2178
6759
6556

6556
5061
6556

2178
6759

6759
6556

6556
2178

6759
6556

6759
6556

6556

5061
6759

8893
3933
2178

2178
6759
6556

920

6759

5061
6759

Check
SJL/TA

3708

5061
6759

Design
SSN

DATE
07.02.14
REV : 0

2178
6759

6759
6556

6556

Load Case:41&42
Cascading Condition: Tranverse Wind
F.O.S
(Loads)
1.2
F.O.S
S.W
1.1

(Maximum Weight Span)


3969
7620

7677
3146

2967
6042
5854
6042

3159
5854
5245

5854
6042

5854
3159
5854
3159

5854
5245

Load Case:43&44
Cascading Condition: Oblique Wind
F.O.S
(Loads)
1.2
F.O.S
S.W
1.1

5854
5245
5854
5245

5245

6042
5854

3159

3159
5854
5245

7677
3146

5245

6042

5245

1901

2967

6042

5245

5245

(Minimum Weight Span)


3969
7620

3740

3159
5854

5245

5854
5245

Project :

Document No :

132kV DC for Liberia Eletricty Corporation


Loading Calculation For Tower Type
" S (0-2) "

Title :

(Maximum Weight Span)


3969
0

(Minimum Weight Span)


1977
0

3740
0
0

0
6042

Design
SSN

0
6042

3159
0
0

0
6042
0

3159
0

0
0

0
3159

0
0

0
0

6042
0

3159

3159
0
0

0
0

6042
0

1901

6042
0

Check
SJL/TA

DATE
07.02.14
REV : 0

3159
0

0
0

Load Case:41&42
Erection & Maintenance Condition: No Wind
F.O.S
(Loads)
2
F.O.S
S.W
1.1

(Maximum Weight Span)


2988
0

0
1966

1854
5061
0
5061

2178
0
3279

0
5061

0
2178
0
2178

0
3279

0
3279
0
3279

3279

5061
0

2178

2178
0
3279

0
1966

3279

5061

3279

920

1854

5061

3279

3279

(Minimum Weight Span)


996
0

2759

2178
0

3279

Load Case:43&44
Erection & Maintenance Condition: 50% Transverse Wind
F.O.S
(Loads)
2
F.O.S
S.W
1.1

0
3279

Project :

Loading Calculation For Tower Type


" S (0-2) "

Title :

(Maximum Weight Span)


3969
0

0
1966

6042
3279
6042

3159
0
3279

3279
6042

3159
0

0
3279

3279
3159

0
3279

0
3279

3279

6042
0

0
1966
3159

3159
0
3279

3159
0

3279

Load Case:43&44
Erection & Maintenance Condition: 50% Transverse Wind
F.O.S
(Loads)
2
F.O.S
S.W
1.1

DATE
07.02.14
REV : 0

1901

6042
0

Check
SJL/TA

1854

6042
0

Design
SSN
(Minimum Weight Span)
1977
0

3740

1854

3279

Document No :

132kV DC for Liberia Eletricty Corporation

0
3279

Anda mungkin juga menyukai