Tack is an adhesive term that relates to a sort of stickiness. A tack bond is a surface bond created by highly mobile or highly polar material. This is NOT what is meant by a tack coat in asphalt technology. In the AEMA emulsion guidelines its defined as A spray application of Asphalt Emulsion applied to an e!isting asphaltic "ortland cement concrete pavement prior to a new asphalt overlay# or patching to eliminate slippage planes and provide a bond between new and e!isting pavement layers. $ometimes erroneously called a prime coat a tack coat is solely to ensure a good bond on the ne!t layer. It need not be done with asphalt emulsion. In some countries cutback asphalt % asphalt dissolved in solvents such as kerosene or diesel& are used and even penetration grade % '((pen& asphalt is sprayed neat. The residual binder is the key to the overall tack coat performance. )owever retained solvent or over application can have severe conse*uences. 2. How does a Tack Coat work? The tack coat is a very thin surface. The tack coat is sprayed using a tack coater spray system. It should be an even coat over the entire substrate to be overlaid. The hot mi!ture placed on top should soften the tack coat layer allowing it to partially fill surface voids in the hotmi!. $o that when compaction occurs it becomes partially interlocked with the hot mi! layer. If used before a microsurfacing the tack coat will not be softened but the emulsion from the microsurfacing will wet the tack coat creating an asphalt+asphalt bond. %Note in most cases tack coat is NOT re*uired for microsurfacing e!cept where the surface is a "ortland cement concrete which is highly polished&. ,ilms of asphalt have a stability based on their cohesion versus the thickness of the layer. To act as a good tack coat the layer must not shear sideways under traffic. This means that thick films have relatively less cohesion. $o over applied tack coats will cause a shear plane resulting is slippage or shear cracks in the hotmi!. Thus application rate is -E./ important. If the surface is absorbent or open te!tured then more tack coat will be re*uired. The aim is always to get a layer of membrane about (.01(.'mm thick. Application .ates. ,or stiffer materials such as asphalt rubber or polymer modified emulsions the layers may be thicker. )owever as these materials are e!pensive there is little point. An e!ception is where the overlay is open graded or has high voids levels. In such instances e.g. Novachip2 or thin bonded layers# higher levels of tack coat are used. This is almost always polymer modified to ensure cohesion is sufficient to prevent shear slippage. 3. Suitable Materials For Tack Coat Emulsions are the preferred tack coat material. To achieve the low application rates re*uired emulsions are ideal as they can be diluted. The emulsion should break before the hotmi! is applied. ,or this reason rapid set emulsions are used in some countries . )owever 3.$ emulsions with some emulsifiers s are not stable to dilution and slow set or medium set emulsions are used. 4here adhesion is problematic or where a thicker layer is desirable# late! modification may be re*uired. $uitable emulsions are5 3.$10 % stable& 3M$10 3$$10 3$$10 6(7 emulsion $$10 M$10 .$10 4here cutback is used it should be at least partially cured before hotmi! is applied. M3# $3# cutbacks have been used with success. 4here neat asphalt is used a difficulty in ensuring the application rate is usual and difficult to overcome. 4. Applicatio! The emulsion is diluted with water# the compatibility must be checked. It is important to do a compatibility test as follows. 0. ,ill a can %0 lt & half full with emulsion '. Add re*uired amount of water 6. Mi! with a non metal spatula 8. E!amine for lumping by pouring through a 09(um prewetted sieve 9. 4ash sieve thoroughly1 any balls of material: )ow much: ;. If more than 07 or so there may be an incompatibility problem1 call manufacturer. The water should always be added to the emulsion1 NOT the other way around. <o not store the diluted emulsion. =se it straight away %that day&. 4armed water may be used at '919(3 if desired. This will lower viscosity and make handling easier. a. Sur"ace #reparatio As in most processes that involve application to an e!isting surface to achieve adhesion re*uires a clean substrate. The road must be thoroughly swept so that all loose material and dust is removed. )eavy oil drippings must be removed with detergent # burning or dig out. $ometimes a light water spray on the surface is beneficial % (.; lt+m'&. This will improve flow of the material into the voids# however it should not be flooded. b. $%uip&et As in most processes that involve application to an e!isting surface to achieve adhesion re*uires a clean substrate. The road must be thoroughly swept so that all loose material and dust is removed. )eavy oil drippings must be removed with detergent # burning or dig out. $ometimes a light water spray on the surface is beneficial % (.; lt+m'&. This will improve flow of the material into the voids# however it should not be flooded. '. Tack Coats are ot re%uired so&eti&es! If the surface has been primed# i.e. it is a new construction a tack coat is not necessary. If the surface has been stabili>ed with an asphalt based dust suppressant a tack coat is not re*uired. If a new membrane $AMI seal has been applied only a light tack coat is re*uired. Microsurfacing or slurry application on "33 pavements that are worn and absorbent will not re*uire a tack coat. The slurry or microsurfacing mi!ture can be designed to ensure that the emulsion wets the surface of the pavement to create the bond re*uired. In $lurry $urfacings of all types the mi!ture is highly mobile at spreading. Even under higher temperature conditions a spray of water is all that is needed. Tack coats are ot tack( ad do ot reall( coat. The( are a brid)e la(er betwee a e*isti) sur"ace ad a ew sur"ace course. Whe the ew sur"ace course is a chip seal or slurr( the( will ot be re%uired. Where it is a hot &i* or cold &i* a tack coat is critical. 4here tack 3oats may not be needed5 primed surfaces# stabili>ed surfaces# chip sealed surfaces# membrane seals. 3opyright ? '((( -alley $lurry $eal 3o All .ights .eserved.
Quantum Physics for Beginners: Simple Illustrated Guide to Discover with Practical Explanations the Paradoxes of the Life and Universe Reconsidering Reality
Google Sheets For Beginners: The Ultimate Step-By-Step Guide To Mastering Google Sheets To Simplify Data Analysis, Use Spreadsheets, Create Diagrams, And Boost Productivity