AAR AIRCRAFT SERVICES
Indianapolis
TITLE: Installation Of Single HFS700 HF Communications System
ATA AI RCRAt'T EFl'ECTIVITY
N776AS
PW245
MA.JOR
MINOR
X REPAIR
ALTERATION X
OTHER
W/O ZONE.ITEM
Gabe Guerrero
18595 2300-0026
2311 737-400
:l
Prepared By:
-.~-J"'~~
Date: 10/10/10
CUSTOMER: Boeing Capital Corp
Authorized By: ~-..~
Shane Henderson Dare: \0/10/10
CUSTOMER ENGINEERING DOCUMENT:
N/A
Engineering Management Review:
Dale: \0/10/10
Dare: IOl '/
EFFECT ON WEIGHT AND BALANCE:
Customer Representative:
TOTAL TIME:
TOTAL CYCLES:
FOLLOW ON ACTION
REQUIRED:
29,123
YES x
Weight.
Station.
N/A
NIA
Description:
During Boeing Capi tal eorp Aie maintenance check, customer has requested that a
Collins Single HFS700 HF Communications System be installed per Ref lEI after the
ACARS System is removed per Ref IB/.
Approval Basis:
This modification installs a Single HF eommunications System per Ref IAI which could
adversely af feet ai rworthiness. Therefore i according to AA Maj or IMinor Decision
Diagram, this repair is classified as Major. Ref IAI and lEI are FAA approved data.
References:
IA/: eMS Aircraft Support Group Modification Order M.O. 737-231004, Initial Release,
Da t ed 81 1 5/2 01 0
AAR EA 101185
EMI Test Plan - Janzair Dwg No. 737-2311-301, Dated 7/1/2003
HF Communication System AM 23-11
CMS Aircraft Support Group Modification Order M.O. 737-231004, Rev A, Dated
10/02/2010
IB/:
IC/:
ID/:
lEI:
Revisions:
P1: Preliminary
P2: Revised Description, Approval Basis, Ref i AI and Steps 2 & 6. Added Ref lEI and
note after step 2.
IR: Final Release - Revised Step 1 and deleted steps 2~6.
Accomplishment Instructions:
11. Verify EA 101141 P2 Steps
deviation and all steps have
I ACCOMP BY
. XXXXXX
1 - 6 and Ref IAI and lEI
been completed and signed
i IN~IMllc1~~
.. /& ~/~~/-l
been completed wi thout have
off.
I
AAR F,~ EA-OO'. R", "',,,.. ~
AAR em,
075
JMC1'lr,
AAR AIRCRAFT SERVICES
Indianapolis
ENGINEERING
AUTHORIZATION
E.A. No.:
Date Issued:
Revision:
Revision Date:
Page:
101141
9/14/1 0
10f3
TITLE: Installation Of Single HFS700 HF Communications System
ATA AIRCRAFT EFl'ECTIVITY
N776AS
PW245
d
Craig Blandford --
REPAIR
ALTERATION
OTHER
w/O ZONE-ITEM
23 i 1 737-400
x
18595 2300-0026
Prepared By:
Date: 9/1 4/1 0
CUSTOMER: Boeing Capital Corp
Authorized By: Dale: CUSTOMER ENGINEERING DOCUMENT:
N/A
Engineering Management Review: Dale:
Customer Representative: Date:
EFFECT ON WEIGHT AND BALANCE:
TOTAL TIME:
TOTAL CYCLES:
FOLLOW ON ACTION
REQUIRED:
51,558
29,123
YES x
Weight -
Station -
N/A
N/A
Description:
During Boeing eapital Corp A/c maintenance check, customer has requested that a
Collins Single HFS700 HF eommunications System be installed per Ref IAI after the
ACARS System is removed per Ref IB/.
Approval Basis:
This modification installs a Single HF Communications System per Ref IAI which could
adversely affect airworthiness. Therefore, according to AAR Major/Minor Decision
Diagram, this repair is classified as Major. Ref IAI is F:iA approved data.
References:
IA/: General Aerospace Modification Order M. O. 737-231004, Initial Release, Dated
8/15/2010
AAR EA 101185
EMI Test Plan - Janzair Dwg No. 737-2311-301, Dated 7/1/2003
HF Communication System AMM 23-11
IB/:
Ic/:
IDI:
Revisions:
P1: Preliminary
AAR Form EA-OOJ, Rev: 6/09/09
ENGINEERING
AUTHORIZATION
E.A. No.:
Date Issued:
Revision:
Revision Date:
Page:
101141
9/14/10
PI
AAR AIRCRAFT SERVICES
Indianapolis
20f3
TITLE: Installation Of Single HFS700 HF Communications System
Accomplishment Instructions:
1. Review the front page of the Preliminary EA #l for any corrections/additions needed to the Title,
Effectivity, Work Order, Zone-Item, Customer and Description paragraph.
ACCOMP BY fNSP BY
f
-/O-!rJ
IMC075
2. Install Collins HFS 700 HF Communication system per Ref / AI.
Were any deviations to Ref /AI required? Yes or No
If Yes, contact Engineering and write a brief description below:
ACCOMP BY fNSP BY
*'
IMC075
o4()O
3. Conduct ground system tests to detect the presence of Electromagnetic Interference between various
electrical equipment per Ref /C/.
Were any deviations to Ref /C/ required? Yes or No
If Yes, contact Engineering and write a brief description below:
l-
ACCOMP BY INSP BY
- 0-1
AAR 5
07
4. Attach the AIRPLANE FLIGHT MANUAL SUPPLEMENT to the FAA APPROVED BOEING
B737 AIRPLANE FLIGHT MANUAL after the HF COMMUNICATIONS SYSTEMS have been
installed.
l ACCOMP BY
10--10 0
AAR Form EA-001, Rev: 6/09/09
* fce o""ph slJ (' '" ~IUO II 'f i P ~
AAR AIRCRAFT SERVICES
Indianapolis
ENGINEERING
AUTHORIZATION
E.A. No.:
Date Issued:
Revision:
Revision Date:
Page:
101141
9/14/10
PI
30f3
TITLE: Installation Of Single HFS700 HF Communications System
5. Upon repair completion, Production and Qe personnel are to verify all Instruction Steps of this EA
have been complied with and check front page (through Revision section) for accuracy.
ACCOMP BY ~PBY
IMe07S 10\ to\ tV
" '
xxxxxx
6. Upon completion of the previous step, Production personnel are required (if this is a "Preliminary"
EA), to report repair completion with any and all deviations/correction requests to AAR Engineering
via E-mail at: E-mail Engineering a scanned copy of the completed PI and
Ref I AI and Ref iei documents.
ACCOMP BY
XXXXXX
I_BY
IMe07S tQ \ \O~ 10
\ \
AAR Form EA-OOl, Rev: 6/09/09
"*
. ..
AAR
071)
JM .c.
AAR AIRCRAFT SERVICES
Indianapolis
ENGINEERING
AUTHORIZATION
E.. No.:
Date Issued:
Revision:
Revision Date:
Page:
101141
9/14/10
P2
10103/10
10f3
TITLE: Installation Of
Single HFS700 HF Communications System
ATA AIRCRAT EFFECTITY
N776AS
PW245
REPAIR
ALTERATION X
OTHER
W/O ZONE-ITEM
2311 737-400
18595 2300-0026
Prepared By:
Date: 10/03/10
CUSTOMER: Boeing Capital Corp
Authorized By:
Date: CUSTOMER ENGINEERIG qpCUMENT:
;r!;:
N/A'~
/ '~
/ ~j
Engineering Management Review:
Date:
x
Weight -
'
Station - 1:1
:#w~;r~%Fi;!pJ~
EFFECT ON WEl~HT ANDIf4ANCE:
%;(',r 1G;
k/f;r ,t;;
,:/,-://;///;0" %
///;;0',;:':
~%~0,
/f;:;:;;, N/ A 'c;;,i:K;;/
Y/);,;,;;7
/;~~'cJ' JY:Y
1s\.r':A j~ -;
~~ /;r '~(f
\
Customer Representative:
Date:
TOTAL TIME:
TOTAL CYCLES:
FOLLOW ON ACTION YES
REQUIRED:
51,558
29,123
:fff
~:,/~:;f
';~Y
Description:
During Boeing eapital Corp Ale maintenance
Collins Single HFS700 HF Communications
AeARS System is removed per Ref IB/.
requested that a
per Ref lEI after the
Approval Basis:
This modification
adversely affect
Diagram, this repair is
System per Ref IAI which could
, according to AAR MajorlMinor Decision
Ref IAI and lEI are FAA approved data.
Order M.O. 737-231004, Initial Release,
IB/:
lei:
ID/:
lEI:
Dwg No. 737-2311-301, Dated 7/1/2003
AM 23-11
Group Modification Order M.O. 737-231004, Rev A, Dated
Approval Basis, Ref IAI and Steps 2 & 6. Added Ref lEI and
AAR Form EA-OOl, Rev: 6/09/09
.
,
AAR AIRCRAFT SERVICES
Indianapolis
E.A. No.:
Date Issued:
Revision:
Revision Date:
Page:
ENGINEERING
AUTHORIZATION
TITLE: Installation Of Single HFS700 HF Communications System
Accomplishment Instructions:
1. Review ~e front page ofthe Preliminary EA #2 for any corrections/additions needed to the Title,
Effectivity, Work Order, Zone-Item, Customer and Description paragraph.
INSP BY
J\
JM" D
I 2. Install Collins HFS 700 HF Communication system per Ref /A! and IE/.
Note: Some of the Ref / A! work steps had already been signed
Were any deviations to Ref / A! or IE/ required? Yes or rt
If Yes, contact Engineering and wrte a brief description b~~*
0' /f;?;%
;~8: -"%~~%;
!:k/):t;::,_ 17/
-F "/////// /'
;jJl;i$L //
/0:(1:,::;;/
~'
;///;0
/':;);/
#$'
;;::::://
;; "'~~f/;~/_
/':1~'.:;y
//;:\;;'P/-////
//:Pl;
1;//:::
/
INSP BY
J\ )
U4 If)?
;f~0i~:
;/ /z~~~~
3. Conduct ground system tests tOf~;etect tl~greseii'~(Electromagnetic Interference between various
electrcal equipment per Ref /er: ..... z ~. .. j
&i1/;:-. _/'~%::Y'
::2;. _ ;(%:::;; _ _~q;
ii~~~:~~a:~;n~~~':=::~i~c:~nw.
/1~f:t, ...:
;Y(~~~:
'W/
/
/;:0;:;,
;;C:0V4;;::'
:;' )(// 'l
;;7 ;;
~-A;; //
-~~%///_//_:,_;(Zr;tI /'/:/mm;:q(lj/
-/::/ ::
~~;::~:--
/!f// ~,&k;
Sf::: - :
0#;//._ .if
//;/%:?: )7
/. '-;-N1~iL_ _-_.;;
/W,~.:
//lr.::V(//-
4. Attacl"J:tAlRPLANE FLIGHT MANUAL SUPPLEMENT to the FAA APPROVED BOEING
B737 AIRPLANE FLIGHT MANUAL after the HF COMMUICATIONS SYSTEMS have been
ij
installed.
I ACCO~
I P--. kJ I msr~080
w/1J,lO
AAR Form EA-OOl, Rev: 6/09/09
101141
9/14/10
P2
10103/10
20f3
,
. ~
AAR AIRCRAFT SERVICES
Indianapolis
ENGINEERING
AUTHORIZATION
E.. No.:
Date Issued:
Revision:
Revision Date:
Page:
101141
9/14/10
P2
10/03/10
30f3
TITLE: Installation Of Single HFS700 HF Communications System
5. Upon repair completion, Production and QC personnel are to verify all Instrction Steps of
this EA
have been complied with and check front page (through Revision section) for accuracy.
ACCOMP BY INSP BY
XX :~075 0\ \0 ~ 'P
6. Upon completion of
the previous step, Production personnel are required (if
this is ~~Ji:li ary"
E~), to r~port ~epair completion with any an? all d~viat~ons/correction requests t~M~~.C'ering
via E-mail at: 11d-eng(qaarcorp.com. E-mail Eng11eenng a scanned copy oft~(partially or 'lly)
L d P 1 P2 d f IAI ICi d I d ;;;;W'.&;;~ ,/%; comp ete , an Re , an ocuments. r ~~4!/, f;!J
~/~t~~~// "d
8;;
ACCOMP BY /y
xx
AAR Form EA-OOl, Rev: 6/09/09

Anda mungkin juga menyukai