Anda di halaman 1dari 229

14.

00%

12.00%

MONTHLY PROGRESS
10.00%

8.00%

6.00%

4.00%

2.00%

0.00%

10

11

12

PROJECT MONTH

13

14

15

16

17

18

19

20

21

22

23

24

100.00%

90.00%

80.00%

70.00%

60.00%

50.00%

40.00%

30.00%

20.00%

10.00%

0.00%

14

15

16

17

18

19

20

21

22

23

24

25

26

S cheduled Monthly Progress


A ctual Monthly P rogress
Original P lan
S cheduled Cumulative Progress
A ctual Cumulative P rogress

SHANDONG
PT. REKAD AYA ELEKTRIKA
MACHINE RY I & E
GROUP CORP ORATI ON

CONSTRUCTION S-CURVE
As of Mar. 25, 2011
Project Name : PLTU SULTRA 2 x 10 MW
Job No : 08.18.03
Price
No

Month

Description

III

CONSTRUCTION

III.1

CIVIL WORKS

Mar-08

WF
Total PCS
(Rp)
35,785,047,874

Apr-08

1
W1

W2

May-08

2
W3

W4

W1

W2

Jun-08

3
W3

W4

W1

W2

Jul-08

4
W3

W4

W1

W2

Aug-08

5
W3

W4

W1

W2

Sep-08

6
W3

W4

W1

W2

Oct-08

7
W3

W4

W1

W2

Nov-08

8
W3

W4

W1

W2

Dec-08

9
W3

W4

W1

W2

Jan-09

10
W3

Feb-09

11

W4

W1

W2

W3

W4

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

0.00

0.00

0.00

0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

W1

W2

Mar-09

12
W3

W4

W1

Apr-09

13

W2

W3

W4

W1

W2

May-09

14
W3

W4

W1

Jun-09

15

W2

W3

W4

W1

W2

Jul-09

16
W3

W4

W1

Aug-09

17

W2

W3

W4

W1

W2

Sep-09

18
W3

W4

W1

Oct-09

19

W2

W3

W4

W1

W2

Nov-09

20
W3

W4

W1

W2

Dec-09

21
W3

W4

W1

W2

Jan-10

22
W3

W4

W1

W2

Feb-10

23
W3

W4

W1

W2

Mar-10

24
W3

W4

W1

Apr-10

25

W2

W3

W4

May-10

26

Jun-10

27
W3

W4

W3

W4

W1

W2

0.00

0.00

0.00

0.00

W1

W2

W3

W4

W1

W4

W1

0.00

0.00

0.00

0.00

0.00

### 0.00

0.00

0.00

### 0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.01

0.00
0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00 0.00
0.00 0.00
0.00 0.00
### 0.00

0.00

0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

### 0.00
### 0.00
### 0.00
### 0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

### 0.00
### 0.00
### 0.00
### 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

### 0.00
0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00

0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.01

0.00

0.00

0.00

0.00

0.00

0.00

### 0.00

0.00

0.00

0.00
0.00

### 0.00
### 0.00

0.00
0.00

0.00
0.00

0.00

0.00

0.00
0.00

### 0.00
### 0.00

0.00
0.00

0.00
0.00

0.00

### 0.00
0.00 0.00
0.00 0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00 0.00
0.00 0.00
### 0.00
### 0.00

0.00

0.35458

46.74%

0.070

90.67%

0.03117

44.80%

0.00197

0.00041

49.41%

0.03438

4,269,780,000

0.157

94.81%

0.09729

61.86%

0.00339

0.00204

65.25%

0.10261

3 Boiler and Auxiliary Foundation

6,240,750,000

0.230

98.67%

0.10618

46.19%

0.00567

0.00076

46.82%

0.10761

4 CW Intake & Discharge Structure


5 Stack Foundation and Structure

1,615,000,000
1,675,650,000

0.059
0.062

39.09%

0.02144

36.05%

0.00083

0.00181

92.23%

0.05486

53.08%

0.02518

40.80%

0.00091

0.00724

76.86%

0.04744

6 BOP Foundation and Structure


7 Coal Storage and Facilities

2,535,710,000
1,626,500,000

0.093
0.060

87.48%

0.03570

38.23%

0.00227

0.00292

43.70%

0.04081

16.00%

0.00306

5.12%

0.00027

0.00315

31.97%

0.01915

1,445,000,000

0.053

3.80%

0.00139

2.60%

0.00004

0.00213

68.49%

0.03645

0.00%

#DIV/0!

#DIV/0!

0.01944

69.37%

0.01861

#DIV/0!

#DIV/0!

0.02682

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

29.70%

0.01267

16.87%

0.00062

0.00660

56.79%

0.04264

5.85%

0.00188

#DIV/0!

#DIV/0!

0.03216

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.15497

20.42%

62.52%

0.05655

#DIV/0!

#DIV/0!

0.09045

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00

0.00

###

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.01

0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

###

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00

0.00
0.00

0.00

0.00

0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00

0.00

###

0.00

0.00

0.00

0.00 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Ash Disposal Area and Facilities Cooling Water


Way

11 Miscellanious Buildings and Structure


12

70 kV Transformers and Switchgear Room


(Anexed to S/T Building) Switchyard

13 Site Finishing
14 Cooling Tower

W2

Aug-10

29

W2

0.00

0.759

1,888,943,946

Steam Turbine Building and Annex Central Control


2 Room, Emergency Diesel and Air Compressor
Rooms

9 Coal Unloading Jetty


10 Adminsitration Building

Jul-10

28

W1

0.00

W3

W2

Sep-10

30
W3

W4

W1

W2

0.00

0.00

### 0.00

0.00
0.00

0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

### 0.00
### 0.00
### 0.00

0.00

0.00

### 0.00

0.00

0.00

### 0.00
### 0.00

0.00
0.00

0.00
0.00

### 0.00

### 0.00
### 0.00
0.00 0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

Oct-10

31
W3

W2

Nov-10

32

W4

W1

W3

W4

0.00
0.00
0.00

0.00
0.00
0.00

### 0.00
### 0.00

0.00
0.00

0.00
0.00

0.00

0.00

### 0.00

0.00

0.00

### 0.00
### 0.00
### 0.00

0.00
0.00
0.00

0.00
0.00
0.00

### 0.00
### 0.00
### 0.00
### 0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

### 0.00

0.00

0.00

0.00

0.00

0.00

0.00

### 0.00

0.00

0.00

0.00
0.00

0.00

W1

W2

Dec-10

33
W3

W4

W1

W2

0.00

### 0.00

34
W3

W4

W1

0.00

###

W2

W3

W4

1.000

27,149,983,946

1 Preparation Work

2,910,500,000

0.107

903,500,000

0.033

2,038,650,000

0.075

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

###

0.00
0.00 0.00

0.00 0.00 0.00


0.00 0.00 0.00

0.00 0.00 0.00


0.00 0.00 0.00

0.00

0.00

### 0.00
0.00

0.00

0.00

0.00

### 0.00

0.00

0.00

0.00

ERECTION AND COMMISSIONING

III.2
III.2.I

MECHANICAL WORKS
1 General (Not Used)

6,828,663,928
5,182,784,826
-

0.1908245017
0.759

0.191
0.759

2,746,234,400

0.529876

0.530

49.66%

0.04333

8.18%

0.00548

0.02425

16.47%

0.08724

1,547,318,500

0.298550

0.227

39.60%

0.01589

7.01%

0.00204

0.01711

17.71%

0.04014

0.00%

#DIV/0!

0.02701

4 Condenser and Feed Water Heating Plant


5 Plant Water System
6 Drainage and Waste Water Treatment Plant
7 Fire Protection System
8 Compressed Air System
Chemical Feed System (Included in Boiler &
Auxiliary)
10 Sampling Rack System
9

11 Laboratory and Instruments


12 Chlorination System
13 Air Conditioning and Ventilation
14 Crane and Hoist
15 Workshop and Machinery Equipment
16 Mobile Equipment
17 Coal Handling
18 Fuel Oil System
19 Ash Handling System
20 Vacuum Cleaning
21 Studies / Calculation

#DIV/0!

0.00%

#DIV/0!

#DIV/0!

0.00946

170,084,562

0.032817

0.033

9.00%

0.00156

4.76%

0.00007

0.00187

52.87%

0.01735

64,398,685

0.012425

0.012

0.00%

0.00%

ELECTRICAL WORKS
1 Power Station
2 Switchyard
3 Control and Instrumentation

Training, Mandatory Spare Part, Maintenance


III.3 Tool & Testing, Consumable and Manufacture
Inspection & Design Review

TOTAL
Plan Progress Incremental
Plan Progress Cummulative/Weeks

0.00104

32.80%

0.00408

###

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.01

0.00%

#DIV/0!

#DIV/0!

0.00278

0.00%

#DIV/0!

#DIV/0!

0.00265

10,116,745

0.001952

0.002

0.00%

0.00%

0.00016

135.89%

0.00265

0.00%

#DIV/0!

#DIV/0!

0.00330

0.00%

#DIV/0!

#DIV/0!

0.00193

5,622,591
113,117,533

0.001085
0.021826

0.001
0.022

98.50%

0.01958

1805.11%

0.00003

0.00000

1832.60%

0.01988

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00%

0.00%

0.00091

11.93%

0.00260

49.50%

0.01806

#DIV/0!

#DIV/0!

0.03649

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

395,426,065
37,062,205

0.076296
0.007151

0.076
0.007

93,403,540
-

0.018022
-

0.018
-

0.00%

#DIV/0!

#DIV/0!

0.01025

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00

0.00

0.00

0.00

1,645,879,102

0.241

0.50707

0.507

4.44%

0.00159

0.31%

0.00094

0.03461

7.05%

0.03576

0.24303
0.24990

0.243
0.250

0.00%

0.00%

0.02430

8.98%

0.02183

0.00%

0.00%

0.01562

7.90%

0.01975

0.050

35,785,047,874

1.000

0.00159

0.00

0.00

###

0.00

0.00

0.00

0.00 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00 0.00

0.00

0.00

0.00

### 0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

### 0.00

0.00

0.00

0.00 0.00
### 0.00

0.00
0.00

0.00
0.00

0.00

0.00

0.00

0.00

### 0.00

0.00

0.00

### 0.00
### 0.00
0.00 0.00

0.00
0.00
0.00

0.00
0.00
0.00

### 0.00
### 0.00
### 0.00

0.00

0.00

0.00

0.00

0.00

### 0.00

0.66%

834,578,900
400,000,000
411,300,202

1,806,400,000

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.01

0.01

0.03

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.04

0.04

0.00

0.00

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.03

0.03

0.02

0.02

0.01

0.01

0.01

0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.10%

0.19%

0.29%

0.39%

0.49%

0.58%

0.68%

0.78%

0.88%

0.98%

1.08%

1.18%

1.28%

1.38%

1.48%

1.58%

1.98%

2.38%

2.78%

3.19%

3.59%

3.99%

4.39%

4.79%

5.19%

5.59%

5.99%

6.39%

7.14%

7.89%

8.65%

9.40%

10.11%

10.82%

11.53%

12.25%

12.96%

13.67%

14.38%

15.09%

16.01%

16.92%

17.83%

18.74%

19.68%

20.61%

21.55%

22.48%

23.47%

24.46%

25.45%

26.43%

27.42%

28.41%

29.41%

30.40%

31.39%

32.38%

33.37%

34.36%

35.04%

35.71%

36.38%

37.06%

37.73%

38.40%

39.08%

39.75%

40.02%

40.29%

40.56%

40.83%

41.10%

41.36%

41.63%

41.90%

42.00%

42.10%

42.20%

42.31%

42.71%

43.20%

43.78%

44.67%

48.11%

49.05%

49.88%

51.11%

52.59%

54.07%

55.55%

57.03%

61.08%

65.13%

65.23%

65.33%

67.33%

69.33%

71.33%

73.32%

75.79%

78.25%

80.59%

82.93%

85.50%

88.06%

90.18%

92.30%

93.67%

95.03%

95.94%

96.84%

97.34%

97.84%

98.34%

98.84%

98.95%

99.07%

99.18%

99.30%

99.42%

99.53%

99.65%

99.76%

99.88%

100.00%

100.00%

100.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.10%

0.10%

0.10%

0.10%

0.10%

0.10%

0.10%

0.10%

0.10%

0.10%

0.10%

0.10%

0.10%

0.10%

0.10%

0.10%

0.40%

0.40%

0.40%

0.40%

0.40%

0.40%

0.40%

0.40%

0.40%

0.40%

0.40%

0.40%

0.75%

0.75%

0.75%

0.75%

0.71%

0.71%

0.71%

0.71%

0.71%

0.71%

0.71%

0.71%

0.91%

0.91%

0.91%

0.91%

0.93%

0.93%

0.93%

0.93%

0.99%

0.99%

0.99%

0.99%

0.99%

0.99%

0.99%

0.99%

0.99%

0.99%

0.99%

0.99%

0.67%

0.67%

0.67%

0.67%

0.67%

0.67%

0.67%

0.67%

0.27%

0.27%

0.27%

0.27%

0.27%

0.27%

0.27%

0.27%

0.10%

0.10%

0.10%

0.10%

0.40%

0.49%

0.58%

0.89%

3.44%

0.94%

0.84%

1.23%

0.14%

0.50%

5.45%

1.20%

1.35%

0.53%

1.51%

1.22%

1.33%

0.27%

0.54%

1.64%

0.33%

0.59%

0.91%

0.69%

0.54%

0.61%

0.34%

0.45%

0.60%

0.23%

0.24%

0.68%

0.15%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.10%

0.19%

0.29%

0.39%

0.49%

0.58%

0.68%

0.78%

0.88%

0.98%

1.08%

1.18%

1.28%

1.38%

1.48%

1.58%

1.98%

2.38%

2.78%

3.19%

3.59%

3.99%

4.39%

4.79%

5.19%

5.59%

5.99%

6.39%

7.14%

7.89%

8.65%

9.40%

10.11%

10.82%

11.53%

12.25%

12.96%

13.67%

14.38%

15.09%

16.01%

16.92%

17.83%

18.74%

19.68%

20.61%

21.55%

22.48%

23.47%

24.46%

25.45%

26.43%

27.42%

28.41%

29.41%

30.40%

31.39%

32.38%

33.37%

34.36%

35.04%

35.71%

36.38%

37.06%

37.73%

38.40%

39.08%

39.75%

40.02%

40.29%

40.56%

40.83%

41.10%

41.36%

41.63%

41.90%

42.00%

42.10%

42.20%

42.31%

42.71%

43.20%

43.78%

44.67%

48.11%

49.05%

49.88%

51.11%

51.25%

51.75%

57.20%

58.40%

59.74%

60.28%

61.78%

63.01%

64.34%

64.60%

65.15%

66.79%

67.12%

67.71%

68.62%

69.31%

69.85%

70.46%

70.80%

71.26%

71.85%

72.08%

72.32%

73.00%

73.16%

73.16%

73.16%

Plan Progress Incremental/Months

0.00%

Plan Progress Cummulative/Months

0.00%

0.00%

Actual Progress Incremental/Weeks


Actual Progress Cummulative/Weeks

0.00

III.2.II

2 Boiler and Auxiliary Equipment & Facilities


3 Steam Turbine And Auxiliary

0.39%

0.00%

0.39%

0.39%

0.40%

0.78%

0.40%

1.18%

1.60%

1.58%

1.60%

3.19%

1.60%

4.79%

3.01%

6.39%

2.85%

9.40%

2.85%

12.25%

3.65%

15.09%

3.74%

18.74%

3.95%

22.48%

3.96%

26.43%

3.96%

30.40%

2.70%

34.36%

2.70%

37.06%

1.08%

39.75%

1.06%

40.83%

0.41%

41.90%

2.37%

42.31%

6.44%

44.67%

5.92%

51.11%

8.30%

57.03%

7.99%

65.33%

9.61%

73.32%

9.37%

82.93%

4.54%

92.30%

2.00%

96.84%

98.84%

Actual Progress Incremental/Months

0.00%

0.00%

0.39%

0.39%

0.40%

0.40%

1.60%

1.60%

1.60%

3.01%

2.85%

2.85%

3.65%

3.74%

3.95%

3.96%

3.96%

2.70%

2.70%

1.08%

1.06%

0.41%

2.37%

6.44%

7.29%

4.61%

3.78%

2.52%

1.95%

1.75%

0.15%

Actual Progress Cummulative/Months

0.00%

0.00%

0.39%

0.78%

1.18%

1.58%

3.19%

4.79%

6.39%

9.40%

12.25%

15.09%

18.74%

22.48%

26.43%

30.40%

34.36%

37.06%

39.75%

40.83%

41.90%

42.31%

44.67%

51.11%

58.40%

63.01%

66.79%

69.31%

71.26%

73.00%

73.16%

1.05%

0.007

0.46%

0.46%

0.23%

99.30%

99.76%

100.00%

73.16%

73.16%

73.16%

644juta

644

2536

3180

2536

CONSTRUCTION S-CURVE
As of Januari 2014
Project Name : PLTU Kendari Unit 3 (1 x 10 MW)

Price
No

Description

III

Scope

CONSTRUCTION
III.1
1
2
3
4
5
6
7
8
9
10
11
12
13
14

CIVIL WORKS
Preparation Work
Steam Turbine Building and Annex Central Control Room,
Emergency Diesel and Air Compressor Rooms
Boiler and Auxiliary Foundation
CW Intake & Discharge Structure
Stack Foundation and Structure
BOP Foundation and Structure
Coal Storage and Facilities
Ash Disposal Area and Facilities Cooling Water Way
Coal Unloading Jetty
Adminsitration Building
Miscellanious Buildings and Structure
70 kV Transformers and Switchgear Room (Anexed to S/T
Building) Switchyard
Site Finishing
Cooling Tower

R
R
R
R
R
R
R
R
R
R
R
R
R
R

Month

1.000

27,149,983,946
1,888,943,946
4,269,780,000
6,240,750,000
1,615,000,000
1,675,650,000
2,535,710,000
1,626,500,000
1,445,000,000
2,910,500,000
903,500,000
2,038,650,000
-

0.759
0.070
0.157
0.230
0.059
0.062
0.093
0.060
0.053
0.107
0.033
0.075
-

III.2

ERECTION AND COMMISSIONING

6,828,663,928

0.191

III.2.I

MECHANICAL WORKS

5,182,784,826

0.759

2,746,234,400
1,547,318,500
170,084,562
64,398,685
10,116,745
5,622,591
113,117,533
395,426,065
37,062,205
93,403,540
-

0.530
0.299
0.033
0.012
0.002
0.001
0.022
0.076
0.007
0.018
-

1,645,879,102

0.241

834,578,900
400,000,000
411,300,202

0.507
0.243
0.250

1,806,400,000

0.05048

35,785,047,874

1.000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
III.2.II

General (not Used)


Boiler and Auxiliary Equipment & Facilities
Steam Turbine And Auxiliary
Condenser and Feed Water Heating Plant
Plant Water System
Drainage and Waste Water Treatment Plant
Fire Protection System
Compressed Air System
Chemical Feed System (Included in Boiler & Auxiliary)
Sampling Rack System
Laboratory and Instruments
Chlorination System
Air Conditioning and Ventilation
Crane and Hoist
Workshop and Machinery Equipment
Mobile Equipment
Coal Handling
Fuel Oil System
Ash Handling System
Vacuum Cleaning
Studies / Calculation

R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R

ELECTRICAL WORKS
1 Power Station
2 Switchyard
3 Control and Instrumentation

R
R
R

Training, Mandatory Spare Part, Maintenance Tool &


III.3 Testing, Consumable and Manufacture Inspection & Design
Review

TOTAL

Mar-08

WF
Total PCS
(Rp)
35,785,047,874

Apr-08

May-08

Jun-08

Jul-08

Aug-08

Sep-08

Oct-08

Nov-08

Dec-08

Jan-09

Feb-09

Mar-09

Apr-09

May-09

Jun-09

Jul-09

Aug-09

Sep-09

Oct-09

Nov-09

Dec-09

Jan-10

Feb-10

Mar-10

Apr-10

May-10

Jun-10

Jul-10

Aug-10

Sep-10

Oct-10

Nov-10

Dec-10

Jan-11

Feb-11

Mar-11

Apr-11

May-11

Jun-11

Jul-11

Aug-11

Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

Apr-12

May-12

Jun-12

Jul-12

Aug-12

Sep-12

Oct-12

Nov-12

Dec-12

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

M1

M2

M3

M4

M5

M6

M7

M8

M9

M10

M11

M12

M13

M14

M15

M16

M17

M18

M19

M20

M21

M22

M23

M24

M25

M27

M28

M29

M30

M31

M32

M33

M34

M35

M36

M37

M38

M39

M40

M41

M42

M43

M44

M45

M46

M47

M48

M49

M50

M51

M52

M53

M54

M55

M56

M57

M58

M59

90.67%
98.96%
99.74%
91.31%
90.68%
97.66%
32.32%
3.80%
0.00%
0.00%
98.87%

0.004

0.004

0.004

0.004

0.004
0.009

0.004
0.009

0.004
0.009

0.004
0.009
0.011

0.009
0.011

0.009
0.011

0.003

0.003

0.009
0.011
0.003
0.003
0.004
0.000
0.000

0.009
0.011
0.003
0.003
0.004
0.000
0.000

0.009
0.011
0.003
0.003
0.004
0.000
0.000

0.009
0.011
0.003
0.003
0.004
0.000
0.000

0.009
0.011
0.003
0.003
0.004
0.000
0.000

0.011
0.003
0.003
0.004
0.000
0.000

0.011
0.003
0.003
0.004
0.000
0.000

0.000

8.90%

0.000

0.000

0.000

0.000

0.000

0.000

0.001
0.005
0.001
0.007

0.000

0.001

0.004
0.000
0.000

0.000

0.007

###

0.006

0.005

0.001
0.001
0.000
0.002
0.001
0.000
0.000
0.000
0.000
0.000
0.001
0.000
0.000
0.001
0.001

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

0.001
0.001
0.000
0.002
0.001
0.000
0.000
0.000
0.000
0.000
0.001
0.000
0.000
0.001
0.001

0.001
0.001
0.000
0.002
0.001
0.000
0.000
0.000
0.000
0.000
0.001
0.000
0.000
0.001
0.001

0.008
0.006

0.008
0.006
0.004

0.001

0.015

0.007

0.005

0.002

0.005

0.005

0.005

0.005

0.002

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.003

0.002

0.005

0.006
0.004
0.001

0.006
0.004
0.001

0.006
0.004
0.001

0.006
0.004
0.001

0.006
0.004
0.001

0.006
0.004
0.001

0.006
0.004
0.001

0.006
0.004
0.001

0.006
0.004
0.001

0.006
0.004
0.001

0.008
0.008
0.006

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.004

0.013
0.012
0.009
0.007
0.002
0.002

0.006
0.008
0.004
0.007
0.002
0.002

0.006
0.008
0.004
0.007
0.002
0.002
0.001
0.001
0.001
0.001
0.001
0.001

0.008
0.002
0.007
0.002
0.002
0.001
0.001
0.001
0.001
0.001
0.001

60.73%
60.30%
30.00%

0.005

0.106

0.001

0.001

0.005

0.001
0.005 0.005

0.001
0.001
0.000
0.002
0.001
0.000
0.000
0.000
0.000
0.000
0.001
0.000
0.000
0.001
0.001

0.000

0.000

###

0.000

0.002
0.002

0.004
0.002

###
###

0.003
0.002

0.002

0.002

0.002

0.002

0.002

0.002

0.002

0.002

0.002

0.000

0.002

0.002

0.002

0.002

0.002

0.002

0.002

0.002

0.002

0.002

0.000
0.005

0.001
0.002
0.001
0.001
0.001
0.001
0.001
0.001

0.502
0.293

0.029
0.009

0.001

0.005 0.005

0.000

0.000

0.000

0.000

0.000

0.000

0.010 0.010
0.009 0.004

0.010
0.009

0.005

84.00%

0.002

0.000
0.000
0.000
0.000
0.001
0.000
0.002
0.006
0.004
0.002
0.000

0.002

0.000
0.000
0.000
0.001
0.001
0.000
0.003
0.007
0.004
0.002
0.000

0.000

0.001
###
###
###
###
###
0.003
###
###
###
###

0.001

0.000

0.001
0.000
0.000
0.001
0.001
0.000
0.003
0.008
0.004
0.002
0.000

0.002

0.004
0.001

0.000
0.000
0.000
0.000
0.000
0.000
0.002
0.006
0.004
0.002
0.000

0.063
0.156
0.229
0.054
0.056
0.091
0.019
0.002

0.002

0.004

0.003

0.002

96.65%
94.76%
98.00%
65.50%
40.13%
89.75%
75.00%
75.00%
75.00%
50.00%
0.00%
50.00%
98.50%
0.00%
91.60%

0.002

0.000

0.004
0.003
0.002

0.007
0.004
0.002
0.004
0.008

0.002
0.001

0.000

0.001 0.000

0.002
0.001

0.001

0.007
0.004
0.002
0.004

0.002
0.001

0.001

0.002
0.001

0.003
0.011

0.002
0.001

0.007
0.002
0.002
0.004
0.008
0.006
0.004

0.004
0.000
0.000

0.001
-

0.001

0.308
0.147

Jan-13
59
M60
-

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

0.000

###

###

###

###

###

###

0.002
0.002

###

###

###

###

###

###

###

###

###

###

###

###

0.050

9,200
Original Plan

0.00%

0.00%

0.43%

0.86%

1.46%

2.07%

3.96%

5.84%

7.73%

11.45%

16.49%

21.53%

29.65%

38.13%

47.01%

55.93%

65.36%

73.05%

80.75%

86.00%

91.25%

94.82%

96.98%

98.17%

99.08%

100.00%

Plan Progress Incremental/Months EOT1

0.00%

0.00%

0.39%

0.39%

0.40%

0.40%

1.60%

1.60%

1.60%

3.01%

2.85%

2.85%

3.65%

3.74%

3.95%

3.96%

3.96%

2.70%

2.70%

1.08%

1.06%

0.41%

2.37%

6.44%

5.92%

8.30%

7.50%

9.12%

8.87%

4.05%

2.00%

0.46%

0.46%

0.23%

Plan Progress Cummulative/Months EOT1

0.00%

0.00%

0.39%

0.78%

1.18%

1.58%

3.19%

4.79%

6.39%

9.40%

12.25%

15.09%

18.74%

22.48%

26.43%

30.40%

34.36%

37.06%

39.75%

40.83%

41.90%

42.31%

44.67%

51.11%

57.03%

65.33%

72.83%

81.95%

90.82%

94.86%

96.86%

97.32%

97.79%

98.02%

Actual Progress Incremental/Months EOT1

0.00%

0.00%

0.39%

0.39%

0.40%

0.40%

1.60%

1.60%

1.60%

3.01%

2.85%

2.85%

3.65%

3.74%

3.95%

3.96%

3.96%

2.70%

2.70%

1.08%

1.06%

0.41%

2.37%

6.44%

7.29%

4.61%

3.79%

2.52%

1.94%

1.76%

0.15%

1.39%

3.43%

1.32%

0.00%

0.00%

0.39%

0.78%

1.18%

1.58%

3.19%

4.79%

6.39%

9.40%

12.25%

15.09%

18.74%

22.48%

26.43%

30.40%

34.36%

37.06%

39.75%

40.83%

41.90%

42.31%

44.67%

51.11%

58.40%

63.01%

66.80%

69.32%

71.26%

73.02%

73.17%

74.56%

77.99%

79.31%

Actual Progress Cummulative/Months EOT1


Plan Progress Incremental/MonthsEOT2

0.00%

0.00%

0.39%

0.39%

0.40%

0.40%

1.60%

1.60%

1.60%

3.01%

2.85%

2.85%

3.65%

3.74%

3.95%

3.96%

3.96%

2.70%

2.70%

1.08%

1.06%

0.41%

2.37%

6.44%

0.00%

3.20%

4.14%

4.14%

3.63%

3.25%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Plan Progress Cummulative/MonthsEOT2

0.00%

0.00%

0.39%

0.78%

1.18%

1.58%

3.19%

4.79%

6.39%

9.40%

12.25%

15.09%

18.74%

22.48%

26.43%

30.40%

34.36%

37.06%

39.75%

40.83%

41.90%

42.31%

44.67%

51.11%

80.26%

83.45%

87.60%

91.74%

95.36%

98.62%

98.62%

98.62%

98.62%

98.62%

98.62%

98.62%

98.62%

98.62%

98.62%

98.62%

98.62%

98.62%

98.62%

98.62%

98.62%

98.62%

98.62%

98.62%

98.62%

Actual Progress Incremental/MonthsEOT2

0.00%

0.00%

0.39%

0.39%

0.40%

0.40%

1.60%

1.60%

1.60%

3.01%

2.85%

2.85%

3.65%

3.74%

3.95%

3.96%

3.96%

2.70%

2.70%

1.08%

1.06%

0.41%

2.37%

6.44%

0.71%

1.12%

0.88%

0.00%

0.00%

0.59%

0.89%

0.56%

0.46%

0.12%

0.00%

0.16%

0.00%

0.210%

0.560%

0.000%

0.290%

0.670%

0.100%

0.110%

0.003%

0.172%

0.280%

0.086%

Actual Progress Cummulative/Months EOT2

0.00%

0.00%

0.39%

0.78%

1.18%

1.58%

3.19%

4.79%

6.39%

9.40%

12.25%

15.09%

18.74%

22.48%

26.43%

30.40%

34.36%

37.06%

39.75%

40.83%

41.90%

42.31%

44.67%

51.11%

80.26%

80.97%

82.09%

82.96%

82.96%

82.96%

83.55%

84.44%

85.00%

85.46%

85.58%

85.58%

85.74%

85.74%

85.95%

86.51%

86.51%

86.80%

87.47%

87.57%

87.683%

87.69%

87.86%

88.14%

88.22%

CONSTRUCTION P
As of September
Project Name : PLTU Kendari Unit 3 (1 x 10 MW)
Item No
: Monthly Progress Certificate Civil Work No. 08
Phase
: Construction

Cummulative Last Period


No

Description

Price

WF

Plan
Prog.

Civil

2
3

WF

27,149,983,946.00

0.7990

100.00%

0.7990

Mechanical

5,182,784,826.00

0.1525

100.00%

0.1525

Electrical

1,645,879,102.00

0.0484

100.00%

0.0484

33,978,647,874.00

1.0000

Total

100.00%

TRUCTION PROGRESS CALCULATION


As of September 2013

ulative Last Period

Incremental This Period


Actual

Prog.

Plan
WF

Prog.

Cummulative This Period


Actual

WF

Prog.

Plan
WF

Prog.

Actual
WF

Prog.

WF

43.56%

0.3481

100.00%

0.7990

7.21%

0.0576

100.00%

0.3481

50.78%

0.4057

95.23%

0.1452

100.00%

0.1525

-36.94%

-0.0563

100.00%

0.1452

58.29%

0.0889

77.663%

0.0376

100.00%

0.0484

100.00%

0.0376

52.75%

0.0255

53.10%

100.00%

0.129%

53.10%

52.02%

CONSTRUCTION PROGRESS CALCULATION


As of September 2013
Project Name : PLTU Kendari Unit 3 (1 x 10 MW)
Item No
: Monthly Progress Certificate Civil Work No. 08
Phase
: Construction
Item of Works : CIVIL (SUMMARY)

No

Description

Price

WF

Cummulative
Last Periode
Prog.

WF

Preparation Work

1,888,943,946.00

0.0696

87.08%

0.0606

Steam Turbine Building and Annex Central Control Room,


Emergency Diesel and Air Compressor Rooms

4,269,780,000.00

0.1573

60.82%

0.0956

Boiler and Auxiliary Foundation

6,240,750,000.00

0.2299

67.94%

0.1562

CW Intake & Discharge Structure

1,615,000,000.00

0.0595

23.81%

0.0142

Stack Foundation and Structure

1,675,650,000.00

0.0617

22.37%

0.0138

BOP Foundation and Structure

2,535,710,000.00

0.0934

34.69%

0.0324

Coal Storage and Facilities

1,626,500,000.00

0.0599

58.04%

0.0348

Ash Disposal Area and Facilities Cooling Water Way

1,445,000,000.00

0.0532

21.06%

0.0112

Coal Unloading Jetty

10

Adminsitration Building

11

Miscellanious Buildings and Structure

2,910,500,000.00

0.1072

15.75%

0.0169

12

70 kV Transformers and Switchgear Room (Anexed to S/T


Building) Switchyard

903,500,000.00

0.0333

0.00%

0.0000

13

Site Finishing

2,038,650,000.00

0.0751

0.00%

0.0000

14

Cooling Tower

CONSTRUCTION PROGRESS CALCULATION


As of September 2013
Project Name : PLTU Kendari Unit 3 (1 x 10 MW)
Item No
: Monthly Progress Certificate Civil Work No. 08
Phase
: Construction
Total

27,149,983,946.00

1.0000

43.56%

CTION PROGRESS CALCULATION


September 2013

###
Incremental
This Periode
Prog.

Cummulative
This Periode
WF

Prog.

Price
WF

0.37%

0.0003

87.45%

0.0608
###

1.14%

0.0018

61.95%

0.0974
###

12.52%

0.0288

80.47%

0.1850
###

10.68%

0.0064

34.49%

0.0205
###

49.79%

0.0307

72.15%

0.0445
###

0.00%

0.0000

34.69%

0.0324
###

6.98%

0.0042

65.02%

0.0390
###

0.05%

0.0000

21.11%

0.0112
###
###
###

0.00%

0.0000

15.75%

0.0169

0.00%

0.0000

0.00%

0.0000

0.00%

0.0000

0.00%

0.0000
###
###

CTION PROGRESS CALCULATION


September 2013

7.21%

50.78%
###

CONSTRUCTION PROGRESS CALCULATION


As of September 2013
Project Name : PLTU Kendari Unit 3 (1 x 10 MW)
Item No
: Monthly Progress Certificate Civil Work No. 08
Phase
: Construction
Discipline

: CIVIL (DETAIL)
Total Price

No

Description

WF

Cummulative
Last Periode
Prog.

Praparation Works

###

1.1 Mobilization & Demobilization

0.43713

95.69%

0.41830

1.2 Excavation and Backfill

0.72425

89.79%

0.65027

1.3 Concrete Works

0.09213

40.88%

0.03766

1.4 Masonry Works

0.01681

0.00%

0.00000

Total
2

WF

###

1.27032

87.08%

Turbine Foundation and Structure


2.1 Pilling Works

1.38065

100.00%

1.38065

2.2 Earthworks

0.03389

89.29%

0.03026

2.3 Concrete Works

0.62232

49.84%

0.31016

2.4 Masonry Works

0.03699

0.00%

0.00000

2.5 Siding and Roofing

0.18897

0.00%

0.00000

2.6 Architectural Finishing Works

0.10424

0.00%

0.00000

2.7 Special Structure

0.50438

5.00%

0.02522

Page 11 of 229

Discipline

: CIVIL (DETAIL)
Total Price

No

Description

WF

Cummulative
Last Periode
Prog.

Total
3

###

60.82%

Boiler and Auxiliary Foundation


3.1 Pilling Works

2.16439

100.00%

2.16439

3.2 Earthworks

0.03363

93.60%

0.03147

3.3 Concrete Works

0.67116

82.94%

0.55663

3.4 Masonry Works

0.05044

0.00%

0.00000

3.5 Structure Steel, Miscelanious Steel

0.91797

10.79%

0.09903

3.6 Siding and Roofing

0.27304

0.00%

0.00000

3.7 Architectural Finishing Works

0.08632

0.00%

0.00000

Total
4

2.87145

WF

###

4.19693

67.94%

4.1. Shallow Foundation

###

0.15131

10.00%

0.01513

4.2. Earthworks

###

0.16140

37.50%

0.06053

4.3. Concrete Works

###

0.24378

75.03%

0.18292

4.4. Masonry Works

###

0.10760

0.00%

0.00000

4.5. Structure Steel, Miscelanious Steel

###

0.23538

0.00%

0.00000

0.11769

0.00%

0.00000

###

0.06893

0.00%

0.00000

###

1.08609

CW Intake & Discharge Structure

4.6. Siding and Roofing


4.7. Architectural Finishing Works
Total
Page 12 of 229

23.81%

Discipline

: CIVIL (DETAIL)
Total Price

No

Description

WF

Cummulative
Last Periode
Prog.

Stack Foundation And Structure Included The Boiler


5.1. Pilling Works

###

0.14123

100.00%

0.14123

5.2. Earthworks

###

0.02152

82.81%

0.01782

5.3. Concrete Works

###

0.07744

72.75%

0.05634

5.4. Structure Steel, Miscelanious Steel

###

0.74312

4.93%

0.03665

5.5. Siding and Roofing

###

0.11769

0.00%

0.00000

5.6. Architectural Finishing Works

###

0.02589

0.00%

0.00000

###

1.12688

6.1. Pilling Works

###

0.47573

100.00%

0.47573

6.2. Earthworks

###

0.06994

39.81%

0.02784

6.3. Concrete Works

###

0.60170

14.62%

0.08798

6.4. Masonry Works

0.11876

0.00%

0.00000

6.5. Structure Steel, Miscelanious Steel

0.12509

0.00%

0.00000

6.6. Siding and Roofing

0.07767

0.00%

0.00000

###

0.23639

0.00%

0.00000

###

1.70528

Total
6

22.37%

BOP Foundation And Structure

6.7. Architectural Finishing Works


Total
7

WF

Coal Storage And Facilities


Page 13 of 229

34.69%

Discipline

: CIVIL (DETAIL)
Total Price

No

Description

WF

Cummulative
Last Periode
Prog.

7.1. Pilling Works

0.19267

100.00%

0.19267

7.2. Earthworks

0.05548

36.36%

0.02018

7.3. Concrete Works

0.25891

76.36%

0.19772

7.4. Masonry Works

0.03699

0.00%

0.00000

7.5. Structure Steel, Miscelanious Steel

0.42704

49.37%

0.21083

7.6. Siding and Roofing

0.10760

12.50%

0.01345

7.7. Architectural Finishing Works

0.01513

0.00%

0.00000

Total
8

###

1.09383

58.04%

Ash Disposal And Facilities


8.1. Shallow Foundation

0.15131

0.00%

0.00000

8.2. Earthworks

0.13786

89.63%

0.12357

8.3. Concrete Works

0.27909

29.04%

0.08104

8.4. Masonry Works

0.05044

0.00%

0.00000

8.5. Structure Steel, Miscelanious Steel

0.29590

0.00%

0.00000

8.6. Siding and Roofing

0.04035

0.00%

0.00000

8.7. Architectural Finishing Works

0.01681

0.00%

0.00000

Total
9

WF

###

0.97177

###

0.30868

21.06%

Miscellaneous Building
9.1. Pilling Works
Page 14 of 229

100.00%

0.30868

Discipline

: CIVIL (DETAIL)
Total Price

No

Description

WF

Cummulative
Last Periode
Prog.

9.2. Earthworks

0.04035

0.00%

0.00000

9.3. Concrete Works

0.27573

0.00%

0.00000

9.4. Masonry Works

0.17149

0.00%

0.00000

9.5. Structure Steel, Miscelanious Steel

0.40014

0.00%

0.00000

9.6. Siding and Roofing

0.37828

0.00%

0.00000

9.7. Architectural Finishing Works

0.34567

0.00%

0.00000

9.8. Plumbing

0.03893

0.00%

0.00000

Total
10

###

1.95927

15.75%

70 KV Substation Building & Switchyard


10.1. Substation 70 kV Building

0.48757

0.00%

0.00000

10.2. 70 kV Switchyard Foundation

0.12004

0.00%

0.00000

Total
11

WF

###

0.60761

0.00%

Site Finishing (Road, Drains, Fence, Etc)


11.1.

Earthworks

0.04119

0.00%

0.00000

11.2.

Concrete Works

0.22529

0.00%

0.00000

11.3.

Masonry Works

0.16813

0.00%

0.00000

11.4.

Roads, Paved Area and Landscaping

0.61696

0.00%

0.00000

11.5.

Landscaping - Planting - Irrigation

0.16476

0.00%

0.00000

11.6.

Fence Work and Gates

0.12105

0.00%

0.00000

Page 15 of 229

Discipline

: CIVIL (DETAIL)
Total Price

No

Description

WF

Cummulative
Last Periode
Prog.

11.7.

Perimeter Wall and Fencing Work

Total

0.03363
###

Page 16 of 229

1.37100

0.00%

WF
0.00000
0.00%

RUCTION PROGRESS CALCULATION


As of September 2013

Incremental
This Periode
Prog.

Cummulative
This Periode
WF

Prog.

WF

1.08%

0.00471

96.77%

0.42301

0.00%

0.00000

89.79%

0.65027

0.00%

0.00000

40.88%

0.03766

0.00%

0.00000

0.00%

0.00000

0.37%

87.45%

0.00%

0.00000

100.00%

1.38065

3.57%

0.00121

92.86%

0.03147

5.05%

0.03145

54.89%

0.34161

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

5.00%

0.02522

Page 17 of 229

Incremental
This Periode
Prog.

Cummulative
This Periode
WF

Prog.
1.14%

WF
61.95%

0.00%

0.00000

100.00%

2.16439

3.20%

0.00108

96.80%

0.03255

1.00%

0.00673

83.94%

0.56336

0.00%

0.00000

0.00%

0.00000

56.41%

0.51783

67.20%

0.61685

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

12.52%

80.47%

60.00%

0.09079

70.00%

0.10592

15.63%

0.02522

53.13%

0.08574

0.00%

0.00000

75.03%

0.18292

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

10.68%
Page 18 of 229

34.49%

Incremental
This Periode
Prog.

Cummulative
This Periode
WF

Prog.

WF

0.00%

0.00000

100.00%

0.14123

1.09%

0.00024

83.91%

0.01806

4.48%

0.00347

77.23%

0.05981

75.00%

0.55734

79.93%

0.59399

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

49.79%

72.15%

0.00%

0.00000

100.00%

0.47573

0.00%

0.00000

39.81%

0.02784

0.00%

0.00000

14.62%

0.08798

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

0.00%

Page 19 of 229

34.69%

Incremental
This Periode
Prog.

Cummulative
This Periode
WF

Prog.

WF

0.00%

0.00000

100.00%

0.19267

0.00%

0.00000

36.36%

0.02018

8.18%

0.02118

84.55%

0.21890

80.00%

0.02959

80.00%

0.02959

2.83%

0.01211

52.20%

0.22294

12.50%

0.01345

25.00%

0.02690

0.00%

0.00000

0.00%

0.00000

6.98%

65.02%

0.00%

0.00000

0.00%

0.00000

0.37%

0.00050

90.00%

0.12408

0.00%

0.00000

29.04%

0.08104

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

0.05%

0.00%

0.00000
Page 20 of 229

21.11%

100.00%

0.30868

Incremental
This Periode
Prog.

Cummulative
This Periode
WF

Prog.

WF

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

0.00%

15.75%

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

0.00%

0.00%

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

0.00%

0.00000

Page 21 of 229

Incremental
This Periode
Prog.
0.00%

Cummulative
This Periode
WF

Prog.

0.00000
0.00%

Page 22 of 229

0.00%

WF
0.00000
0.00%

CONSTRUCTION PROGRESS CALCULATION


As of September 2013
Project Name : PLTU Kendari Unit 3 (1 x 10 MW)
Item No
: Monthly Progress Certificate Civil Work No. 08
Phase
: Construction
Discipline

: CIVIL (DETAIL)

No

Description

Cummulative
Last Periode

WF

Prog.
1 Preparation Works
1.1 Mobilization & Demobilization
1.2 Excavation and Backfill
1.3 Concrete Works
1.4 Masonry Works
Total
2 Turbine Foundation and Structure
2.1. Turbine Hall
Foundation
Column Top Table
Total
Turbine Foundation and Structure
2.2. Main Power Building
Foundation
Steel Structure & Architectural Work
Total
3 Boiler and Auxiliary Foundation
3.1. Boiler House
Foundation
Column
Boiler Concrete & Steel Structure
Total

0.4371
0.7242
0.0921
0.0168

100.00%
89.51%
100.00%
89.51%

1.2703

0.8249
0.1751

100.00%
100.00%

1.0000

Prog.

0.1105
0.7962
0.1105
0.7962

-98.32%
-89.51%
-3.23%
-89.51%

0.8249
0.1751

-45.11%

100.00%

100.00%
99.52%

1.0000

0.6500
0.1500
0.2000

WF

90.67%

1.0000

0.6460
0.3540

Incremental
This Periode

0.6460
0.3523

-100.00%
-94.52%

99.83%

100.00%
100.00%
100.00%

0.6500
0.1500
0.2000
100.00%

-16.06%
-32.80%
Err:509

CONSTRUCTION PROGRESS CALCULATION


As of September 2013
Project Name : PLTU Kendari Unit 3 (1 x 10 MW)
Item No
: Monthly Progress Certificate Civil Work No. 08
Phase
: Construction
Discipline

: CIVIL (DETAIL)

No

Description

Cummulative
Last Periode

WF

Prog.
3.2. ESP & ID Fan
Foundation
Steel Structure & Architectural Work
Total
3.3. Stack
Foundation
Total
4 CW Intake & Discharge Structure
4.1. Water Tank of WTS
Foundation
Total
4.2. Pressurize Pump Room
Foundation
Steel Structure
Total
4.3. CWP Room
Foundation
Steel Structure
Total
4.4. Water Pool
Foundation & Structure

0.9100
0.0900

100.00%
91.11%

1.0000

1.0000

100.00%

99.72%

100.00%
100.00%

-100.00%

1.0000

Err:509

0.9972

-46.60%

0.9000
0.1000

-24.97%
-100.00%

100.00%

98.46%
0.00%

1.0000

1.0000

0.9100
0.0820

99.72%

1.0000

0.9000
0.1000

Prog.

100.00%

1.0000

0.9000
0.1000

WF

99.20%

1.0000

1.0000

Incremental
This Periode

0.8862
0.0000

-98.46%
0.00%

88.62%

100.00%

1.0000

-100.00%

CONSTRUCTION PROGRESS CALCULATION


As of September 2013
Project Name : PLTU Kendari Unit 3 (1 x 10 MW)
Item No
: Monthly Progress Certificate Civil Work No. 08
Phase
: Construction
Discipline

: CIVIL (DETAIL)

No

Description

Cummulative
Last Periode

WF

Prog.
Total
4.5. Discharge Canal
Foundation & Structure
Total
4.6. Sea Water Tank
Foundation
Total
5 BOP Foundation and Structure
5.1. Water Treathment Plant
Foundation
Steel Structure & Architectural Work
Total
5.2. Cooling Tower
Foundation
Total
5.3. Blower Fan House
Foundation
Steel Structure
Total

1.0000

1.0000

95.50%

100.00%

100.00%
100.00%

1.0000

Err:509

1.0000

Err:509

0.8500
0.1500

0.00%
-16.09%

100.00%

100.00%

1.0000

0.9000
0.1000

0.9550

100.00%

1.0000

1.0000

Prog.

95.50%

1.0000

0.8500
0.1500

WF
100.00%

1.0000

1.0000

Incremental
This Periode

1.0000

-22.77%

100.00%

100.00%
100.00%

0.9000
0.1000
100.00%

-20.07%
-100.00%

CONSTRUCTION PROGRESS CALCULATION


As of September 2013
Project Name : PLTU Kendari Unit 3 (1 x 10 MW)
Item No
: Monthly Progress Certificate Civil Work No. 08
Phase
: Construction
Discipline

: CIVIL (DETAIL)

No

Description

Cummulative
Last Periode

WF

Prog.
5.4. Ash Loading Arm
Foundation
Steel Structure
Total
5.5. Ash Bin
Foundation
Steel Structure
Total
5.6. Waste Water Treathment Plant
Foundation
Total
5.7. Garage
Foundation
Steel Structure
Total
5.8. Clarifier
Foundation
Total
5.9. Flue Bracket
Foundation

0.8900
0.1100

99.50%
100.00%

1.0000

0.0000
0.0000

100.00%
100.00%

82.75%

2.22%
0.00%

-99.50%

0.8900
0.1100

Err:509

0.8275

Err:509

0.0188
0.0000

Err:509

1.88%

100.00%

0.0000

1.0000

0.8855
0.1100

82.75%

1.0000

0.0000

Prog.

89.00%

1.0000

0.8500
0.1500

WF

99.55%

0.0000

1.0000

Incremental
This Periode

1.0000

Err:509

100.00%

99.78%

0.9978

Err:509

CONSTRUCTION PROGRESS CALCULATION


As of September 2013
Project Name : PLTU Kendari Unit 3 (1 x 10 MW)
Item No
: Monthly Progress Certificate Civil Work No. 08
Phase
: Construction
Discipline

: CIVIL (DETAIL)

No

Description

Cummulative
Last Periode

WF

Prog.
Total
6 Coal Storage and Facilities
6.1. Coal Trestle
Foundation
Steel Structure
Total
6.2. Coal Crusher Room
Foundation
Steel Structure
Total
6.3. Dry Coal Shed
Foundation
Steel Structure
Total

1.0000

0.9000
0.1000

100.00%
100.00%

Prog.

0.9000
0.1000

0.00%
-60.19%

100.00%

99.98%
100.00%

1.0000

0.9000
0.1000

WF
99.78%

1.0000

0.9000
0.1000

Incremental
This Periode

0.8998
0.1000

-85.36%
-100.00%

99.98%

100.00%
100.00%

1.0000

0.9000
0.1000

Err:509

100.00%

6.4. Storage Coal Yard


1.0000
Total
7 Ash Disposal Area and Facilities
7.1. Ash Yard & Setl. Pond
Foundation

80.33%

1.0000

1.0000

0.8033

-80.33%

80.33%

45.02%

0.4502

-45.02%

CONSTRUCTION PROGRESS CALCULATION


As of September 2013
Project Name : PLTU Kendari Unit 3 (1 x 10 MW)
Item No
: Monthly Progress Certificate Civil Work No. 08
Phase
: Construction
Discipline

: CIVIL (DETAIL)

No

Description

Cummulative
Last Periode

WF

Prog.
Total
8 Coal Unloading Jetty
8.1. Unloading Jetty
Foundation
Slab, Beam & Struktur
Total
8.2. Marine Building
Foundation
Architecture
Total
9 Administration Building
Foundation
Steel Structure & Architectural Work
Total
10 Miscellaneous Building
10.1. Workshop/Warehouse
Foundation
Steel Structure & Architectural Work
Total
10.2. Guard House
Foundation

1.0000

0.4250
0.5750

10.00%
0.00%

0.00%
0.00%

1.0000

0.8100
0.1900

0.0000
0.0000

0.6185
0.2070

-10.00%
0.00%

0.00%
0.00%

-81.38%

82.55%

100.00%
95.26%

1.0000

0.8500

0.0425
0.0000

0.00%

81.38%
86.25%

SHANDOGMACHINERY&
Prog.

4.25%

1.0000

0.7600
0.2400

WF
45.02%

1.0000

0.9000
0.1000

Incremental
This Periode

0.8100
0.1810

-100.00%
-95.26%

99.10%

100.00%

0.8500

-100.00%

CONSTRUCTION PROGRESS CALCULATION


As of September 2013
Project Name : PLTU Kendari Unit 3 (1 x 10 MW)
Item No
: Monthly Progress Certificate Civil Work No. 08
Phase
: Construction
Discipline

: CIVIL (DETAIL)

No

Description

Cummulative
Last Periode

WF

Prog.
Architectural Work
Total
10.3. Mosque
Foundation
Architectural Work
Total
11 70 KV Substation Building & Switchyard
11.1. Substation Building
Foundation
Steel Structure
Total
11.2. Transformer Area
Foundation
Total
12 Site Finishing (Road, Drains, Fence, Etc)
12.1. Road
12.2. Drainage
12.3. Fence
Total

0.1500

100.00%

1.0000

0.8500
0.1500

0.00%
0.00%

98.00%
100.00%

1.0000

0.5000
0.3000
0.2000
1.0000

0.1500

0.0000
0.0000

0.8330
0.1500
98.30%

100.00%

1.0000
100.00%

20.00%
57.25%
61.00%

GROUPC ORATIN
Prog.

0.00%

1.0000

1.0000

WF
100.00%

1.0000

0.8500
0.1500

Incremental
This Periode

0.1000
0.1718
0.1220
39.37%
PT. REKADAYA ELEKTRIKA

-100.00%

Err:509

Err:509

Err:509

Err:509
Err:509
Err:509

STRUCTION PROGRESS CALCULATION


As of September 2013

Incremental
This Periode

Cummulative
This Periode
WF

Prog.

-0.1032
-0.7962
-0.0214
-0.7962

1.68%
0.00%
96.77%
0.00%

-81.76%

WF

0.0073
0.0000
0.0892
0.0000
8.92%

-0.3721

54.89%

0.4528

Err:509
-37.21%

-0.6460
-0.3346

45.28%

0.00%
5.00%

-98.06%

-0.1044
-0.0492
#VALUE! Err:509
#VALUE!

0.0000
0.0177
1.77%

83.94%
67.20%

0.5456
0.1008
64.64%

STRUCTION PROGRESS CALCULATION


As of September 2013

Incremental
This Periode

Cummulative
This Periode
WF

Prog.
-0.9100

0.00%

WF
0.0000

Err:509
-91.00%

0.00%

Err:509 Err:509

Err:509

Err:509

Err:509

-0.4660

53.13%

-46.60%

-0.2247
-0.1000

53.13%

75.03%
0.00%

-32.47%

-0.8862
0.0000

0.6753
0.0000
67.53%

0.00%
0.00%

-88.62%

-1.0000

0.5313

0.0000
0.0000
0.00%

0.00%

0.0000

STRUCTION PROGRESS CALCULATION


As of September 2013

Incremental
This Periode

Cummulative
This Periode
WF

Prog.

-100.00%

WF
0.00%

Err:509 Err:509

Err:509

Err:509

Err:509

Err:509 Err:509

Err:509

Err:509

Err:509

0.0000
-0.0241

100.00%
83.91%

-2.41%

-0.2277

97.59%

77.23%

-22.77%

-0.1806
-0.1000
-28.06%

0.8500
0.1259

0.7723
77.23%

79.93%
0.00%

0.7194
0.0000
71.94%

STRUCTION PROGRESS CALCULATION


As of September 2013

Incremental
This Periode

Cummulative
This Periode
WF

Prog.
-0.8855

0.00%

WF
0.0000

Err:509
-88.55%

0.00%

Err:509 Err:509
Err:509

Err:509

Err:509

Err:509

Err:509 Err:509

Err:509

Err:509

Err:509

Err:509 Err:509
Err:509

Err:509

Err:509

Err:509

Err:509 Err:509

Err:509

Err:509

Err:509

Err:509 Err:509

Err:509

STRUCTION PROGRESS CALCULATION


As of September 2013

Incremental
This Periode

Cummulative
This Periode
WF

Prog.
Err:509

0.0000
-0.0602

Err:509

100.00%
39.81%

-6.02%

-0.7682
-0.1000

WF

0.9000
0.0398
93.98%

14.62%
0.00%

-86.82%

0.1316
0.0000
13.16%

Err:509 Err:509
Err:509

Err:509

Err:509

Err:509

-0.8033

0.00%

-80.33%

-0.4502

0.0000
0.00%

0.00%

0.0000

STRUCTION PROGRESS CALCULATION


As of September 2013

SHANDOGMACHINERY&

Incremental
This Periode

Cummulative
This Periode
WF

Prog.

-45.02%

WF
0.00%

-0.0425
0.0000

0.00%
0.00%

-4.25%

0.0000
0.0000
0.00%

0.0000
0.0000

0.00%
0.00%

0.00%

0.0000
0.0000
0.00%

-0.6185

0.00%

0.0000

Err:509
-61.85%

-0.8100
-0.1810

0.00%

0.00%
0.00%

-99.10%

-0.8500

0.0000
0.0000
0.00%

0.00%

0.0000

STRUCTION PROGRESS CALCULATION


As of September 2013

GROUPC ORATIN

Incremental
This Periode

Cummulative
This Periode
WF

Prog.
-0.1500

-100.00%

0.00%

WF
0.0000
0.00%

Err:509 Err:509
Err:509

Err:509

Err:509

Err:509

Err:509 Err:509
Err:509

Err:509

Err:509

Err:509

Err:509 Err:509

Err:509

Err:509

Err:509

Err:509 Err:509
#VALUE! Err:509
#VALUE! Err:509
Err:509

Err:509

Err:509

CONSTRUCTION PROGRESS CALCULATION


As of September 2013
Project Name : PLTU Kendari Unit 3 (1 x 10 MW)
Item No
: Monthly Progress Certificate Civil Work No. 08
Phase
: Construction
Discipline

: CIVIL (DETAIL)

No

Description

Cummulative
Last Periode
Prog.
WF

WF

1 Preparation Works
1.1 Mobiization & Demobilization
- Preparatory Works
- Mobilization & Demobilization
- Survey and Setting Out
- Soil Investigation
- Site Facilities
- Site Office for the Owner
- Site Laboratory including equipment

0.0740
0.0336
0.1177
0.1009
0.0168
0.0942

Total

100.00%
100.00%
100.00%
100.00%
100.00%
80.00%

0.4371
1.2 Excavation and Backfill
- Excavation and Disposal
- Backfill
- Rock Fill Type I
- Rock Fill Type II
- Rock Fill Type III
- Gabion
- Woven Geotextile

Total
1.3 Concrete Works
- Lean Concrete 10 cm,cement type I
- Structure RC below ground, cement type I
- Reinforcing, plain bar
- Reinforcing, deformed bar
Total
1.4 Masonry Works
- Rip-rap (t=25 cm)
Total

Prog.

0.0740
0.0336
0.1177
0.1009
0.0168
0.0753

0.00%
0.00%
0.00%
0.00%
0.00%
5.00%

95.69%

WF

0.0000
0.0000
0.0000
0.0000
0.0000
0.0047
1.08%

0.2018
0.1459
0.1009
0.0942
0.0841
0.0235
0.0740
0.7242

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%

0.2018
0.1459
0.1009
0.0942
0.0841
0.0235
0.0000
89.79%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.00%

0.0081
0.0572
0.0101
0.0168
0.0921

50.00%
40.00%
40.00%
40.00%

0.0040
0.0229
0.0040
0.0067
40.88%

0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.00%

0.0168

0.00%

0.0000

0.00%

0.0000

0.0168

Page 37 of 229

Incremental
This Periode

0.00%

0.00%

Discipline

: CIVIL (DETAIL)

No

Description

Cummulative
Last Periode
Prog.
WF

WF

2 Turbine Foundation and Structure


2.1 Pilling Works
- Driving rig setting up for driven piles
- Driving piles (refer item 15 A)
- Piles tests on driven piles
Total
2.2 Earthworks
- Excavation and Disposal
- Backfill
Total
2.3 Concrete Works
- Lean Concrete 10 cm, cement type I
- Gravel Layer 15 cm
- Structure RC below ground, cement type I
- Elevated slab with,metal decking, cement type I
- Reinforcing, plain bar
- Reinforcing, deformed bar
- Metal decking
Total

Total
2.5 Siding and Roofing
- Insulated walls (double skin)
- Insulated roof (double skin)
- Metal Windows
- Glass louvers
Total
2.6 Architectural Finishing Works
- Suspended ceillings, louvered grid type
- Suspended ceillings, accoustical type,moisture
- Suspended ceillings, accoustical type
- Monolithic cemen floor finishing, with hardener
- Chemical resistan floor finish
- Kitchen Units
- Steel Locker
Page 38 of 229

Prog.

WF

0.0767
1.2266
0.0773
1.3807

100.00%
100.00%
100.00%

0.0767
1.2266
0.0773
100.00%

0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.00%

0.0218
0.0121
0.0339

100.00%
70.00%

0.0218
0.0085
89.29%

0.00%
10.00%

0.0000
0.0012
3.57%

0.0242
0.0091
0.2179
0.0872
0.0407
0.1525
0.0908

100.00%
100.00%
65.00%
0.00%
70.00%
70.00%
0.00%

0.0242
0.0091
0.1416
0.0000
0.0285
0.1068
0.0000

0.00%
0.00%
10.00%
0.00%
5.00%
5.00%
0.00%

0.0000
0.0000
0.0218
0.0000
0.0020
0.0076
0.0000

0.6223
2.4 Masonry Works
- Masonry walls 20 cm with concrete blocks class 10.5

Incremental
This Periode

49.84%

5.05%

0.0370
0.0370

0.00%

0.0000
0.00%

0.00%

0.0000
0.00%

0.1009
0.0572
0.0141
0.0168
0.1890

0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.00%

0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.00%

0.0182
0.0182
0.0182
0.0182
0.0145
0.0109
0.0145

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

Discipline

: CIVIL (DETAIL)

No

Description

Cummulative
Last Periode
Prog.
WF

WF

Total

0.0944
2.7 Special Structure
- Supporting of Steelwork for all Auxilliaries,such
- Platform, Walkways and Stairways,including
- All Embedded Parts in Concrete Including

0.5044

Total

3.2 Earthworks
- Excavation and Disposal
- Backfill
Total
3.3 Concrete Works
- Lean Concrete 10 cm, cement type I
- Gravel Layer 15 cm
- Structure RC below ground, cement type I
- Elevated slab with,metal decking, cement type I
- Reinforcing, plain bar
- Reinforcing, deformed bar
Total

5.00%
0.00%
0.00%

Total
3.5 Structure Steel, Miscellaneus Steel
- Structure steel > 40 kg/m
- Structure steel < 40 kg/m
- Expansion anchor bolts, supply and setting
- Expansion anchor bolts, setting only
- Embedded metals & frame, supply and setting
- Embedded metals & frame, setting only

Page 39 of 229

0.0252
0.0000
0.0000

WF
0.00%

0.00%
0.00%
0.00%

5.00%

0.0000
0.0000
0.0000
0.00%

0.1241
1.9852
0.0551
2.1644

100.00%
100.00%
100.00%

0.1241
1.9852
0.0551
100.00%

0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.00%

0.0282
0.0054
0.0336

100.00%
60.00%

0.0282
0.0032
93.60%

0.00%
20.00%

0.0000
0.0011
3.20%

0.0323
0.0121
0.3632
0.0336
0.0484
0.1816

100.00%
0.00%
85.00%
60.00%
85.00%
85.00%

0.0323
0.0000
0.3087
0.0202
0.0412
0.1543

0.00%
0.00%
0.00%
20.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0067
0.0000
0.0000

0.6712
3.4 Masonry Works
- Masonry walls 20 cm with concrete blocks class 10.5

Prog.
0.00%

0.5044

3 Boiler And Auxiliary Foundation


3.1 Pilling Works
- Driving rig setting up for driven piles
- Driving piles (refer item 15 A)
- Piles tests on driven piles
Total

Incremental
This Periode

82.94%

1.00%

0.0504
0.0504

0.00%

0.0000
0.00%

0.00%

0.0000
0.00%

0.4371
0.3026
0.0605
0.0706
0.0370
0.0101

0.00%
0.00%
45.00%
45.00%
85.00%
85.00%

0.0000
0.0000
0.0272
0.0318
0.0314
0.0086

70.00%
70.00%
0.00%
0.00%
0.00%
0.00%

0.3060
0.2118
0.0000
0.0000
0.0000
0.0000

Discipline

: CIVIL (DETAIL)

No

Description

Cummulative
Last Periode
Prog.
WF

WF

Total

0.9180
3.6 Siding and Roofing
- Insulated walls (double skin)
- Insulated roof (double skin)
- Metal Windows
- Glass louvers

Total
3.7 Architectural Finishing Works
- Door type I (90 x 210 cm) - Steel exterior
- Door type III (180 x 210 cm) - Steel exterior
- Rooling door 600 x 450 cm, motorized
- Monolithic cemen floor finishing, with hardener
- Chemical resistan floor finish
Total

4.2 Earthworks
- Excavation and Disposal
- Backfill
- Dredging & Disposal
Total

56.41%

0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.00%

0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.00%

0.0114
0.0076
0.0370
0.0168
0.0135

0.00%
0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.0000

0.00%
0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.0000

0.00%

0.00%

0.1513
0.1513

10.00%

0.0151
10.00%

60.00%

0.0908
60.00%

0.1009
0.0504
0.0101

50.00%
20.00%
0.00%

0.0504
0.0101
0.0000

10.00%
30.00%
0.00%

0.0101
0.0151
0.0000

0.0101
0.0050
0.1513
0.0101
0.0168
0.0504

Total

WF

0.1345
0.0841
0.0141
0.0404
0.2730

0.1614
4.3 Concrete Works
- Lean Concrete 10 cm, cement type I
- Gravel Layer 15 cm
- Structure RC below ground, cement type I
- Elevated slab with,metal decking, cement type I
- Reinforcing, plain bar
- Reinforcing, deformed bar

Prog.
10.79%

0.0863

4 CW Intake & Discharge Structure


4.1 Shallow Foundation
- Shallow Foundation
Total

Incremental
This Periode

37.50%

80.00%
0.00%
80.00%
0.00%
80.00%
80.00%

0.0081
0.0000
0.1211
0.0000
0.0135
0.0404

0.2438

15.63%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

75.03%

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.00%

\
4.4 Masonry Works
- Masonry Wall 20 cm with concrete blocks 10.5
- Rip-rap (t=25cm)

0.0841
0.0235
Page 40 of 229

0.00%
0.00%

0.0000
0.0000

0.00%
0.00%

0.0000
0.0000

Discipline

: CIVIL (DETAIL)

No

Description

Cummulative
Last Periode
Prog.
WF

WF

Total

0.1076
4.5 Structure Steel, Miscellaneus Steel
- Structure steel > 40 kg/m
- Structure steel < 40 kg/m
- Crane rails
- Grating, stair treads
- Ladders
- Handrails
- Chequered plates
- Anchor bolts, supply and setting
- Anchor bolts, setting only
- Expansion anchor bolts, supply and setting
- Expansion anchor bolts, setting only
- Embedded metals & Frames, supply and setting
- Embedded metals & Frames, setting only

0.0639
0.0572
0.0336
0.0135
0.0101
0.0067
0.0168
0.0101
0.0067
0.0050
0.0034
0.0050
0.0034

Total

0.0336
0.0437
0.0303
0.0101

Total

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.0050
0.0067
0.0370
0.0101
0.0101

Total

0.00%
0.00%
0.00%
0.00%

0.0081
0.1291
0.0040

Total

0.1412

Page 41 of 229

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000

0.00%
0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.0000

0.00%
0.00%
0.00%
0.00%

0.0081
0.1291
0.0040
100.00%

0.0000
0.0000
0.0000
0.0000
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%

0.00%

100.00%
100.00%
100.00%

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.00%

0.00%

0.0689

5 STACK FOUNDATION AND STRUCTURE


5.1. Pilling Works
- Driving rig setting up for driven piles
- Driving piles (refer item 15 D)
- Piles tests on driven piles

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

WF
0.00%

0.00%

0.1177
4.7 Architectural Finishing Works
- Door type I(90 x 210 cm) - Steel exterior
- Door type III (180 x 210 cm) - Steel exterior
- Rolling door 600 x 450 cm, motorized
- Monolithic cement floor finishing without hardner
- Monolithic cement floor finishing with hardner

Prog.
0.00%

0.2354
4.6 Siding and Roofing
- Insulated walls (double skin)
- Insulated roof (double skin)
- Louvers with same material as siding
- Metal Windows

Incremental
This Periode

0.0000
0.0000
0.0000
0.0000
0.0000
0.00%

0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.00%

Discipline

: CIVIL (DETAIL)

No

Description

Cummulative
Last Periode
Prog.
WF

WF

5.2. Earthworks
- Excavation and Disposal
- Backfill

0.0168
0.0047

Total

85.00%
75.00%

0.0215

5.3. Concrete Works


- Lean concrete 10 cm, cement type I
- Gravel layer 15 cm
- Structure RC below ground,cement type I
- Structure RC above ground,cement type I
- Chemney Mechanical Slip Forming
- Grouting
- Reinforcing, plain bar
- Reinforcing, deformed bar

0.0050
0.0020
0.0235
0.0101
0.0067
0.0050
0.0082
0.0168

Total

0.4876
0.1009
0.0504
0.0168
0.0135
0.0202
0.0269
0.0202
0.0067

Total

100.00%
0.00%
71.40%
71.40%
71.40%
0.00%
90.00%
90.00%

0.0370
0.0269
0.0437
0.0101

Total

0.00%
0.00%
40.00%
30.00%
30.00%
30.00%
0.00%
5.00%
5.00%

0.0050
0.0040
0.0101
0.0067
Page 42 of 229

0.00%
5.00%

0.0050
0.0000
0.0168
0.0072
0.0048
0.0000
0.0074
0.0151

0.0000
0.0000
0.0202
0.0050
0.0040
0.0061
0.0000
0.0010
0.0003

0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000

0.00%
0.00%
8.60%
8.60%
8.60%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000

0.0000
0.0002

0.0000
0.0000
0.0020
0.0009
0.0006
0.0000
0.0000
0.0000
4.48%

85.00%
85.00%
40.00%
0.00%
50.00%
50.00%
0.00%
75.00%
75.00%

0.4144
0.0857
0.0202
0.0000
0.0067
0.0101
0.0000
0.0151
0.0050
75.00%

0.00%
0.00%
0.00%
0.00%

0.00%

0.00%
0.00%
0.00%
0.00%

WF

1.09%

4.93%

0.1177

5.6. Architectural Finishing Works


- Door type III (180 x 210 cm) - Steel exterior
- Extra for fire panel in steel door
- Monolithic cemen floor finishing without hardner
- Chimney Painting

0.0143
0.0035

72.75%

0.7431

5.5. Siding and Roofing


- Insulated roof (single skin)
- Chimney Fiber Glass Insulation
- Chimney Legging (aluminium sheet, t=5mm,h=2)
- Metal windows

Prog.

82.81%

0.0774

5.4. Structure Steel, Miscellaneus Steel


- Structure steel > 40 kg/m
- Structure steel < 40 kg/m
- Crane rails
- Grating, stair treads
- Ladders
- Handrails
- Chequered plates
- Anchor bolts, supply and setting
- Embedded metals & Frames, supply and setting

Incremental
This Periode

0.0000
0.0000
0.0000
0.0000
0.00%

0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000

Discipline

: CIVIL (DETAIL)

No

Description

Cummulative
Last Periode
Prog.
WF

WF

Total

0.0259

6 BOP Foundation And Structure


6.1. Pilling Works
- Driving rig setting up for driven piles
- Driven piles (refer to item 15 I)
- Piles test on driven piles

0.0272
0.4358
0.0127

Total

0.0464
0.0168
0.0067

Total

100.00%
100.00%
100.00%

0.0100
0.0172
0.1597
0.1059
0.1318
0.0580
0.0383
0.0168
0.0135
0.0504

Total

60.00%
0.00%
0.00%

Total

0.0383
0.0273
0.0532

85.00%
0.00%
0.00%
10.00%
10.00%
30.00%
0.00%
0.00%
60.00%
60.00%

0.0504
0.0235
0.0135
0.0135
Page 43 of 229

0.0278
0.0000
0.0000

0.0085
0.0000
0.0000
0.0106
0.0132
0.0174
0.0000
0.0000
0.0081
0.0303

0.00%
0.00%
0.00%

0.0000
0.0000
0.0000

0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000

0.0000
0.0000
0.0000
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.00%

0.00%
0.00%
0.00%

0.00%

0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.00%

14.62%

0.1188

6.5. Structure steel, Miscellaneous


- Structure steel > 40 kg/m
- Structure steel < 40 kg/m
- Grating, stair treads
- Ladders

0.00%
0.00%
0.00%

39.81%

0.6017

6.4. Masonry Works


- Common brick walls
- Masonry Walls 20 cm with concrete blocks class 10.5
- Cement plastering

0.0272
0.4358
0.0127

WF
0.00%

100.00%

0.0699

6.3. Concrete Works


- Lean concrete 10 cm, cement type I
- Gravel layer 15 cm
- Mass Concrete
- Structure RC below ground, cement type II
- Structure RC below ground, cement type II
- Structure RC below ground, cement type I
- Built-up Aspalt Water Proofing
- Grouting
- Reinforcing, plain bar
- Reinforcing, deformed bar

Prog.
0.00%

0.4757

6.2. Steel Structure


- Excavation and Disposal
- Backfill
- Sands fill in trenches, incl supply

Incremental
This Periode

0.0000
0.0000
0.0000
0.00%

0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000

Discipline

: CIVIL (DETAIL)

No

Description

WF

- Handrails
- Anchor bolts, supply and setting
- Anchor bolts, setting only
- Expansion anchor bolts, supply and setting
- Embedded metals & Frames, supply and setting
- Embedded metals & Frames, setting only

Cummulative
Last Periode
Prog.
WF
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Incremental
This Periode
WF

Total
6.6. Siding and Roofing
- Insulated walls (double skin)
- Uninsulated walls (single skin)
- Wall/roof penetration dia. Up to 250 mm
- Wall/roof penetration dia. 251 to 400 mm
- Metal Windows
- Glass louvers
Total

0.0303
0.0101
0.0168
0.0135
0.0050
0.0020
0.0777

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.00%

0.0050
0.0027
0.0101
0.0303
0.0202
0.0303
0.0235
0.0269
0.0235
0.0168
0.0101
0.0202
0.0168

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

6.7. Architecturel Finishing Works


- Door type I (90 x 210 cm) - Steel exterior
- Door type I (90 x 210 cm) - Wood exterior
- Door type III (180 x 210 cm) - Steel exterior
- Rolling door 300 x 300 cm, motorized
- Monolithic cement floor finishing, without hardner
- Monolithic cement floor finishing, with hardner
- Ceramic Floor Tiles
- Acid proof floor finish
- Vinly flooring and tiles
- Thin ceramic tiles
- Painting work on concrete or plastered walls
- Suspended ceillings, accoustical type,moisture
- Suspended ceillings, accoustical type
Total

0.2364

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.00%

Prog.
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.0101
0.0047
0.0020
0.0020
0.0034
0.0020
0.1251

0.00%

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.00%

0.00%

7 Coal Storage And Facilities


7.1. Pilling Works
- Driving rig setting up for driven piles
- Driven piles (refer to item 15 J)
- Piles test on driven piles
Total

0.0111
0.1775
0.0040
0.1927

100.00%
100.00%
100.00%

0.0111
0.1775
0.0040
100.00%

0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.00%

7.2. Earthworks
- Excavation and Disposal

0.0235

60.00%

0.0141

0.00%

0.0000

Page 44 of 229

Discipline

: CIVIL (DETAIL)

No

Description

WF

- Backfill
- HDPE Layer
- Final Grading

Cummulative
Last Periode
Prog.
WF
60.00%
0.0061
0.00%
0.0000
0.00%
0.0000
36.36%

Incremental
This Periode
Prog.
0.00%
0.00%
0.00%

WF

Total

0.0101
0.0168
0.0050
0.0555

7.3. Concrete Works


- Lean concrete 10 cm, cement type I
- Gravel layer 15 cm
- Structure RC below ground, cement type I
- Grouting
- Reinforcing, plain bar
- Reinforcing, deformed bar
Total

0.0101
0.0135
0.1513
0.0101
0.0168
0.0572
0.2589

100.00%
0.00%
80.00%
0.00%
90.00%
90.00%

0.0101
0.0000
0.1211
0.0000
0.0151
0.0514
76.36%

0.00%
0.00%
10.00%
60.00%
0.00%
0.00%

0.0000
0.0000
0.0151
0.0061
0.0000
0.0000
8.18%

0.0370
0.0370

0.00%

0.0000
0.00%

80.00%

Total

0.0296
80.00%

7.5. Structure Steel, Miscellaneus Steel


- Structure steel > 40 kg/m
- Grating, stair treads
- Ladders
- Handrails
- Chequered plates
- Anchor bolts, setting only
- Anchor bolts, supply and setting
- Expansion anchor bolts, supply and setting
- Embedded metals & Frames, supply and setting
Total

0.2354
0.0572
0.0168
0.0168
0.0135
0.0504
0.0168
0.0135
0.0067
0.4270

65.00%
0.00%
0.00%
0.00%
0.00%
65.00%
65.00%
65.00%
80.00%

0.1530
0.0000
0.0000
0.0000
0.0000
0.0328
0.0109
0.0087
0.0054
49.37%

0.00%
0.00%
0.00%
0.00%
0.00%
15.00%
15.00%
15.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.0000
0.0076
0.0025
0.0020
0.0000
2.83%

7.6. Siding and Roofing


- Uninsulated walls (single skin)
- Uninsulated roof (single skin)
- Louvers with same material as siding
Total

0.0437
0.0336
0.0303
0.1076

0.00%
40.00%
0.00%

0.0000
0.0135
0.0000
12.50%

0.00%
40.00%
0.00%

0.0000
0.0135
0.0000
12.50%

7.7. Architecturel Finishing Works


- Door type I (90 x 210 cm) - Steel exterior
- Monolithic cement floor finishing, with hardner
Total

0.0050
0.0101
0.0151

0.00%
0.00%

0.0000
0.0000
0.00%

0.00%
0.00%

0.0000
0.0000
0.00%

7.4 Masonry Works


- Masonry walls 20 cm with concrete blocks class 10.5

8 Ash Disposal and Facilities


8.1 Shallow Foundation
Page 45 of 229

0.0000
0.0000
0.0000
0.00%

Discipline

: CIVIL (DETAIL)

No

Description

WF

- Shallow Foundation

0.1513
0.1513

Total
8.2 Earthworks
- Excavation and Disposal
- Backfill
- HDPE Layer
- Final Grading

Cummulative
Last Periode
Prog.
WF
0.00%
0.0000
0.00%

Incremental
This Periode
Prog.
0.00%

WF
0.0000
0.00%

90.00%
90.00%
90.00%
85.00%

0.0454
0.0182
0.0514
0.0086
89.63%

0.00%
0.00%
0.00%
5.00%

Total

0.0504
0.0202
0.0572
0.0101
0.1379

0.0000
0.0000
0.0000
0.0005
0.37%

8.3. Concrete Works


- Lean concrete 10 cm, cement type I
- Gravel layer 15 cm
- Structure RC below ground, cement type I
- Grouting
- Reinforcing, plain bar
- Reinforcing, deformed bar
Total

0.0101
0.0168
0.1614
0.0168
0.0135
0.0605
0.2791

30.00%
0.00%
30.00%
0.00%
40.00%
40.00%

0.0030
0.0000
0.0484
0.0000
0.0054
0.0242
29.04%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.00%

0.0370
0.0370

0.00%

0.0000
0.00%

0.00%

0.0000
0.00%

0.1849
0.0504
0.0168
0.0135
0.0101
0.0101
0.0067
0.0034
0.2959

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.00%

0.0404
0.0404

0.00%

0.0000
0.00%

0.00%

0.0000
0.00%

0.0168
0.0168

0.00%

0.0000
0.00%

0.00%

0.0000
0.00%

8.4 Masonry Works


- Masonry walls 20 cm with concrete blocks class 10.5
Total
8.5 Structure Steel, Miscellaneus Steel
- Structure steel > 40 kg/m
- Grating, stair treads
- Ladders
- Handrails
- Chequered plates
- Anchor bolts, setting only
- Expansion anchor bolts, supply and setting
- Embedded metals & Frames, supply and setting
Total
8.6 Siding and Roofing
- Uninsulated roof (single skin)
Total
8.7 Architecturel Finishing Works
- Monolithic cement floor finishing, with hardner
Total
9 Misscellaneous Building
Page 46 of 229

Discipline

: CIVIL (DETAIL)

No

Description

Cummulative
Last Periode
Prog.
WF

WF

9.1 Pilling Works


- Driving rig setting up for driven piles
- Driven piles (refer to item 15 L)
Total
9.2 Earthworks
- Excavation and Disposal
- Backfill
Total
9.3 Concrete Works
- Lean concrete 10 cm, cement type I
- Gravel layer 15 cm
- Mass Concrete
- Structure RC below ground, cement type I
- Grouting
- Reinforcing, plain bar
- Reinforcing, deformed bar
- Underground cable ducts
Total
9.4 Masonry Works
- Common brick wall
- Masonry walls 20 cm with concrete block class 10.5
- Masonry walls 15 cm with concrete block class 10.5
- Masonry walls 10 cm with concrete block class 10.5
- Masonry walls 10 cm with concrete block class 7
- Reinforcing, deformed bar
Total
9.5 Structure steel, Miscellaneous Steel
- Structure steel > 40 kg/m
- Structure steel < 40 kg/m
- Crane rails
- Grating, stair treads
- Ladders
- Handrails
- Chequered plate
- Anchor bolts, supply and setting
- Anchor bolts, setting only
- Expansion anchor bolts, supply and setting
- Expansion anchor bolts, setting only
- Embedded metals & Frames, supply and setting
Page 47 of 229

Incremental
This Periode
Prog.

WF

0.0182
0.2905
0.3087

100.00%
100.00%

0.0182
0.2905
100.00%

0.00%
0.00%

0.0000
0.0000
0.00%

0.0303
0.0101
0.0404

0.00%
0.00%

0.0000
0.0000
0.00%

0.00%
0.00%

0.0000
0.0000
0.00%

0.0168
0.0135
0.1177
0.0336
0.0067
0.0135
0.0639
0.0101
0.2757

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.00%

0.0303
0.0336
0.0269
0.0235
0.0235
0.0336
0.1715

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.00%

0.1513
0.0572
0.0504
0.0235
0.0202
0.0202
0.0168
0.0135
0.0135
0.0101
0.0101
0.0067

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

Discipline

: CIVIL (DETAIL)

No

Description

WF

- Embedded metals & Frames, setting only

0.0067
0.4001

Total
9.6 Siding and Roofing
- Insulated walls (double skin)
- Unisulated walls (single skin)
- Insulated roof (double skin)
- Uninsulated roof (single skin)
- Walls/roof penetration dia Up to 250 mm
- Walls/roof penetration dia 251 to 400 mm
- Walls/roof penetration dia 401 to 600 mm
- Louvers with same materials as siding
- Metal windows
- Glass louvers
- Gate house roofing
- Mosque roofing
Total
9.7 Architectural Finishing Works
- Door type I (90 x 210 cm) - Steel exterior
- Door type I (90 x 210 cm) - Steel Interior
- Door type I (90 x 210 cm) - Wood Exterior
- Door type I (90 x 210 cm) - Wood interior
- Door type II (150 x 210 cm) - Steel exterior
- Door type II (150 x 210 cm) - Steel interior
- Door type II (150 x 210 cm) - Wood exterior
- Door type II (150 x 210 cm) - Wood interior
- Door type III (180 x 210 cm) - Steel exterior
- Door type III (180 x 210 cm) - Steel Interior
- Door type III (180 x 210 cm) - Wood exterior
- Door type III (180 x 210 cm) - Wood Interior
- Extra for fire panel in steel door
- Extra for fire panel in wood door
- Extra for upper panel 50 cm in steel door
- Extra for upper panel 50 cm in wood door
- Rolling door 300 x 300 cm, manual drive
- Monolithic cemen floor finishing, without hardner
- Monolithic cemen floor finishing, with hardner
- Ceramic Floor Tiles
- Glazed Tiles
- Chemical resistant floor finish
- Acid proof floor finish
- Vinyl flooring and tiles
Page 48 of 229

Cummulative
Last Periode
Prog.
WF
0.00%
0.0000
0.00%

Incremental
This Periode
Prog.
0.00%

WF
0.0000
0.00%

0.0605
0.0504
0.0471
0.0370
0.0336
0.0370
0.0336
0.0336
0.0168
0.0135
0.0101
0.0050
0.3783

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.00%

0.0050
0.0050
0.0017
0.0017
0.0061
0.0061
0.0024
0.0024
0.0067
0.0067
0.0030
0.0030
0.0027
0.0027
0.0017
0.0017
0.0101
0.0168
0.0135
0.0101
0.0067
0.0114
0.0101
0.0135

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

Discipline

: CIVIL (DETAIL)

No

Description

WF

- Partition walls in office


- Thin ceramic tile
- Painting work on concrete or plastered walls
- Suspended ceilling, louvered grid type
- Suspended ceilling,accoustical type, moisture
- Suspended ceilling,accoustical type
- Painting work on concrete ceillings
- Kitchen units
- Steel locker

0.0235
0.0135
0.0303
0.0269
0.0303
0.0235
0.0235
0.0101
0.0135
0.3457

Total
9.8 Plumbing
- Plumbing

0.0389

Total

Cummulative
Last Periode
Prog.
WF
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%

0.0389

10 70 kV Substation Building and Switchyard


10.1 Substation 70 Kv Building
- Substation 70 Kv Building

0.4876

Total

0.1200

Total

0.00%

0.0202
0.0126
0.0050
0.0034

Total

0.00%

0.0101
0.0168
0.1177
0.0202
0.0101
0.0504

Total

0.2253
Page 49 of 229

0.00%

0.0000

0.0000

0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000

0.00%

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.00%

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.00%

0.0000

0.0000
0.00%

0.00%

0.0000
0.00%

0.00%
0.00%
0.00%
0.00%

0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

WF

0.00%

0.00%

0.0412

11.2 Concrete Works


- Lean concrete 10 cm, cement type I
- Gravel layer 15 cm
- Structure RC below ground, cement type I
- Grouting
- Reinforcing, plain bar
- Reinforcing, deformed bar

0.0000

Prog.
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%

0.1200

11 SITE FINISHING (ROAD, DRAINS, FENCE,ETC)


11.1 Earthworks
- Excavation and Disposal
- Backfilling
- HDPE Layer
- Final Grading

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.00%

0.00%

0.4876

10.2 70 kV Switchyard Foundation (refer to item 15 K)


- 70 kV Switchyard Foundation (refer to item 15 K)

Incremental
This Periode

0.0000
0.0000
0.0000
0.0000
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.00%

Discipline

: CIVIL (DETAIL)

No

Description

Cummulative
Last Periode
Prog.
WF

WF

11.3 Masonry Works


- Common brick walls
- Mansonry walls 10 cm with concrete block class 7
- Cement plastering
- Rip-rap (t=25cm)

0.1053
0.1316
0.2895
0.0526

Total

0.00%
0.00%
0.00%
0.00%

0.5789

11.4 Roads, Paved Area and Landscaping


- Road base and subbase
- Aspalt Pavement
- Concrete Pavement - conblocks
- Gravel surfacing
- Hard shoulders
- Road making in power plant area
- Concrete curb
- Wheel stops
- Rehabilition of access road

0.1177
0.1513
0.0841
0.1009
0.0218
0.0101
0.0605
0.0336
0.0370

Total

0.0504
0.0538
0.0353
0.0252

Total

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.1176
0.1412

Total

0.00%
0.00%
0.00%
0.00%

0.0336

Total

0.0336

Page 50 of 229

0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

0.0000
0.0000
0.0000
0.0000

0.00%
0.00%

0.0000
0.0000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.0000
0.00%

0.0000
0.0000
0.0000
0.0000

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.00%

0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.00%

0.00%
0.00%

0.00%

0.00%

WF

0.00%

0.00%

0.2588

11.7 Perimeter Wall and Fencing Work


- Perimeter Wall and Fencing Work

0.0000
0.0000
0.0000
0.0000

0.00%

0.1648

11.6 Fence work and gates


- Security and boundary fence
- Gates

Prog.

0.00%

0.6170

11.5 Landscaping - Planting - Irrigation


- Seeding and mulching
- Seeding and mulching
- Planting scheme
- Irrigation schema

Incremental
This Periode

0.0000
0.0000
0.00%

0.00%

0.0000
0.00%

ION PROGRESS CALCULATION


f September 2013

Cummulative
This Periode
Prog.
WF

100.00%
100.00%
100.00%
100.00%
100.00%
85.00%

0.0740
0.0336
0.1177
0.1009
0.0168
0.0800
96.77%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%

0.2018
0.1459
0.1009
0.0942
0.0841
0.0235
0.0000
89.79%

50.00%
40.00%
40.00%
40.00%

0.0040
0.0229
0.0040
0.0067
40.88%

0.00%

0.0000
0.00%

Page 51 of 229

Cummulative
This Periode
Prog.
WF

100.00%
100.00%
100.00%

0.0767
1.2266
0.0773
100.00%

100.00%
80.00%

0.0218
0.0097
92.86%

100.00%
100.00%
75.00%
0.00%
75.00%
75.00%
0.00%

0.0242
0.0091
0.1634
0.0000
0.0305
0.1144
0.0000
54.89%

0.00%

0.0000
0.00%

0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

Page 52 of 229

Cummulative
This Periode
Prog.
WF
0.00%

5.00%
0.00%
0.00%

0.0252
0.0000
0.0000
5.00%

100.00%
100.00%
100.00%

0.1241
1.9852
0.0551
100.00%

100.00%
80.00%

0.0282
0.0043
96.80%

100.00%
0.00%
85.00%
80.00%
85.00%
85.00%

0.0323
0.0000
0.3087
0.0269
0.0412
0.1543
83.94%

0.00%

0.0000
0.00%

70.00%
70.00%
45.00%
45.00%
85.00%
85.00%

0.3060
0.2118
0.0272
0.0318
0.0314
0.0086

Page 53 of 229

Cummulative
This Periode
Prog.
WF
67.20%

0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.0000
0.00%

70.00%

0.1059
70.00%

60.00%
50.00%
0.00%

0.0605
0.0252
0.0000
53.13%

80.00%
0.00%
80.00%
0.00%
80.00%
80.00%

0.0081
0.0000
0.1211
0.0000
0.0135
0.0404
75.03%

0.00%
0.00%
Page 54 of 229

0.0000
0.0000

Cummulative
This Periode
Prog.
WF
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.00%

0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.0000
0.00%

100.00%
100.00%
100.00%

0.0081
0.1291
0.0040
100.00%

Page 55 of 229

Cummulative
This Periode
Prog.
WF
85.00%
80.00%

0.0143
0.0038
83.91%

100.00%
0.00%
80.00%
80.00%
80.00%
0.00%
90.00%
90.00%

0.0050
0.0000
0.0188
0.0081
0.0054
0.0000
0.0074
0.0151
77.23%

85.00%
85.00%
80.00%
30.00%
80.00%
80.00%
0.00%
80.00%
80.00%

0.4144
0.0857
0.0404
0.0050
0.0108
0.0161
0.0000
0.0161
0.0054
79.93%

0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.00%

0.00%
0.00%
0.00%
0.00%
Page 56 of 229

0.0000
0.0000
0.0000
0.0000

Cummulative
This Periode
Prog.
WF
0.00%

100.00%
100.00%
100.00%

0.0272
0.4358
0.0127
100.00%

60.00%
0.00%
0.00%

0.0278
0.0000
0.0000
39.81%

85.00%
0.00%
0.00%
10.00%
10.00%
30.00%
0.00%
0.00%
60.00%
60.00%

0.0085
0.0000
0.0000
0.0106
0.0132
0.0174
0.0000
0.0000
0.0081
0.0303
14.62%

0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.00%

0.00%
0.00%
0.00%
0.00%
Page 57 of 229

0.0000
0.0000
0.0000
0.0000

Cummulative
This Periode
Prog.
WF
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.00%

100.00%
100.00%
100.00%

0.0111
0.1775
0.0040
100.00%

60.00%

0.0141

Page 58 of 229

Cummulative
This Periode
Prog.
WF
60.00%
0.0061
0.00%
0.0000
0.00%
0.0000
36.36%

100.00%
0.00%
90.00%
60.00%
90.00%
90.00%

0.0101
0.0000
0.1362
0.0061
0.0151
0.0514
84.55%

80.00%

0.0296
80.00%

65.00%
0.00%
0.00%
0.00%
0.00%
80.00%
80.00%
80.00%
80.00%

0.1530
0.0000
0.0000
0.0000
0.0000
0.0404
0.0135
0.0108
0.0054
52.20%

0.00%
80.00%
0.00%

0.0000
0.0269
0.0000
25.00%

0.00%
0.00%

0.0000
0.0000
0.00%

Page 59 of 229

Cummulative
This Periode
Prog.
WF
0.00%
0.0000
0.00%

90.00%
90.00%
90.00%
90.00%

0.0454
0.0182
0.0514
0.0091
90.00%

30.00%
0.00%
30.00%
0.00%
40.00%
40.00%

0.0030
0.0000
0.0484
0.0000
0.0054
0.0242
29.04%

0.00%

0.0000
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.00%

0.00%

0.0000
0.00%

0.00%

0.0000
0.00%

Page 60 of 229

Cummulative
This Periode
Prog.
WF
100.00%
100.00%

0.0182
0.2905
100.00%

0.00%
0.00%

0.0000
0.0000
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

Page 61 of 229

Cummulative
This Periode
Prog.
WF
0.00%
0.0000
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

Page 62 of 229

Cummulative
This Periode
Prog.
WF
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.00%

0.0000
0.00%

0.00%

0.0000
0.00%

0.00%

0.0000
0.00%

0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.00%

Page 63 of 229

Cummulative
This Periode
Prog.
WF

0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.00%

0.00%
0.00%
0.00%
0.00%

0.0000
0.0000
0.0000
0.0000
0.00%

0.00%
0.00%

0.0000
0.0000
0.00%

0.00%

0.0000
0.00%

Page 64 of 229

CONSTRUCTION PROGRESS CALCULATION


As of September 2013
Project Name :
Item No
Phase
:
Discipline
No

PLTU Kendari Unit 3 (1 x 10 MW)


: Monthly Progress Certificate Civil Work No. 08
Construction
: CIVIL (DETAIL)
Description

UNIT

1 Preparation Works
1.1 Mobiization & Demobilization
- Preparatory Works
- Mobilization & Demobilization
- Survey and Setting Out
- Soil Investigation
- Site Facilities
- Site Office for the Owner
- Site Laboratory including equipment

Cummulative
Last Periode
Prog.
Q'ty

Q'TY

ls
ls
ls
ls
ls
ls

1.00
1.00
1.00
1.00
1.00
1.00

100.00%
100.00%
100.00%
100.00%
100.00%
80.00%

1.000
1.000
1.000
1.000
1.000
0.800

1.2 Excavation and Backfill


- Excavation and Disposal
- Backfill
- Rock Fill Type I
- Rock Fill Type II
- Rock Fill Type III
- Gabion
- Woven Geotextile

ls
ls
ls
ls
ls
ls
ls

1.00
1.00
1.00
1.00
1.00
1.00
1.00

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%

1.000
1.000
1.000
1.000
1.000
1.000
0.000

1.3 Concrete Works


- Lean Concrete 10 cm,cement type I

ls

1.00

50.00%

0.500

Total

Total

Page 65 of 229

No

Description

UNIT

- Structure RC below ground, cement type I


- Reinforcing, plain bar
- Reinforcing, deformed bar

Q'TY

Cummulative
Last Periode
Prog.
Q'ty
40.00%
0.400
40.00%
0.400
40.00%
0.400

ls
ls
ls

1.00
1.00
1.00

ls

1.00

0.00%

0.000

ls
ls
ls

1.00
1.00
1.00

100.00%
100.00%
100.00%

1.000
1.000
1.000

2.2 Earthworks
- Excavation and Disposal
- Backfill

ls
ls

1.00
1.00

100.00%
70.00%

1.000
0.700

2.3 Concrete Works


- Lean Concrete 10 cm, cement type I
- Gravel Layer 15 cm
- Structure RC below ground, cement type I
- Elevated slab with,metal decking, cement type I
- Reinforcing, plain bar
- Reinforcing, deformed bar
- Metal decking

ls
ls
ls
ls
ls
ls
ls

1.00
1.00
1.00
1.00
1.00
1.00
1.00

100.00%
100.00%
65.00%
0.00%
70.00%
70.00%
0.00%

1.000
1.000
0.650
0.000
0.700
0.700
0.000

2.4 Masonry Works


- Masonry walls 20 cm with concrete blocks class 10.5

ls

1.00

0.00%

0.000

Total
1.4 Masonry Works
- Rip-rap (t=25 cm)
Total
2 Turbine Foundation and Structure
2.1 Pilling Works
- Driving rig setting up for driven piles
- Driving piles (refer item 15 A)
- Piles tests on driven piles
Total

Total

Total

Total
Page 66 of 229

No

Description

UNIT

Cummulative
Last Periode
Prog.
Q'ty

Q'TY

2.5 Siding and Roofing


- Insulated walls (double skin)
- Insulated roof (double skin)
- Metal Windows
- Glass louvers

ls
ls
ls
ls

1.00
1.00
1.00
1.00

0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000

2.6 Architectural Finishing Works


- Suspended ceillings, louvered grid type
- Suspended ceillings, accoustical type,moisture
- Suspended ceillings, accoustical type
- Monolithic cemen floor finishing, with hardener
- Chemical resistan floor finish
- Kitchen Units
- Steel Locker

ls
ls
ls
ls
ls
ls
ls

1.00
1.00
1.00
1.00
1.00
1.00
1.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000
0.000
0.000

2.7 Special Structure


- Supporting of Steelwork for all Auxilliaries,such
- Platform, Walkways and Stairways,including
- All Embedded Parts in Concrete Including

ls
ls
ls

1.00
1.00
1.00

5.00%
0.00%
0.00%

0.050
0.000
0.000

ls
ls
ls

1.00
1.00
1.00

100.00%
100.00%
100.00%

1.000
1.000
1.000

ls
ls

1.00
1.00

100.00%
60.00%

1.000
0.600

Total

Total

Total
3 Boiler And Auxiliary Foundation
3.1 Pilling Works
- Driving rig setting up for driven piles
- Driving piles (refer item 15 A)
- Piles tests on driven piles
Total
3.2 Earthworks
- Excavation and Disposal
- Backfill
Total
Page 67 of 229

No

Description

UNIT

Cummulative
Last Periode
Prog.
Q'ty

Q'TY

3.3 Concrete Works


- Lean Concrete 10 cm, cement type I
- Gravel Layer 15 cm
- Structure RC below ground, cement type I
- Elevated slab with,metal decking, cement type I
- Reinforcing, plain bar
- Reinforcing, deformed bar

ls
ls
ls
ls
ls
ls

1.00
1.00
1.00
1.00
1.00
1.00

100.00%
0.00%
85.00%
60.00%
85.00%
85.00%

1.000
0.000
0.850
0.600
0.850
0.850

3.4 Masonry Works


- Masonry walls 20 cm with concrete blocks class 10.5

ls

1.00

0.00%

0.000

1.00

0.00%

0.000

Total

Total
3.5 Structure Steel, Miscellaneus Steel
- Structure steel > 40 kg/m
- Structure steel < 40 kg/m
- Expansion anchor bolts, supply and setting
- Expansion anchor bolts, setting only
- Embedded metals & frame, supply and setting
- Embedded metals & frame, setting only

ls
ls
ls
ls
ls
ls

1.00
1.00
1.00
1.00
1.00
1.00

0.00%
0.00%
45.00%
45.00%
85.00%
85.00%

0.000
0.000
0.450
0.450
0.850
0.850

3.6 Siding and Roofing


- Insulated walls (double skin)
- Insulated roof (double skin)
- Metal Windows
- Glass louvers

ls
ls
ls
ls

1.00
1.00
1.00
1.00

0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000

3.7 Architectural Finishing Works


- Door type I (90 x 210 cm) - Steel exterior
- Door type III (180 x 210 cm) - Steel exterior
- Rooling door 600 x 450 cm, motorized
- Monolithic cemen floor finishing, with hardener

ls
ls
ls
ls

1.00
1.00
1.00
1.00

0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000

Total

Total

Page 68 of 229

No

Description

UNIT

- Chemical resistan floor finish

Q'TY

Cummulative
Last Periode
Prog.
Q'ty
0.00%
0.000

ls

1.00

ls

1.00

10.00%

0.100

4.2 Earthworks
- Excavation and Disposal
- Backfill
- Dredging & Disposal

ls
ls
ls

1.00
1.00
1.00

50.00%
20.00%
0.00%

0.500
0.200
0.000

4.3 Concrete Works


- Lean Concrete 10 cm, cement type I
- Gravel Layer 15 cm
- Structure RC below ground, cement type I
- Elevated slab with,metal decking, cement type I
- Reinforcing, plain bar
- Reinforcing, deformed bar

ls
ls
ls
ls
ls
ls

1.00
1.00
1.00
1.00
1.00
1.00

80.00%
0.00%
80.00%
0.00%
80.00%
80.00%

0.800
0.000
0.800
0.000
0.800
0.800

4.4 Masonry Works


- Masonry Wall 20 cm with concrete blocks 10.5
- Rip-rap (t=25cm)

ls
ls

1.00
1.00

0.00%
0.00%

0.000
0.000

4.5 Structure Steel, Miscellaneus Steel


- Structure steel > 40 kg/m
- Structure steel < 40 kg/m
- Crane rails
- Grating, stair treads
- Ladders
- Handrails

ls
ls
ls
ls
ls
ls

1.00
1.00
1.00
1.00
1.00
1.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000
0.000

Total
4 CW Intake & Discharge Structure
4.1 Shallow Foundation
- Shallow Foundation
Total

Total

Total

Total

Page 69 of 229

No

Description

UNIT

- Chequered plates
- Anchor bolts, supply and setting
- Anchor bolts, setting only
- Expansion anchor bolts, supply and setting
- Expansion anchor bolts, setting only
- Embedded metals & Frames, supply and setting
- Embedded metals & Frames, setting only

Q'TY

Cummulative
Last Periode
Prog.
Q'ty
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

ls
ls
ls
ls
ls
ls
ls

1.00
1.00
1.00
1.00
1.00
1.00
1.00

0.000
0.000
0.000
0.000
0.000
0.000
0.000

4.6 Siding and Roofing


- Insulated walls (double skin)
- Insulated roof (double skin)
- Louvers with same material as siding
- Metal Windows

ls
ls
ls
ls

1.00
1.00
1.00
1.00

0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000

4.7 Architectural Finishing Works


- Door type I(90 x 210 cm) - Steel exterior
- Door type III (180 x 210 cm) - Steel exterior
- Rolling door 600 x 450 cm, motorized
- Monolithic cement floor finishing without hardner
- Monolithic cement floor finishing with hardner

ls
ls
ls
ls
ls

1.00
1.00
1.00
1.00
1.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000

ls
ls
ls

1.00
1.00
1.00

100.00%
100.00%
100.00%

1.000
1.000
1.000

ls
ls

1.00
1.00

85.00%
75.00%

0.850
0.750

Total

Total

Total
5 STACK FOUNDATION AND STRUCTURE
5.1 Pilling Works
- Driving rig setting up for driven piles
- Driving piles (refer item 15 D)
- Piles tests on driven piles
Total
5.2 Earthworks
- Excavation and Disposal
- Backfill
Page 70 of 229

No

Description

UNIT

Cummulative
Last Periode
Prog.
Q'ty

Q'TY

Total
5.3 Concrete Works
- Lean concrete 10 cm, cement type I
- Gravel layer 15 cm
- Structure RC below ground,cement type I
- Structure RC above ground,cement type I
- Chemney Mechanical Slip Forming
- Grouting
- Reinforcing, plain bar
- Reinforcing, deformed bar

ls
ls
ls
ls
ls
ls
ls
ls

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

100.00%
0.00%
71.40%
71.40%
71.40%
0.00%
90.00%
90.00%

1.000
0.000
0.714
0.714
0.714
0.000
0.900
0.900

5.4 Structure Steel, Miscellaneus Steel


- Structure steel > 40 kg/m
- Structure steel < 40 kg/m
- Crane rails
- Grating, stair treads
- Ladders
- Handrails
- Chequered plates
- Anchor bolts, supply and setting
- Embedded metals & Frames, supply and setting

ls
ls
ls
ls
ls
ls
ls
ls
ls

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

0.00%
0.00%
40.00%
30.00%
30.00%
30.00%
0.00%
5.00%
5.00%

0.000
0.000
0.400
0.300
0.300
0.300
0.000
0.050
0.050

5.5 Siding and Roofing


- Insulated roof (single skin)
- Chimney Fiber Glass Insulation
- Chimney Legging (aluminium sheet, t=5mm,h=2)
- Metal windows

ls
ls
ls
ls

1.00
1.00
1.00
1.00

0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000

5.6 Architectural Finishing Works


- Door type III (180 x 210 cm) - Steel exterior

ls

1.00

0.00%

0.000

Total

Total

Total

Page 71 of 229

No

Description

UNIT

- Extra for fire panel in steel door


- Monolithic cemen floor finishing without hardner
- Chimney Painting

Q'TY

Cummulative
Last Periode
Prog.
Q'ty
0.00%
0.000
0.00%
0.000
0.00%
0.000

ls
ls
ls

1.00
1.00
1.00

ls
ls
ls

1.00
1.00
1.00

100.00%
100.00%
100.00%

1.000
1.000
1.000

6.2 Steel Structure


- Excavation and Disposal
- Backfill
- Sands fill in trenches, incl supply

ls
ls
ls

1.00
1.00
1.00

60.00%
0.00%
0.00%

0.600
0.000
0.000

6.3 Concrete Works


- Lean concrete 10 cm, cement type I
- Gravel layer 15 cm
- Mass Concrete
- Structure RC below ground, cement type II
- Structure RC below ground, cement type II
- Structure RC below ground, cement type I
- Built-up Aspalt Water Proofing
- Grouting
- Reinforcing, plain bar
- Reinforcing, deformed bar

ls
ls
ls
ls
ls
ls
ls
ls
ls
ls

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

85.00%
0.00%
0.00%
10.00%
10.00%
30.00%
0.00%
0.00%
60.00%
60.00%

0.850
0.000
0.000
0.100
0.100
0.300
0.000
0.000
0.600
0.600

6.4 Masonry Works


- Common brick walls
- Masonry Walls 20 cm with concrete blocks class 10.5

ls
ls

1.00
1.00

0.00%
0.00%

0.000
0.000

Total
6 BOP Foundation And Structure
6.1 Pilling Works
- Driving rig setting up for driven piles
- Driven piles (refer to item 15 I)
- Piles test on driven piles
Total

Total

Total

Page 72 of 229

No

Description

UNIT

- Cement plastering

Q'TY

Cummulative
Last Periode
Prog.
Q'ty
0.00%
0.000

ls

1.00

6.5 Structure steel, Miscellaneous


- Structure steel > 40 kg/m
- Structure steel < 40 kg/m
- Grating, stair treads
- Ladders
- Handrails
- Anchor bolts, supply and setting
- Anchor bolts, setting only
- Expansion anchor bolts, supply and setting
- Embedded metals & Frames, supply and setting
- Embedded metals & Frames, setting only

ls
ls
ls
ls
ls
ls
ls
ls
ls
ls

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

6.6 Siding and Roofing


- Insulated walls (double skin)
- Uninsulated walls (single skin)
- Wall/roof penetration dia. Up to 250 mm
- Wall/roof penetration dia. 251 to 400 mm
- Metal Windows
- Glass louvers

ls
ls
ls
ls
ls
ls

1.00
1.00
1.00
1.00
1.00
1.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000
0.000

6.7. Architecturel Finishing Works


- Door type I (90 x 210 cm) - Steel exterior
- Door type I (90 x 210 cm) - Wood exterior
- Door type III (180 x 210 cm) - Steel exterior
- Rolling door 300 x 300 cm, motorized
- Monolithic cement floor finishing, without hardner
- Monolithic cement floor finishing, with hardner
- Ceramic Floor Tiles
- Acid proof floor finish

ls
ls
ls
ls
ls
ls
ls
ls

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Total

Total

Total

Page 73 of 229

No

Description

UNIT

- Vinly flooring and tiles


- Thin ceramic tiles
- Painting work on concrete or plastered walls
- Suspended ceillings, accoustical type,moisture
- Suspended ceillings, accoustical type

Q'TY

Cummulative
Last Periode
Prog.
Q'ty
0.00%
0.00%
0.00%
0.00%
0.00%

ls
ls
ls
ls
ls

1.00
1.00
1.00
1.00
1.00

0.000
0.000
0.000
0.000
0.000

ls
ls
ls

1.00
1.00
1.00

100.00%
100.00%
100.00%

1.000
1.000
1.000

ls
ls
ls
ls

1.00
1.00
1.00
1.00

60.00%
60.00%
0.00%
0.00%

0.600
0.600
0.000
0.000

ls
ls
ls
ls
ls
ls

1.00
1.00
1.00
1.00
1.00
1.00

100.00%
0.00%
80.00%
0.00%
90.00%
90.00%

1.000
0.000
0.800
0.000
0.900
0.900

ls

1.00

0.00%

0.000

Total
7 Coal Storage And Facilities
7.1. Pilling Works
- Driving rig setting up for driven piles
- Driven piles (refer to item 15 J)
- Piles test on driven piles
Total
7.2. Earthworks
- Excavation and Disposal
- Backfill
- HDPE Layer
- Final Grading
Total
7.3. Concrete Works
- Lean concrete 10 cm, cement type I
- Gravel layer 15 cm
- Structure RC below ground, cement type I
- Grouting
- Reinforcing, plain bar
- Reinforcing, deformed bar
Total
7.4. Masonry Works
- Masonry walls 20 cm with concrete blocks class 10.5
Total
7.5. Structure Steel, Miscellaneus Steel
Page 74 of 229

No

Description

UNIT

- Structure steel > 40 kg/m


- Grating, stair treads
- Ladders
- Handrails
- Chequered plates
- Anchor bolts, setting only
- Anchor bolts, supply and setting
- Expansion anchor bolts, supply and setting
- Embedded metals & Frames, supply and setting

Q'TY

Cummulative
Last Periode
Prog.
Q'ty
65.00%
0.00%
0.00%
0.00%
0.00%
65.00%
65.00%
65.00%
80.00%

ls
ls
ls
ls
ls
ls
ls
ls
ls

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

0.650
0.000
0.000
0.000
0.000
0.650
0.650
0.650
0.800

ls
ls
ls

1.00
1.00
1.00

0.00%
40.00%
0.00%

0.000
0.400
0.000

ls
ls

1.00
1.00

0.00%
0.00%

0.000
0.000

ls

1.00

0.00%

0.000

ls
ls
ls
ls

1.00
1.00
1.00
1.00

90.00%
90.00%
90.00%
85.00%

0.900
0.900
0.900
0.850

Total
7.6. Siding and Roofing
- Uninsulated walls (single skin)
- Uninsulated roof (single skin)
- Louvers with same material as siding
Total
7.7. Architecturel Finishing Works
- Door type I (90 x 210 cm) - Steel exterior
- Monolithic cement floor finishing, with hardner
Total
8 Ash Disposal and Facilities
8.1 Shallow Foundation
- Shallow Foundation
Total
8.2 Earthworks
- Excavation and Disposal
- Backfill
- HDPE Layer
- Final Grading
Total

Page 75 of 229

No

Description

UNIT

8.3. Concrete Works


- Lean concrete 10 cm, cement type I
- Gravel layer 15 cm
- Structure RC below ground, cement type I
- Grouting
- Reinforcing, plain bar
- Reinforcing, deformed bar

Cummulative
Last Periode
Prog.
Q'ty

Q'TY

ls
ls
ls
ls
ls
ls

1.00
1.00
1.00
1.00
1.00
1.00

30.00%
0.00%
30.00%
0.00%
40.00%
40.00%

0.300
0.000
0.300
0.000
0.400
0.400

8.4 Masonry Works


- Masonry walls 20 cm with concrete blocks class 10.5

ls

1.00

0.00%

0.000

8.5 Structure Steel, Miscellaneus Steel


- Structure steel > 40 kg/m
- Grating, stair treads
- Ladders
- Handrails
- Chequered plates
- Anchor bolts, setting only
- Expansion anchor bolts, supply and setting
- Embedded metals & Frames, supply and setting

ls
ls
ls
ls
ls
ls
ls
ls

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

8.6 Siding and Roofing


- Uninsulated roof (single skin)

ls

1.00

0.00%

0.000

8.7 Architecturel Finishing Works


- Monolithic cement floor finishing, with hardner

ls

1.00

0.00%

0.000

Total

Total

Total

Total

Total
9 Miscellaneous Building
9.1 Pilling Works
Page 76 of 229

No

Description

UNIT

- Driving rig setting up for driven piles


- Driven piles (refer to item 15 L)

Q'TY

Cummulative
Last Periode
Prog.
Q'ty
100.00%
1.000
100.00%
1.000

ls
ls

1.00
1.00

9.2 Earthworks
- Excavation and Disposal
- Backfill

ls
ls

1.00
1.00

0.00%
0.00%

0.000
0.000

9.3 Concrete Works


- Lean concrete 10 cm, cement type I
- Gravel layer 15 cm
- Mass Concrete
- Structure RC below ground, cement type I
- Grouting
- Reinforcing, plain bar
- Reinforcing, deformed bar
- Underground cable ducts

ls
ls
ls
ls
ls
ls
ls
ls

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

9.4 Masonry Works


- Common brick wall
- Masonry walls 20 cm with concrete block class 10.5
- Masonry walls 15 cm with concrete block class 10.5
- Masonry walls 10 cm with concrete block class 10.5
- Masonry walls 10 cm with concrete block class 7
- Reinforcing, deformed bar

ls
ls
ls
ls
ls
ls

1.00
1.00
1.00
1.00
1.00
1.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000
0.000

9.5 Structure steel, Miscellaneous Steel


- Structure steel > 40 kg/m
- Structure steel < 40 kg/m
- Crane rails
- Grating, stair treads
- Ladders

ls
ls
ls
ls
ls

1.00
1.00
1.00
1.00
1.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000

Total

Total

Total

Total

Page 77 of 229

No

Description

UNIT

- Handrails
- Chequered plate
- Anchor bolts, supply and setting
- Anchor bolts, setting only
- Expansion anchor bolts, supply and setting
- Expansion anchor bolts, setting only
- Embedded metals & Frames, supply and setting
- Embedded metals & Frames, setting only

Q'TY

Cummulative
Last Periode
Prog.
Q'ty
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

ls
ls
ls
ls
ls
ls
ls
ls

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

9.6 Siding and Roofing


- Insulated walls (double skin)
- Unisulated walls (single skin)
- Insulated roof (double skin)
- Uninsulated roof (single skin)
- Walls/roof penetration dia Up to 250 mm
- Walls/roof penetration dia 251 to 400 mm
- Walls/roof penetration dia 401 to 600 mm
- Louvers with same materials as siding
- Metal windows
- Glass louvers
- Gate house roofing
- Mosque roofing

ls
ls
ls
ls
ls
ls
ls
ls
ls
ls
ls
ls

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

9.7 Architectural Finishing Works


- Door type I (90 x 210 cm) - Steel exterior
- Door type I (90 x 210 cm) - Steel Interior
- Door type I (90 x 210 cm) - Wood Exterior
- Door type I (90 x 210 cm) - Wood interior
- Door type II (150 x 210 cm) - Steel exterior
- Door type II (150 x 210 cm) - Steel interior
- Door type II (150 x 210 cm) - Wood exterior
- Door type II (150 x 210 cm) - Wood interior
- Door type III (180 x 210 cm) - Steel exterior

ls
ls
ls
ls
ls
ls
ls
ls
ls

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Total

Total

Page 78 of 229

No

Description

UNIT

- Door type III (180 x 210 cm) - Steel Interior


- Door type III (180 x 210 cm) - Wood exterior
- Door type III (180 x 210 cm) - Wood Interior
- Extra for fire panel in steel door
- Extra for fire panel in wood door
- Extra for upper panel 50 cm in steel door
- Extra for upper panel 50 cm in wood door
- Rolling door 300 x 300 cm, manual drive
- Monolithic cemen floor finishing, without hardner
- Monolithic cemen floor finishing, with hardner
- Ceramic Floor Tiles
- Glazed Tiles
- Chemical resistant floor finish
- Acid proof floor finish
- Vinyl flooring and tiles
- Partition walls in office
- Thin ceramic tile
- Painting work on concrete or plastered walls
- Suspended ceilling, louvered grid type
- Suspended ceilling,accoustical type, moisture
- Suspended ceilling,accoustical type
- Painting work on concrete ceillings
- Kitchen units
- Steel locker

Q'TY

Cummulative
Last Periode
Prog.
Q'ty
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

ls
ls
ls
ls
ls
ls
ls
ls
ls
ls
ls
ls
ls
ls
ls
ls
ls
ls
ls
ls
ls
ls
ls
ls

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

ls

1.00

0.00%

0.000

ls

1.00

0.00%

0.000

Total
9.8 Plumbing
- Plumbing
Total
10 70 kV Substation Building and Switchyard
10.1 Substation 70 Kv Building
- Substation 70 Kv Building
Total

Page 79 of 229

No

Description

UNIT

10.2 70 kV Switchyard Foundation (refer to item 15 K)


- 70 kV Switchyard Foundation (refer to item 15 K)
Total

Cummulative
Last Periode
Prog.
Q'ty

Q'TY

ls

1.00

0.00%

0.000

ls
ls
ls
ls

1.00
1.00
1.00
1.00

0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000

11.2 Concrete Works


- Lean concrete 10 cm, cement type I
- Gravel layer 15 cm
- Structure RC below ground, cement type I
- Grouting
- Reinforcing, plain bar
- Reinforcing, deformed bar
Total

ls
ls
ls
ls
ls
ls

1.00
1.00
1.00
1.00
1.00
1.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000
0.000

11.3 Masonry Works


- Common brick walls
- Mansonry walls 10 cm with concrete block class 7
- Cement plastering
- Rip-rap (t=25cm)
Total

ls
ls
ls
ls

1.00
1.00
1.00
1.00

0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000

ls
ls
ls
ls
ls
ls

1.00
1.00
1.00
1.00
1.00
1.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000
0.000

11 SITE FINISHING (ROAD, DRAINS, FENCE,ETC)


11.1 Earthworks
- Excavation and Disposal
- Backfilling
- HDPE Layer
- Final Grading
Total

11.4 Roads, Paved Area and Landscaping


- Road base and subbase
- Aspalt Pavement
- Concrete Pavement - conblocks
- Gravel surfacing
- Hard shoulders
- Road making in power plant area
Page 80 of 229

No

Description

UNIT

- Concrete curb
- Wheel stops
- Rehabilition of access road

Q'TY

Cummulative
Last Periode
Prog.
Q'ty
0.00%
0.000
0.00%
0.000
0.00%
0.000

ls
ls
ls

1.00
1.00
1.00

11.5 Landscaping - Planting - Irrigation


- Seeding and mulching
- Seeding and mulching
- Planting scheme
- Irrigation schema
Total

ls
ls
ls
ls

1.00
1.00
1.00
1.00

0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000

11.6 Fence work and gates


- Security and boundary fence
- Gates
Total

ls
ls

1.00
1.00

0.00%
0.00%

0.000
0.000

11.7 Perimeter Wall and Fencing Work


- Perimeter Wall and Fencing Work
Total

ls

1.00

0.00%

0.000

Total

Approved by,
PT. PLN (Persero)
UPK PEMBANGKIT SULAWESI 3

Checked by
PT. REKADAYA ELEKTRIKA
CONSULTANT

ARIF RAHMAN HAKIM


Manager

STEVENSON SEBAYANG
Project Manager

Page 81 of 229

ON PROGRESS CALCULATION
September 2013

Incremental
This Periode
Prog.

Cummulative
This Periode
Prog.
Q'ty

Q'ty

0.00%
0.00%
0.00%
0.00%
0.00%
5.00%

0.000
0.000
0.000
0.000
0.000
0.050

100.00%
100.00%
100.00%
100.00%
100.00%
85.00%

1.000
1.000
1.000
1.000
1.000
0.850

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%

1.000
1.000
1.000
1.000
1.000
1.000
0.000

0.00%

0.000

50.00%

0.500

Page 82 of 229

Incremental
This Periode
Prog.
0.00%
0.00%
0.00%

Q'ty
0.000
0.000
0.000

Cummulative
This Periode
Prog.
Q'ty
40.00%
0.400
40.00%
0.400
40.00%
0.400

0.00%

0.000

0.00%

0.000

0.00%
0.00%
0.00%

0.000
0.000
0.000

100.00%
100.00%
100.00%

1.000
1.000
1.000

0.00%
10.00%

0.000
0.100

100.00%
80.00%

1.000
0.800

0.00%
0.00%
10.00%
0.00%
5.00%
5.00%
0.00%

0.000
0.000
0.100
0.000
0.050
0.050
0.000

100.00%
100.00%
75.00%
0.00%
75.00%
75.00%
0.00%

1.000
1.000
0.750
0.000
0.750
0.750
0.000

0.00%

0.000

0.00%

0.000

Page 83 of 229

Incremental
This Periode
Prog.

Cummulative
This Periode
Prog.
Q'ty

Q'ty

0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%

0.000
0.000
0.000

5.00%
0.00%
0.00%

0.050
0.000
0.000

0.00%
0.00%
0.00%

0.000
0.000
0.000

100.00%
100.00%
100.00%

1.000
1.000
1.000

0.00%
20.00%

0.000
0.200

100.00%
80.00%

1.000
0.800

Page 84 of 229

Incremental
This Periode
Prog.

Cummulative
This Periode
Prog.
Q'ty

Q'ty

0.00%
0.00%
0.00%
20.00%
0.00%
0.00%

0.000
0.000
0.000
0.200
0.000
0.000

100.00%
0.00%
85.00%
80.00%
85.00%
85.00%

1.000
0.000
0.850
0.800
0.850
0.850

0.00%

0.000

0.00%

0.000

0.000

0.00%

0.000

70.00%
70.00%
0.00%
0.00%
0.00%
0.00%

0.700
0.700
0.000
0.000
0.000
0.000

70.00%
70.00%
45.00%
45.00%
85.00%
85.00%

0.700
0.700
0.450
0.450
0.850
0.850

0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000

Page 85 of 229

Incremental
This Periode
Prog.
0.00%

Q'ty
0.000

Cummulative
This Periode
Prog.
Q'ty
0.00%
0.000

60.00%

0.600

70.00%

0.700

10.00%
30.00%
0.00%

0.100
0.300
0.000

60.00%
50.00%
0.00%

0.600
0.500
0.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000
0.000

80.00%
0.00%
80.00%
0.00%
80.00%
80.00%

0.800
0.000
0.800
0.000
0.800
0.800

0.00%
0.00%

0.000
0.000

0.00%
0.00%

0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000
0.000

Page 86 of 229

Incremental
This Periode
Prog.
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Q'ty
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Cummulative
This Periode
Prog.
Q'ty
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%

0.000
0.000
0.000

100.00%
100.00%
100.00%

1.000
1.000
1.000

0.00%
5.00%

0.000
0.050

85.00%
80.00%

0.850
0.800

Page 87 of 229

Incremental
This Periode
Prog.

Cummulative
This Periode
Prog.
Q'ty

Q'ty

0.00%
0.00%
8.60%
8.60%
8.60%
0.00%
0.00%
0.00%

0.000
0.000
0.086
0.086
0.086
0.000
0.000
0.000

100.00%
0.00%
80.00%
80.00%
80.00%
0.00%
90.00%
90.00%

1.000
0.000
0.800
0.800
0.800
0.000
0.900
0.900

85.00%
85.00%
40.00%
0.00%
50.00%
50.00%
0.00%
75.00%
75.00%

0.850
0.850
0.400
0.000
0.500
0.500
0.000
0.750
0.750

85.00%
85.00%
80.00%
30.00%
80.00%
80.00%
0.00%
80.00%
80.00%

0.850
0.850
0.800
0.300
0.800
0.800
0.000
0.800
0.800

0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000

0.00%

0.000

0.00%

0.000

Page 88 of 229

Incremental
This Periode
Prog.
0.00%
0.00%
0.00%

Q'ty
0.000
0.000
0.000

Cummulative
This Periode
Prog.
Q'ty
0.00%
0.000
0.00%
0.000
0.00%
0.000

0.00%
0.00%
0.00%

0.000
0.000
0.000

100.00%
100.00%
100.00%

1.000
1.000
1.000

0.00%
0.00%
0.00%

0.000
0.000
0.000

60.00%
0.00%
0.00%

0.600
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

85.00%
0.00%
0.00%
10.00%
10.00%
30.00%
0.00%
0.00%
60.00%
60.00%

0.850
0.000
0.000
0.100
0.100
0.300
0.000
0.000
0.600
0.600

0.00%
0.00%

0.000
0.000

0.00%
0.00%

0.000
0.000

Page 89 of 229

Incremental
This Periode
Prog.
0.00%

Q'ty
0.000

Cummulative
This Periode
Prog.
Q'ty
0.00%
0.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Page 90 of 229

Incremental
This Periode
Prog.
0.00%
0.00%
0.00%
0.00%
0.00%

Q'ty
0.000
0.000
0.000
0.000
0.000

Cummulative
This Periode
Prog.
Q'ty
0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%

0.000
0.000
0.000

100.00%
100.00%
100.00%

1.000
1.000
1.000

0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000

60.00%
60.00%
0.00%
0.00%

0.600
0.600
0.000
0.000

0.00%
0.00%
10.00%
60.00%
0.00%
0.00%

0.000
0.000
0.100
0.600
0.000
0.000

100.00%
0.00%
90.00%
60.00%
90.00%
90.00%

1.000
0.000
0.900
0.600
0.900
0.900

80.00%

0.800

80.00%

0.800

Page 91 of 229

Incremental
This Periode
Prog.
0.00%
0.00%
0.00%
0.00%
0.00%
15.00%
15.00%
15.00%
0.00%

Q'ty
0.000
0.000
0.000
0.000
0.000
0.150
0.150
0.150
0.000

Cummulative
This Periode
Prog.
Q'ty
65.00%
0.00%
0.00%
0.00%
0.00%
80.00%
80.00%
80.00%
80.00%

0.650
0.000
0.000
0.000
0.000
0.800
0.800
0.800
0.800

0.00%
40.00%
0.00%

0.000
0.400
0.000

0.00%
80.00%
0.00%

0.000
0.800
0.000

0.00%
0.00%

0.000
0.000

0.00%
0.00%

0.000
0.000

0.00%

0.000

0.00%

0.000

0.00%
0.00%
0.00%
5.00%

0.000
0.000
0.000
0.050

90.00%
90.00%
90.00%
90.00%

0.900
0.900
0.900
0.900

Page 92 of 229

Incremental
This Periode
Prog.

Cummulative
This Periode
Prog.
Q'ty

Q'ty

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000
0.000

30.00%
0.00%
30.00%
0.00%
40.00%
40.00%

0.300
0.000
0.300
0.000
0.400
0.400

0.00%

0.000

0.00%

0.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

Page 93 of 229

Incremental
This Periode
Prog.
0.00%
0.00%

Q'ty
0.000
0.000

Cummulative
This Periode
Prog.
Q'ty
100.00%
1.000
100.00%
1.000

0.00%
0.00%

0.000
0.000

0.00%
0.00%

0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000

Page 94 of 229

Incremental
This Periode
Prog.
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Q'ty
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Cummulative
This Periode
Prog.
Q'ty
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Page 95 of 229

Incremental
This Periode
Prog.
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Q'ty
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Cummulative
This Periode
Prog.
Q'ty
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

Page 96 of 229

Incremental
This Periode
Prog.

Cummulative
This Periode
Prog.
Q'ty

Q'ty

0.00%

0.000

0.00%

0.000

0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000
0.000

Page 97 of 229

Incremental
This Periode
Prog.
0.00%
0.00%
0.00%

Q'ty
0.000
0.000
0.000

Cummulative
This Periode
Prog.
Q'ty
0.00%
0.000
0.00%
0.000
0.00%
0.000

0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000

0.00%
0.00%

0.000
0.000

0.00%
0.00%

0.000
0.000

0.00%

0.000

0.00%

0.000

Prepared and Submitted by,


PT. HUTAMA KARYA

SLAMET SUPRIYONO
Project Manager

Page 98 of 229

LEVEL OF WF
Project Name : PLTU Kendari Unit 3 (1 x 10 MW)
Item No
:
Phase
: Construction
Discipline
No

: CIVIL (DETAIL)
WF CIVIL
WORKS

Description
1 Preparation Works
1.1 Mobiization & Demobilization
- Preparatory Works
- Mobilization & Demobilization
- Survey and Setting Out
- Soil Investigation
- Site Facilities
- Site Office for the Owner
- Site Laboratory including equipment
1.2 Excavation and Backfill
- Excavation and Disposal
- Backfill
- Rock Fill Type I
- Rock Fill Type II
- Rock Fill Type III
- Gabion
- Woven Geotextile
1.3 Concrete Works
- Lean Concrete 10 cm,cement type I
- Structure RC below ground, cement type I
- Reinforcing, plain bar
- Reinforcing, deformed bar
1.4 Masonry Works
- Rip-rap (t=25 cm)

3
0.0696

0.0696

1.0000

0.1573

0.1573

1.0000

0.0041
0.0018
0.0064
0.0055
0.0009
0.0052
0.0110
0.0080
0.0055
0.0052
0.0046
0.0013
0.0041
0.0004
0.0031
0.0006
0.0009
0.0009

2 Turbine Foundation and Structure


2.1 Pilling Works
- Driving rig setting up for driven piles

0.0042
Page 99 of 229

242747043.xlsx/
LEVEL WF

Discipline

: CIVIL (DETAIL)

No

WF CIVIL
WORKS

Description

2.2

2.3

2.4
2.5

2.6

2.7

- Driving piles (refer item 15 A)


- Piles tests on driven piles
Earthworks
- Excavation and Disposal
- Backfill
Concrete Works
- Lean Concrete 10 cm, cement type I
- Gravel Layer 15 cm
- Structure RC below ground, cement type I
- Elevated slab with,metal decking, cement type I
- Reinforcing, plain bar
- Reinforcing, deformed bar
- Metal decking
Masonry Works
- Masonry walls 20 cm with concrete blocks class 10.5
Siding and Roofing
- Insulated walls (double skin)
- Insulated roof (double skin)
- Metal Windows
- Glass louvers
Architectural Finishing Works
- Suspended ceillings, louvered grid type
- Suspended ceillings, accoustical type,moisture
- Suspended ceillings, accoustical type
- Monolithic cemen floor finishing, with hardener
- Chemical resistan floor finish
- Kitchen Units
- Steel Locker
Special Structure
- Supporting of Steelwork for all Auxilliaries,such
- Platform, Walkways and Stairways,including
- All Embedded Parts in Concrete Including
Page 100 of 229

0.0672
0.0042
0.0012
0.0007
0.0013
0.0005
0.0119
0.0048
0.0022
0.0084
0.0050
0.0020
0.0055
0.0031
0.0008
0.0009
0.0009
0.0009
0.0009
0.0009
0.0007
0.0006
0.0007
0.0276

242747043.xlsx/
LEVEL WF

Discipline
No

: CIVIL (DETAIL)
WF CIVIL
WORKS

Description

3 Boiler And Auxiliary Foundation


3.1 Pilling Works
- Driving rig setting up for driven piles
- Driving piles (refer item 15 A)
- Piles tests on driven piles
3.2 Earthworks
- Excavation and Disposal
- Backfill
3.3 Concrete Works
- Lean Concrete 10 cm, cement type I
- Gravel Layer 15 cm
- Structure RC below ground, cement type I
- Elevated slab with,metal decking, cement type I
- Reinforcing, plain bar
- Reinforcing, deformed bar
3.4 Masonry Works
- Masonry walls 20 cm with concrete blocks class 10.5
3.5 Structure Steel, Miscellaneus Steel
- Structure steel > 40 kg/m
- Structure steel < 40 kg/m
- Expansion anchor bolts, supply and setting
- Expansion anchor bolts, setting only
- Embedded metals & frame, supply and setting
- Embedded metals & frame, setting only
3.6 Siding and Roofing
- Insulated walls (double skin)
- Insulated roof (double skin)
- Metal Windows
- Glass louvers
3.7 Architectural Finishing Works
Page 101 of 229

0.2299

0.2299

1.0000

0.0068
0.1087
0.0030
0.0015
0.0003
0.0018
0.0007
0.0199
0.0018
0.0027
0.0099
0.0028
0.0239
0.0166
0.0033
0.0039
0.0020
0.0006
0.0074
0.0046
0.0008
0.0022

242747043.xlsx/
LEVEL WF

Discipline
No

: CIVIL (DETAIL)
WF CIVIL
WORKS

Description
- Door type I (90 x 210 cm) - Steel exterior
- Door type III (180 x 210 cm) - Steel exterior
- Rooling door 600 x 450 cm, motorized
- Monolithic cemen floor finishing, with hardener
- Chemical resistan floor finish

0.0006
0.0004
0.0020
0.0009
0.0007

4 CW Intake & Discharge Structure


4.1 Shallow Foundation
- Shallow Foundation
4.2 Earthworks
- Excavation and Disposal
- Backfill
- Dredging & Disposal
4.3 Concrete Works
- Lean Concrete 10 cm, cement type I
- Gravel Layer 15 cm
- Structure RC below ground, cement type I
- Elevated slab with,metal decking, cement type I
- Reinforcing, plain bar
- Reinforcing, deformed bar
4.4 Masonry Works
- Masonry Wall 20 cm with concrete blocks 10.5
- Rip-rap (t=25cm)
4.5 Structure Steel, Miscellaneus Steel
- Structure steel > 40 kg/m
- Structure steel < 40 kg/m
- Crane rails
- Grating, stair treads
- Ladders
- Handrails
- Chequered plates
Page 102 of 229

0.0595

0.0595

1.0000

0.0083
0.0055
0.0028
0.0006
0.0006
0.0003
0.0083
0.0006
0.0009
0.0028
0.0046
0.0013
0.0035
0.0031
0.0018
0.0007
0.0006
0.0004
0.0009
242747043.xlsx/
LEVEL WF

Discipline
No

: CIVIL (DETAIL)
WF CIVIL
WORKS

Description
- Anchor bolts, supply and setting
- Anchor bolts, setting only
- Expansion anchor bolts, supply and setting
- Expansion anchor bolts, setting only
- Embedded metals & Frames, supply and setting
- Embedded metals & Frames, setting only
4.6 Siding and Roofing
- Insulated walls (double skin)
- Insulated roof (double skin)
- Louvers with same material as siding
- Metal Windows
4.7 Architectural Finishing Works
- Door type I(90 x 210 cm) - Steel exterior
- Door type III (180 x 210 cm) - Steel exterior
- Rolling door 600 x 450 cm, motorized
- Monolithic cement floor finishing without hardner
- Monolithic cement floor finishing with hardner
5 STACK FOUNDATION AND STRUCTURE
5.1. Pilling Works
- Driving rig setting up for driven piles
- Driving piles (refer item 15 D)
- Piles tests on driven piles
5.2. Earthworks
- Excavation and Disposal
- Backfill
5.3. Concrete Works
- Lean concrete 10 cm, cement type I
- Gravel layer 15 cm
- Structure RC below ground,cement type I
- Structure RC above ground,cement type I
- Chemney Mechanical Slip Forming

0.0006
0.0004
0.0003
0.0002
0.0003
0.0002
0.0018
0.0024
0.0017
0.0006
0.0003
0.0004
0.0020
0.0006
0.0006
0.0617

0.0617

1.0000

0.0004
0.0071
0.0002
0.0009
0.0003
0.0003
0.0001
0.0013
0.0006
0.0004
Page 103 of 229

242747043.xlsx/
LEVEL WF

Discipline
No

: CIVIL (DETAIL)
WF CIVIL
WORKS

Description
- Grouting
- Reinforcing, plain bar
- Reinforcing, deformed bar
5.4. Structure Steel, Miscellaneus Steel
- Structure steel > 40 kg/m
- Structure steel < 40 kg/m
- Crane rails
- Grating, stair treads
- Ladders
- Handrails
- Chequered plates
- Anchor bolts, supply and setting
- Embedded metals & Frames, supply and setting
5.5. Siding and Roofing
- Insulated roof (single skin)
- Chimney Fiber Glass Insulation
- Chimney Legging (aluminium sheet, t=5mm,h=2)
- Metal windows
5.6. Architectural Finishing Works
- Door type III (180 x 210 cm) - Steel exterior
- Extra for fire panel in steel door
- Monolithic cemen floor finishing without hardner
- Chimney Painting

6 BOP Foundation And Structure


6.1. Pilling Works
- Driving rig setting up for driven piles
- Driven piles (refer to item 15 I)
- Piles test on driven piles
6.2. Steel Structure
- Excavation and Disposal

0.0003
0.0004
0.0009
0.0267
0.0055
0.0028
0.0009
0.0007
0.0011
0.0015
0.0011
0.0004
0.0020
0.0015
0.0024
0.0006
0.0003
0.0002
0.0006
0.0004

0.0934

0.0934

1.0000

0.0015
0.0239
0.0007
0.0025
Page 104 of 229

242747043.xlsx/
LEVEL WF

Discipline

: CIVIL (DETAIL)

No

WF CIVIL
WORKS

Description

6.3.

6.4.

6.5.

6.6.

- Backfill
- Sands fill in trenches, incl supply
Concrete Works
- Lean concrete 10 cm, cement type I
- Gravel layer 15 cm
- Mass Concrete
- Structure RC below ground, cement type II
- Structure RC below ground, cement type II
- Structure RC below ground, cement type I
- Built-up Aspalt Water Proofing
- Grouting
- Reinforcing, plain bar
- Reinforcing, deformed bar
Masonry Works
- Common brick walls
- Masonry Walls 20 cm with concrete blocks class 10.5
- Cement plastering
Structure steel, Miscellaneous
- Structure steel > 40 kg/m
- Structure steel < 40 kg/m
- Grating, stair treads
- Ladders
- Handrails
- Anchor bolts, supply and setting
- Anchor bolts, setting only
- Expansion anchor bolts, supply and setting
- Embedded metals & Frames, supply and setting
- Embedded metals & Frames, setting only
Siding and Roofing
- Insulated walls (double skin)
- Uninsulated walls (single skin)
- Wall/roof penetration dia. Up to 250 mm
Page 105 of 229

0.0009
0.0004
0.0005
0.0009
0.0087
0.0058
0.0072
0.0032
0.0021
0.0009
0.0007
0.0028
0.0021
0.0015
0.0029
0.0028
0.0013
0.0007
0.0007
0.0006
0.0003
0.0001
0.0001
0.0002
0.0001
0.0017
0.0006
0.0009
242747043.xlsx/
LEVEL WF

Discipline
No

: CIVIL (DETAIL)
WF CIVIL
WORKS

Description
- Wall/roof penetration dia. 251 to 400 mm
- Metal Windows
- Glass louvers
6.7. Architecturel Finishing Works
- Door type I (90 x 210 cm) - Steel exterior
- Door type I (90 x 210 cm) - Wood exterior
- Door type III (180 x 210 cm) - Steel exterior
- Rolling door 300 x 300 cm, motorized
- Monolithic cement floor finishing, without hardner
- Monolithic cement floor finishing, with hardner
- Ceramic Floor Tiles
- Acid proof floor finish
- Vinly flooring and tiles
- Thin ceramic tiles
- Painting work on concrete or plastered walls
- Suspended ceillings, accoustical type,moisture
- Suspended ceillings, accoustical type

7 Coal Storage And Facilities


7.1. Pilling Works
- Driving rig setting up for driven piles
- Driven piles (refer to item 15 J)
- Piles test on driven piles
7.2. Earthworks
- Excavation and Disposal
- Backfill
- HDPE Layer
- Final Grading
7.3. Concrete Works
- Lean concrete 10 cm, cement type I
- Gravel layer 15 cm

0.0007
0.0003
0.0001
0.0003
0.0001
0.0006
0.0017
0.0011
0.0017
0.0013
0.0015
0.0013
0.0009
0.0006
0.0011
0.0009

0.0599

0.0599

1.0000

0.0006
0.0097
0.0002
0.0013
0.0006
0.0009
0.0003
0.0006
0.0007
Page 106 of 229

242747043.xlsx/
LEVEL WF

Discipline

: CIVIL (DETAIL)

No

WF CIVIL
WORKS

Description

7.4.
7.5.

7.6.

7.7.

- Structure RC below ground, cement type I


- Grouting
- Reinforcing, plain bar
- Reinforcing, deformed bar
Masonry Works
- Masonry walls 20 cm with concrete blocks class 10.5
Structure Steel, Miscellaneus Steel
- Structure steel > 40 kg/m
- Grating, stair treads
- Ladders
- Handrails
- Chequered plates
- Anchor bolts, setting only
- Anchor bolts, supply and setting
- Expansion anchor bolts, supply and setting
- Embedded metals & Frames, supply and setting
Siding and Roofing
- Uninsulated walls (single skin)
- Uninsulated roof (single skin)
- Louvers with same material as siding
Architecturel Finishing Works
- Door type I (90 x 210 cm) - Steel exterior
- Monolithic cement floor finishing, with hardner

8 Ash Disposal and Facilities


8.1 Shallow Foundation
- Shallow Foundation
8.2 Earthworks
- Excavation and Disposal
- Backfill
- HDPE Layer

0.0083
0.0006
0.0009
0.0031

0.0297

0.0020
0.0129
0.0031
0.0009
0.0009
0.0007
0.0028
0.0009
0.0007
0.0004

0.0155

0.0024
0.0018
0.0017
0.0003
0.0006

0.0532

0.0532

1.0000

0.0084
0.0028
0.0011
0.0032
Page 107 of 229

242747043.xlsx/
LEVEL WF

Discipline

: CIVIL (DETAIL)

No

WF CIVIL
WORKS

Description

8.3.

8.4
8.5

8.6
8.7

- Final Grading
Concrete Works
- Lean concrete 10 cm, cement type I
- Gravel layer 15 cm
- Structure RC below ground, cement type I
- Grouting
- Reinforcing, plain bar
- Reinforcing, deformed bar
Masonry Works
- Masonry walls 20 cm with concrete blocks class 10.5
Structure Steel, Miscellaneus Steel
- Structure steel > 40 kg/m
- Grating, stair treads
- Ladders
- Handrails
- Chequered plates
- Anchor bolts, setting only
- Expansion anchor bolts, supply and setting
- Embedded metals & Frames, supply and setting
Siding and Roofing
- Uninsulated roof (single skin)
Architecturel Finishing Works
- Monolithic cement floor finishing, with hardner

9 Misscellaneous Building
9.1 Pilling Works
- Driving rig setting up for driven piles
- Driven piles (refer to item 15 L)
9.2 Earthworks
- Excavation and Disposal
- Backfill

0.0006
0.0006
0.0009
0.0090
0.0009
0.0007
0.0034
0.0021
0.0103
0.0028
0.0009
0.0007
0.0006
0.0006
0.0004
0.0002
0.0022
0.0009

0.1072

0.1072

1.0000

0.0010
0.0159
0.0017
0.0006
Page 108 of 229

242747043.xlsx/
LEVEL WF

Discipline
No

: CIVIL (DETAIL)
WF CIVIL
WORKS

Description
9.3 Concrete Works
- Lean concrete 10 cm, cement type I
- Gravel layer 15 cm
- Mass Concrete
- Structure RC below ground, cement type I
- Grouting
- Reinforcing, plain bar
- Reinforcing, deformed bar
- Underground cable ducts
9.4 Masonry Works
- Common brick wall
- Masonry walls 20 cm with concrete block class 10.5
- Masonry walls 15 cm with concrete block class 10.5
- Masonry walls 10 cm with concrete block class 10.5
- Masonry walls 10 cm with concrete block class 7
- Reinforcing, deformed bar
9.5 Structure steel, Miscellaneous Steel
- Structure steel > 40 kg/m
- Structure steel < 40 kg/m
- Crane rails
- Grating, stair treads
- Ladders
- Handrails
- Chequered plate
- Anchor bolts, supply and setting
- Anchor bolts, setting only
- Expansion anchor bolts, supply and setting
- Expansion anchor bolts, setting only
- Embedded metals & Frames, supply and setting
- Embedded metals & Frames, setting only
9.6 Siding and Roofing
- Insulated walls (double skin)
Page 109 of 229

0.0009
0.0007
0.0064
0.0018
0.0004
0.0007
0.0035
0.0006
0.0017
0.0018
0.0015
0.0013
0.0013
0.0018
0.0083
0.0031
0.0028
0.0013
0.0011
0.0011
0.0009
0.0007
0.0007
0.0006
0.0006
0.0004
0.0004
0.0033
242747043.xlsx/
LEVEL WF

Discipline
No

: CIVIL (DETAIL)
WF CIVIL
WORKS

Description
- Unisulated walls (single skin)
- Insulated roof (double skin)
- Uninsulated roof (single skin)
- Walls/roof penetration dia Up to 250 mm
- Walls/roof penetration dia 251 to 400 mm
- Walls/roof penetration dia 401 to 600 mm
- Louvers with same materials as siding
- Metal windows
- Glass louvers
- Gate house roofing
- Mosque roofing
9.7 Architectural Finishing Works
- Door type I (90 x 210 cm) - Steel exterior
- Door type I (90 x 210 cm) - Steel Interior
- Door type I (90 x 210 cm) - Wood Exterior
- Door type I (90 x 210 cm) - Wood interior
- Door type II (150 x 210 cm) - Steel exterior
- Door type II (150 x 210 cm) - Steel interior
- Door type II (150 x 210 cm) - Wood exterior
- Door type II (150 x 210 cm) - Wood interior
- Door type III (180 x 210 cm) - Steel exterior
- Door type III (180 x 210 cm) - Steel Interior
- Door type III (180 x 210 cm) - Wood exterior
- Door type III (180 x 210 cm) - Wood Interior
- Extra for fire panel in steel door
- Extra for fire panel in wood door
- Extra for upper panel 50 cm in steel door
- Extra for upper panel 50 cm in wood door
- Rolling door 300 x 300 cm, manual drive
- Monolithic cemen floor finishing, without hardner
- Monolithic cemen floor finishing, with hardner
- Ceramic Floor Tiles
Page 110 of 229

0.0028
0.0026
0.0020
0.0018
0.0020
0.0018
0.0018
0.0009
0.0007
0.0006
0.0003
0.0003
0.0003
0.0001
0.0001
0.0003
0.0003
0.0001
0.0001
0.0004
0.0004
0.0002
0.0002
0.0001
0.0001
0.0001
0.0001
0.0006
0.0009
0.0007
0.0006
242747043.xlsx/
LEVEL WF

Discipline
No

: CIVIL (DETAIL)
WF CIVIL
WORKS

Description
- Glazed Tiles
- Chemical resistant floor finish
- Acid proof floor finish
- Vinyl flooring and tiles
- Partition walls in office
- Thin ceramic tile
- Painting work on concrete or plastered walls
- Suspended ceilling, louvered grid type
- Suspended ceilling,accoustical type, moisture
- Suspended ceilling,accoustical type
- Painting work on concrete ceillings
- Kitchen units
- Steel locker
9.8 Plumbing
- Plumbing

0.0004
0.0006
0.0006
0.0007
0.0013
0.0007
0.0017
0.0015
0.0017
0.0013
0.0013
0.0006
0.0007
0.0021

10 70 kV Substation Building and Switchyard


10.1 Substation 70 Kv Building
- Substation 70 Kv Building
10.2 70 kV Switchyard Foundation (refer to item 15 K)
- 70 kV Switchyard Foundation (refer to item 15 K)

11 SITE FINISHING (ROAD, DRAINS, FENCE,ETC)


11.1 Earthworks
- Excavation and Disposal
- Backfilling
- HDPE Layer
- Final Grading
11.2 Concrete Works
- Lean concrete 10 cm, cement type I

0.0333

0.0333

1.0000

0.0751

0.0751

1.0000
-

0.0267
0.0066

0.0008
0.0005
0.0002
0.0001
0.0004
Page 111 of 229

242747043.xlsx/
LEVEL WF

Discipline

: CIVIL (DETAIL)

No

WF CIVIL
WORKS

Description

11.3

11.4

11.5

11.6

11.7

- Gravel layer 15 cm
- Structure RC below ground, cement type I
- Grouting
- Reinforcing, plain bar
- Reinforcing, deformed bar
Masonry Works
- Common brick walls
- Mansonry walls 10 cm with concrete block class 7
- Cement plastering
- Rip-rap (t=25cm)
Roads, Paved Area and Landscaping
- Road base and subbase
- Aspalt Pavement
- Concrete Pavement - conblocks
- Gravel surfacing
- Hard shoulders
- Road making in power plant area
- Concrete curb
- Wheel stops
- Rehabilition of access road
Landscaping - Planting - Irrigation
- Seeding and mulching
- Seeding and mulching
- Planting scheme
- Irrigation schema
Fence work and gates
- Security and boundary fence
- Gates
Perimeter Wall and Fencing Work
- Perimeter Wall and Fencing Work

Page 112 of 229

0.0007
0.0046
0.0008
0.0004
0.0020
0.0041
0.0051
0.0113
0.0021
0.0046
0.0059
0.0033
0.0039
0.0009
0.0004
0.0024
0.0013
0.0014
0.0020
0.0021
0.0014
0.0010
0.0046
0.0055
0.0013

242747043.xlsx/
LEVEL WF

Discipline
No

: CIVIL (DETAIL)
WF CIVIL
WORKS

Description

Page 113 of 229

242747043.xlsx/
LEVEL WF

0.0239

5
1.0000
0.3441

0.0397

0.5701

0.0050

0.0725

0.0009

0.0132

0.0756

0.4808

Page 114 of 229

1.0000
0.1692
0.0769
0.2692
0.2308
0.0385
0.2154
1.0000
0.2786
0.2014
0.1393
0.1300
0.1161
0.0325
0.1021
1.0000
0.0876
0.6204
0.1095
0.1825
1.0000
1.0000

1.0000
0.0555
242747043.xlsx/
LEVEL WF

0.0019

0.0118

0.0341

0.2167

0.0020

0.0129

0.0103

0.0658

0.0057

0.0363

0.0276

0.1757

Page 115 of 229

0.8885
0.0560
1.0000
0.6429
0.3571
1.0000
0.0389
0.0146
0.3501
0.1401
0.0654
0.2451
0.1459
1.0000
1.0000
1.0000
0.5338
0.3025
0.0747
0.0890
1.0000
0.1613
0.1613
0.1613
0.1613
0.1290
0.0968
0.1290
1.0000
1.0000
242747043.xlsx/
LEVEL WF

0.1185

0.5157

0.0018

0.0080

0.0368

0.1599

0.0028

0.0120

0.0503

0.2187

0.0150

0.0651

0.0047

0.0206
Page 116 of 229

1.0000
0.0573
0.9172
0.0254
1.0000
0.8400
0.1600
1.0000
0.0481
0.0180
0.5411
0.0501
0.0721
0.2705
1.0000
1.0000
1.0000
0.4762
0.3297
0.0659
0.0769
0.0403
0.0110
1.0000
0.4926
0.3079
0.0517
0.1478
1.0000
242747043.xlsx/
LEVEL WF

5
0.1325
0.0884
0.4285
0.1948
0.1558

0.0083

0.1393

0.0088

0.1486

0.0134

0.2245

0.0059

0.0991

0.0129

0.2167

Page 117 of 229

1.0000
1.0000
1.0000
0.6250
0.3125
0.0625
1.0000
0.0414
0.0207
0.6207
0.0414
0.0690
0.2069
1.0000
0.7813
0.2188
1.0000
0.2714
0.2429
0.1429
0.0571
0.0429
0.0286
0.0714
242747043.xlsx/
LEVEL WF

0.0064

0.1084

0.0038

0.0635

0.0077

0.1253

0.0012

0.0191

0.0042

0.0687

Page 118 of 229

0.0429
0.0286
0.0214
0.0143
0.0214
0.0143
1.0000
0.2857
0.3714
0.2571
0.0857
1.0000
0.0732
0.0976
0.5366
0.1463
0.1463

1.0000
0.0571
0.9143
0.0286
1.0000
0.7813
0.2188
1.0000
0.0651
0.0261
0.3040
0.1303
0.0868
242747043.xlsx/
LEVEL WF

0.0407

0.6594

0.0064

0.1044

0.0014

0.0230

0.0261

0.2790

0.0038

0.0410

Page 119 of 229

0.0651
0.1055
0.2171
1.0000
0.6561
0.1357
0.0679
0.0226
0.0181
0.0271
0.0362
0.0271
0.0090
1.0000
0.3143
0.2286
0.3714
0.0857
1.0000
0.1948
0.1558
0.3896
0.2597

1.0000
0.0573
0.9160
0.0267
1.0000
0.6635
242747043.xlsx/
LEVEL WF

0.0330

0.3528

0.0065

0.0696

0.0069

0.0734

0.0043

0.0455

Page 120 of 229

0.2404
0.0962
1.0000
0.0166
0.0287
0.2654
0.1760
0.2191
0.0964
0.0637
0.0279
0.0224
0.0838
1.0000
0.3228
0.2296
0.4476
1.0000
0.4032
0.1882
0.1075
0.1075
0.0806
0.0376
0.0161
0.0161
0.0269
0.0161
1.0000
0.3896
0.1299
0.2165
242747043.xlsx/
LEVEL WF

0.0129

0.1386

0.0106

0.1761

0.0030

0.0507

0.0142

0.2367

Page 121 of 229

0.1732
0.0649
0.0260
1.0000
0.0213
0.0114
0.0427
0.1280
0.0853
0.1280
0.0996
0.1138
0.0996
0.0711
0.0427
0.0853
0.0711

1.0000
0.0576
0.9215
0.0209
1.0000
0.4242
0.1818
0.3030
0.0909
1.0000
0.0390
0.0519
242747043.xlsx/
LEVEL WF

0.0020

0.0338

0.0234

0.3904

0.0059

0.0984

0.0008

0.0138

0.0084

0.1579

0.0077

0.1439

Page 122 of 229

0.5844
0.0390
0.0649
0.2208
1.0000
1.0000
1.0000
0.5512
0.1339
0.0394
0.0394
0.0315
0.1181
0.0394
0.0315
0.0157
1.0000
0.4063
0.3125
0.2813
1.0000
0.3333
0.6667

1.0000
1.0000
1.0000
0.3659
0.1463
0.4146
242747043.xlsx/
LEVEL WF

0.0155

0.2912

0.0021

0.0386

0.0164

0.3088

0.0022

0.0421

0.0009

0.0175

0.0169

0.1575

0.0022

0.0206

Page 123 of 229

0.0732
1.0000
0.0361
0.0602
0.5783
0.0602
0.0482
0.2169
1.0000
1.0000
1.0000
0.6250
0.1705
0.0568
0.0455
0.0341
0.0341
0.0227
0.0114
1.0000
1.0000
1.0000
1.0000

1.0000
0.0588
0.9412
1.0000
0.7500
0.2500
242747043.xlsx/
LEVEL WF

0.0151

0.1407

0.0094

0.0875

0.0219

0.2042

0.0207

0.1931

Page 124 of 229

1.0000
0.0610
0.0488
0.4268
0.1220
0.0244
0.0488
0.2317
0.0366
1.0000
0.1765
0.1961
0.1569
0.1373
0.1373
0.1961
1.0000
0.3782
0.1429
0.1261
0.0588
0.0504
0.0504
0.0420
0.0336
0.0336
0.0252
0.0252
0.0168
0.0168
1.0000
0.1600
242747043.xlsx/
LEVEL WF

0.0189

0.1764

Page 125 of 229

0.1333
0.1244
0.0978
0.0889
0.0978
0.0889
0.0889
0.0444
0.0356
0.0267
0.0133
1.0000
0.0146
0.0146
0.0049
0.0049
0.0175
0.0175
0.0068
0.0068
0.0195
0.0195
0.0088
0.0088
0.0078
0.0078
0.0049
0.0049
0.0292
0.0486
0.0389
0.0292
242747043.xlsx/
LEVEL WF

0.0021

0.0199

0.0267

0.8024

0.0066

0.1976

0.0016

0.0215

0.0088

0.1174

Page 126 of 229

0.0195
0.0331
0.0292
0.0389
0.0681
0.0389
0.0875
0.0778
0.0875
0.0681
0.0681
0.0292
0.0389
1.0000
1.0000

1.0000
1.0000
1.0000
1.0000

1.0000
0.4898
0.3061
0.1224
0.0816
1.0000
0.0448
242747043.xlsx/
LEVEL WF

0.0226

0.3016

0.0241

0.3214

0.0064

0.0858

0.0101

0.1348

0.0013

0.0175

Page 127 of 229

0.0746
0.5224
0.0896
0.0448
0.2239
1.0000
0.1818
0.2273
0.5000
0.0909
1.0000
0.1908
0.2453
0.1363
0.1635
0.0353
0.0164
0.0981
0.0545
0.0600
0.2671
0.0818
0.0872
0.0572
0.0409
1.0000
0.4545
0.5455
1.0000
1.0000

242747043.xlsx/
LEVEL WF

Page 128 of 229

242747043.xlsx/
LEVEL WF

CONSTRUCTION PROGRESS CALCULATION


#VALUE!
Project Name : PLTU Kendari Unit 3 (1 x 10 MW)
Item No
: Progress Certificate No. 02
Phase
: Construction
Discipline

: Mechanical

No

Description

WF

Cumulative Last
Period
Prog

2
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
2.11
2.12
2.13
2.14
2.15
2.16
2.17
2.18
2.19
2.20
2.21

WF

Incremental Last Pe
Prog

MECHANICAL WORK
General (Not Used)
Boiler and Auxiliary Equipment & Facilities
Steam Turbine And Auxiliary
Condenser and Feed Water Heating Plant
Plant Water System

2,746,234,400
1,547,318,500
-

0.000
0.530
0.299
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000

0.00%
82.10%
23.75%
0.00%
0.00%

Drainage and Waste Water Treatment Plant

170,084,562

0.033

0.00%

0.000

0.00%

64,398,685
-

0.012
0.000

0.00%
0.00%

0.000
0.000

0.00%
0.00%

0.000

0.00%

0.000

0.00%

10,116,745
5,622,591
113,117,533
395,426,065
37,062,205
93,403,540
-

0.002
0.000
0.000
0.001
0.022
0.000
0.000
0.076
0.007
0.018
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

90.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
98.56%
0.00%
0.00%
0.00%
0.00%

0.00%

0.000

58.29%

Fire Protection System


Compressed Air System
Chemical Feed System (Included in Boiler & Auxiliary)
Sampling Rack System
Laboratory and Instruments
Chlorination System
Air Conditioning and Ventilation
Crane and Hoist
Workshop and Machinery Equipment
Mobile Equipment
Coal Handling
Fuel Oil System
Ash Handling System
Vacuum Cleaning
Studies / Calculation
Sub Total

5,182,784,826

1.000

ROGRESS CALCULATION

#VALUE!

Incremental Last Period


WF

Cumulative This Period


Prog

WF

0.000
0.435
0.071
0.000
0.000

0.00%
82.10%
23.75%
0.00%
0.00%

0.000
0.435
0.071
0.000
0.000

0.000

0.00%

0.000

0.000
0.000

0.00%
0.00%

0.000
0.000

0.000

0.00%

0.000

0.002
0.000
0.000
0.000
0.000
0.000
0.000
0.075
0.000
0.000
0.000
0.000

90.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
98.56%
0.00%
0.00%
0.00%
0.00%

0.002
0.000
0.000
0.000
0.000
0.000
0.000
0.075
0.000
0.000
0.000
0.000

0.583

58.29%

0.583

CONSTRUCTION PROGRESS CALCULATION


#VALUE!
Project Name : PLTU Kendari Unit 3 (1 x 10 MW)
Item No

: Progress Certificate No. 02

Phase

: Construction

Discipline

: Mechanical

No

Description

WF

Cumulative Last Period


Prog

2
2.1

MECHANICAL WORK
The Boiler and Auxiliaries.

2.1.1
2.1.2

Erection Boiler
Erection ESP & ID Fan

2.1.3

Erection Chimney / Stack

0.530
0.318
0.132
0.079
Sub Total

2.2
2.2.1
2.2.2
2.2.3

Steam Turbine Generator & Auxiliaries

0.299
0.179

Erection Steam Turbine


Erection Generator
Deaerator System

0.075
0.045
Sub Total

2.3
2.3.1

Condenser And Feed Water Heating Plant

0.000
0.000

Erection Condenser
Sub Total

2.4

Plant Water System

0.000
Sub Total

2.5

Drainage and Waste Water Treatment Plant

0.033
Sub Total

2.6

Fire Protection System

0.012
Sub Total

2.7

Compressed Air System

0.000
Sub Total

2.8

Chemical Feed System

0.000
Sub Total

2.9

Sampling Rack System

0.002
Sub Total

2.10

Laboratory and Instruments

0.000
Sub Total

2.11

Chlorination System

0.000
Sub Total

2.12

Air Conditioning and Ventilation

0.001
Sub Total

2.13
2.13.1
2.13.2
2.13.3

Crane and Hoist


Crane
Hoist
Instrument & Control

0.022
0.013
0.005
0.003
Sub Total

2.14

Workshop and Machinery Equipment

0.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Sub Total
2.15
2.15.1
2.15.2
2.15.3

Coal Handling
Conveyor
Coal Cruser & Coal bin
Hopper, Chut, Duct, Bin Cyclone

0.00%
0.076
0.034
0.031
0.011

Sub Total
2.16

Fuel Oil System

0.007
Sub Total

2.17
2.17.1

0.00%
0.00%
0.00%
0.00%

Ash Handling System


Dust Collection

0.00%
0.018
0.018

Sub Total
Total

1.000

0.00%
0.00%
0.00%

N PROGRESS CALCULATION
#VALUE!

Cumulative Last Period


WF

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Incremental Last
Period

Cumulative This
Period

Prog

Prog

WF

WF

76.74%
88.30%
93.20%
82.10%

0.244
0.117
0.074
0.435

76.74%
88.30%
93.20%

0.244
0.117
0.074

82.10%

0.435

18.00%
20.00%
53.00%
23.75%

0.032
0.015
0.024
0.071

18.00%
20.00%
53.00%
23.75%

0.032
0.015
0.024

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
90.00%
90.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.002
0.002
0.000
0.000
0.000
0.000
0.000
0.000

0.00%

0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%

0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
90.00%
90.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.071

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.002
0.002
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.000

0.00%

0.000

0.00%

0.000

0.000
0.000
0.000

0.033
0.030
0.011
0.075

97.25%
99.50%
100.00%

0.033
0.030
0.011

0.000

97.25%
99.50%
100.00%
98.56%

98.56%

0.075

0.000

0.00%

0.000

0.00%

0.000

0.000

0.000

0.00%

0.000

0.000

0.00%
0.00%

0.000

0.00%

0.000

0.000

58.29%

0.583

58.29%

0.583

CONSTRUCTION PROGRESS CALCULATION


#VALUE!
Project Name : PLTU Kendari Unit 3 (1 x 10 MW)
Item No

: Progress Certificate No. 02

Phase

: Construction

Discipline

: Mechanical
Description

No

WF

Cumulative Last Per


Prog

2
2.1
2.1.1
2.1.1.1
2.1.1.2
2.1.1.3
2.1.1.4
2.1.1.5
2.1.1.6
2.1.1.7
2.1.1.8
2.1.1.9
2.1.1.10
2.1.1.11
2.1.1.12
2.1.1.13
2.1.1.14
2.1.1.15

MECHANICAL WORK
The Boiler and Auxiliaries.

0.530
0.318

Erection Boiler
Firebrick
Steamdrum
Waterwall
Downcomer
Superheater
Economizer
Air Preheater
Casing & Out Casing
Platform & Stairs
Awning & Roofing
Chaingrate
Coalfeeder
Primary Airduct
Secondary Airduct
Instrument & Control

0.017

0.00%

0.021

0.00%

0.021

0.00%

0.034

0.00%

0.021

0.00%

0.021

0.00%

0.021

0.00%

0.009

0.00%

0.013

0.00%

0.021

0.00%

0.021

0.00%

0.021

0.00%

0.021

0.00%

0.021

0.00%

0.034

0.00%
0.00%

Sub Total
2.1.2
2.1.2.1
2.1.2.2

Erection ESP & ID Fan

0.132

ESP
ID Fan

0.126

0.00%

0.007

0.00%
0.00%

Sub Total
2.1.3
2.1.3.1
2.1.3.2
2.1.3.3
2.1.3.4
2.1.3.5

0.079

Erection Chimney / Stack


Chimney / Stack
Ducting
Firebrick & Mortar
Air proof Door
Ladder and Platform

0.032

0.00%

0.016

0.00%

0.008

0.00%

0.008

0.00%

0.016

0.00%
0.00%

Sub Total
2.2
2.2.1
2.2.1.1
2.2.1.2
2.2.1.3
2.2.1.4
2.2.1.5

Steam Turbine Generator & Auxiliaries

0.299

Erection Steam Turbine


Lower Casing
Inner Casing ( Lower )
Inner Casing ( Upper )
Upper Casing
Rotor

0.179

Sub Total

0.036

0.00%

0.036

0.00%

0.018

0.00%

0.018

0.00%

0.072

0.00%
0.00%

Discipline

: Mechanical
Description

No

WF

Cumulative Last Per


Prog

2.2.2
2.2.2.1
2.2.2.2

Erection Generator
Generator
Piping

0.075
0.037

0.00%

0.037

0.00%
0.00%

Sub Total
2.2.3
2.2.3.1
2.2.3.3
2.2.3.4

Deaerator System
Deaerator tank
Flash tank

0.045

Piping

0.013

0.00%

0.009

0.00%

0.009

0.00%
0.00%

Sub Total
2.3
2.3.1
2.3.1.1
2.3.1.2
2.3.1.3
2.3.1.4
2.3.1.5

Condenser And Feed Water Heating Plant

0.000

Erection Condenser
Expansion Joint Turbine & Condenser
Condenser
Butterfly Valve
Water Box
CW Pipe to Water Box

0.000
0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

Sub Total
2.4

Plant Water System

0.00%
0.000

Sub Total
2.5
2.5.1

Drainage and Waste Water Treatment Plant

0.00%
0.033

Install Waste Water Treatment Plant

0.033

Sub Total
2.6

Fire Protection System

0.012

Compressed Air System

0.000

Chemical Feed System

0.000

Sampling Rack System

0.002

Laboratory and Instruments


Chlorination System

0.000

0.00%
0.00%

0.000

0.00%
0.00%

0.001

0.00%

Sub Total
2.12

Air Conditioning and Ventilation


Sub Total

2.13
2.13.1
2.13.2
2.13.3

Crane and Hoist


Crane
Hoist
Instrument & Control

0.00%
0.022
0.013

0.00%

0.005

0.00%

0.003

0.00%

Sub Total
2.14

Workshop and Machinery Equipment

0.00%
0.000

Sub Total
2.15
2.15.1
2.15.2
2.15.3

Coal Handling
Conveyor
Coal Cruser & Coal bin
Hopper, Chute, Duct, Bin Cyclone

0.00%
0.00%

Sub Total
2.11

0.00%
0.00%

Sub Total
2.10

0.00%
0.00%

Sub Total
2.9

0.00%
0.00%

Sub Total
2.8

0.00%
0.00%

Sub Total
2.7

0.00%

0.00%
0.00%

0.076
0.034

0.00%

0.031

0.00%

0.011

0.00%

Discipline

: Mechanical
Description

No

WF

Cumulative Last Per


Prog

Sub Total
2.16

Fuel Oil System

0.00%
0.007

Sub Total
2.17
2.17.1

Ash Handling
Dust Collection

0.00%
0.00%

0.018
0.018

Sub Total

0.00%
0.00%

ROGRESS CALCULATION

#VALUE!

Cumulative Last Period Incremental Last Period


WF

Prog

WF

Cumulative This
Period
Prog

WF

0.000

100.00%

0.017

100.00%

0.017

0.000

95.00%

0.020

95.00%

0.020

0.000

90.00%

0.019

90.00%

0.019

0.000

90.00%

0.031

90.00%

0.031

0.000

90.00%

0.019

90.00%

0.019

0.000

90.00%

0.019

90.00%

0.019

0.000

100.00%

0.021

100.00%

0.021

0.000

61.33%

0.005

61.33%

0.005

0.000

84.43%

0.011

84.43%

0.011

0.000

50.00%

0.011

50.00%

0.011

0.000

100.00%

0.021

100.00%

0.021

0.000

60.00%

0.013

60.00%

0.013

0.000

100.00%

0.021

100.00%

0.021

0.000

77.14%

0.016

77.14%

0.016

0.000

0.00%

0.000

0.00%

0.000

0.000

76.74%

0.244

76.74%

0.244

0.000

88.00%

0.111

88.00%

0.111

0.000

94.00%

0.006

94.00%

0.006

0.000

88.30%

0.117

88.30%

0.117

0.000

95.00%

0.030

95.00%

0.030

0.000

100.00%

0.016

100.00%

0.016
0.008

0.000

100.00%

0.008

100.00%

0.000

90.00%

0.007

90.00%

0.007

0.000

0.013

81.00%

0.013

0.000

81.00%
93.20%

0.074

93.20%

0.074

0.000

90.00%

0.032

90.00%

0.032

0.000

0.00%

0.000

0.00%

0.000
0.000

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.000

0.00%

0.000

0.00%

0.000

0.000

18.00%

0.032

18.00%

0.032

Cumulative Last Period Incremental Last Period


WF
0.000

Prog

WF

Cumulative This
Period
Prog

WF

0.000

0.00%

0.000

40.00%

0.015

40.00%

0.015

0.000

20.00%

0.015

20.00%

0.015

0.000

90.00%

0.012

90.00%

0.012
0.008

0.000

0.00%

0.000

90.00%

0.008

90.00%

0.000

40.00%

0.004

40.00%

0.004

0.000

53.00%

0.024

53.00%

0.024

0.000

90.00%

0.000

90.00%

0.000

0.000

90.00%

0.000

90.00%

0.000

0.000

5.00%

0.000

5.00%

0.000
0.000

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.000

0.00%

0.000

0.00%

0.000

0.000

0.00%

0.000

0.00%

0.000
0.000

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.000

0.00%

0.000

0.00%

0.000
0.000

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.000

0.00%

0.000

0.00%

0.000

0.000

0.00%

0.000

0.00%

0.000
0.000

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.000

90.00%

0.002

90.00%

0.002

0.000
0.000

90.00%

0.002

90.00%

0.00%

0.000

0.00%

0.002
0.000

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000
0.000

0.000
0.000

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.000

0.00%

0.000

0.00%

0.000
0.000

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.000

0.00%

0.000

0.00%

0.000

0.000

0.00%

0.000

0.00%

0.000
0.000

0.000

0.00%

0.000

0.00%

0.000

97.25%

0.033

97.25%

0.033

0.000

99.50%

0.030

99.50%

0.030

0.011

100.00%

0.011

0.000

100.00%

Cumulative Last Period Incremental Last Period


WF

Prog

WF

Cumulative This
Period
Prog

WF

0.000

98.56%

0.075

98.56%

0.075

0.000

0.00%

0.000

0.00%

0.000
0.000

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.000

0.00%

0.000

0.00%

0.000

CONSTRUCTION PROGRESS CALCULA


#VALUE!
Project Name : PLTU Kendari Unit 3 (1 x 10 MW)
Item No

: Progress Certificate No. 02

Phase

: Construction

Discipline

: Mechanical
Description

No
2
2.1
2.1.1
2.1.1.1
2.1.1.1.1
2.1.1.1.2

WF

MECHANICAL WORK
The Boiler and Auxiliaries.

0.530
0.318

Erection Boiler
Firebrick
Firebrick Under Chaingrate
Firebrick Burner

0.017
0.012
0.005

Sub Total
2.1.1.2

0.021

Steamdrum
Sub Total

2.1.1.3
2.1.1.3.1
2.1.1.3.2
2.1.1.3.3
2.1.1.3.4
2.1.1.3.5
2.1.1.3.6
2.1.1.3.7

Waterwall
Down Header of Front waterwall
Down Header of Back Waterwall
Down Header of Side waterwall (both sides)
Up Header
Front Waterwall pipe
Back waterwall pipe
Side Waterwall (both sides)

2.1.1.4

Downcomer

0.021
0.002
0.003
0.003
0.003
0.003
0.003
0.004

Sub Total
0.034

Sub Total
2.1.1.5
2.1.1.5.1
2.1.1.5.2
2.1.1.5.3
2.1.1.5.4
2.1.1.5.5
2.1.1.5.6
2.1.1.5.7

Superheater
Coil of High Superheater
Coil of Low Superheater
Outlet Header of Low Temp. Superheater
Inlet Header of High Temp. Superheater
Mid Header of High temp Superheater
Outlet Header of High Temp. Superheater
Spray Attemperator

0.021
0.006
0.005
0.003
0.003
0.003
0.001
0.001

Sub Total
2.1.1.6
2.1.1.6.1
2.1.1.6.2
2.1.1.6.3
2.1.1.6.4
2.1.1.6.5
2.1.1.6.6

Economizer
Outlet Header
Middle Header
Inlet Header
Outlet Snake Tube
Middle Snake Tube
Inlet Snake Tube

Page 141 of 229

0.021
0.003
0.004
0.004
0.004
0.004
0.004

Discipline

: Mechanical
Description

No

WF
Sub Total

2.1.1.7
2.1.1.7.1
2.1.1.7.2
2.1.1.7.3
2.1.1.7.4
2.1.1.7.5
2.1.1.7.6
2.1.1.7.7
2.1.1.7.8
2.1.1.7.9

Air Preheater
Tube Box
Expansion Joint
Frame
Hot Wind Tie In
Cold Wind Tie In
Guide Plate
Casing
Lower support
Upper Support

0.021
0.002
0.002
0.004
0.002
0.002
0.002
0.002
0.002
0.002

Sub Total
2.1.1.8
2.1.1.8.1
2.1.1.8.2
2.1.1.8.3

Casing & Out Casing


Boiler Casing
Out Casing
Flat Roof

2.1.1.9
2.1.1.9.1
2.1.1.9.2
2.1.1.9.3
2.1.1.9.4

Platform & Stairs


Platform frame
Staircases
Railing Rack
Bracket

0.009
0.003
0.003
0.002

Sub Total
0.013
0.001
0.010
0.001
0.001

Sub Total
2.1.1.10
2.1.1.10.1
2.1.1.10.2

0.021

Awning & Roofing


Awning
Roofing

0.011
0.011

Sub Total
2.1.1.11
2.1.1.11.1
2.1.1.11.2
2.1.1.11.3
2.1.1.11.4
2.1.1.11.5
2.1.1.11.6
2.1.1.11.7
2.1.1.11.8

Chain grate
Bearing Fire Grate
Lower Track
Furnace Chain and Bar
Initiative Axle
Driven Axle
Curtain Coal Device
Front Damper
Chain Grate Motor

2.1.1.12
2.1.1.12.1
2.1.1.12.2
2.1.1.12.3
2.1.1.12.4
2.1.1.12.5

Coalfeeder
Coalspreader Gearing
Coal Feeder Gearing
Front Wall Slab
Spreader Air Noozle
Coal Bunker

0.021
0.004
0.004
0.002
0.002
0.002
0.002
0.002
0.002

Sub Total
0.021
0.004
0.004
0.004
0.004
0.004

Sub Total
2.1.1.13

Primary Airduct

Page 142 of 229

0.021

Discipline

: Mechanical
Description

No

WF
Sub Total

2.1.1.14
2.1.1.14.1
2.1.1.14.2
2.1.1.14.3
2.1.1.14.4
2.1.1.14.5
2.1.1.14.6

Secondary Airduct
Total Blast Tube
Bend Blast Tube
Front Overgrate Blast Tube
Back Overgrate Blast Tube
Blast Tube
Socket
Tube support

0.021
0.002
0.003
0.003
0.003
0.003
0.004
0.003

Sub Total
2.1.1.15

Instrument & Control

0.034

Sub Total
2.1.2
2.1.2.1
2.1.2.1.1
2.1.2.1.2
2.1.2.1.3
2.1.2.1.4
2.1.2.1.5
2.1.2.1.6
2.1.2.1.7
2.1.2.1.8
2.1.2.1.9

Erection ESP & ID Fan

0.132

Erection ESP
Out shell
Inner Shell
Roof
Collecting Electrodes
Discharge Electrodes
Ash Handling
Electrical Power Supply
Platforms
Ladders

0.126
0.013
0.025
0.013
0.013
0.013
0.013
0.013
0.013
0.013

Sub Total
2.1.2.2
2.1.2.2.1
2.1.2.2.2
2.1.2.2.3

0.007

Erection ID Fan
Casing
Fan
Motor

0.002
0.003
0.002

Sub Total
2.1.3
2.1.3.1
2.1.3.2
2.1.3.3
2.1.3.4
2.1.3.5

0.079

Erection Chimney / Stack


Chimney / Stack
Ducting
Firebrick & Mortar
Air proof Door
Ladder and Platform

0.032
0.016
0.008
0.008
0.016

Sub Total
2.2
2.2.1
2.2.1.1
2.2.1.2
2.2.1.3
2.2.1.4
2.2.1.5

Steam Turbine Generator & Auxiliaries

0.299
0.179

Erection Steam Turbine


Lower Casing
Inner Casing ( Lower )
Inner Casing ( Upper )
Upper Casing
Rotor

0.036
0.036
0.018
0.018
0.072

Sub Total
2.2.2

Erection Generator

Page 143 of 229

0.075

Discipline

: Mechanical
Description

No
2.2.2.1
2.2.2.2

WF
0.037

Generator
Piping

0.037

Sub Total
2.2.3
2.2.3.1
2.2.3.3
2.2.3.4

0.045

Deaerator System
Deaerator tank
Flash tank

0.013
0.009
0.009

Piping
Sub Total

2.3
2.3.1
2.3.1.1
2.3.1.2
2.3.1.3
2.3.1.4
2.3.1.5

Condenser And Feed Water Heating Plant

0.000
0.000

Erection Condenser
Expansion Joint Turbine & Condenser
Condenser
Butterfly Valve
Water Box
CW Pipe to Water Box

0.000
0.000
0.000
0.000
0.000

Sub Total
2.4
2.5.1.1
2.5.1.2
2.5.1.3
2.5.1.4

0.000

Plant Water System


Water Treatment (R/O System)
Cooling Water & pump
Tank & Pump
Piping

0.000
0.000
0.000
0.000

Sub Total
2.5
2.5.1
2.5.1.1
2.5.1.2

Drainage and Waste Water Treatment Plant

0.033
0.033

Installation Waste Water treatment & Tank.


Install Waste Water Treatment Plant
Piping

0.016
0.016

Sub Total
2.6

Fire Protection System

2.7

Compressed Air System

0.012

Sub Total
0.000

Sub Total
2.8

Chemical Feed System

2.9

Sampling Rack System

0.000

Sub Total
0.002

Sub Total
2.10

Laboratory and Instruments

2.11
2.11.1
2.11.2
2.11.3
2.11.4
2.11.5

Chlorination System
Install Electrolytic cells and associated equip.
Install Pumps
Install Storage Tank and Accessories
Piping
Control and Instrumentation

0.000

Sub Total
0.000
0.000
0.000
0.000
0.000
0.000

Sub Total
2.12

Air Conditioning and Ventilation

Page 144 of 229

0.001

Discipline

: Mechanical
Description

No

WF
Sub Total

2.13
2.13.1
2.13.2
2.13.3

0.022

Crane and Hoist


Crane
Hoist
Instrument & Control

0.013
0.005
0.003

Sub Total
2.14

0.000

Workshop and Machinery Equipment


Sub Total

2.15
2.15.1
2.15.2
2.15.3

Coal Handling
Conveyor
Coal Cruser & Coal bin
Hopper, Chut, Duct, Bin Cyclone

2.16

Fuel Oil System

0.076
0.034
0.031
0.011

Sub Total
0.007

Sub Total
2.17
2.17.1

0.018

Ash Handling System


Dust Collection

0.018

Sub Total

Page 145 of 229

ON PROGRESS CALCULATION
#VALUE!

Cumulative Last Period Incremental Last Period Cumulative This Period


Prog

WF

Prog

WF

Prog

WF

0.00%

0.000

100.00%

0.012

100.00%

0.012

0.00%

0.000

100.00%

0.005

100.00%

0.005

0.00%

0.000

100.00%

0.017

100.00%

0.017

0.00%

0.000

95.00%

0.020

95.00%

0.020

0.00%

0.000

95.00%

0.020

95.00%

0.020

0.00%

0.000

90.00%

0.002

90.00%

0.002

0.00%

0.000

90.00%

0.003

90.00%

0.003

0.00%

0.000

90.00%

0.003

90.00%

0.003

0.00%

0.000

90.00%

0.003

90.00%

0.003

0.00%

0.000

90.00%

0.003

90.00%

0.003

0.00%

0.000

90.00%

0.003

90.00%

0.003

0.00%

0.000

90.00%

0.004

90.00%

0.004

0.00%

0.000

0.019

90.00%

0.019

0.00%

0.000

90.00%

0.031

90.00%

0.031

0.00%

0.000

90.00%

0.031

90.00%

0.031

0.00%

0.000

90.00%

0.005

90.00%

0.005

0.00%

0.000

90.00%

0.004

90.00%

0.004

0.00%

0.000

90.00%

0.003

90.00%

0.003

0.00%

0.000

90.00%

0.003

90.00%

0.003

0.00%

0.000

90.00%

0.003

90.00%

0.003

0.00%

0.000

90.00%

0.001

90.00%

0.001

0.00%

0.000

90.00%

0.001

90.00%

0.001

0.00%

0.000

90.00%

0.019

90.00%

0.019

0.00%

0.000

90.00%

0.003

90.00%

0.003

0.00%

0.000

90.00%

0.003

90.00%

0.003

0.00%

0.000

90.00%

0.003

90.00%

0.003

0.00%

0.000

90.00%

0.003

90.00%

0.003

0.00%

0.000

90.00%

0.003

90.00%

0.003

0.00%

0.000

90.00%

0.003

90.00%

0.003

90.00%

Page 146 of 229

Cumulative Last Period Incremental Last Period Cumulative This Period


Prog

WF

0.00%

0.000

0.00%

Prog

WF

Prog

WF

90.00%

0.019

90.00%

0.019

0.000

100.00%

0.002

100.00%

0.002

0.00%

0.000

100.00%

0.002

100.00%

0.002

0.00%

0.000

100.00%

0.004

100.00%

0.004

0.00%

0.000

100.00%

0.002

100.00%

0.002

0.00%

0.000

100.00%

0.002

100.00%

0.002

0.00%

0.000

100.00%

0.002

100.00%

0.002

0.00%

0.000

100.00%

0.002

100.00%

0.002

0.00%

0.000

100.00%

0.002

100.00%

0.002

0.00%

0.000

100.00%

0.002

100.00%

0.002

0.00%

0.000

100.00%

0.021

100.00%

0.021

0.00%

0.000

23.33%

0.001

23.33%

0.001

0.00%

0.000

80.00%

0.003

80.00%

0.003

0.00%

0.000

100.00%

0.002

100.00%

0.002
0.005

0.00%

0.000

61.33%

0.005

61.33%

0.00%

0.000

93.33%

0.001

93.33%

0.001

0.00%

0.000

82.22%

0.008

82.22%

0.008

0.00%

0.000

90.00%

0.001

90.00%

0.001

0.00%

0.000

98.62%

0.001

98.62%

0.001

0.00%

0.000

84.43%

0.011

84.43%

0.011

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

100.00%

0.011

100.00%

0.011

0.00%

0.000

50.00%

0.011

50.00%

0.011

0.00%

0.000

100.00%

0.004

100.00%

0.004

0.00%

0.000

100.00%

0.004

100.00%

0.004

0.00%

0.000

100.00%

0.002

100.00%

0.002

0.00%

0.000

100.00%

0.002

100.00%

0.002

0.00%

0.000

100.00%

0.002

100.00%

0.002

0.00%

0.000

100.00%

0.002

100.00%

0.002

0.00%

0.000

100.00%

0.002

100.00%

0.002

0.00%

0.000

100.00%

0.002

100.00%

0.002

0.00%

0.000

100.00%

0.021

100.00%

0.021

0.00%

0.000

100.00%

0.004

100.00%

0.004

0.00%

0.000

100.00%

0.004

100.00%

0.004

0.00%

0.000

100.00%

0.004

100.00%

0.004

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

60.00%

0.013

60.00%

0.013

0.00%

0.000

100.00%

0.021

100.00%

0.021

Page 147 of 229

Cumulative Last Period Incremental Last Period Cumulative This Period


Prog

WF

0.00%

0.000

0.00%

Prog

WF

Prog

WF

100.00%

0.021

100.00%

0.021

0.000

90.00%

0.002

90.00%

0.002

0.00%

0.000

90.00%

0.003

90.00%

0.003

0.00%

0.000

90.00%

0.003

90.00%

0.003

0.00%

0.000

90.00%

0.003

90.00%

0.003

0.00%

0.000

90.00%

0.003

90.00%

0.003

0.00%

0.000

90.00%

0.003

90.00%

0.003

0.00%

0.000

100.00%

0.003

100.00%

0.003

0.00%

0.000

77.14%

0.016

77.14%

0.016

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

100.00%

0.013

100.00%

0.013

0.00%

0.000

100.00%

0.025

100.00%

0.025

0.00%

0.000

95.00%

0.012

95.00%

0.012

0.00%

0.000

95.00%

0.012

95.00%

0.012

0.00%

0.000

95.00%

0.012

95.00%

0.012

0.00%

0.000

95.00%

0.012

95.00%

0.012

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

100.00%

0.013

100.00%

0.013

0.00%

0.000

100.00%

0.013

100.00%

0.013
0.111

0.00%

0.000

88.00%

0.111

88.00%

0.00%

0.000

94.00%

0.002

94.00%

0.002

0.00%

0.000

94.00%

0.002

94.00%

0.002

0.00%

0.000

94.00%

0.002

94.00%

0.002

0.00%

0.000

94.00%

0.006

94.00%

0.006

0.00%

0.000

95.00%

0.030

95.00%

0.030

0.00%

0.000

100.00%

0.016

100.00%

0.016

0.00%

0.000

100.00%

0.008

100.00%

0.008

0.00%

0.000

90.00%

0.007

90.00%

0.007

0.00%

0.000

81.00%

0.013

81.00%

0.013
0.074

0.00%

0.000

93.20%

0.074

93.20%

0.00%

0.000

90.00%

0.032

90.00%

0.032

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.032

18.00%

0.032

0.00%

0.000

18.00%

Page 148 of 229

Cumulative Last Period Incremental Last Period Cumulative This Period


Prog

WF

Prog

0.00%

0.000

0.00%

0.00%

0.000

0.00%

WF

Prog

WF

0.000

0.00%

0.000

40.00%

0.015

40.00%

0.015

0.000

20.00%

0.015

20.00%

0.015

0.00%

0.000

90.00%

0.012

90.00%

0.012

0.00%

0.000

90.00%

0.008

90.00%

0.008

0.00%

0.000

40.00%

0.004

40.00%

0.004

0.00%

0.000

53.00%

0.024

53.00%

0.024

0.00%

0.000

90.00%

0.000

90.00%

0.000

0.00%

0.000

90.00%

0.000

90.00%

0.000
0.000

0.00%

0.000

5.00%

0.000

5.00%

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000
0.000

0.00%

0.000

0.00%

0.000

0.00%

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000
0.000

0.00%

0.000

0.00%

0.000

0.00%

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000
0.000

0.00%

0.000

0.00%

0.000

0.00%

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

90.00%

0.002

90.00%

0.002

0.00%

0.000

90.00%

0.002

90.00%

0.002
0.000

0.00%

0.000

0.00%

0.000

0.00%

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000
0.000

0.00%

0.000

0.00%

0.000

0.00%

0.00%

0.000

95.00%

0.000

95.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.000

0.00%

0.000

0.000

0.00%

0.000

0.00%
0.00%

0.000
0.000

0.00%
0.00%

Page 149 of 229

Cumulative Last Period Incremental Last Period Cumulative This Period


Prog

WF

Prog

WF

Prog

WF

0.00%

0.000

0.00%

0.000

0.00%

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000
0.000

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

97.25%

0.033

97.25%

0.033

0.00%

0.000

99.50%

0.030

99.50%

0.030

0.00%

0.000

100.00%

0.011

100.00%

0.011
0.075

0.00%

0.000

98.56%

0.075

98.56%

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

Page 150 of 229

CONSTRUCTION PROGR
#VALUE!
Project Name : PLTU
Project
Kendari
NameUnit
: PLTU
3 (1 Kendari
x 10 MW)Unit 3 (1 x 10 MW)
Item No
: Item No
: Progress Certificate No. 02
Phase
: Construction
Phase
: Construction
Discipline

: Mechanical
Discipline

: Mechanical

No.
2
2.1
2.1.1

DESCRIPTION

Unit

MECHANICAL WORK
The Boiler and Auxiliaries.
Erection Boiler Unit 3
Firebrick Under Chaingrate
Percentage
m2
m2
Firebrick Burner
Percentage
m2
m2
Steamdrum
Percentage
Ls
Ls
Waterwall
Down Header of Front waterwall
Percentage
Ls
Ls
Down Header of Back Waterwall
Percentage
Ls
Ls

Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual

Discipline

: Mechanical
Discipline

: Mechanical

No.

DESCRIPTION

Unit

Down Header of Side waterwall (both sides of Rear and back cooling box)
Percentage
Ls
Ls
Up Header (both sides)
Percentage
Ls
Ls
Front Waterwall pipe
Percentage
Ls
Ls
Back waterwall pipe
Percentage
Ls
Ls
Side Waterwall Pipe
Percentage
Ls
Ls
Downcomer
Percentage
Ls
Ls
Superheater
Coil of High Superheater
Percentage
Ls
Ls
Coil of Low Superheater
Percentage
Ls
Ls

Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual

Discipline

: Mechanical
Discipline

: Mechanical

No.

DESCRIPTION

Unit

Outlet Header of Low Temp. Superheater


Percentage
Ls
Ls
Inlet Header of High Temp. Superheater
Percentage
Ls
Ls
Mid Header of High temp Superheater
Percentage
Ls
Ls
Outlet Header of High Temp. Superheater
Percentage
Ls
Ls
Spray Attemperator
Percentage
Ls
Ls
Economizer
Outlet Header
Percentage
Ls
Ls
Middle Header
Percentage
Ls
Ls
Inlet Header
Percentage
Ls
Ls
Outlet Snake Tube

Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep

Discipline

: Mechanical
Discipline

: Mechanical

No.

DESCRIPTION

Unit
Percentage
Ls
Ls

Middle Snake Tube


Percentage
Ls
Ls
Inlet Snake Tube
Percentage
Ls
Ls
Air Preheater
Tube Box
Percentage
Ls
Ls
Expansion Joint
Percentage
Ls
Ls
Frame
Percentage
Ls
Ls
Hot Wind Tie In
Percentage
Ls
Ls
Cold Wind Tie In
Percentage
Ls
Ls
Guide Plate
Percentage

WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF

Discipline

: Mechanical
Discipline

: Mechanical

No.

DESCRIPTION

Unit
Ls
Ls

Casing
Percentage
Ls
Ls
Lower support
Percentage
Ls
Ls
Upper Support
Percentage
Ls
Ls
Casing & Out Casing
Boiler case
Percentage
Ls
Ls
Out Casing (corugated Plate and Folding Plate)
Percentage
Ls
Ls
Flat Roof
Percentage
Ls
Ls
Plateform & Stairs
Plateform Frame
Percentage
level
Ls
Staircases
Percentage

Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF

Discipline

: Mechanical
Discipline

: Mechanical

No.

DESCRIPTION

Unit
Ls
Ls

Railing Rack
Percentage
Ls
Ls
Bracket
Percentage
Ls
Ls
Awning & Roofing
Awning
Percentage
Ls
Ls
Roofing
Percentage
Ls
Ls
Chain grate
Bearing Fire Grate
Percentage
Ls
Ls
Lower Track
Percentage
Ls
Ls
Furnace Chain and Bar
Percentage
Ls
Ls
Initiative Axle
Percentage

Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF

Discipline

: Mechanical
Discipline

: Mechanical

No.

DESCRIPTION

Unit
Ls
Ls

Driven Axle
Percentage
Ls
Ls
Curtain Coal Device
Percentage
Ls
Ls
Front Damper
Percentage
Ls
Ls
Chain Grate Motor
Percentage
Ls
Ls
Coalfeeder
Coalspreader Gearing
Percentage
Ls
Ls
Coal Feeder Gearing
Percentage
Ls
Ls
Front Wall Slab
Percentage
Ls
Ls
Spreader Air Noozle
Percentage
Ls

Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan

Discipline

: Mechanical
Discipline

: Mechanical

No.

DESCRIPTION

Unit
Ls
Percentage
Ls
Ls

Qty Actual
Workstep
WF
Qty Plan
Qty Actual

Percentage
Ls
Ls

Workstep
WF
Qty Plan
Qty Actual

Coal Bunker

Primary Airduct

Secondary Airduct
Total Blast Tube
Percentage
Ls
Ls
Bend Blast Tube
Percentage
Ls
Ls
Front Overgrate Blast Tube
Percentage
Ls
Ls
Back Overgrate Blast Tube
Percentage
Ls
Ls
Blast Tube
Percentage
Ls
Ls
Socket
Percentage
Ls

Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan

Discipline

: Mechanical
Discipline

: Mechanical

No.

DESCRIPTION

Unit
Ls
Percentage
Ls
Ls

Qty Actual
Workstep
WF
Qty Plan
Qty Actual

Percentage
Ls
Ls

Workstep
WF
Qty Plan
Qty Actual

Tube Support

Instrument & Control

Erection ESP unit 1


ESP
Out Shell (Wall Plate)
Percentage
Ls
Ls
Inner Shell
Percentage
Ls
Ls
Roof
Percentage
Ls
Ls
Collecting Electrodes
Percentage
Ls
Ls
Discharge Electrodes
Percentage
Ls
Ls
Ash Handling

Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep

Discipline

: Mechanical
Discipline

: Mechanical

No.

DESCRIPTION

Unit
Percentage
Ls
Ls

Electrical Power Supply


Percentage
Ls
Ls
Platform
Percentage
Ls
Ls
Ladder
Percentage
Ls
Ls
ID Fan & Aux Fan
Casing
Percentage
Ls
Ls
Fan
Percentage
Ls
Ls
Motor
Percentage
Ls
Ls
2.1.3

Erection Chimney / Stack


Chimney / Stack
Percentage
Ls
Ls
Ducting

WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep

Discipline

: Mechanical
Discipline

: Mechanical

No.

DESCRIPTION

Unit
Percentage
Ls
Ls

Firebrick & Mortar


Percentage
Ls
Ls
Air proof Door
Percentage
Ls
Ls
Ladder and Platform

2.2
2.2.1
2.2.1.1
2.2.1.2
2.2.1.3
2.2.1.4
2.2.1.5

Steam Turbine Generator & Auxiliaries

Percentage
Ls
Ls
Percentage

Erection Steam Turbine Unit 3


Lower Casing
Inner Casing ( Lower )
Inner Casing ( Upper )
Upper Casing
Rotor

Ls
Ls
Ls
Ls
Ls

WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF

Sub Total
Percentage
2.2.2
2.2.2.1

2.2.2.2

Erection Generator 3
Generator

Piping
Percentage
Ls
Ls
Sub Total

2.2.3

Deaerator System

Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual

Discipline

: Mechanical
Discipline

: Mechanical

No.

DESCRIPTION

Unit

Dearator Tank unit 3


Percentage
Ls
Ls
Flash Tank
Percentage
Ls
Ls
Piping
Percentage
Ls
Ls

Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual

Sub Total
2.3
2.3.1
2.3.1.1
2.3.1.2
2.3.1.3

Condenser And Feed Water Heating Plant

Workstep

Erection Condenser
Expansion Joint Turbine & Condenser
Condenser
Butterfly Valve

Percentage

WF

Workstep
Water Box

Percentage

WF

2.3.1.4
Workstep
CW Pipe to Water Box

Percentage

WF

2.3.1.5
Sub Total
Workstep
2.4
2.4.1.1
2.4.1.2
2.4.1.3

Plant Water System


Water Treatment (R/O System)
Cooling Water & pump
Tank & Pump

Percentage
LS
LS
LS

WF

Workstep
2.4.1.4

Piping
Percentage

WF

Discipline

: Mechanical
Discipline

: Mechanical

No.

DESCRIPTION

Unit

Sub Total
2.5

Drainage and Waste Water Treatment Plant

Workstep
Percentage

2.5.1

WF

Installation Waste Water treatment & Tank.


Workstep

2.5.2

Percentage

WF

Percentage
Ls
Ls

Workstep
WF
Qty Plan
Qty Actual

Piping
Sub Total

2.6
2.6.1

2.6.2

Fire Protection System


Fire Protection Equipment

Fire Water System Pipe

Workstep
Percentage
Ls
Ls

WF
Qty Plan
Qty Actual

Sub Total
2.7

Compressed Air System

Ls
Sub Total

0.5

Chemical Feed System

Ls
Sub Total

2.9

Workstep

Sampling Rack System


Sub Total

2.10

Laboratory and Instruments

Percentage
Ls
Ls

Sub Total

WF

Discipline

: Mechanical
Discipline

: Mechanical

No.
2.11
2.11.1

DESCRIPTION

Unit

Chlorination System
Install equip.

Workstep
Percentage

2.11.2

Install Pumps
Percentage
Ls
Ls

2.11.3

Install Storage Tank and Accessories


Percentage
Ls
Ls

2.11.4

Piping
Percentage
Ls
Ls

2.11.5

Control and Instrumentation


Percentage
Ls
Ls

WF
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual

Sub Total
2.12

Air Conditioning and Ventilation

Ls
Sub Total

2.13
2.13.1
2.13.1.1

Crane and Hoist


Over Head Crane & Hoist
Crane
Percentage
Ls
Ls

2.13.1.2

Hoist
Percentage
Ls
Ls

2.13.1.3

Instrument & Control

Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep

Discipline

: Mechanical
Discipline

: Mechanical

No.

DESCRIPTION

Unit
Percentage
Ls
Ls

WF
Qty Plan
Qty Actual

Percentage

Workstep
WF

Sub Total
2.14

Workshop and Machinery Equipment


Sub Total

2.15
2.15.1
2.15.2
2.15.3

Coal Handling
Conveyor
Coal Cruser & Coal bin
Hopper, Chut, Duct, Bin Cyclone

Ls
Ls
Ls
Sub Total

2.16

Fuel Oil System

Ls
Sub Total

2.17
2.17.1

Ash Handling

Percentage

Dust Collection

Ls
Sub Total

Workstep
WF

ON PROGRESS CALCULATION
#VALUE!

Progress Measurement

Installation
100%
132
132
Installation
100%
731
731
Erection
90%
1
1

Test
5%
1
1

Erection
90%
1
1
Erection
90%
1
1

Test
5%
80
0
Test
5%
110
0

Last Period

Progress (%)
Incremental

0.00%

100.00%

0.00%

100.00%

Commissioning
5%
1
0

0.00%

95.00%

Commissioning
5%
1
0
Commissioning
5%
1
0

0.00%

90.00%

0.00%

90.00%

Progress Measurement

Last Period

Progress (%)
Incremental

Erection
90%
4
4
Erection
90%
2
2
Erection
90%
148
148
Erection
90%
204
204
Erection
90%
68
68
Erection
90%
96
96

Test
5%
72
0
Test
5%
24
0
Test
5%
222
0
Test
5%
306
0
Test
5%
102
0
Test
5%
144
0

Commissioning
5%
1
0
Commissioning
5%
1
0
Commissioning
5%
1
0
Commissioning
5%
1
0
Commissioning
5%
1
0
Commissioning
5%
1
0

0.00%

90.00%

0.00%

90.00%

0.00%

90.00%

0.00%

90.00%

0.00%

90.00%

0.00%

90.00%

Erection
90%
84
84
Erection
90%
84
84

Test
5%
168
0
Test
5%
168
0

Commissioning
5%
1
0
Commissioning
5%
1
0

0.00%

90.00%

0.00%

90.00%

Progress Measurement

Last Period

Progress (%)
Incremental

Erection
90%
1
1
Erection
90%
2
2
Erection
90%
1
1
Erection
90%
1
1
Erection
90%
1
1

Test
5%
92
0
Test
5%
52
0
Test
5%
44
0
Test
5%
90
0
Test
5%
100
0

Commissioning
5%
1
0
Commissioning
5%
1
0
Commissioning
5%
1
0
Commissioning
5%
1
0
Commissioning
5%
1
0

0.00%

90.00%

0.00%

90.00%

0.00%

90.00%

0.00%

90.00%

0.00%

90.00%

Erection
90%
6
6
Erection
90%
6
6
Erection
90%
6
6
Erection

Test
5%
41
0
Test
5%
82
0
Test
5%
41
0
Test

Commissioning
5%
1
0
Commissioning
5%
1
0
Commissioning
5%
1
0
Commissioning

0.00%

90.00%

0.00%

90.00%

0.00%

90.00%

0.00%

90.00%

Progress Measurement
90%
41
41
Erection
90%
41
41
Erection
90%
41
41

5%
82
0
Test
5%
82
0
Test
5%
82
0

Erection
70%
2
2
Erection
70%
2
2
Erection
70%
2
2
Erection
70%
2
2
Erection
70%
1
1
Erection
70%

Tightening/Welding
30%
8
8
Tightening/Welding
30%
2
2
Tightening/Welding
30%
2
2
Tightening/Welding
30%
8
8
Tightening/Welding
30%
4
4
Tightening/Welding
30%

5%
1
0
Commissioning
5%
1
0
Commissioning
5%
1
0

Last Period

Progress (%)
Incremental

0.00%

90.00%

0.00%

90.00%

0.00%

100.00%

0.00%

100.00%

0.00%

100.00%

0.00%

100.00%

0.00%

100.00%

0.00%

100.00%

Progress Measurement
1
1
Erection
70%
2
2
Erection
70%
1
1
Erection
70%
1
1

2
2
Tightening/Welding
30%
4
4
Tightening/Welding
30%
4
4
Tightening/Welding
30%
4
4

Installation
60%
48
16
Installation
60%
443
354.4
Installation
60%
1
1
Erection
60%
60
60
Erection
60%

Last Period

Progress (%)
Incremental

0.00%

100.00%

0.00%

100.00%

0.00%

100.00%

Tightening/Welding
40%
192
16
Tightening/Welding
40%
1772
1417.6
Tightening/Welding
40%
1
1

0.00%

23.33%

0.00%

80.00%

0.00%

100.00%

Tightening/Welding
40%
60
50
Tightening/Welding
40%

0.00%

93.33%

0.00%

82.22%

Progress Measurement
18
18
Erection
60%
288
259.2
Erection
60%
58
58

18
10
Tightening/Welding
40%
288
259.2
Tightening/Welding
40%
58
56

Erection
60%
1
0
Erection
60%
1
1
Installation
70%
1
1
Installation
70%
1
1
Installation
70%
1
1
Installation
70%

Last Period

Progress (%)
Incremental

0.00%

90.00%

0.00%

98.62%

Tightening/Welding
40%
1
0
Tightening/Welding
40%
1
1

0.00%

0.00%

0.00%

100.00%

Tightening
30%
1
1
Tightening
30%
1
1
Tightening
30%
1
1
Tightening
30%

0.00%

100.00%

0.00%

100.00%

0.00%

100.00%

0.00%

100.00%

Progress Measurement
1
1
Installation
70%
2
2
Installation
70%
1
1
Installation
70%
1
1
Installation
70%
1
1

1
1
Tightening
30%
2
2
Tightening
30%
1
1
Tightening
30%
1
1
Tightening
30%
1
1

Installation
70%
6
6
Installation
70%
1
1
Installation
70%
1
1
Installation
70%
1

Tightening
30%
6
6
Tightening
30%
1
1
Tightening
30%
1
1
Tightening
30%
1

Last Period

Progress (%)
Incremental

0.00%

100.00%

0.00%

100.00%

0.00%

100.00%

0.00%

100.00%

0.00%

100.00%

0.00%

100.00%

0.00%

100.00%

0.00%

0.00%

Progress Measurement
0
Installation
70%
6
0

0
Tightening
30%
1
0

Fit Up
70%
8
8

Tightening/Welding
30%
16
16

Erection
90%
2
2
Erection
90%
4
4
Erection
90%
2
2
Erection
90%
1
1
Erection
90%
4
4
Erection
90%
12

Test
5%
4
0
Test
5%
8
0
Test
5%
4
0
Test
5%
2
0
Test
5%
8
0
Test
5%
24

Last Period

Progress (%)
Incremental

0.00%

0.00%

0.00%

100.00%

Commissioning
5%
1
0
Commissioning
5%
1
0
Commissioning
5%
1
0
Commissioning
5%
1
0

0.00%

90.00%

0.00%

90.00%

0.00%

90.00%

0.00%

90.00%

Commissioning
5%
1
0

0.00%

90.00%

Commissioning
5%
1

0.00%

90.00%

Progress Measurement
12
Fit Up
70%
20
20

0
Tightening
30%
20
20

Erection
90%
1
0

Test
5%
1
0

Commissioning
5%
1
0
%

Installing
70%
6
6
Installation
70%
1
1
Erection
90%
1
1
Erection
90%
1
1
Erection
90%
1
1
Erection

Tightening/Welding
30%
24
24
Tightening/Welding
30%
1
1
Test
5%
1
1
Test
5%
1
1
Test
5%
1
1
Test

Commissioning
5%
1
0
Commissioning
5%
1
0
Commissioning
5%
1
0
Commissioning

Last Period

Progress (%)
Incremental

0.00%

100.00%

0.00%

0.00%

0.00%

100.00%

0.00%

100.00%

0.00%

95.00%

0.00%

95.00%

0.00%

95.00%

0.00%

95.00%

Progress Measurement
90%
1
1
Erection
90%
1
0
Erection
70%
1
1
Erection
70%
3
3

5%
1
1
Test
5%
1
0
Tightening/Welding
30%
1
1
Tightening/Welding
30%
3
3

Installation
70%
4
4
Installation
70%
4
4
Installation
70%
4
4

Grouting
30%
48
38.4
Grouting
30%
48
38.4
Grouting
30%
48
38.4

Erection
90%
2
2
Installation

Test
5%
18
18
Tightening/Welding

5%
1
0
Commissioning
5%
1
0

Commissioning
5%
1
0

Last Period

Progress (%)
Incremental

0.00%

0.00%

0.00%

100.00%

0.00%

100.00%

0.00%

94.00%

0.00%

94.00%

0.00%

94.00%

0.00%

95.00%

0.00%

100.00%

Progress Measurement
60%
1
1
Installation
100%
1
1
Installation
60%
1
0.9
Erection
90%
1
0.9
Erection
90%
1
0
0
0
0

Tightening/Welding
40%
1
0.9
Test
5%
1
0
Test
5%
0
0
0
0
0

Erection
90%
1
0
Fit Up
50%
1
0.5

Last Period

Progress (%)
Incremental

40%
1
1
0.00%

100.00%

0.00%

90.00%

Commissioning
5%
1
0
Commissioning
5%
0
0
0
0
0

0.00%

81.00%

0.00%
0.00%
0.00%
0.00%
0.00%

90.00%
0.00%
0.00%
0.00%
0.00%

Test
5%
1
0

Commissioning
5%
1
0

0.00%

0.00%

Welding (joint)
30%
1
0.5

Painting, Cleaning
10%
1
0

0.00%

40.00%

Test
10%
1
0

Progress Measurement

Last Period

Erection
90%
1
1
Erection
90%
1
1
Fit Up
50%
123
61.5

Test
5%
1
0
Test
5%
1
0
Welding (joint)
30%
246
123

Commissioning
5%
1
0
Commissioning
5%
1
0
Painting, Cleaning
10%
123
0

Erection
90%
100%
100%
0%
Erection
90%
0%
Erection
90%
0%

Test
5%
0%
0%
0%
Test
5%
0%
Test
5%
0%

Commissioning
5%
0%
0%
0%
Commissioning
5%
0%
Commissioning
5%
0%

Erection
90%
0%
0%
0%

Test
5%
0%
0%
0%

Commissioning
5%
0%
0%
0%

Under Ground
Piping

Above Ground Piping

Pipe Support

Valve Install

Wrapping

50%

30%

10%

5%

5%

Test
10%
1
0

Progress (%)
Incremental

0.00%

90.00%

0.00%

90.00%

0.00%

40.00%

0.00%
0.00%
0.00%

90.00%
90.00%
5.00%

0.00%

0.00%

0.00%

0.00%

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

Progress Measurement

Last Period

0%

0%

0%

0%

0%

Install & Setting

Alignment

Cleaning, Painting,
Insullation

60%
0%

30%
0%

10%
0%

Under Ground
Piping

Above Ground Piping

Pipe Support

Valve Install

Wrapping

50%

30%

10%

5%

5%

0%

0%

0%

0%

0%

Progress (%)
Incremental

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%
0.00%

0.00%
0.00%

0.00%

0.00%

Erection
90%
1
0

Test
5%
1
0

Commissioning
5%
1
0

Under Ground
Piping

Above Ground Piping

Pipe Support

Valve Install

Wrapping

50%

30%

10%

5%

5%

1
0

1
0

1
0

1
0

1
0

0.00%

0.00%

0.00%

0.00%

Erection
90%
100%

Test
5%
0%

Commissioning
5%
0%

0.00%

90.00%

0.00%

0.00%

Progress Measurement

Erection
90%
0%
Erection
90%
1
0
Erection
90%
1
1
Fit Up
50%
1
0
Install Panel
50%
1
0

Test
5%
0%
Test
5%
1
0
Test
5%
1
1
Welding (joint)
30%
1
0
Pulling Cable
30%
1
0

Commissioning
5%
0%
Commissioning
5%
1
0
Commissioning
5%
1
0
Painting, Cleaning
10%
1
0
Termination
10%
1
0

50%
0%

10%
0%

Erection
90%
1
0
Erection
90%
1
0
Install Panel

Test
5%
1
0
Test
5%
1
0
Pulling Cable

Last Period

Progress (%)
Incremental

0.00%
0.00%

0.00%
0.00%

0.00%

95.00%

0.00%

0.00%

0.00%

0.00%

40%
0%

0.00%

0.00%

Commissioning
5%
1
0
Commissioning
5%
1
0
Termination

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Test
10%
1
0
Test
10%
1
0

Test

Progress Measurement

Last Period

Progress (%)
Incremental

10%

50%
1
0

30%
1
0

10%
1
0

0%

0%

0%

0.00%

0.00%

Erection
90%
1
1
1

Test
5%
1
1
1

Commissioning
5%
0.45
0.9
1

0.00%
0.00%
0.00%

97.25%
99.50%
100.00%

90%
0

5%
0

5%
0

0.00%

0.00%

Erection
90%
0.00

Test
5%
0.00

Commissioning
5%
0.00

0.00%

0.00%

1
0

Progress (%)
Cummulative

100.00%

100.00%

95.00%

90.00%

90.00%

Progress (%)
Cummulative
90.00%

90.00%

90.00%

90.00%

90.00%

90.00%

90.00%

90.00%

Progress (%)
Cummulative
90.00%

90.00%

90.00%

90.00%

90.00%

90.00%

90.00%

90.00%

90.00%

Progress (%)
Cummulative

90.00%

90.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

Progress (%)
Cummulative

100.00%

100.00%

100.00%

23.33%

80.00%

100.00%

93.33%

82.22%

Progress (%)
Cummulative

90.00%

98.62%

0.00%

100.00%

100.00%

100.00%

100.00%

100.00%

Progress (%)
Cummulative

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

0.00%

Progress (%)
Cummulative
0.00%

100.00%

90.00%

90.00%

90.00%

90.00%

90.00%

90.00%

Progress (%)
Cummulative
100.00%

0.00%

100.00%

100.00%

95.00%

95.00%

95.00%

95.00%

Progress (%)
Cummulative

0.00%

100.00%

100.00%

94.00%

94.00%

94.00%

95.00%

100.00%

Progress (%)
Cummulative

100.00%

90.00%

81.00%

90.00%
0.00%
0.00%
0.00%
0.00%
0.00%

40.00%

Progress (%)
Cummulative
90.00%

90.00%

40.00%

90.00%
90.00%
5.00%

0.00%

0.00%

0.00%
0.00%
0.00%

Progress (%)
Cummulative
0.00%

0.00%

0.00%
0.00%
0.00%

0.00%

0.00%
0.00%
90.00%

0.00%

Progress (%)
Cummulative

0.00%
0.00%

95.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Progress (%)
Cummulative

0.00%

97.25%
99.50%
100.00%
0.00%

0.00%

CONSTRUCTION PROGRESS CALC


As September 2013
Project Name : PLTU Kendari Unit 3 (1 x 10 MW)
Item No

Phase

: Construction

Discipline

: Electrical

No
3
3.1
3.2
3.3

Description
ELECTRICAL WORK
Power Station
Switchyard
Control and Instrumentation
Total

TION PROGRESS CALCULATION


As September 2013

Price

WF

Cumulative
Last Period
Prog

Rp834,578,900
Rp400,000,000
Rp411,330,202
###

0.507 75.73%
0.243 84.15%
0.250 74.00%
1.000
###

WF

Incremental
Last Period
Prog

WF

Cumulative This
Period
Prog

0.384 -12.86% -6.52% 62.87%


0.205 #DIV/0! #DIV/0! #DIV/0!
0.185 9.50% 2.37% 83.50%
0.773
###
### 52.75%

WF
0.319
0.209
0.527

CONSTRUCTION PROGRESS CAL


As September 2013
Project Name :
Item No
:
Phase
:
Discipline

No
3
3.1
3.1.1
3.1.2
3.1.3
3.1.4
3.1.5
3.1.6
3.1.7
3.1.8
3.1.9
3.1.10
3.1.11
3.1.12
3.1.13
3.1.14
3.1.15
3.1.16
3.1.17
3.1.18
3.1.19

3.2
3.2.1
3.2.2

3.2.3
3.2.4
3.2.5
3.3
3.3.1
3.3.2
3.3.3
3.3.4
3.3.5

CONSTRUCTION PROGRESS CALCULATION


As September 2013
PLTU Kendari Unit 3 (1 x 10 MW)
Construction
Electrical

Description
ELECTRICAL WORK
Power Station

WF

0.507

Generator complete with excitation, cooling, auxiliary, control and Instrumentation systems and
equipment. local control panels, baring pedestals, etc.

0.027

Generator circuit breaker including isolators, DS and ES, potential transformers, surge arresters,
and associated control, metering and protection and instrumentation

0.027

MV Switchgears complete with necessary control metering and protection and instrumentation
system.

0.027

Non segregated phase bus duct system (if furnished) complete with support and structure.

0.027

Power Distribution Centre (PDC) switchgears complete with necessary control metering and
protection and instrumentation system.

0.027

PDC transformers complete with necessary metering and protection and instrumentation system.

0.027

Low voltage motor control centers complete with necessary control, metering and protection and
instrumentation system.

0.027

Uninterruptible AC power supply complete with necessary control, metering and protection and
instrumentation system.

0.027

Emergency diesel generator complete with necessary control, metering and protection and
instrumentation system.

0.027

Batteries, battery chargers and DC distribution panels complete with necessary control, metering
and protection and instrumentation system.

0.027

Cabling and wiring complete cable trays, conduits and fittings and underground ducts.
Grounding and lightning protection system complete.
Cathodic protection system complete.
Lighting and small power installation complete.
Communication systems complete.
Closed circuit TV system equipment complete.
Power Plant Metering and Protection panels complete.

0.027
0.027
0.027
0.027
0.027
0.027
0.027

Generator transformer complete with surge arresters, current transformers, etc.

0.027

Unit auxiliary transformer complete with surge arrester, current transformers etc.

0.027

Sub Total
Switchyard
20 kV Switchgear stattion complete
AC distribution system including cables, and associated equipment.

0.243
0.049
0.049

Batteries, battery charger and DC distribution panels complete with necessary control,
protection and instrumentation system and equipment.
Uninterruptible AC power supply complete with necessary control, protection and
instrumentation system and equipment.
Switchyard station metering and protection panels, control and monitoring system and
associated equipment complete.

0.049
0.049
0.049

Sub Total
Control and Instrumentation
Distributed digital control system complete with necessary hardware
Power plant operation control desks.
Diagnostic Software
Supervisory and plant management system
The studies required to be performed as stipulated in Book II Part 4 Section 4.2.

Sub Total

0.250
0.050
0.050
0.050
0.050
0.050

S CALCULATION

13

Cumulative Last Incremental Last


Period
Period
Prog

WF

78.00%

0.026

100.00%

Prog

Cumulative This
Period

WF

Prog

WF

5.50%

-0.003

83.50%

0.022

0.033

0.00%

-0.006

100.00%

0.027

100.00%

0.033

0.00%

-0.006

100.00%

0.027

89.50%

0.030

7.00%

-0.004

96.50%

0.026

86.00%

0.028

10.50%

-0.003

96.50%

0.026

89.00%

0.029

10.00%

-0.003

99.00%

0.026

89.00%

0.029

9.50%

-0.003

98.50%

0.026

100.00%

0.033

0.00%

-0.006

100.00%

0.027

79.00%

0.026

3.50%

-0.004

82.50%

0.022

85.17%

0.028

0.83%

-0.005

86.00%

0.023

68.50%

0.023

9.50%

-0.002

78.00%

0.021

75.00%
21.00%
21.00%
79.00%
85.17%
68.50%

0.025
0.007
1.007
2.007
3.007
4.007

8.00%
6.00%
-21.00%
-14.97%
-85.17%
-68.50%

-0.003
0.000
-1.007
-1.990
-3.007
-4.007

83.00%
27.00%
0.00%
64.03%
0.00%
0.00%

0.022
0.007
0.000
0.017
0.000
0.000

75.00%

5.007

-75.00%

-5.007

0.00%

0.000

0.00%

0.000

0.00%

0.000

0.00%

0.000

75.73%

0.350

-12.86%

-0.031

62.87%

0.319

93.50%
90.00%

0.066
0.064

2.00%
5.40%

-0.020
-0.017

95.50%
95.40%

0.046
0.046

0.059

#DIV/0!

#DIV/0!

83.60%

1.059

-83.60%

-1.059

69.50%
84.15%

0.049

#DIV/0!

#DIV/0!

#DIV/0! #DIV/0!

0.238

#DIV/0!

#DIV/0!

#DIV/0! #DIV/0!

74.00%
74.00%
74.00%
74.00%

0.063
1.063
2.063
0.063

9.50%
9.50%
9.50%
9.50%

-0.021
-1.021
-2.021
-0.021

83.50%
83.50%
83.50%
83.50%

0.042
0.042
0.042
0.042

74.00%

0.063

9.50%

-0.021

83.50%

0.042

74.00%

0.189

9.50%

0.020

83.50%

0.209

83.60%

#DIV/0! #DIV/0!
0.00%

0.000

CONSTRUCTION PROGRES

As September 20
Project Name :
Item No

Phase

Discipline

No

3
3.1
3.1.1
3.1.2
3.1.3
3.1.4
3.1.5
3.1.6
3.1.7
3.1.8
3.1.9
3.1.10
3.1.11
3.1.12
3.1.13
3.1.14
3.1.15
3.1.16
3.1.17
3.1.18
3.1.19

3.2
3.2.1
3.2.1.1
3.2.1.2
3.2.2
3.2.2.1

3.2.2.2
3.2.2.3
3.2.2.4
3.2.2.5
3.2.3
3.2.3.1
3.2.3.2
3.2.3.3
3.2.4
3.2.4.1
3.2.4.2
3.2.4.3
3.2.4.4
3.2.5
3.2.5.1
3.2.5.2
3.2.5.3

3.3
3.3.1
3.3.2
3.3.3
3.3.4
3.3.5

CONSTRUCTION PROGRESS CALCULATION


As September 2013
PLTU Kendari Unit 3 (1 x 10 MW)
Construction
Electrical

Description

ELECTRICAL WORK
Power Station
Generator complete with excitation, cooling, auxiliary, control and Instrumentation systems and equipment.
local control panels, baring pedestals, etc.
Generator circuit breaker including isolators, DS and ES, potential transformers, surge arresters, and associated
control, metering and protection and instrumentation
MV Switchgears complete with necessary control metering and protection and instrumentation system.
Non segregated phase bus duct system (if furnished) complete with support and structure.
Power Distribution Centre (PDC) switchgears complete with necessary control metering and protection and
instrumentation system.
PDC transformers complete with necessary metering and protection and instrumentation system.
Low voltage motor control centers complete with necessary control, metering and protection and
instrumentation system.
Uninterruptible AC power supply complete with necessary control, metering and protection and instrumentation
system.
Emergency diesel generator complete with necessary control, metering and protection and instrumentation
system.
Batteries, battery chargers and DC distribution panels complete with necessary control, metering and
protection and instrumentation system.
Cabling and wiring complete cable trays, conduits and fittings and underground ducts.
Grounding and lightning protection system complete.
Cathodic protection system complete.
Lighting and small power installation complete.
Communication systems complete.
Closed circuit TV system equipment complete.
Power Plant Metering and Protection panels complete.
Generator transformer complete with surge arresters, current transformers, etc.
Unit auxiliary transformer complete with surge arrester, current transformers etc.

Sub Total

Switchyard
HV Facilities (70 kV Switchyard)
HV Equipment
Protection Relay & Control Panel
Sub Total
Power Plant Metering and Protection System
Protection,Control & Metering

HV System
Generator Protection, Control & Metering
AC & DC Distribution System
Transmission Line
Sub Total
Insulated Cables
Power Cable
Control Cable
Signal & Instrumentation Cable
Sub Total
Electrical Auxiliary System
Cable Tray
Conduit & Fitting
Junction Boxes
Heat Tracing
Sub Total
Switchyard Station Metering And Protection
Panels
Control
Monitoring
Sub Total

Control and Instrumentation


Distributed digital control system complete with necessary hardware
Power plant operation control desks.
Diagnostic Software
Supervisory and plant management system
The studies required to be performed as stipulated in Book II Part 4 Section 4.2.

Sub Total

SS CALCULATION

2013

WF

Cumulative Last
Period
Prog

WF

Incremental Last
Period
Prog

Cumulative This
Period

WF

Prog

WF

0.507
0.027

78.00%

0.026

5.50%

-0.003

83.50%

0.022

0.027

100.00%

0.033

0.00%

-0.006

100.00%

0.027

0.027

100.00%

0.033

0.00%

-0.006

100.00%

0.027

0.027

89.50%

0.030

7.00%

-0.004

96.50%

0.026

0.027

86.00%

0.028

10.50%

-0.003

96.50%

0.026

0.027

89.00%

0.029

10.00%

-0.003

99.00%

0.026

0.027

89.00%

0.029

9.50%

-0.003

98.50%

0.026

0.027

100.00%

0.033

0.00%

-0.006

100.00%

0.027

0.027

79.00%

0.026

3.50%

-0.004

82.50%

0.022

0.027

79.00%

1.026

-79.00%

-1.026

0.00%

0.000

0.027
0.027
0.027
0.027
0.027
0.027
0.027
0.027
0.027

79.00%
79.00%
79.00%
79.00%
85.17%
68.50%
75.00%
21.00%
0.00%
75.73%

2.026
3.026
4.026
5.026
0.028
0.023
0.025
0.007
0.000
0.350

-79.00%
-79.00%
7.00%
-79.00%
0.83%
9.50%
8.00%
6.00%
0.00%
-11.70%

-2.026
-3.026
-4.003
-5.026
-0.005
-0.002
-0.003
0.000
0.000
-0.025

0.00%
0.00%
86.00%
0.00%
86.00%
78.00%
83.00%
27.00%
0.00%
64.03%

0.000
0.000
0.023
0.000
0.023
0.021
0.022
0.007
0.000
0.325

100.00%
87.00%
93.50%

0.035
0.031
0.066

-5.00%
9.00%
2.00%

-0.012
-0.007
-0.020

95.00%
96.00%
95.50%

0.023
0.023
0.046

92.00%

0.013

4.00%

-0.004

96.00%

0.009

0.243
0.049
0.024
0.024
0.049
0.010

0.010
0.010
0.010
0.010
0.049
0.019
0.015
0.015
0.049
0.012
0.012
0.012
0.012
0.050
0.019
0.015
0.015
0.250
0.050
0.050
0.050
0.050
0.050

100.00%
84.00%
74.00%
100.00%
90.00%

0.014
0.012
0.010
0.014
0.064

83.00%
83.00%
85.00%
83.60%

0.023
0.018
0.018
0.059

#DIV/0! #DIV/0!
#DIV/0! #VALUE!
#DIV/0! #VALUE!
#DIV/0! #DIV/0!

#DIV/0! #DIV/0!
#DIV/0!
#DIV/0!
#DIV/0! #DIV/0!

84.00%
81.00%
71.00%
42.00%
69.50%

0.015
0.014
0.013
0.007
0.049

0.50% -0.005
3.50% -0.004
13.00% -0.002
41.50%
0.003
#DIV/0! #DIV/0!

84.50%
0.010
84.50%
0.010
84.00%
0.010
83.50%
0.010
#DIV/0! #DIV/0!

71.00%
42.00%
71.00%
69.50%

0.013
0.007
0.013
0.049

-71.00% -0.013
-42.00% -0.007
12.50%
0.000
#DIV/0! #DIV/0!

0.00%
0.000
0.00%
0.000
83.50%
0.012
#DIV/0! #DIV/0!

74.00%
54.00%
34.00%
74.00%
74.00%
74.00%

0.063
1.063
2.063
0.063
0.063
0.189

9.50%
-54.00%
-34.00%
9.50%
9.50%
-23.90%

83.50%
0.00%
0.00%
83.50%
83.50%
50.10%

-5.00%
12.00%
21.00%
-5.00%
5.40%

-0.005
-0.003
-0.001
-0.005
-0.017

-0.021
-1.063
-2.063
-0.021
-0.021
-0.064

95.00%
96.00%
95.00%
95.00%
95.40%

0.009
0.009
0.009
0.009
0.046

0.042
0.000
0.000
0.042
0.042
0.125

CONS
Project Name :
Item No

Phase

Discipline

No.
3
3.1
3.1.1

3.1.2

3.1.3

3.1.4

3.1.5

3.1.6

3.1.7

3.1.8

3.1.9

3.1.10

3.1.11

3.1.12

3.1.13

3.1.14

3.1.15

3.1.16

3.1.17

3.1.18

3.1.19

3.2
3.2.1
3.2.1.1

3.2.1.2

3.2.2
3.2.2.1

3.2.2.2

3.2.2.3

3.2.2.4

3.2.2.5

3.2.3
3.2.3.1

3.2.3.2

3.2.3.3

3.2.4
3.2.4.1

3.2.4.2

3.2.4.3

3.2.4.4

3.2.5
3.2.5.1

3.2.5.2

3.2.5.3

3.3
3.3.1

3.3.2

3.3.3

3.3.4

3.3.5

CONSTRUCTION

As
PLTU Kendari Unit 3 (1 x 10 MW)
Construction
Electrical
DESCRIPTION

ELECTRICAL WORK
Power Station
Generator complete with excitation, cooling, auxiliary, control and Instrumentation systems and equipment. local
control panels, baring pedestals, etc.

Generator circuit breaker including isolators, DS and ES, potential transformers, surge arresters, and associated
control, metering and protection and instrumentation

MV Switchgears complete with necessary control metering and protection and instrumentation system.

Non segregated phase bus duct system (if furnished) complete with support and structure.

Power Distribution Centre (PDC) switchgears complete with necessary control metering and protection and
instrumentation system.

PDC transformers complete with necessary metering and protection and instrumentation system.

Low voltage motor control centers complete with necessary control, metering and protection and instrumentation
system.

Uninterruptible AC power supply complete with necessary control, metering and protection and instrumentation
system.

Emergency diesel generator complete with necessary control, metering and protection and instrumentation
system.

Batteries, battery chargers and DC distribution panels complete with necessary control, metering and protection
and instrumentation system.

Cabling and wiring complete cable trays, conduits and fittings and underground ducts.

Grounding and lightning protection system complete.

Cathodic protection system complete.

Lighting and small power installation complete.

Communication systems complete.

Closed circuit TV system equipment complete.

Power Plant Metering and Protection panels complete.

Generator transformer complete with surge arresters, current transformers, etc.

Unit auxiliary transformer complete with surge arrester, current transformers etc.

Switchyard
HV Facilities (70 kV Switchyard)
HV Equipment

Protection Relay & Control Panel

Power Plant Metering and Protection System


Protection,Control & Metering

HV System

Generator Protection, Control & Metering

AC & DC Distribution System

Transmission Line

Insulated Cables
Power Cable

Control Cable

Signal & Instrumentation Cable

Electrical Auxiliary System


Cable Tray

Conduit & Fitting

Junction Boxes

Heat Tracing

Switchyard Station Metering And Protection System


Panels

Controls

Monitoring

Control and Instrumentation


Distributed digital control system complete with necessary hardware

Power plant operation control desks.

Diagnostic Software

Supervisory and plant management system

The studies required to be performed as stipulated in Book II Part 4 Section 4.2.

Approved by,
PT. PLN (Persero)
UPK PEMBANGKIT SULAWESI 3

ARIF RAHMAN HAKIM


Manager

NSTRUCTION PROGRESS CALCULATION


As September 2013

Unit

Progress Measurement

Workstep
Percentage
WF
ls
Qty Plan
ls
Qty Actual

Erection
90%
1
0.9

Test
5%
1
0.5

Commissioning
5%

Workstep
Percentage
WF
ls
Qty Plan
ls
Qty Actual

Erection
90%
1
1

Test
5%
1
1

Commissioning
5%
1
1

Workstep
Percentage
WF
ls
Qty Plan
ls
Qty Actual
Workstep
Percentage
WF
ls
Qty Plan
ls
Qty Actual

Erection
90%
1
1
Erection
90%
1
1

Test
5%
1
1
Test
5%
1
0.8

Commissioning
5%
1
1
Commissioning
5%
1
1

Workstep
Percentage
WF
Ls
Qty Plan
Ls
Qty Actual

Erection
90%
1
1

Test
5%
1
0.8

Commissioning
5%
1
0.5

Workstep
WF
Qty Plan

Erection
90%
1

Test
5%
1

Commissioning
5%
1

Percentage
Ls

Ls

0.8

Workstep
Percentage
WF
Ls
Qty Plan
Ls
Qty Actual

Erection
90%
1
1

Test
5%
1
0.9

Commissioning
5%
1
0.8

Workstep
Percentage
WF
Ls
Qty Plan
Ls
Qty Actual

Erection
90%
1
1

Test
5%
1
1

Commissioning
5%
1
1

Workstep
Percentage
WF
Ls
Qty Plan
Ls
Qty Actual

Erection
90%
1
0.85

Test
5%
1
0.8

Commissioning
5%
1
0.4

Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF

Erection
90%
36
33
Erection
90%
1
0.85
Erection
90%
1
0.9
Erection
90%
1
0.3
Erection
90%
1
0.3
Erection
90%
1
0.3
Erection
90%
1
0.3
Erection
90%

Test
5%
1
0.7
Test
5%
1
0.3
Test
5%
1
0.4
Test
5%
1
0
Test
5%
1
0
Test
5%
1
0
Test
5%
1
0
Test
5%

Commissioning
5%

Percentage
Ls
Ls
Percentage
Ls
Ls
Percentage
Ls
Ls
Percentage
Ls
Ls
Percentage
Ls
Ls
Percentage
Ls
Ls
Percentage
Ls
Ls
Percentage

Qty Actual

Commissioning
5%

Commissioning
5%

Commissioning
5%

Commissioning
5%

Commissioning
5%

Commissioning
5%

Commissioning
5%

Ls
Ls

Qty Plan
Qty Actual
Workstep
Percentage
WF
Ls
Qty Plan
Ls
Qty Actual
Workstep
Percentage
WF
Ls
Qty Plan
Ls
Qty Actual

1
0.3
Erection
90%
1
0.3
Erection
90%
1
0

1
0
Test
5%
1
0
Test
5%
1
0

Workstep
Percentage
WF
Ls
Qty Plan
Ls
Qty Actual
Workstep
Percentage
WF
Ls
Qty Plan
Ls
Qty Actual

Erection
90%
1
1
Erection
90%
1
1

Test
5%
1
1
Test
5%
1
0.9

Commissioning
5%

Workstep
Percentage
WF
Ls
Qty Plan
Ls
Qty Actual
Workstep
Percentage
WF
Ls
Qty Plan
Ls
Qty Actual
Workstep
Percentage
WF
Ls
Qty Plan
Ls
Qty Actual
Workstep
Percentage
WF
Ls
Qty Plan
Ls
Qty Actual
Workstep
Percentage
WF
Ls
Qty Plan
Ls
Qty Actual

Erection
90%
1
1
Erection
90%
1
1
Erection
90%
1
1
Erection
90%
1
1
Erection
90%
1
1

Test
5%
1
1
Test
5%
1
1
Test
5%
1
0.9
Test
5%
1
0.8
Test
5%
1
1

Commissioning
5%
1
0.2
Commissioning
5%

Workstep
WF
Qty Plan

Erection
90%
1

Test
5%
1

Commissioning
5%
1

Percentage
M

Commissioning
5%

Commissioning
5%

Commissioning
5%
1
0.3

Commissioning
5%
1
0.3
Commissioning
5%
1
0.2
Commissioning
5%

Qty Actual
Workstep
Percentage
WF
Ls
Qty Plan
Ls
Qty Actual
Workstep
Percentage
WF
Ls
Qty Plan
Ls
Qty Actual

0.9
Erection
90%
1
0.9
Erection
90%
1
0.9

0.9
Test
5%
1
0.9
Test
5%
1
0.9

0.8
Commissioning
5%
1
0.8
Commissioning
5%
1
0.8

Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual

Erection
90%
1
0.9
Erection
90%
1
0.9
Erection
90%
1
0.9
Erection
90%
1
0.6

Test
5%
1
0.7
Test
5%
1
0.6
Test
5%
1
0.5
Test
5%
1
0

Commissioning
5%

Workstep
Percentage
WF
Ls
Qty Plan
Ls
Qty Actual
Workstep
Percentage
WF
Ls
Qty Plan
Ls
Qty Actual
Workstep
Percentage
WF
Ls
Qty Plan
Ls
Qty Actual

Erection
90%
1
0.9
Erection
90%
1
0.9
Erection
90%
1
0.6

Test
5%
1
0.7
Test
5%
1
0.7
Test
5%
1
0

Commissioning
5%

Workstep
Percentage
WF
Ls
Qty Plan
Ls
Qty Actual

Erection
90%
1
0.9

Test
5%
1
0.5

Commissioning
5%

Percentage
Ls
Ls
Percentage
Ls
Ls
Percentage
Ls
Ls
Percentage
Ls
Ls

Commissioning
5%

Commissioning
5%

Commissioning
5%

Commissioning
5%

Commissioning
5%

Percentage
Ls
Ls
Percentage
Ls
Ls
Percentage
Ls
Ls
Percentage
Ls
Ls

Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual
Workstep
WF
Qty Plan
Qty Actual

Erection
90%
1
0.9
Erection
90%
1
0.9
Erection
90%
1
0.9
Erection
90%
1
0.9

Test
5%
1
0.5
Test
5%
1
0.5
Test
5%
1
0.5
Test
5%
1
0.5
Checked by
PT. REKADAYA ELEKTRIKA
CONSULTANT

STEVENSON SEBAYANG
Project Manager

Commissioning
5%

Commissioning
5%

Commissioning
5%

Commissioning
5%

Progress (%)
Last Week Incremental This Week

ement

78.00%

#VALUE!

83.50%

100.00%

0.000

100.00%

100.00%

0.000

100.00%

89.50%

0.070

96.50%

86.00%

0.105

96.50%

89.00%

0.100

99.00%

89.00%

0.095

98.50%

100.00%

0.000

100.00%

79.00%

0.035

82.50%

85.17%

0.008

86.00%

68.50%

0.095

78.00%

75.00%

0.080

83.00%

21.00%

0.060

27.00%

21.00%

0.060

27.00%

21.00%

0.060

27.00%

21.00%

0.060

27.00%

21.00%

0.060

27.00%

21.00%

0.060

27.00%

0.00%

0.000

0.00%

100.00%

-0.050

95.00%

87.00%

0.090

96.00%

92.00%

0.040

96.00%

100.00%

-0.050

95.00%

84.00%

0.120

96.00%

74.00%

0.210

95.00%

100.00%

-0.050

95.00%

83.00%

#DIV/0!

#DIV/0!

83.00%

#DIV/0!

#DIV/0!

85.00%

#DIV/0!

#DIV/0!

84.00%

0.005

84.50%

81.00%

0.030

84.00%

71.00%

0.125

83.50%

42.00%

0.120

54.00%

84.00%

0.005

84.50%

84.00%

0.005

84.50%

42.00%

0.120

54.00%

74.00%

0.095

83.50%

74.00%

0.095

83.50%

74.00%

0.095

83.50%

74.00%

0.095

83.50%

74.00%

0.095

83.50%

Prepared and Submitted by,


PT. HUTAMA KARYA

SLAMET SUPRIYONO
Project Manager