Anda di halaman 1dari 7

Final Report

Review Feasibility Study Lombok CFSPP (2x33 MW)


List of Content

LIST OF CONTENT
REVIEW FEASIBILITY STUDY LOMBOK
CFSPP
(2x33 MW)
Page.
PREFACE......................................................................................... .i
LIST OF CONTENT.........................................................................ii
LIST OF TABLE.............................................................................vi
Chapter 1 ...............................................................INTRODUCTION 11
1.1.

GENERAL........................................................................1-1

1.2.

PURPOSE AND OBJECTIVE................................................1-2

1.3.

METHODS PREPARATION OF FEASIBILITY STUDY................1-2

1.3.1

Data Collection...............................................................1-3

1.3.2

Literature Studies...........................................................1-3

1.3.3

Site Survey.....................................................................1-3

1.4.

SYSTEMATICS DISCUSSION...............................................1-3

1.4.1

Introduction....................................................................1-3

1.4.2

Legality Aspects..............................................................1-3

1.4.3

Aspects of Organization and Management........................1-4

1.4.4

Technical Aspects............................................................1-4

1.4.5

Aspects of Investment Plan..............................................1-4

1.4.6

Financial Aspects............................................................1-4

1.4.7

Conclusions and Recommendations..................................1-4

CHAPTER 2 ..............................................................LEGAL ASPECT. .


2-1
2.1

COMPANYS BACKGROUND.............................................. 2-1

2.2

MAIN ACTIVITIES............................................................2- 1

2.3

ORGANIZATION..............................................................2- 3

2.4

EXPERIENCE LIST............................................................2- 4

Final Report
Review Feasibility Study Lombok CFSPP (2x33 MW)
List of Content

CHAPTER 3.......................SITE CONDITION AND SITE INVESTIGATION 31


3.1.

Background....................................................................3-1

3.2.

Regional Geology And Seismicity......................................3-2

3.2.1. Geographical Condition...................................................3-2


3.2.2. Geological Conditions......................................................3-2
3.2.3. Seismicity.......................................................................3-5
3.3.

Soil Investigation Results................................................3-6

3.3.1. Drilling, SPT and Sampling...............................................3-6


3.3.2. Dutch Cone Penetration Test..........................................3-12
3.3.3. Test Pits.......................................................................3-14
3.3.4. Geoelectric investigation...............................................3-14
3.3.5. Results of Labolatory Tests............................................3-16
3.4.

Recommendation Of Design Parameter...........................3-17

3.4.1. Soil Properties..............................................................3-17


3.4.2. Shear Strength Parameter for Stability Analysis..............3-19
3.4.3. Soil Compressibility and Consolidation Characteristics.....3-21
3.4.4. Embankment Material....................................................3-21
3.5.

Basic Formula For Calculation Of Bearing Capacity...........3-23

3.6.

Settlement...................................................................3-26

3.7.

Shallow Foundation.......................................................3-30

3.8.

Driven Pile....................................................................3-32

3.9.

Liqefaction...................................................................3-41

3.10.

Climatology..................................................................3-43

3.11.

Wind............................................................................3-44

3.12.

Monthly Rainfall............................................................3-45

3.12.1.

Data Availability.........................................................3-45

3.12.2.

Filling Rain Data.........................................................3-46

3.12.3.

Regional Rain.............................................................3-46

3.13.

Bm Installation And Measurement...............................3-48

3.14.

Hydrology & Hydro-Oceanography..................................3-49

3.14.1.

Discharge, Velocity and Fluctuation River Water Level..3-49

3.14.2.

Sea Water Temperature...............................................3-50

3.14.3.

Sea currents..............................................................3-50

3.14.4.

Sea Water Salinity, suspended Sediment, Bottom Sediment351

ii

Final Report
Review Feasibility Study Lombok CFSPP (2x33 MW)
List of Content

3.14.5.

Water Quality.............................................................3-51

3.14.6.

Flood Information.......................................................3-53

3.14.7.

Increase in Sea Water Level.........................................3-54

3.15.
3.15.1.
3.16.

Tidal Forecasting And Wave Hindcasting.........................3-54


Wave Hight Estimates.................................................3-54
Flow And Thermal Dispersion Model...............................3-88

3.16.1.

Large Domain of RMA2 Model......................................3-88

3.16.2.

Small Domain Model of RMA2......................................3-99

3.16.3.

Thermal Disspersion Model of Small Domain...............13-07

3.17.

Conclusion..................................................................13-09

3.18.

Recomendations..........................................................13-10

CHAPTER 4.......CONCEPTUAL DESIGN OF COAL STEAM POWER PLANT 41


4.1

MECHANICAL..................................................................4-1

4.1.1

Boiler.............................................................................4-1

4.1.2

Turbine and Auxiliary.......................................................4-6

4.1.3

Condenser and Cooling System......................................4-11

4.1.4

Water Treatment System...............................................4-15

4.1.5

Waste Water Treatment System.....................................4-17

4.1.6

Coal and Fuel Handling System.......................................4-18

4.1.7

Ancillary System...........................................................4-19

4.1.8

Chemical Supply and System..........................................4-21

4.1.9

Sampling System..........................................................4-22

4.1.10 Chlorination System......................................................4-22


4.1.11 Heating, Ventilation and Air Conditioning System............4-23
4.1.12 Mobile Equipment.........................................................4-23
4.1.13 Lifting Device................................................................4-24
4.2

Electrical System and Equipment....................................4-25

4.2.1

Plant Electrical System..................................................4-25

4.2.1.1

General......................................................................4-25

4.2.1.2

Single Line Diagram....................................................4-25

4.2.1.3

Voltage Level System..................................................4-26

4.2.1.4

Power Plant Auxiliary Power System............................4-26

4.2.1.5

Power plant start-up, Operational and Shutdown..........4-27

4.2.1.6

Power Output Transmission System.............................4-27

iii

Final Report
Review Feasibility Study Lombok CFSPP (2x33 MW)
List of Content

4.2.2

Main Output System......................................................4-27

4.2.2.1

Generator..................................................................4-27

4.2.2.2

Isolated Phase Bus Duct..............................................4-28

4.2.2.3

Generator Circuit Breaker............................................4-28

4.2.2.4

Generator Transformer................................................4-28

4.2.3

Auxiliary Power System.................................................4-29

4.2.3.1

Transformers..............................................................4-29

4.2.3.2

MV and LV Switchgear.................................................4-30

4.2.3.3

UPS...........................................................................4-32

4.2.3.4

DC Systems................................................................4-32

4.2.3.5

Emergency Diesel Generator.......................................4-33

4.2.3.6

Cable And Raceway System.........................................4-34

4.2.3.7

Cable Tray and Conduit...............................................4-34

4.2.3.8

Grounding and Lightning Protection System.................4-34

4.2.3.9

Lighting & Communication System...............................4-35

4.2.3.10 Cathodic Protection System.........................................4-37


4.2.3.11 Protection Systems.....................................................4-37
4.2.3.12 150 kV Substation......................................................4-37
4.2.3.13 Transmission Line.......................................................4-39
4.3

Instrumentation and Control System...............................4-39

4.4

Civil Design...................................................................4-40

4.4.1

Site Preparation Plan.....................................................4-40

4.4.2

Basic Design Concept....................................................4-40

4.4.3

Basic Design Criteria.....................................................4-42

4.4.4

Layout Plan...................................................................4-42

4.4.4.1

Development of Layout Plan........................................4-42

4.4.4.2

Water Intake and Discharge Outlet..............................4-43

4.4.4.3

Steam Turbine Building...............................................4-43

4.4.4.4

Boiler House...............................................................4-44

4.4.4.5

Stack.........................................................................4-44

4.4.4.6

Coal Bunker Bay.........................................................4-45

4.4.4.7

Electrostatic Precipitator............................................4-45

4.4.4.8

Air Compressor House.................................................4-45

4.4.4.9

Fuel Oil Pump House...................................................4-45

4.4.4.10 Fuel Oil Storage Tank..................................................4-45

iv

Final Report
Review Feasibility Study Lombok CFSPP (2x33 MW)
List of Content

4.4.4.11 kV Substation and Substation Building.........................4-46


4.4.4.12 Coal Handling Control Building....................................4-46
4.4.4.13 Crusher House............................................................4-46
4.4.4.14 Transfer Tower...........................................................4-46
4.4.4.15 Belt Conveyor Trestle..................................................4-46
4.4.4.16 Coal Yard...................................................................4-46
4.4.4.17 Fly Ash Silo................................................................4-46
4.4.4.18 Water Treatment Plant................................................4-46
CHAPTER 5............................................PROJECT COST ESTIMATION. .
5-1
5.1.

GENERAL........................................................................5-1

5.2

PROJECT COST ............................................................... 5-1

5.3.

CONTRUCTION COST....................................................... 5-2

5.4.

Non - Construction Cost...................................................5-2

CHAPTER 6 FINANCIAL ANALYSIS...............................................6-1


6.1.

APPROACH AND MAIN ASSUMPTION..................................6-1

6.2.

Structure of Electricity Tarif............................................6-1

6.3.

Capacity ChargeComponent A.........................................6-2

6.4.

Fixed O&M ChargeComponent B......................................6-2

6.5.

Fuel Charge - Component C..............................................6-2

6.6.

Variable O&M Charge - Component D................................6-3

6.7.

BASIS OF FINANCIAL ANALYSIS.........................................6-3

6.8.

SOURCE OF FUND............................................................6-4

6.9.

RESULT OF FINANCIAL ANALYSIS.......................................6-4

6.10.

RECOMMENDATION..........................................................6-4

LIST OF TABLE
v

Final Report
Review Feasibility Study Lombok CFSPP (2x33 MW)
List of Content

Page.
Table 3. 1 Implementation Drilling Information............................3-6
Table 3. 2 Results of Ground Water Measurement........................3-6
Table 3. 3 Consistency and density of soil....................................3-7
Table 3. 4 Amendments to the value of N SPT field (modified from Youd
and Idriss, 1997)..........................................................3-8
Table 3. 5 Standard penetration test results - SPT, the NSPT value of
field and corrected value NSPT......................................3-8
Table 3. 6 Extraction of Soil Undisturb Sample Results...............3-11
Table 3. 7 Fine grained of Soil...................................................3-12
Table 3. 8 Granular of Soil........................................................3-12
Table 3. 9 Implementation of information and well test (Test Pits)3-14
Table 3. 10 The interpretation of Resistivity is correlated with the core
drilling data...............................................................3-14
Table 3. 11 The Result of geo-electrical Resistivity.....................3-15
Table 3. 12 Summary of Laboratory Test Result..........................3-16
Table 3. 13 Recapitulation of laboratory Test Pit Sampel.............3-22
Table 3. 14......................................................Soil Compaction Test 322
Table 3. 15 Standard Penetration Test (SPT) Classification of Soil in
Accordance with ASTM Standard D2487.......................3-23
Table 3. 16 Relationship between, Penetration Resistanc, Cone
Resistance, Relative Density and Friction Angle for
Cohesionless soil (Meyerhof, 1956)..............................3-24
Table 3. 17.......Internal friction Angle and Cohesion for Embankment 324
Table 3. 18 Determination of Allowable Bearing Capacity from
Experience.................................................................3-25
Table 3. 19 Allowable bearing capacity in each layer..................3-26
Table 3. 20 Terzaghis Bearing Capacity Factor...........................3-31
Table 3. 21.....................................K and Value (Tomlinson, 1986) 334
Table 3. 22 pb Value.................................................................3-37
Table 3. 23 BM points...............................................................3-49
Table 3. 24 Current Velocity and WaterLevel Fluctuation Babak River349
Table 3. 25 Sea Water Temperature...........................................3-50

vi

Final Report
Review Feasibility Study Lombok CFSPP (2x33 MW)
List of Content

Table 3. 26.......................................Sea Flow Velocity and Direction 350


Table 3. 27 Results of salinity and suspended sediment..............3-51
Table 3. 28 Result analysis of bottom sediment grain.................3-51
Table 3. 29 Laboratory Test Result of water quality river Babak 3-52
Table 3. 30 Laboratory Test Result of

water quality of Dug Well 3-53

Table 3. 31 Fetch Calculation of Lombok Site.............................3-56


Table 3. 32 Significant Wave Height At Lombok Site From Hindcasting 358
Table 3. 33 Frequency Analysis of Hindcast Wave Based on Selaparang
Wind Data..................................................................3-59
Table 3. 34 Predicted Waves.....................................................3-60
Table 3. 35 Zone Distribution Area Coverage Observations Indonesian
Waters.......................................................................3-61
Table 3. 36 Tidal Constituent of Tidal forecasting from AWLR Survey371
Table 3. 37 Important Tidal Water Level at Lombok Site from AWLR
Surveys....................................................................3-71
Table 3. 38 Tidal Constituent of Tidal forecasting from Peilschaal
Observation Survey....................................................3-74
Table 3. 39 Tidal Type..............................................................3-74
Table 3. 40 Important Elevation at Lombok Site from AWLR Surveys376
Table 3. 41..................Wind Frequency Analysis in Storm Conditions 383
Table 3. 42 The wind speed in determining the Storm Surge Plan 3-83
Table 3. 43 Calculation of Water Surface Height Due to Storm Surge385
Table 3. 44 Set up the calculation of water surface area due to wave
breaking....................................................................3-86
Table 3. 45 Final Elevation Calculation - Final Ground Level (FGL)(CERC
Method).....................................................................3-86
Table 3. 46 Wave Set-up Calculation..........................................3-87
Table 3. 47 Wind Set-up Calculation..........................................3-87
Table 3. 48 Comparison between CERC and Bambang Trihatmojo
method using the same Data (Wind Selaparang Station hourly
from 2005 to 2009).....................................................3-88

vii

Anda mungkin juga menyukai