SCHEDULE "A"

'" ". .. ... .ASlf


\ Saudi EJectricity Company
e-mpowenng Euersy
CONTRACT NO. 31121016/00
intervals, CONTRACTOR shall revise the WORK SCHEDULE to
include the effect of Changes (as defined in Paragraph 16.1 of this
Schedule "A") and to reflect actual WORK progress. CONTRACTOR
shall regulacly prepare schedule forecasts that predict the actual
date(s) of design and fabrication completion, Technical Completion
as defined in Paragraph 17.3 of this Schedule "A" and Final
Acceptance as defined in Paragraph 17.8 of this Schedule "A", and
any separable portions thereof specified by COMPANY, plus the
occurrence of any Critical Milestone Dates listed in Attachment 1I to
Schedule "6".
13.2.2 CONTRACTOR shall promptly notify COMPANY of any anticipated or
actual slippage in the performance of the WORK as compared to the
WORK SCHEDULE to enable COMPANY and CONTRACTOR to
promptly initiate appropriate remedial action.
13.3 Progress Repprts
CONTRACTOR shall provide COMPANY with a monthly report on the progress
of production, fabrication and execution, as specified In the Scope of Work
and Technical Specifications, PTS No. 07EG908.
13.4 Other Reports and Schedules
In addition to the WORK SCHEDULE and reports set forth under this
Paragraph 13, CONTRACTOR shall furnish the COMPANY with other reports
and schedules as stipulated in the Scope of Work and Technical
Specifications, PTS No. 07EG908.
13.S WORK Progress Meetings
WORK progress meetings shall be held regularly between COMPANY and
CONTRACTOR in accordance with the provisions of the Scope of Work and
Technical Specifications, PTS No. 07EG908.
13.6 Twenty-tour (24) Hours NotjC!! tor WORK beyond Normal Workjoa
.I:Isl\i[I
Should it be necessary for CONTRACTOR to work other than its normal
working hours as shown on the WORK SCHEDULE, then CONTRACTOR shall
give COMPANY a minimum of twenty four (24) hours written advance
notification In each instance.
13.7 CONTRACTOR pemobilization Plan
Not less than sixty [601 calendar days prior to the date CONTRACTOR
anticipates Final Acceptance of the WORK, CONTRACTOR shall submit to
COMPANY REPRESENTA TIllE a plan for demobilizing from the WORK SITE.
Said Plan shall provide coverage for start-up and commissioning assistance.
Start-up and commissioning assistance by CONTRACTOR shall be provided
during the warranty period and shall not be continued beyond the warranty
period except for remedying of warranty defects.
13.8 Updating the WORK SCHEDULE aDd Other Reports
Neither the updating of CONTRACTOR's WORK SCHEDULE, nor the
submission, updating, change or revision of any other report or schedule
submitted to COMPANY by CONTRACTOR under the CONTRACT nor
A-19
Qurayyah Combined Cycle Power PIlJlnt,. Extension 1 [Block 6J