Project: Development of Palm Deira Client: NAKHEEL

Main Contractor: ZSML MEP Contractor: BBAE


METHOD STATEMENT O !NSTALLAT!ON O !NS"LAT!ON ON D"CT#O$K
!NSTALLAT!ON O !NS"LAT!ON ON D"CT #O$K
%&' SCOPE O #O$K
To define the method of installing closed cell elastomeric insulations of 48-98 Kg/m3 on duct works to ASTM
C34
(&' $ESPONS!B!L!T)
!efore commencement of an" installation acti#it"$ the following %rocedures are re&uired to 'e carried out(
)(* All materials used must ha#e an a%%ro#ed material su'mittal(
)() All works shall 'e installed as %er a%%ro#ed construction drawings(
)(3 All works shall 'e installed in a neat and tid" fashion(
*&' DESC$!PT!ON O #O$K
*&% Preparation #or+ ,- BBAE
!efore the commencement of an" ducting installation the following works are to 'e carried out(
3(*(* Check ductwork to 'e installed as indicated on a%%ro#ed construction drawings(
3(*() Check materials to 'e used ha#e an a%%ro#ed material su'mittal(
3(*(3 Check work area is clean and safe(
*&( !n.tallation Proce/0re
+uct work installation using closed cell elastomeric ru''er insulation of *9mm thick
3()(* Clean the surface of duct(
3()() A%%l" foster adhesi#e 8*-*, or e&ui#alent a%%ro#ed(
3()(3 -i. stuck %ins/ +"rod"ne$ where steel %ins are used$ as in the sam%le cut ends close to the surface and seal
with A 3, . 3, S0-T to co#er with 1, . 1, Alu 2 3lass ta%e(
3()(4 -i. Aerofle. of 48-98 K3/m3 +ensit" ha#ing thickness *9mm as re&uired(
3()( Seal the longitudinal 4oints with self-adhesi#e ta%e of 1) mm wide(
3()(5 6einforce the longitudinal ta%e seal with cross ta%ing at 5,,mm centers with *, mm o#erla% on either
side(
1&' LABO"$2 PLANT 3 MATE$!AL $E4"!$EMENTS
4(* The material shall 'e of a%%ro#ed Manufacturer as %er the material su'mittal(
4() Skilled technicians$ in sufficient num'ers$ shall carr" out the installation(
4(3 The workmanshi% shall 'e maintained at all times(
5&' S"PE$6!S!ON A$$AN7EMENTS
(* A constant su%er#ision '" the foreman and su%er#isor shall 'e carried out in order to control the work and
the workmanshi%(
() 7.%erienced su%er#isors shall 'e a%%ointed to carr" out the work smoothl" and to ha#e the full control of
the la'our(
8&' TEMPO$A$) #O$KS TO BE DES!7NATED AND !NSTALLED&
8/A
9&' HEALTH AND SAET) $E4"!$EMENT
9&% 7nsure work area is clean and tid"(
9&( 7nsure the work Area is well #entilated(
9&* All em%lo"ees shall ado%t safe working %ractices(
9&1 Safet" e&ui%ment 9e.am%le :ard :ats$ Safet" Shoes$ Co#eralls$ 3lo#es$ 3oggles when necessar" etc(; to
'e worn at all times(
:&' EN6!$ONMENTAL $E4"!$EMENTS
8(* A safet" officer shall ensure that the la'our has a good working en#ironment$ a ha<ard free en#ironment(
8() The en#ironmental changes and the climatic e.tremes shall 'e recorded and necessar" ste%s shall 'e taken
'" the site safet"$ in order to %re#ent an" incident due to climatic e.tremes(
;&' SEC"$!T) A$$AN7EMENTS
8/A

%'&' SPEC!!C CONT$ACT"AL OBL!7AT!ONS&
*,(*() Technical S%ecifications Mechanical S"stems( Section *,83
%%&' $EE$ENCE DOC"MENTS
**(* 6ele#ant drawing issued for construction
**() Technical S%ecifications Mechanical S"stems( Section *,83
%(&' $ECO$DS TO BE P$OD"CED
%(&% 4A < 4C Doc0ment.<Proce/0re
Prepare/ ,-: K& Lin=anna $evie>e/ ,-: Caner Tona+ Approve/ ,-: Caner Tona+
Si=nat0re: Si=nat0re: Si=nat0re: