Anda di halaman 1dari 14

1

CURRICULUM VITAE
September 2010


JAVIER L. MUHI
Registered Geologist
PRC No. 000692
Mobile No. 0939-3036825




1.0 PROFESSIONAL EXPERIENCES AND QUALIFICATION

1.1 Synopsis of Experience:

Have gained more than 30 years of wide range of hard-earned experiences in exploration
Geology, ENGINEERING GEOLOGY and ENVIRONMENTAL GEOLOGY in
application and as required for various engineering geology including works in post-
environmental and hydrological mining problem:

EXPLORATION GEOLOGY in search/ prospering of metallic deposits such as
gold-copper silver/ lead, iron, manganese, chromites and other related valuable
mineral including nickel lataterites, coal. Silica with related works in Mining
Geology/ Engineering
ENGINEERING GEOLOGY in application as required for pre-construction and
post-construction of land and water based engineering infrastructures projects. Water
based infrastructures engineering such as hydro-electric, irrigation dam and canal,
Multi-purpose dam and flood control scheme, power barge mooring site/ pier
facilities. Land based power engineering projects such as transmission lines and
substation, diesel and coal fired thermal projects, bridges, water storage reservoir, tall
rise building, housing, and subdivision, eco-tourism park with related works in
Geotechnical Engineering and Hydrological study.


1.2 Working experiences and Specialization

Exploration Geology includes works in Nickel Laterites and Coal Geology
Exploration
Engineering geology with related Geotechnical Works:
o Dam Engineering
o Geotechnical Engineering/ Foundation Geology
o Tunneling Support Evaluation (NGI Method
o Grouting


2
o Land Formed terrain Classification
o Slope Stability Analysis
o Hydro Geology and Deep Well Drilling Development
Environmental geology
o Geo-Environmental Engineering
o Preparation of Environmental Study Report
o Environmental Impact Assessment (EIA)
o Environmental Impact Statement (EIS)
o Engineering Geology and Geo Hazard Assessment (EGGA)
o Environmental Compliance Certificate (ECC)
o Environmental Geological Statement (EGS)

2.0 EMPLOYMENT RECORDS
2009 Present
Self-Employed

Pre lance Geologist: As a need arises consulted by various mining firm, foreign investors and
businessman engaged in mining exploration and engineering contractors in Zamboanga Peninsula,
Iligan City, and Lanao Provinces:

Projects of Involvement:
HDS Natural Resources Mining Corporation, Tigpalay Manganese Project, Tigpalay,
Tungawan, Zamboanga Sibugay
Consulting Exploration Geologist: Evaluates and assess the geology and mineralization of
the Manganese Ore Deposit in the mining claim of said Korean Firm.
City Life Ore Incorporated, Kamalaran Iron Project, Kamalaran, Zamboanga Sibugay
Consulting Exploration Geologist: Evaluates and assess the Geology and Mineralization of
the iron deposit in the mining claim of the said firm for the Magnetic Survey Tests to be
undertaken
KWANGMING Mineral Co., Inc., Port Lamao, Lilog, Zamboanga Sibugay. Contributes in
the preparation of Exploration Program for the application of Coal Blocks 41-H-150, 151,
and 152, located at Naga, Zamboanga Sibugay. To be designated a one (1) of Technical Men
to handle the field operation when COC Exploration is to start.
GERONA ENTERPRICES, Iligan Ecotourism/ Paradise Inn Project, Mimbalut, Buruan,
Iligan City
Consultant: in the preparation of Engineering Geology and Geohazard Assessment (EGGA)
as required for issuance of Environmental Compliance Certificate (ECC) by DENR-MGB.
SIBUGAY TECHNICAL SCHOOL, Ipil, Zamboanga Sibugay.
Consultant: For the Foundation Geology of five (5) story Expansion Building and Additional
Deep Well Drilling Development another sources of potable water supply for the school
premises and compound.
Conducts Geological Assessment and Mineralyzation of Ore Deposits including Coal
Geology in the following prospects areas:
o Mabini Coal Prospects, Mabini Titay, Zamboanga Sibugay
o New Dapitan Manganese Prospects, Tampilisan, Zamboanga del Norte
o New Calamba Manganese Prospects, New Calamba, Gata, Zamboanga del Norte
o Nuburan Iron Project, Nuburan, Labangan, Zamboanga del Sur
o Little Baguio Copper Prospects, little Baguio, Kabasalan, Zamboanga Sibugay
3
3.0 PAST EMPLOYERS
2000 2009

3.1 Mining Firm And Trading:

GEOEARTH MINING AND DEVELOPMENT CORPORATION, Sanghanan Iron
Project, Sanghanan, kabasalan, Zamboanga Sibugay
Field Operation In-Charge and Chief of Exploration:
o An open pit mining operation for iron deposit of mining the Skarn type/ iron
deposit with associated copper, mineral and silver. Further explored the adjacent
mining claim area for expansion of company mining operation if viable.

- Sim Gamay Iron Prospect
- Red Iron Prospect
- Mati Iron Prospect
- Almasiga Iron Prospect
Sanghalan, Kalabasa, Zamboanga Sibugay

CANADIAN EAGLE MINING CORPORATION:

o COPPER-GOLD PROJ ECT, Tagoloan, Lanao del Sur
Mine Project Coordinator and Geologist-In-Charge:
1. With partnership with AL-FAJ R Mining Development Corporation, under
Phase II Geological Exploration works covering 4,000 hecatares and more
of Exploration Permit Area No. EPA 41 ARMM 2005, did supervision and
monitoring the exploration, propecting, geological mapping and rock
sampling, trenching being undertaken by the contractor of the aforecited
mining firm.

ULYSSIS MINING AND DEVELOPMENT CORPORATION:

o CANDIZ COAL EXPLORATION PROJ ECT, Candiz, Siocon, Zamboanga del
Norte
Resident Geologist and Chief of Exploration:
1. Geological Mapping of three (3) Coal blocks claim covering 3, 000 hectares,
at Candiz, Siocon, Zamboang Sibugay to ascertain the coal deposit in each
coal block which includes, coal sampling for laboratory tests and calculated
the Estimated Reserved in each coal blocks and likewise made the work
program for the Phase II exploration works.

o BUNAWAN COAL MINING OPERATION, Bunawan, Gudod, Zamboanga del
Norte
Resident Geologist and Asst. Operation Manager:
1. Re-Assessment of the coal deposit beneath coal blocks 1, 2, 3 prior to
resumed mining operation.
2. Conducted geological mapping between the boundary limits of coal blocks
1, 2, 3 to ascertain the continuity of coal seam for future mining operation/
expansion if viable to operate.
4

o ALICIA GOLD PROSPECT, Milagrosa, Alicia, Zamboanga Sibugay
1. Conducted geological mapping, rock sampling of 300 hectares of mining
claim reportly have gold deposit with associated copper mineral as company
venture for another mining projects.
2. Geological Assessment and report writings.
VERDANT VALLE MINING
o NICKEL LATERITES PROJ ECT PHASE 1, Impasugong, Bukidnon
Sr. Geologist/ Chief of Exploration:
1. A 200 blocks of mining claim of nickel laterites with associated mineral of
chromite and copper, together with co-geologist and mappers conducted
geological mapping to identify the nickel laterites bearing rock formation,
and subsurface exploratory tests to ascertain the depth thickness of nickel
lateritic soil and sapphrolite layer. Made the sampling for one (1) meter
interval and test the sample using X-Ray Innovex Gun.

J IREH MINING, Iligan City
Consulting Exploration Geologist:
1. Made geological assessment of the open pit mining at manganese deposit
suddenly disappeared below a certain meter depth from the ground of the
pit. Suggests additional drill holes to confirm the presence of manganese
vein below at deeper depth of the pit.
2. Continuation of geological aping in nearby creek for possible exposed of
manganese outcrops that previously mapped in the mining pit.
3. Geologic assessment of Silica Deposit in Sultan Naga, Dimaporo for
possible venture to other mineral deposit of the company if viable.

AL FRANCIS TRADING, Zamboanga City
Consulting Exploration Geologist:
1. On their gypsum mine in Zamboanga City evaluated, and assessed the
temporary suspension of the mining of gypsum vein in site Pulang-Lupa and
likewise the reported multiple gypsum vein system in site Patalon Area this
City.

AL-FAJ R MINING DEVELOPMENT CORPORATION
o COPPER-GOLD PROJ ECT PHASE 1, Tagoloan 2, Lanao del Sur
1. Contracted Phase 1 Geological Exploration Survey Works of 16,200
hectares of Mining claims at the said company together with the co-
geologist involved in the mining project performed the following contract
works; to wit:
a. Research Works
b. Regional Survey
c. Rapid reconnaissance survey
d. Lithological and rock sampling
e. Logging of rocks, mineral samples for laboratory analysis
f. Sample location, plotting and lithologic data input
g. Data compilation, map preparation, and laboratory analysis
h. Report writing and documentation
5

3.2 Post Hydrological And Environmental Problem

o Philippine Eagle Mining Corporation (1984 1985)
Larap Camarines Norte
Engineering Geologist of Integral Chemical Company for Post Hydrological
Mining Problem on mining the rich gold deposit below the sea water elevation
o Marcopper Mining Corporation
Sta. Cruz, Marinduque
Technical Consultant of Dodie Zuleta Consultancy and Associates
Pertaining to hidden facts concerning the environmental damage effect of alleged
pollution of Boac River attributable to spillage of mine waste water as requested
by Ateneo de manila University Social Department

3.3 Consultancy Geotechnical And Environmental Firms
1999-2000

Geozite Environs Tech. Company
Cagayan de Oro City
Supervising Geologist
Project Involved: Housing Project in Macasandig, Cagayan de Oro City that requires
Engineering Geology and Geohazard Assessment Study

CMA Geoconstruct
Cagayan de Oro City
Consulting Engineering Geologist and Staff Officer
Project Involved:
1. CMA survey and prospectd of small and large scale mining, Misamis Oriental
and Bukidnon
2. Geological and Geotechnical Investigation of Butig Diversion Dam, Butig.
Lanao del Sur
3. Bukidnon Economic Ecozone Project, Bukidnon Province

CMA geoservice and Construction Corporation
Cagayn de Oro City
Consulting Engineering Geologist/ Project Geologist
1. Geological and Geotechnical Investigation of Balo-i Plain Flood Control
Project, Balo-I, Maria Cristina, Lanao del Norte of National Power
Corporation
2. Drilling and Grouting Works of the construction of Buyongan Dam/ Bohol
Site of National Irrigation Administration
3. Marawi City Deep Well Development Project

Mandrel Geotechnical Company
Tandang Sora, Quezon City
Engineering Geologist and Project Representative
Project Involved: 230KV Extra High Voltage Transmission Line Towers (EHV) of
National Transmission Corporation covering Laguna and Batangas Provinces.
6
As a Project geologist and Sub-Contractor Field Representative of 500 KV Iligan
Cut In Point T/L Project, Batangas and Laguan Provinces under contract by Sumitono
Electric Company, Ltd. Project of the National Transmission Corporation, responsible
for field implementation and supervision of manual/auger with SPT drilling of 149
Towers and soil logging analysis. Prepared descriptive logs and site geological
mapping of individual tower sites and Project Geological/ Geotechnical Report.


4.0 EMPLOYMENT RECORD HELD IN THE LOCAL GOVERNMENT UNIT

Iligan City Water District
Palao, Iligan City
Environmental Specialist
Project Involved:
1. Pugaan Potable Water Supply Project Support the Agrarian Communities in
Central Mindanao (STARCM), Pugan, Iligan City
2. Maria Cristina Deep Well Drilling Evaluation and Assessment, Maria Cristina,
Iligan City
3. Proposed Mandulog River Deep Well Development, Mandulog, Iligan City
4. Proposed Slaughter House Deep Well Drilling Development, Iligan City
5. Mandulog River Methodology and Implication of quarrying river bed deposit with
regards to the flooding of the said river, Hinaplanon, Iligan City
6. Geological Assessment of proposed City 650,000 gallons Reservoir Project,
Luinab, Iligan City
7. Rapid Geohazard Assessment of the reported cracks, uphill slope of Abigail Home
Subdivision, Iligan City


5.0 EMPLOYMENT RECORDS HELD IN THE GOVERNMENT CONTROL
CORPORATION
1976 1998
Since December 1998
Retired Government Employee
National Power Corporation

April 1, 1998 August 31, 1998
Acting, Principal Engineer A/
Section Chief, Geoscience Services Division (GSD)
Mindanao Engineering Resource Service Dept.
Engineering Pre-Construction Group (EPCG)

1992-1998
Principal Geologist B
Geoscience Division Mindanao
Engineering Resource Dept.

1985-1992
Senior Engineer / Geologist
7
Engineering Technical Services Div. (ETS)
Geology and Geotechnics Sec.
1979-1985
Geologist, Project Development Dept. (PDD)
Geology and Geotechnics Div. (GGD)

Nov. 1976 - Dec. 1979
Geological Trainee, Project Development
Development (PDD) Project Investigation Division (PID)
Geology Sect., National Irrigation Administration

5.1 Project Position Obligation/ or Responsibilities
National Power Corporation
Mindanao Regional Center
Maria Cristina, Iligan City

1997-1998
90 MW Agus III Hydro Electric Project
Pantar, Lanao del Norte
Designated Project coordinator and geologist Consultant Counterpart for the Feasibility
Study of Surface Powerhouse Scheme of the said project with SNC-LAVALIN Consultant. In
behalf of NPC Mindanao, in charge of all quality control works done by NPC-MERSD and
coordinator all site investigating activities such as:
Surveys
Geological and Geotechnical Mapping
Selection of sample for Laboratory Testing
Description of Logs
Budget ITEMIZATION and COST related preparatory works for both seismic
refraction works at Agus III
Logs description, geologic report, geological sections and drawing

1996-1997
Bulanog-Batang and Pulangi V Hydroelectric Power Projects
Bukidnon Mindanao
Designated as one of the Technical Consultant Counterpart for Upgrading / Review and
Definite Design Study of both projects for Geological, Geotechnical, Foundation and
Material test investigating in compliance with NPC Contract for consultancy services with
joint venture of ELC Electroconsult and SNC-LAVALIN International. Responsible / tasks
to closely monitor, assist, guide the J V in the implementation of Field Investigation and
Material for the said power projects obtained by drilling and also assists the Consultants in
the preparation of project feasibility study report.

Specifically designated to investigates the sources of construction material to be used for
RCC Dam

5.2 Other NPC Power and Plants Investigated
: 1980-1998
Tagore Hydro-Electric Project, Feasibility Study
8
Impasugong, Bukidnon
Together with site geologist and geotechnical engineers involved in the Geotechnical
Mapping, Assessment and Evaluation of the rock condition along the 10 km. Power
tunnel line of the said project including the foundation on the rock's condition on the 5
alternative power house sites.

: Agus River Complex Hydro-Electric Project
Ma. Christina, Iligan City, Lanao del Norte
Selected as one of the Task Force in the Study of the Geological Statement for the
Environment Aspects of Agus River Basin together with the NPC Mindanao Engineers
and Geologist from Design and Development Services Dept. (DDSD) and Engineering
Resources Department (ERSD).

: Mindanao Hydro Potential Study
Mindanao Island
Reconnaissance Geological Study of various rivers and places in Mindanao for small
hydropwer projects development.

Quipit River, Zamboanga del Norte
Sindangan River, Zamboanga del Norte
Kulaong River, South Cotabato
Banga River, Davao del Norte
Cateel River, Davao del Norte
Sumlog River, Davao del Norte
Libungan River, North Cotabato
Balatocan River, Misamis Oriental

: Mindanao Coal Fired Power Projects Alternative Sites Mindanao Island
Site Selection Survey and Reconnaissance Investigation Mapping for the final location of
Mindanao Coal Fired Thermal Plant at Surigao and Davao Provinces together with NPC
Diliman, Planning Engineers.

: General Santos and Aplaya Diesel Power Plants
General Sanots City, South Cotabato and Aplaya, J assan, Misamis Oriental
Conduct Inspection/ Investigation of the nature and caused of cracks along the engine
foundation block of the said power plants.

: 138 KV NPC Mindanao Transmission Lines Mindanao Island
In connection with the damage/ collapsed 168KV Steel Towers erected in unfair geologic
hazard conditions along fault lines/ zones, slide prone areas, alluvial bar and river banks
subjected to flooding the following steel towers investigated were:

Tower Nos. KA 14 and 11 138 KV Kibawe Davao T/L
Tower Nos. KA C- 190 and 191 138 KV Aurora Kabasalan T/L
Tower Nos. BC 90, and 93 138 KV Bislig Cuevas T/L
Tower Nos. T/L 190, 191, and 192 138 KV Tagoloan Lugait T/L
Tower Nos. AS 95, 94, 161, 74, 75 161, 154, 54, 53, 31, 76, and 77 138 KV
Anislagan Ampayon Butuan Surigao T/L
9
Tower Nos. AB 17, 84, and 85 138 KV Ampayon Badas T/L
Tower Nos. KA 91, 92, 64 and 65 138 KV Kauswagan Aurora T/L

Note: The participation of Geologist during the construction of Tower was not given
importance hence, some towers were situated in unfavorable geologic condition.

In connection with the water requirements of some NPC Power Plants and Substation to
augment the steady water supply of the following deep-well had been investigated.
Olongapo Substation, Olongapo City
Recudo Deep-well Drilling Development, Recudo Zamboanga City

: 1993-1996
Staff Geologist , Geoscience Services
Div. Mindanao Engineering Resource Services Department
Monitoring all power projects being undertaken by Mindanao Engineering Resource
Services and guide/ assists various contractors and foreign consultant engaged in the Pre-
Feasibility Construction of Power projects in Mindanao. Review/ check and commented
all project geological and geotechnical Engineers for inclusion in the power technical pre-
feasibility, feasibility report for submission to NPC Top Management.

: 1986-1992
300MW Pulangi V Hydro-Electric Project
President Roxas, North Cotabato
Designated Officer In-Charge for the Site Geological / Geotechnical Investigation for pre-
feasibility, feasibility study of the said project and closely assist/ guided SNC-
LAVALIN International Consultant in the various field investigation programs.

: 1985-1986
200MV Mindanao Coal Fired Thermal Project
Lianga, Surigao del Norte
Designated as Head for the Geological Plane Table Survey/ Mapping for the selected site
location of the said project. Also responsible for the logging analysis for core samples
obtain by diamond drilling operation and tests pit and guided / coordinated with other
NPC Technical Staff involved in the investigation for the said project.

: 1985 Agus III Hydro-Electric Project
Pantar, Lanao del Norte
Designated as one of the Geological Consultant Counterpart for the review of Geology of
90MW Underground Power House Scheme of Agus III Project with Dr. Peter Morris,
Consulting Engineering Geologist, Shawinigan Consultant.

: 1983 1985 (22 months)
ABRA RIVER BASIN Feasibility Study BINONGAN Hydro-Electric Project ABRA
Selected by the technical training division, Human Resources Department of NPC as one
of NPC Trainees to undertake On the J ob Training (OJ T) under the guidance of
Shawinigan Consultant with Dennis Creamer as Designated Project Manager Assisted
coordinated and provided the Geological and Geotechnical Engineers Mr. Allan Graves,
Geological Expert and Dr. Arumpalan Senthivel, Geotechnical Expert. The necessary
10
geological information and data for the assessment / evaluation foundation rocks along
the location of the dam, power way, and power house includes seismicity study of the
project are vicinity.

: 1982-1983
Detailed at Mindanao Geolgoy and Geotechnics Manager Office NPC Iligan
City as one of the Geotechnical Staff assisting the Geotechnics Manager in evaluation /
assessment and checking of field geological data submitted by Project Geologist /
Geotechnical Engineer such as descriptive and geologic maps and section of on going
construction and feasibility power projects.

: 1981-1982
90MW PULANGI III Hydro-Electric Power Project
Lumbayao, Valencia Bukidnon
Designated as Officer In-Charge in the Feasibility Study of the said power project. Also
provides the Engineering Development Consultants of the Philippines (EDCOP) the
necessary geological data needed in the preparation of Project Feasibility report of the
shifted dam site and other appurtenance structure sites.

Designated also Officer In-Charge for additional site geotechnical investigation of 240
MW Pulangi IV Hydro-Electric Project for the power intake to Powerhouse site of the
said project site handing two (2) power project at the same time and year.

: 1980 1981
Same power project as mentioned above in year 1981-1982. Designated as Resident
Geologic and Unit Head of Plane Table Survey / Geologic Mapping doing semi-detailed
to detailed geological mapping of rock exposures outcropping the shifted dam site
location. Also prepare descriptive and graphical logs of the soil and core samples.
Agus I Deep-well Drilling Development, Marawi City
Pulangi, IV Substation Maramag, Bukidnon
J olo Diesel Plant, J olo, Sulu

In connection with the mooring site facilities in Mindanao Island the following sites were
investigated at Maco Mooring Site Facilities, Maco, Davao del Norte and Taguilon
Mooring Site Zamboanga del Norte. The scope of work includes of logging analysis and
checking review of SPT Data, geological map and drawings.

5.3 Special Project Assignments

Geotehcnical Investigations of the follwing microwave tower backbone station to together with
NPC-SCADA Drilling Crews conducted at:
: Recudo, Zamboanga City
: Talon-Talon, Zamboanga City
: Aplyaa, Misamis Oriental
: Butuan Substation, Butuan City
: Tindalo Submission, Davao del Norte
: Carmen Substation, Cagayan de Oro
In connection with the Feasibility Study of Tuburan Coal Fired Thermal Project, Tubaran Cebu,
11
together with NPC-VERSD Drilling Crews, Conducts geological and geotechnical investigation
which consists of geological mapping and core logging analysis and test pits evaluations.
Prepared also geological and geotechnical feasibility study report of the project.

Brief Sen. Gloria Macapagal Arroyo, now the President of the Philippines regarding the status of
hydro power development in Bukidnon in particular of the study of Pulangi river basin Hydro
power Complex Project.

In connection with the Water suppky requirements of Iligan City, Lanao del Norte as requested
by the Iligan City Water Works District and together with their Civil Engineers, prepared the
geological and hydrogeological study of additional water source supply of the city thru the
Development of the Ditucalan Spring Lines as the additional source of water supply of the city.

Reported movement of Iligan Fault that caused ground cracking which damaged Mabolo Farm
and Five (5) NPC Steel Towers.


6.0 NATIONAL IRRIGATION ADMINISTRATION
EDSA, Diliman, Quezon City

: 1976-1979
With the various irrigation, reservoir and multipurpose dam and irrigation canal of the agency
involved and responsible in the inspection and supervision of drilling exploration under
contracts by private drilling company. Also conducted core logging analysis, water pressure
test data evaluation geological mapping and designated mostly drilling inspector or field site
geologist and NIA Representative of the following irrigation dam projects.

o Quiom Maypalig Reservoir Project Batac, Ilocos Norte with Certeza Drilling
Company
o Papaya Damsite Project Gen. Tinio, Nueva Ecija with Geotechnics of the Philippines
Drilling company.
o Pamacsalan Resrvoir Project, Pamacsalan, Bohol with Engineering Geoscience
Incorporated.
o Palsiguan River Multipurpose Project with Technotest Drilling Company
o Casecnan Transbasin Division Project with Engineering Consultants Inc. of Denver,
Colorado
o Balog-Balog Multipurpose Project with Engineering Geoscience Incorporated


7.0 EDUCATIONAL ATTAINMENT AND BACKGROUND:

: 1
st
Semester1976-1996
Mastert in Management, Major in Human Resource Management
Liceo de Cagayan

: 1
st
Semester 1996-1997
Master in Management, Major in Management Engineering
Liceo de Cagayan

12
: 2
nd
Semester 1996-1997
Master in Management
Liceo de Cagayan

: 1997-1998
Earned 48 units in Master in Management Major in Environmental Management
Liceo de Cagayan University

: 1
st
Semester October 1976-1977
BS Geology, College of Engineering
Adamson University
San Marcelino St., Ermita, Manila

7.1 Civil Service Eligibility

Registered Geologist
PRC No. 000692


8.0 SEMINARS AND TRAINING ATTENDED

120 hrs Seminar Workshop on Geological Exploration organized by Engineering
Geoscience Incorporated

376 hrs. Orientation Seminar organized by ministry of Public Works Transportation
and Communication

8 hrs Seminar on the Salient Features of Magat Hydro-Electric Plant organized by
Shawinigan Consultants

8 hrs Seminar and Lectures on The Geological and Geotechnical Aspects of Magat
Multipurpose Project

Acquired 22 months On the J ob-Training, Abra River Basin, Feasibility Study Phase II
from the period of J anuary 19, 1983 to March 31, 1985 organized by NPC Human
Resource Department Technical Training Division under the guidance of Shawinigan
Consultants of Montreal, Canada. The Training Elements consist of:

A. Engineering Geology
o Data Resources
o Rock Formation and Structures
o Site Reconnaissance
o Aerial Photo Interpretation
o Land Form analysis
o HydroGeology
o Location of Faults
o Seismicity
B. Geotechnical Engineering
13
o Properties of Construction Materials
o Material Investigation and Testing
o Drilling Operation and Logging technique
o Dam Embankment Design
o Underground Excavation (Tunneling Support Evaluation)

C. Seminar in Roller Compacted Dam
(RCC) Conducted by NPC Consultant, RCC Expert

D. Seminar in Recent Development in geology
Conducted by University of the Philippines
Doctorate in Geology Professor

: 42 hrs Live-in-Client Relation Program organized by the NPC Human Resource Department

: 8 hrs Seminar of Magmatic Evolution Dr. Bjorn Mysen

: 16 hrs TQM Awareness Seminar, Huma Resources Department, National Power Corporation.

: 16 hrs Training Seminar on Drilling and Grouting Techniques organized by NPC, Human
Resource Department, Mindanao


9.0 VOLUNTARY WORKS OR CIVIC SERVICES DONE IN THE COMMUNITY

Reconnaissance Survey and did geological study of the proposed two (2) water storage tank
locations in Purok- 7A- Barangay Luniab, Iligan City
Conducted evaluation and assessment of the landslide that will threaten the location of
Cabili High School Building Annex, Sta. Elena, Iligan City. The landslide is so progressive
having circular failure which if not protected will damaged the said school building.
Contributed in the preparation of Brgy. Development Planning (BDP) of Luinab, Iligan
City. Assigned to do the tasks on the present and used and Economics of the said Barangay
last February 2003.
Rehabilitation works of existing spring at Country Hills, Brgy. Luinab, Iligan city last
February 2003.


10.0 SPECIAL SKILLS

Field Geologic Data Interpretation and Evaluation
Preparation of Geologic Map for Exploration and Engineering Geologist


11.0 MEMBERSHIP OF PROFESSIONAL SOCIETIES AND TASKFORCE:

Task Force for the Environmental Study of Agus River Basin, Maria Cristina, Iligan City
(EIA)
Technical Counterpart Mindanao for upgrading the Feasibility Study of Bulanig-Batang
14
and Pulangi-5 Hydro Electric Power Projects, Bukidnon with ELC-SNC Lavalin
Consultants
Geological Society of the Philippines
Liceo de Cagayan Alumni Association
Adamson University Alumni Association
Adamson University Mining and Geology Association


12.0 PESONAL INFORMATION

Name : J avier L. Muhi
Date of Birth : 29 November 1954
Place of Birth : Mogpog, Marinduque
Profession : Geologist
Nationality : Filipino
Permanent Address
: Rizal St., Mogpog, Marinduque
Tel. No. 142-332-3085
City Addresses : Blk. 1, Lot 10 Abegail Subd.
Zone 8 Manggas Del Carmen, Iligan City
Lanao del Norte

1-I Alley 24 Road 1
Project 6, Quezon City
Health Condition :
Very Good


13.0 CERTIFICATION


I, on behalf of my resume, I certify on this day and believe and describe myself, my qualification
and experience. I clearly understand that will full misstatement presented here in my application
will lead to my disqualification or dismissal, if employed.




JAVIER L. MUHI


________________
Date

Anda mungkin juga menyukai