January
February
March
April
May
June
July
August
September
October
November
December
Year (total)
Month
January
February
March
April
May
June
July
August
September
October
November
December
Year (total)
Number of working
hours (h/month)
R 134 a inlet
pressure (bar)
744.00
684.00
744.00
720.00
744.00
720.00
744.00
744.00
720.00
744.00
720.00
744.00
-1.30
1.30
5.50
10.20
14.80
18.00
19.60
18.70
15.10
9.90
4.80
0.30
35.00
35.00
35.00
35.00
35.00
35.00
35.00
35.00
35.00
35.00
35.00
35.00
Qm R134 a (kg/h)
R 134 a inlet
mass flow of ORC
temperature (C)
media
17.96
17.96
17.96
17.96
21.02
24.42
25.50
24.42
21.02
17.96
17.96
17.96
43,360.00
43,360.00
43,360.00
43,360.00
46,960.00
51,800.00
52,230.00
51,800.00
46,960.00
43,360.00
43,360.00
43,360.00
8772
Boiler efficiency
1,800.00
1,800.00
1,800.00
1,800.00
1,950.00
2,151.00
2,169.00
2,151.00
1,950.00
1,800.00
1,800.00
1,800.00
0.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
2,400.00
2,400.00
2,400.00
2,400.00
2,600.00
2,868.00
2,892.00
2,868.00
2,600.00
2,400.00
2,400.00
2,400.00
0.00
Heat duty of
Geothermal heat
exchanger kW
Transfer area of
geothermal heat
2
exchanger (m )
Heat duty of
evaporator
(kW)
Geothermal fluid
volumetric flow rate from
3
production well (m /h)
Outlet temperature of
geothermal fluid in
injection well (C )
Power at
turbine shaft
(kW)
Polytropic
efficiency of
ORC turbine
%
675.00
675.00
675.00
675.00
675.00
675.00
658.10
675.00
675.00
675.00
675.00
675.00
54.29
54.29
54.29
54.29
54.29
54.29
54.29
54.29
54.29
54.29
54.29
54.29
1,800.00
1,800.00
1,800.00
1,800.00
1,950.00
2,151.00
2,169.00
2,151.00
1,950.00
1,800.00
1,800.00
1,800.00
14.40
14.40
14.40
14.40
14.40
14.40
14.40
14.40
14.40
14.40
14.40
14.40
25.00
25.00
25.00
25.00
25.00
25.00
26.00
25.00
25.00
25.00
25.00
25.00
292.30
292.30
292.30
292.30
299.80
310.60
306.90
310.60
299.80
292.30
292.30
292.30
68.02
68.02
68.02
68.02
68.02
68.02
68.02
68.02
68.02
68.02
68.02
68.02
Month
January
February
March
April
May
June
July
August
September
October
November
December
Year (total)
Condensing
pressure (bar)
Condensing
temperature
(C)
Air cooler
duty (kW)
Air inlet
temperature
(C)
5.00
5.00
5.00
5.00
5.50
6.00
6.00
6.00
5.50
5.00
5.00
5.00
15.76
15.76
15.76
15.76
18.77
22.12
23.18
22.12
18.77
15.76
15.76
15.76
2,596.00
2,222.00
2,222.00
2,222.00
2,367.00
2,561.00
2,566.00
2,561.00
2,367.00
2,222.00
2,222.00
2,222.00
-1.30
1.30
5.50
10.20
14.80
18.00
19.60
18.70
15.10
9.90
4.80
0.30
Air outlet
Required power Required
temperature
of centrifugal
power of
(C)
pump (kW)
fan (kW)
4.00
4.00
9.00
14.00
18.76
22.00
23.00
22.00
18.76
14.00
9.00
4.00
38.22
46.72
38.82
38.82
41.71
45.53
45.74
45.53
41.71
38.82
38.82
38.82
79.99
158.55
124.18
116.48
147.53
130.80
155.02
158.92
124.36
107.65
103.20
115.28
Thermodynamic
efficiency of ORC
cycle (%)
1,491,000.00
2,927,000.00
2,258,000.00
2,079,000.00
2,596,000.00
2,276,000.00
2,683,000.00
2,759,000.00
2,299,000.00
1,927,000.00
1,881,000.00
2,136,000.00
7.03
3.52
5.22
5.54
4.21
4.75
3.75
3.76
5.09
5.89
6.07
5.58
5.04
Electricity
production
(MWh)
213.12
195.93
213.12
206.25
218.59
219.16
223.77
226.46
211.54
213.12
206.25
213.12
2,560.44
Electricity production
reduced for own
consumption (MWh)
70.61
-6.39
37.29
36.68
21.84
30.84
17.12
16.38
32.74
49.59
46.24
43.91
396.85
Month
Number of
Average outlet
R 134 a inlet
working hours air temperature
pressure (bar)
(h/month)
(C)
R 134 a inlet
temperature
(C)
Qm R134 a
(kg/h) mass
flow of ORC
media
Transfer area
Heat duty of
of geothermal
Geothermal
heat exchanger heat exchanger
2
kW
(m )
Heat duty of
evaporator
(kW)
January
744.00
-1.30
35.00
23.87
50,950.00
675.00
54.29
2,116.00
February
684.00
1.30
35.00
23.87
50,950.00
675.00
54.29
2,116.00
March
744.00
5.50
35.00
23.87
50,950.00
675.00
54.29
2,116.00
April
720.00
10.20
35.00
23.87
50,950.00
675.00
54.29
2,116.00
May
744.00
14.80
35.00
23.87
52,920.00
590.80
54.29
2,198.00
June
720.00
18.00
35.00
23.87
52,920.00
590.80
54.29
2,198.00
July
744.00
19.60
35.00
23.87
52,920.00
590.80
54.29
2,198.00
August
744.00
18.70
35.00
23.87
52,920.00
590.80
54.29
2,198.00
September
720.00
15.10
35.00
23.87
52,920.00
675.00
54.29
2,116.00
October
744.00
9.90
35.00
23.87
50,950.00
675.00
54.29
2,116.00
November
720.00
4.80
35.00
23.87
50,950.00
675.00
54.29
2,116.00
December
744.00
0.30
35.00
23.87
50,950.00
675.00
54.29
2,116.00
Boiler heat
capacity (kW)
LHV wooden
biomass at 30%
moisture (kJ/kg)
Biomass
consumption
kg/h
Biomass
consumption
t/year
Month
Year (total)
8772
Requested heat
from ORC boiler Boiler efficiency
(kW)
2,116.00
75.00
2,821.33
10,840.00
1,249.30
929.48
January
2,116.00
75.00
2,821.33
10,840.00
1,249.30
854.52
February
2,116.00
75.00
2,821.33
10,840.00
1,249.30
929.48
March
2,116.00
75.00
2,821.33
10,840.00
1,249.30
899.50
April
2,198.00
75.00
2,930.67
10,840.00
1,297.71
965.50
May
2,198.00
75.00
2,930.67
10,840.00
1,297.71
934.35
June
2,198.00
75.00
2,930.67
10,840.00
1,297.71
965.50
July
2,198.00
75.00
2,930.67
10,840.00
1,297.71
965.50
August
2,116.00
75.00
2,821.33
10,840.00
1,249.30
899.50
September
2,116.00
75.00
2,821.33
10,840.00
1,249.30
929.48
October
2,116.00
75.00
2,821.33
10,840.00
1,249.30
899.50
November
2,116.00
75.00
2,821.33
10,840.00
1,249.30
929.48
December
0.00
75.00
0.00
10,840.00
0.00
11,101.77
Year (total)
Geothermal
Outlet
fluid volumetric temperature of
flow rate from
geothermal
production well fluid in injection
3
well (C )
(m /h)
Power at
turbine shaft
(kW)
Polytropic
Condensing
efficiency of
pressure (bar)
ORC turbine %
Condensing
temperature
(C)
Air inlet
temperature
(C)
Air outlet
temperature
(C)
14.40
25.00
308.70
68.20
6.00
21.58
2,527.00
-1.30
21.50
14.40
25.00
308.70
68.20
6.00
21.58
2,527.00
1.30
21.50
14.40
25.00
308.70
68.20
6.00
21.58
2,527.00
5.50
21.50
14.40
25.00
308.70
68.20
6.00
21.58
2,527.00
10.20
21.50
14.40
25.00
290.10
68.20
7.00
26.71
2,544.00
14.80
21.50
14.40
30.00
290.10
68.20
7.00
26.71
2,544.00
18.00
26.70
14.40
30.00
290.10
68.20
7.00
26.71
2,544.00
19.60
26.70
14.40
30.00
290.10
68.20
7.00
26.71
2,544.00
18.70
26.70
14.40
25.00
290.10
68.20
7.00
26.71
2,544.00
15.10
21.50
14.40
25.00
308.70
68.20
6.00
21.58
2,527.00
9.90
21.50
14.40
25.00
308.70
68.20
6.00
21.58
2,527.00
4.80
21.50
14.40
25.00
308.70
68.20
6.00
21.58
2,527.00
0.30
21.50
Required
power of
centrifugal
pump (kW)
Required
power of fan
(kW)
Thermodynamic
efficiency of ORC
cycle (%)
Electricity
production (MWh)
44.87
21.15
394,100.00
8.70
225.08
44.87
24.09
444,800.00
8.59
206.93
94.37
44.87
30.89
561,600.00
8.35
225.08
111.09
44.87
44.46
795,100.00
7.86
217.82
92.51
45.71
43.19
759,900.00
7.21
211.52
91.23
45.71
59.70
1,039,000.00
6.62
204.69
71.48
45.71
73.61
1,274,000.00
6.12
211.52
68.60
45.71
65.09
1,130,000.00
6.43
211.52
74.93
45.71
44.35
779,600.00
7.17
204.69
82.54
44.87
43.27
774,500.00
7.90
225.08
101.88
44.87
29.51
538,000.00
8.40
217.82
103.28
44.87
22.87
423,800.00
8.63
225.08
2,586.82
Electricity production
reduced for own
consumption (MWh)
118.34
117.06
1,127.31
Month
Number of
Average outlet
R 134 a inlet
working hours air temperature
pressure (bar)
(h/month)
(C)
R 134 a inlet
temperature
(C)
Qm R134 a
(kg/h) mass
flow of ORC
media
Transfer area
Heat duty of
of geothermal
Geothermal
heat exchanger heat exchanger
2
kW
(m )
Heat duty of
evaporator
(kW)
January
744.00
-1.30
30.00
23.49
49,940.00
675.00
54.29
2,132.00
February
684.00
1.30
30.00
23.49
49,940.00
675.00
54.29
2,132.00
March
744.00
5.50
30.00
23.87
49,940.00
675.00
54.29
2,132.00
April
720.00
10.20
30.00
23.87
49,940.00
675.00
54.29
2,132.00
May
744.00
14.80
30.00
23.87
49,940.00
675.00
54.29
2,132.00
June
720.00
18.00
30.00
23.87
50,950.00
590.80
54.29
2,205.00
July
744.00
19.60
30.00
23.87
50,950.00
590.80
54.29
2,205.00
August
744.00
18.70
30.00
23.87
50,950.00
590.80
54.29
2,205.00
September
720.00
15.10
30.00
23.87
49,940.00
675.00
54.29
2,132.00
October
744.00
9.90
30.00
23.87
50,950.00
675.00
54.29
2,132.00
November
720.00
4.80
30.00
23.87
50,950.00
675.00
54.29
2,132.00
December
744.00
0.30
30.00
23.87
50,950.00
675.00
54.29
2,132.00
R 134 a inlet
temperature
(C)
Qm R134 a
(kg/h) mass
flow of ORC
media
Year (total)
Month
8772
9.741666667
35
Number of
Average outlet
R 134 a inlet
working hours air temperature
pressure (bar)
(h/month)
(C)
Transfer area
Heat duty of
of geothermal
Geothermal
heat exchanger heat exchanger
kW
(m2)
Heat duty of
evaporator
(kW)
January
744.00
-1.30
30.00
17.60
42,630.00
675.00
54.29
1,820.00
February
684.00
1.30
30.00
17.60
42,630.00
675.00
54.29
1,820.00
March
744.00
5.50
30.00
17.60
42,630.00
675.00
54.29
1,820.00
April
720.00
10.20
30.00
17.60
42,630.00
675.00
54.29
1,820.00
May
744.00
14.80
30.00
17.60
42,630.00
675.00
54.29
1,820.00
June
720.00
18.00
30.00
23.49
49,940.00
675.00
54.29
2,132.00
July
744.00
19.60
30.00
23.49
49,940.00
675.00
54.29
2,132.00
August
744.00
18.70
30.00
23.49
49,940.00
675.00
54.29
2,132.00
September
720.00
15.10
30.00
17.60
42,630.00
675.00
54.29
1,820.00
October
744.00
9.90
30.00
17.60
42,630.00
675.00
54.29
1,820.00
November
720.00
4.80
30.00
17.60
42,630.00
675.00
54.29
1,820.00
December
744.00
0.30
30.00
17.60
42,630.00
675.00
54.29
1,820.00
Boiler heat
capacity (kW)
LHV wooden
biomass at 30%
moisture (kJ/kg)
Biomass
consumption
kg/h
Biomass
consumption
t/year
Month
Year (total)
8772
Requested heat
from ORC boiler Boiler efficiency
(kW)
2,132.00
75.00
2,842.67
10,840.00
1,258.75
936.51
January
2,132.00
75.00
2,842.67
10,840.00
1,258.75
860.98
February
2,132.00
75.00
2,842.67
10,840.00
1,258.75
936.51
March
2,132.00
75.00
2,842.67
10,840.00
1,258.75
906.30
April
2,132.00
75.00
2,842.67
10,840.00
1,258.75
936.51
May
2,205.00
75.00
2,940.00
10,840.00
1,301.85
937.33
June
2,205.00
75.00
2,940.00
10,840.00
1,301.85
968.57
July
2,205.00
75.00
2,940.00
10,840.00
1,301.85
968.57
August
2,132.00
75.00
2,842.67
10,840.00
1,258.75
906.30
September
2,132.00
75.00
2,842.67
10,840.00
1,258.75
936.51
October
2,132.00
75.00
2,842.67
10,840.00
1,258.75
906.30
November
2,132.00
75.00
2,842.67
10,840.00
1,258.75
936.51
December
0.00
75.00
0.00
10,840.00
0.00
11,136.88
Year (total)
Geothermal
Outlet
fluid volumetric temperature of
flow rate from
geothermal
production well fluid in injection
3
well (C )
(m /h)
Power at
turbine shaft
(kW)
Polytropic
Condensing
efficiency of
pressure (bar)
ORC turbine %
Condensing
temperature
(C)
Air inlet
temperature
(C)
Air outlet
temperature
(C)
14.40
25.00
292.60
68.20
6.00
21.58
2,551.00
-1.30
21.50
14.40
25.00
292.60
68.20
6.00
21.58
2,551.00
1.30
21.50
14.40
25.00
292.60
68.20
6.00
21.58
2,551.00
5.50
21.50
14.40
25.00
292.60
68.20
6.00
21.58
2,551.00
10.20
21.50
14.40
25.00
292.60
68.20
6.00
21.58
2,551.00
14.80
21.50
14.40
30.00
271.90
68.20
7.00
26.71
2,561.00
18.00
26.70
14.40
30.00
271.90
68.20
7.00
26.71
2,561.00
19.60
26.70
14.40
30.00
271.90
68.20
7.00
26.71
2,561.00
18.70
26.70
14.40
25.00
292.60
68.20
6.00
21.58
2,527.00
15.10
21.50
14.40
25.00
292.60
68.20
6.00
21.58
2,527.00
9.90
21.50
14.40
25.00
292.60
68.20
6.00
21.58
2,527.00
4.80
21.50
14.40
25.00
292.60
68.20
6.00
21.58
2,527.00
0.30
21.50
Condensing
temperature
(C)
Air inlet
temperature
(C)
Air outlet
temperature
(C)
Geothermal
Outlet
fluid volumetric temperature of
flow rate from
geothermal
production well fluid in injection
well (C )
(m3/h)
Power at
turbine shaft
(kW)
Polytropic
Condensing
efficiency of
pressure (bar)
ORC turbine %
14.40
25.00
279.80
68.20
5.00
15.76
2,247.00
-1.30
16.16
14.40
25.00
279.80
68.20
5.00
15.76
2,247.00
1.30
16.16
14.40
25.00
279.80
68.20
5.00
15.76
2,247.00
5.50
16.16
14.40
25.00
279.80
68.20
5.00
15.76
2,247.00
10.20
16.16
14.40
25.00
279.80
68.20
5.00
15.76
2,247.00
14.80
16.16
14.40
25.00
292.60
68.20
6.00
21.58
2,551.00
18.00
21.58
14.40
25.00
292.60
68.20
6.00
21.58
2,551.00
19.60
21.58
14.40
25.00
292.60
68.20
6.00
21.58
2,551.00
18.70
21.58
14.40
25.00
279.80
68.20
5.00
15.76
2,247.00
15.10
16.16
14.40
25.00
279.80
68.20
5.00
15.76
2,247.00
9.90
16.16
14.40
25.00
279.80
68.20
5.00
15.76
2,247.00
4.80
16.16
14.40
25.00
279.80
68.20
5.00
15.76
2,247.00
0.30
16.16
Boiler heat
capacity (kW)
LHV wooden
biomass at 30%
moisture (kJ/kg)
Biomass
consumption
kg/h
Biomass
consumption
t/year
Month
Requested heat
from ORC boiler Boiler efficiency
(kW)
1,820.00
75.00
2,426.67
10,840.00
1,074.54
799.46
January
1,820.00
75.00
2,426.67
10,840.00
1,074.54
734.98
February
1,820.00
75.00
2,426.67
10,840.00
1,074.54
799.46
March
1,820.00
75.00
2,426.67
10,840.00
1,074.54
773.67
April
1,820.00
75.00
2,426.67
10,840.00
1,074.54
799.46
May
2,132.00
75.00
2,842.67
10,840.00
1,258.75
906.30
June
2,132.00
75.00
2,842.67
10,840.00
1,258.75
936.51
July
2,132.00
75.00
2,842.67
10,840.00
1,258.75
936.51
August
1,820.00
75.00
2,426.67
10,840.00
1,074.54
773.67
September
1,820.00
75.00
2,426.67
10,840.00
1,074.54
799.46
October
1,820.00
75.00
2,426.67
10,840.00
1,074.54
773.67
November
1,820.00
75.00
2,426.67
10,840.00
1,074.54
799.46
December
0.00
75.00
0.00
10,840.00
0.00
9,832.58
Year (total)
Required power
Thermodynamic
Required power Air mass flow in
of centrifugal
efficiency of ORC
of fan (kW) air cooler (kg/h)
pump (kW)
cycle (%)
Electricity
production
(MWh)
36.39
21.34
397,800.00
8.37
213.34
36.39
24.32
444,800.00
8.26
196.14
36.39
31.17
566,800.00
8.02
213.34
36.39
44.46
795,100.00
7.54
206.46
36.39
76.89
1,341,000.00
6.39
213.34
36.66
60.11
1,046,000.00
6.26
191.85
36.66
74.07
1,282,000.00
5.76
198.25
36.66
65.55
1,138,000.00
6.07
198.25
36.39
80.61
1,417,000.00
6.26
206.46
36.39
43.67
781,700.00
7.57
213.34
36.39
29.79
543,000.00
8.07
206.46
36.39
23.09
427,800.00
8.30
213.34
7.24
Required power
Thermodynamic
Required power Air mass flow in
of centrifugal
efficiency of ORC
of fan (kW) air cooler (kg/h)
pump (kW)
cycle (%)
2,470.56
Electricity
production
(MWh)
31.81
24.60
457,600.00
8.95
204.01
31.81
29.10
537,600.00
8.77
187.56
31.81
41.20
749,400.00
8.29
204.01
31.81
74.90
1,340,000.00
6.94
197.43
31.81
333.80
5,874,000.00
-3.44
204.01
36.39
145.60
2,533,000.00
3.94
206.46
36.39
263.10
4,579,000.00
-0.25
213.34
36.39
181.30
3,148,000.00
2.67
213.34
31.81
428.70
7,536,000.00
-7.24
197.43
31.81
71.30
1,276,000.00
7.08
204.01
31.81
38.60
703,300.00
8.39
197.43
31.81
27.20
503,700.00
8.85
204.01
4.41
2,433.01
Electricity
production reduced
for own
consumption (MWh)
115.77
92.63
108.46
90.44
74.45
68.46
65.11
71.45
64.41
99.16
101.00
114.47
1,065.82
Electricity
production reduced
for own
consumption (MWh)
109.81
86.63
97.46
65.32
-120.23
17.62
-64.10
-3.24
-189.42
75.07
91.45
107.88
274.25
Month
Number of
Average outlet
R 134 a inlet
working hours air temperature
pressure (bar)
(h/month)
(C)
R 134 a inlet
temperature
(C)
Qm R134 a
(kg/h) mass
flow of ORC
media
Transfer area
Heat duty of
of geothermal
Geothermal
heat exchanger heat exchanger
2
kW
(m )
Heat duty of
evaporator
(kW)
January
744.00
-1.30
25.00
23.10
49,940.00
675.00
54.29
2,099.00
February
684.00
1.30
25.00
23.10
49,940.00
675.00
54.29
2,099.00
March
744.00
5.50
25.00
23.10
49,940.00
675.00
54.29
2,099.00
April
720.00
10.20
25.00
23.10
49,940.00
675.00
54.29
2,099.00
May
744.00
14.80
25.00
23.10
49,940.00
675.00
54.29
2,099.00
June
720.00
18.00
25.00
23.10
50,950.00
590.80
54.29
2,163.00
July
744.00
19.60
25.00
23.10
50,950.00
590.80
54.29
2,163.00
August
744.00
18.70
25.00
23.10
50,950.00
590.80
54.29
2,163.00
September
720.00
15.10
25.00
23.10
49,940.00
675.00
54.29
2,099.00
October
744.00
9.90
25.00
23.10
50,950.00
675.00
54.29
2,099.00
November
720.00
4.80
25.00
23.10
50,950.00
675.00
54.29
2,099.00
December
744.00
0.30
25.00
23.10
50,950.00
675.00
54.29
2,099.00
R 134 a inlet
temperature
(C)
Qm R134 a
(kg/h) mass
flow of ORC
media
Year (total)
Month
8772
Number of
Average outlet
R 134 a inlet
working hours air temperature
pressure (bar)
(h/month)
(C)
Transfer area
Heat duty of
of geothermal
Geothermal
heat exchanger heat exchanger
kW
(m2)
Heat duty of
evaporator
(kW)
January
744.00
-1.30
25.00
17.24
41,890.00
675.00
54.29
1,797.00
February
684.00
1.30
25.00
17.24
41,890.00
675.00
54.29
1,797.00
March
744.00
5.50
25.00
17.24
41,890.00
675.00
54.29
1,797.00
April
720.00
10.20
25.00
17.24
41,890.00
675.00
54.29
1,797.00
May
744.00
14.80
25.00
17.24
41,890.00
675.00
54.29
1,797.00
June
720.00
18.00
25.00
17.24
41,890.00
675.00
54.29
1,797.00
July
744.00
19.60
25.00
20.27
45,230.00
675.00
54.29
1,941.00
August
744.00
18.70
25.00
20.27
45,230.00
675.00
54.29
1,941.00
September
720.00
15.10
25.00
17.24
41,890.00
675.00
54.29
1,797.00
October
744.00
9.90
25.00
17.24
41,890.00
675.00
54.29
1,797.00
November
720.00
4.80
25.00
17.24
41,890.00
675.00
54.29
1,797.00
December
744.00
0.30
25.00
17.24
41,890.00
675.00
54.29
1,797.00
Boiler heat
capacity (kW)
LHV wooden
biomass at 30%
moisture (kJ/kg)
Biomass
consumption
kg/h
Biomass
consumption
t/year
Month
Year (total)
8772
Requested heat
from ORC boiler Boiler efficiency
(kW)
2,099.00
75.00
2,798.67
10,840.00
1,239.26
922.01
January
2,099.00
75.00
2,798.67
10,840.00
1,239.26
847.66
February
2,099.00
75.00
2,798.67
10,840.00
1,239.26
922.01
March
2,099.00
75.00
2,798.67
10,840.00
1,239.26
892.27
April
2,099.00
75.00
2,798.67
10,840.00
1,239.26
922.01
May
2,163.00
75.00
2,884.00
10,840.00
1,277.05
919.47
June
2,163.00
75.00
2,884.00
10,840.00
1,277.05
950.12
July
2,163.00
75.00
2,884.00
10,840.00
1,277.05
950.12
August
2,099.00
75.00
2,798.67
10,840.00
1,239.26
892.27
September
2,099.00
75.00
2,798.67
10,840.00
1,239.26
922.01
October
2,099.00
75.00
2,798.67
10,840.00
1,239.26
892.27
November
2,099.00
75.00
2,798.67
10,840.00
1,239.26
922.01
December
0.00
75.00
0.00
10,840.00
0.00
10,954.24
Year (total)
Geothermal
Outlet
fluid volumetric temperature of
flow rate from
geothermal
production well fluid in injection
3
well (C )
(m /h)
Power at
turbine shaft
(kW)
Polytropic
Condensing
efficiency of
pressure (bar)
ORC turbine %
Condensing
temperature
(C)
Air inlet
temperature
(C)
Air outlet
temperature
(C)
14.40
25.00
264.30
68.20
6.00
21.58
2,537.00
-1.30
24.07
14.40
25.00
264.30
68.20
6.00
21.58
2,537.00
1.30
24.07
14.40
25.00
264.30
68.20
6.00
21.58
2,537.00
5.50
24.07
14.40
25.00
264.30
68.20
6.00
21.58
2,537.00
10.20
24.07
14.40
25.00
264.30
68.20
6.00
21.58
2,537.00
14.80
24.07
14.40
30.00
241.80
68.20
7.00
26.71
2,540.00
18.00
28.20
14.40
30.00
241.80
68.20
7.00
26.71
2,540.00
19.60
28.20
14.40
30.00
241.80
68.20
7.00
26.71
2,540.00
18.70
28.20
14.40
25.00
264.30
68.20
6.00
21.58
2,537.00
15.10
24.07
14.40
25.00
264.30
68.20
6.00
21.58
2,537.00
9.90
24.07
14.40
25.00
264.30
68.20
6.00
21.58
2,537.00
4.80
24.07
14.40
25.00
264.30
68.20
6.00
21.58
2,537.00
0.30
24.07
Condensing
temperature
(C)
Air inlet
temperature
(C)
Air outlet
temperature
(C)
Geothermal
Outlet
fluid volumetric temperature of
flow rate from
geothermal
production well fluid in injection
well (C )
(m3/h)
Power at
turbine shaft
(kW)
Polytropic
Condensing
efficiency of
pressure (bar)
ORC turbine %
14.40
25.00
256.50
68.20
5.00
15.76
2,241.00
-1.30
19.34
14.40
25.00
256.50
68.20
5.00
15.76
2,241.00
1.30
19.34
14.40
25.00
256.50
68.20
5.00
15.76
2,241.00
5.50
19.34
14.40
25.00
256.50
68.20
5.00
15.76
2,241.00
10.20
19.34
14.40
25.00
256.50
68.20
5.00
15.76
2,241.00
14.80
19.34
14.40
25.00
256.50
68.20
5.00
15.76
2,241.00
18.00
28.20
14.40
25.00
259.60
68.20
5.50
18.77
2,540.00
19.60
28.20
14.40
25.00
259.60
68.20
5.50
18.77
2,540.00
18.70
28.20
14.40
25.00
256.50
68.20
5.00
15.76
2,383.00
15.10
19.34
14.40
25.00
256.50
68.20
5.00
15.76
2,383.00
9.90
19.34
14.40
25.00
256.50
68.20
5.00
15.76
2,241.00
4.80
19.34
14.40
25.00
256.50
68.20
5.00
15.76
2,241.00
0.30
19.34
Boiler heat
capacity (kW)
LHV wooden
biomass at 30%
moisture (kJ/kg)
Biomass
consumption
kg/h
Biomass
consumption
t/year
Month
Requested heat
from ORC boiler Boiler efficiency
(kW)
1,797.00
75.00
2,396.00
10,840.00
1,060.96
789.35
January
1,797.00
75.00
2,396.00
10,840.00
1,060.96
26.52
February
1,797.00
75.00
2,396.00
10,840.00
1,060.96
26.52
March
1,797.00
75.00
2,396.00
10,840.00
1,060.96
26.52
April
1,797.00
75.00
2,396.00
10,840.00
1,060.96
26.52
May
1,797.00
75.00
2,396.00
10,840.00
1,060.96
26.52
June
1,941.00
75.00
2,588.00
10,840.00
1,145.98
28.65
July
1,941.00
75.00
2,588.00
10,840.00
1,145.98
28.65
August
1,797.00
75.00
2,396.00
10,840.00
1,060.96
26.52
September
1,797.00
75.00
2,396.00
10,840.00
1,060.96
26.52
October
1,797.00
75.00
2,396.00
10,840.00
1,060.96
26.52
November
1,797.00
75.00
2,396.00
10,840.00
1,060.96
0.00
December
0.00
75.00
0.00
10,840.00
0.00
1,058.84
Year (total)
Electricity
Required power
Thermodynamic
production reduced
Required power Air mass flow in
Electricity
of centrifugal
efficiency of ORC
of fan (kW) air cooler (kg/h)
production (MWh)
for own
pump (kW)
cycle (%)
consumption (MWh)
28.22
19.13
356,600.00
7.82
192.71
108.15
28.22
21.53
397,500.00
7.73
177.17
87.15
28.22
26.82
487,700.00
7.54
192.71
102.42
28.22
36.56
653,700.00
7.19
186.49
87.63
28.22
55.72
980,500.00
6.50
192.71
80.92
27.99
50.85
885,000.00
5.92
170.61
66.08
27.99
60.67
1,050,000.00
5.56
176.30
65.21
27.99
54.73
950,200.00
5.78
176.30
69.62
28.22
57.23
1,006,000.00
6.45
186.49
72.75
28.22
35.57
636,700.00
7.23
192.71
95.91
28.22
25.68
468,200.00
7.58
186.49
95.46
28.22
20.49
379,600.00
7.77
192.71
107.13
2,223.38
1,038.44
Electricity
Required power
Thermodynamic
production reduced
Required power Air mass flow in
Electricity
of centrifugal
efficiency of ORC
of fan (kW) air cooler (kg/h)
production (MWh)
for own
pump (kW)
cycle (%)
consumption (MWh)
25.00
20.70
386,000.00
8.53
187.02
105.14
25.00
23.90
441,700.00
8.40
171.94
84.16
25.00
31.70
575,700.00
8.08
187.02
96.96
25.00
48.70
871,600.00
7.39
180.99
77.25
25.00
99.70
1,755,000.00
5.33
187.02
46.37
25.00
341.60
5,945,000.00
-4.45
180.99
-133.64
26.56
221.40
3,832,000.00
0.44
189.28
-43.66
26.56
156.80
2,723,000.00
2.91
189.28
4.40
25.00
106.90
1,879,000.00
5.04
180.99
35.34
25.00
47.10
843,900.00
7.46
187.02
85.50
25.00
30.10
547,900.00
8.15
180.99
90.64
25.00
22.60
418,500.00
8.45
187.02
103.73
2,209.54
552.18
Month
Number of
Average outlet
R 134 a inlet
working hours air temperature
pressure (bar)
(h/month)
(C)
R 134 a inlet
temperature
(C)
Qm R134 a
(kg/h) mass
flow of ORC
media
Transfer area
Heat duty of
of geothermal
Geothermal
heat exchanger heat exchanger
kW
(m2)
Heat duty of
evaporator
(kW)
January
744.00
-1.30
20.00
23.10
47,890.00
675.00
54.29
2,031.00
February
684.00
1.30
20.00
23.10
47,890.00
675.00
54.29
2,031.00
March
744.00
5.50
20.00
23.10
47,890.00
675.00
54.29
2,031.00
April
720.00
10.20
20.00
23.10
47,890.00
675.00
54.29
2,031.00
May
744.00
14.80
20.00
23.10
47,890.00
675.00
54.29
2,031.00
June
720.00
18.00
20.00
23.10
50,950.00
590.80
54.29
2,085.00
July
744.00
19.60
20.00
23.10
50,950.00
590.80
54.29
2,085.00
August
744.00
18.70
20.00
23.10
50,950.00
590.80
54.29
2,085.00
September
720.00
15.10
20.00
23.10
49,940.00
675.00
54.29
2,031.00
October
744.00
9.90
20.00
23.10
50,950.00
675.00
54.29
2,031.00
November
720.00
4.80
20.00
23.10
50,950.00
675.00
54.29
2,031.00
December
744.00
0.30
20.00
23.10
50,950.00
675.00
54.29
2,031.00
R 134 a inlet
temperature
(C)
Qm R134 a
(kg/h) mass
flow of ORC
media
Year (total)
Month
8772
9.741666667
35
Number of
Average outlet
R 134 a inlet
working hours air temperature
pressure (bar)
(h/month)
(C)
Transfer area
Heat duty of
of geothermal
Geothermal
heat exchanger heat exchanger
kW
(m2)
Heat duty of
evaporator
(kW)
January
744.00
-1.30
20.00
16.87
41,140.00
675.00
54.29
1,745.00
February
684.00
1.30
20.00
16.87
41,140.00
675.00
54.29
1,745.00
March
744.00
5.50
20.00
16.87
41,140.00
675.00
54.29
1,745.00
April
720.00
10.20
20.00
16.87
41,140.00
675.00
54.29
1,745.00
May
744.00
14.80
20.00
16.87
41,140.00
675.00
54.29
1,745.00
June
720.00
18.00
20.00
16.87
41,140.00
675.00
54.29
1,745.00
July
744.00
19.60
20.00
19.89
44,360.00
675.00
54.29
1,882.00
August
744.00
18.70
20.00
19.89
44,360.00
675.00
54.29
1,882.00
September
720.00
15.10
20.00
16.87
41,140.00
675.00
54.29
1,745.00
October
744.00
9.90
20.00
16.87
41,140.00
675.00
54.29
1,745.00
November
720.00
4.80
20.00
16.87
41,140.00
675.00
54.29
1,745.00
December
744.00
0.30
20.00
16.87
41,140.00
675.00
54.29
1,745.00
Boiler heat
capacity (kW)
LHV wooden
biomass at 30%
moisture (kJ/kg)
Biomass
consumption
kg/h
Biomass
consumption
t/year
Month
Year (total)
8772
Requested heat
from ORC boiler Boiler efficiency
(kW)
2,031.00
75.00
2,708.00
10,840.00
1,199.11
892.14
January
2,031.00
75.00
2,708.00
10,840.00
1,199.11
820.19
February
2,031.00
75.00
2,708.00
10,840.00
1,199.11
892.14
March
2,031.00
75.00
2,708.00
10,840.00
1,199.11
863.36
April
2,031.00
75.00
2,708.00
10,840.00
1,199.11
892.14
May
2,085.00
75.00
2,780.00
10,840.00
1,231.00
886.32
June
2,085.00
75.00
2,780.00
10,840.00
1,231.00
915.86
July
2,085.00
75.00
2,780.00
10,840.00
1,231.00
915.86
August
2,031.00
75.00
2,708.00
10,840.00
1,199.11
863.36
September
2,031.00
75.00
2,708.00
10,840.00
1,199.11
892.14
October
2,031.00
75.00
2,708.00
10,840.00
1,199.11
863.36
November
2,031.00
75.00
2,708.00
10,840.00
1,199.11
892.14
December
0.00
75.00
0.00
10,840.00
0.00
10,589.03
Year (total)
Geothermal
Outlet
fluid volumetric temperature of
flow rate from
geothermal
production well fluid in injection
(m3/h)
well (C )
Power at
turbine shaft
(kW)
Polytropic
Condensing
efficiency of
pressure (bar)
ORC turbine %
Condensing
temperature
(C)
Air inlet
temperature
(C)
Air outlet
temperature
(C)
14.40
25.00
224.80
68.20
6.00
21.58
2,502.00
-1.30
25.54
14.40
25.00
224.80
68.20
6.00
21.58
2,502.00
1.30
25.54
14.40
25.00
224.80
68.20
6.00
21.58
2,502.00
5.50
25.54
14.40
25.00
224.80
68.20
6.00
21.58
2,502.00
10.20
25.54
14.40
25.00
224.80
68.20
6.00
21.58
2,502.00
14.80
25.54
14.40
30.00
200.40
68.20
7.00
26.71
2,495.00
18.00
28.20
14.40
30.00
200.40
68.20
7.00
26.71
2,495.00
19.60
28.20
14.40
30.00
200.40
68.20
7.00
26.71
2,495.00
18.70
28.20
14.40
25.00
224.80
68.20
6.00
21.58
2,502.00
15.10
25.54
14.40
25.00
224.80
68.20
6.00
21.58
2,502.00
9.90
25.54
14.40
25.00
224.80
68.20
6.00
21.58
2,502.00
4.80
25.54
14.40
25.00
224.80
68.20
6.00
21.58
2,502.00
0.30
25.54
Condensing
temperature
(C)
Air inlet
temperature
(C)
Air outlet
temperature
(C)
Geothermal
Outlet
fluid volumetric temperature of
flow rate from
geothermal
production well fluid in injection
(m3/h)
well (C )
Power at
turbine shaft
(kW)
Polytropic
Condensing
efficiency of
pressure (bar)
ORC turbine %
14.40
25.00
222.40
68.20
5.00
15.76
2,216.00
-1.30
20.88
14.40
25.00
222.40
68.20
5.00
15.76
2,216.00
1.30
20.88
14.40
25.00
222.40
68.20
5.00
15.76
2,216.00
5.50
20.88
14.40
25.00
222.40
68.20
5.00
15.76
2,216.00
10.20
20.88
14.40
25.00
222.40
68.20
5.00
15.76
2,216.00
14.80
20.88
14.40
25.00
222.40
68.20
5.00
15.76
2,216.00
18.00
20.88
14.40
25.00
222.60
68.20
5.50
18.77
2,353.00
19.60
23.35
14.40
25.00
222.60
68.20
5.50
18.77
2,353.00
18.70
23.35
14.40
25.00
222.40
68.20
5.00
15.76
2,216.00
15.10
20.88
14.40
25.00
222.40
68.20
5.00
15.76
2,216.00
9.90
20.88
14.40
25.00
222.40
68.20
5.00
15.76
2,216.00
4.80
20.88
14.40
25.00
222.40
68.20
5.00
15.76
2,216.00
0.30
20.88
Boiler heat
capacity (kW)
LHV wooden
biomass at 30%
moisture (kJ/kg)
Biomass
consumption
kg/h
Biomass
consumption
t/year
Month
Requested heat
from ORC boiler Boiler efficiency
(kW)
1,745.00
75.00
2,326.67
10,840.00
1,030.26
766.51
January
1,745.00
75.00
2,326.67
10,840.00
1,030.26
704.70
February
1,745.00
75.00
2,326.67
10,840.00
1,030.26
766.51
March
1,745.00
75.00
2,326.67
10,840.00
1,030.26
741.79
April
1,745.00
75.00
2,326.67
10,840.00
1,030.26
766.51
May
1,745.00
75.00
2,326.67
10,840.00
1,030.26
741.79
June
1,882.00
75.00
2,509.33
10,840.00
1,111.14
826.69
July
1,882.00
75.00
2,509.33
10,840.00
1,111.14
826.69
August
1,745.00
75.00
2,326.67
10,840.00
1,030.26
741.79
September
1,745.00
75.00
2,326.67
10,840.00
1,030.26
766.51
October
1,745.00
75.00
2,326.67
10,840.00
1,030.26
741.79
November
1,745.00
75.00
2,326.67
10,840.00
1,030.26
766.51
December
0.00
75.00
0.00
10,840.00
0.00
9,157.78
Year (total)
Required power
Thermodynamic
Required power Air mass flow in
of centrifugal
efficiency of ORC
of fan (kW) air cooler (kg/h)
pump (kW)
cycle (%)
Electricity
production
(MWh)
Electricity
production reduced
for own
consumption (MWh)
20.36
17.81
331,900.00
6.90
163.91
93.55
20.36
19.72
367,600.00
6.83
150.69
75.66
20.36
24.46
444,800.00
6.65
163.91
88.60
20.36
32.51
581,400.00
6.35
158.62
76.14
20.36
47.06
828,100.00
5.82
163.91
71.79
19.71
46.94
825,900.00
5.00
141.40
53.82
19.71
50.44
872,900.00
4.87
146.12
56.52
19.71
46.19
801,900.00
5.03
146.12
59.68
20.36
48.46
851,900.00
5.76
158.62
64.66
20.36
31.77
568,700.00
6.38
163.91
83.16
20.36
23.53
428,900.00
6.69
158.62
82.60
20.36
19.02
352,400.00
6.85
163.91
1,879.71
Required power
Thermodynamic
Required power Air mass flow in
of centrifugal
efficiency of ORC
of fan (kW) air cooler (kg/h)
pump (kW)
cycle (%)
Electricity
production
(MWh)
92.65
898.82
Electricity
production reduced
for own
consumption (MWh)
18.42
19.06
355,300.00
7.64
162.16
92.76
18.42
21.80
402,400.00
7.53
149.08
74.46
18.42
28.17
512,300.00
7.26
162.16
85.98
18.42
41.25
737,700.00
6.72
156.93
70.02
18.42
73.64
1,296,000.00
5.39
162.16
52.15
18.42
157.20
2,735,000.00
1.93
156.93
-13.46
19.37
128.91
2,231,000.00
2.91
162.30
10.43
19.37
103.63
1,799,000.00
3.90
162.30
29.24
18.42
77.54
1,363,000.00
5.22
156.93
43.90
18.42
40.09
717,600.00
6.77
162.16
77.11
18.42
26.90
490,000.00
7.32
156.93
80.36
18.42
20.67
382,900.00
7.57
162.16
91.56
1,912.17
694.51
Month
Number of
Average outlet
R 134 a inlet
working hours air temperature
pressure (bar)
(h/month)
(C)
R 134 a inlet
temperature
(C)
Qm R134 a
(kg/h) mass
flow of ORC
media
Transfer area
Heat duty of
of geothermal
Geothermal
heat exchanger heat exchanger
2
kW
(m )
Heat duty of
evaporator
(kW)
January
744.00
-1.30
15.00
22.31
40,370.00
675.00
54.29
1,664.00
February
684.00
1.30
15.00
22.31
40,370.00
675.00
54.29
1,664.00
March
744.00
5.50
15.00
22.31
40,370.00
675.00
54.29
1,664.00
April
720.00
10.20
15.00
22.31
40,370.00
675.00
54.29
1,664.00
May
744.00
14.80
15.00
22.31
40,370.00
675.00
54.29
1,664.00
June
720.00
18.00
15.00
22.31
46,840.00
590.80
54.29
1,931.00
July
744.00
19.60
15.00
22.31
46,840.00
590.80
54.29
1,931.00
August
744.00
18.70
15.00
22.31
46,840.00
590.80
54.29
1,931.00
September
720.00
15.10
15.00
22.31
40,370.00
675.00
54.29
1,664.00
October
744.00
9.90
15.00
22.31
40,370.00
675.00
54.29
1,664.00
November
720.00
4.80
15.00
22.31
40,370.00
675.00
54.29
1,664.00
December
744.00
0.30
15.00
22.31
40,370.00
675.00
54.29
1,931.00
Boiler heat
capacity (kW)
LHV wooden
biomass at 30%
moisture (kJ/kg)
Biomass
consumption
kg/h
Biomass
consumption
t/year
Month
Year (total)
8772
Requested heat
from ORC boiler Boiler efficiency
(kW)
1,664.00
75.00
2,218.67
10,840.00
982.44
730.93
January
1,664.00
75.00
2,218.67
10,840.00
982.44
671.99
February
1,664.00
75.00
2,218.67
10,840.00
982.44
730.93
March
1,664.00
75.00
2,218.67
10,840.00
982.44
707.35
April
1,664.00
75.00
2,218.67
10,840.00
982.44
730.93
May
1,931.00
75.00
2,574.67
10,840.00
1,140.07
820.85
June
1,931.00
75.00
2,574.67
10,840.00
1,140.07
848.21
July
1,931.00
75.00
2,574.67
10,840.00
1,140.07
848.21
August
1,664.00
75.00
2,218.67
10,840.00
982.44
707.35
September
1,664.00
75.00
2,218.67
10,840.00
982.44
730.93
October
1,664.00
75.00
2,218.67
10,840.00
982.44
707.35
November
1,931.00
75.00
2,574.67
10,840.00
1,140.07
848.21
December
75.00
0.00
10,840.00
0.00
9,083.27
Year (total)
Geothermal
Outlet
fluid volumetric temperature of
flow rate from
geothermal
production well fluid in injection
3
well (C )
(m /h)
Power at
turbine shaft
(kW)
Polytropic
Condensing
efficiency of
pressure (bar)
ORC turbine %
Condensing
temperature
(C)
Air inlet
temperature
(C)
Air outlet
temperature
(C)
14.40
25.00
177.00
68.20
5.00
15.76
2,174.00
-1.30
20.84
14.40
25.00
177.00
68.20
5.00
15.76
2,174.00
1.30
20.84
14.40
25.00
177.00
68.20
5.00
15.76
2,174.00
5.50
20.84
14.40
25.00
177.00
68.20
5.00
15.76
2,174.00
10.20
20.84
14.40
25.00
177.00
68.20
5.00
15.76
2,174.00
14.80
20.84
14.40
25.00
171.00
68.20
6.00
21.58
2,448.00
18.00
25.60
14.40
25.00
171.00
68.20
6.00
21.58
2,448.00
19.60
25.60
14.40
25.00
171.00
68.20
6.00
21.58
2,448.00
18.70
25.60
14.40
25.00
177.00
68.20
5.00
15.76
2,174.00
15.10
20.84
14.40
25.00
177.00
68.20
5.00
15.76
2,174.00
9.90
20.84
14.40
25.00
177.00
68.20
5.00
15.76
2,174.00
4.80
20.84
14.40
25.00
177.00
68.20
5.00
15.76
2,174.00
0.30
20.84
Required power
Thermodynamic
Required power Air mass flow in
of centrifugal
efficiency of ORC
of fan (kW) air cooler (kg/h)
pump (kW)
cycle (%)
Electricity
production
(MWh)
Electricity
production reduced
for own
consumption (MWh)
12.05
18.74
349,200.00
6.25
129.05
73.11
12.05
21.43
395,700.00
6.14
118.65
58.25
12.05
27.72
504,000.00
5.87
129.05
66.43
12.05
40.63
726,600.00
5.32
124.89
51.99
12.05
72.74
1,280,000.00
3.94
129.05
32.93
12.80
65.80
1,145,000.00
3.66
120.66
30.28
12.80
83.87
1,450,000.00
2.95
124.68
20.84
12.80
72.64
1,261,000.00
3.39
124.68
29.19
12.05
77.14
1,356,000.00
3.75
124.89
25.70
12.05
39.47
706,600.00
5.36
129.05
57.69
12.05
26.44
482,000.00
5.92
124.89
62.21
12.05
20.31
376,400.00
5.55
129.05
71.94
1,508.61
580.57
Month
Number of
Average outlet
R 134 a inlet
working hours air temperature
pressure (bar)
(h/month)
(C)
R 134 a inlet
temperature
(C)
Qm R134 a
(kg/h) mass
flow of ORC
media
Transfer area
Heat duty of
of geothermal
Geothermal
heat exchanger heat exchanger
2
kW
(m )
Heat duty of
evaporator
(kW)
January
744.00
-1.30
10.00
22.31
11,160.00
675.00
54.29
48.14
February
684.00
1.30
10.00
22.31
11,160.00
675.00
54.29
48.14
March
744.00
5.50
10.00
22.31
11,160.00
675.00
54.29
48.14
April
720.00
10.20
10.00
22.31
11,160.00
675.00
54.29
48.14
May
744.00
14.80
10.00
22.31
11,160.00
675.00
54.29
48.14
June
720.00
18.00
10.00
22.31
11,610.00
675.00
54.29
48.14
July
744.00
19.60
10.00
22.31
11,610.00
675.00
54.29
50.05
August
744.00
18.70
10.00
22.31
11,610.00
675.00
54.29
50.05
September
720.00
15.10
10.00
22.31
11,610.00
675.00
54.29
50.05
October
744.00
9.90
10.00
22.31
11,160.00
675.00
54.29
48.14
November
720.00
4.80
10.00
22.31
11,160.00
675.00
54.29
48.14
December
744.00
0.30
10.00
22.31
11,160.00
675.00
54.29
48.14
Boiler heat
capacity (kW)
LHV wooden
biomass at 30%
moisture (kJ/kg)
Biomass
consumption
kg/h
Biomass
consumption
t/year
Month
Year (total)
8772
Requested heat
from ORC boiler Boiler efficiency
(kW)
48.14
75.00
64.19
10,840.00
28.42
21.15
January
48.14
75.00
64.19
10,840.00
28.42
19.44
February
48.14
75.00
64.19
10,840.00
28.42
21.15
March
48.14
75.00
64.19
10,840.00
28.42
20.46
April
48.14
75.00
64.19
10,840.00
28.42
21.15
May
48.14
75.00
64.19
10,840.00
28.42
20.46
June
48.14
75.00
64.19
10,840.00
28.42
21.15
July
50.05
75.00
66.73
10,840.00
29.55
21.99
August
50.05
75.00
66.73
10,840.00
29.55
21.28
September
50.05
75.00
66.73
10,840.00
29.55
21.99
October
48.14
75.00
64.19
10,840.00
28.42
20.46
November
48.14
75.00
64.19
10,840.00
28.42
21.15
December
75.00
0.00
10,840.00
0.00
251.81
Year (total)
Geothermal
Outlet
fluid volumetric temperature of
flow rate from
geothermal
production well fluid in injection
3
well (C )
(m /h)
Power at
turbine shaft
(kW)
Polytropic
Condensing
efficiency of
pressure (bar)
ORC turbine %
Condensing
temperature
(C)
Air inlet
temperature
(C)
Air outlet
temperature
(C)
14.40
25.00
31.32
68.20
5.00
15.76
597.20
-1.30
19.35
14.40
25.00
31.32
68.20
5.00
15.76
597.20
1.30
19.35
14.40
25.00
31.32
68.20
5.00
15.76
597.20
5.50
19.35
14.40
25.00
31.32
68.20
5.00
15.76
597.20
10.20
19.35
14.40
25.00
31.32
68.20
5.00
15.76
597.20
14.80
19.35
14.40
25.00
23.99
68.20
6.00
21.58
602.40
18.00
24.15
14.40
25.00
23.99
68.20
6.00
21.58
602.40
19.60
24.15
14.40
25.00
23.99
68.20
6.00
21.58
602.40
18.70
24.15
14.40
25.00
23.99
68.20
6.00
21.58
602.40
15.10
24.15
14.40
25.00
31.32
68.20
5.00
15.76
597.20
9.90
19.35
14.40
25.00
31.32
68.20
5.00
15.76
597.20
4.80
19.35
14.40
25.00
31.32
68.20
5.00
15.76
597.20
0.30
19.35
Required power
Thermodynamic
Required power Air mass flow in
of centrifugal
efficiency of ORC
of fan (kW) air cooler (kg/h)
pump (kW)
cycle (%)
Electricity
production
(MWh)
Electricity
production reduced
for own
consumption (MWh)
1.67
5.52
102,800.00
3.34
22.84
11.64
1.67
6.38
117,700.00
3.22
20.99
8.85
1.67
8.43
153,300.00
2.93
22.84
9.48
1.67
12.45
232,100.00
2.38
22.10
5.75
1.67
26.52
466,600.00
0.43
22.84
-3.98
1.41
20.01
348,200.00
0.36
16.93
-3.23
1.41
27.19
470,600.00
-0.64
17.49
-8.26
1.41
22.63
392,900.00
-0.01
17.49
-4.87
1.41
13.46
236,600.00
1.26
16.93
1.48
1.67
12.55
224,700.00
2.36
22.84
6.41
1.67
8.00
145,900.00
2.99
22.10
8.95
1.67
6.02
111,500.00
3.27
22.84
11.27
248.21
43.47