Anda di halaman 1dari 28

S.

N.
Qty Rate Unit Premi
um%
Total
rate
1
54.45 1108.10
%
cum 425 58.18
2
18.15 343.40
%
cum 370 16.14
3
26.13 100.00 cum - 100.00
4
13.01 403.10 cum 450 2217.05
5
6.50 1188.75 cum 450 6538.13
8.60 1084.8 cum 450 5966.40
7
10.14 45.00 sqm - 45.00
ABSTRACT OF COST OF LAB/COMPUTER ROOM SIZE 26'-3"X21'-0" WITH
6'-0" VARANDAH RMSA 2012-13
Earth filling under floors with surplus soil
excavated from foundation and taken only from
outside the building plinth in 15 cm layer
including ramming watering and consolidating
lead upto 30 metres. (HSR 6.13a)
2 coats of bitumen 20/30 penetration at 1.65 kg.
per sqm. On plinth beam laid hot and sanded
(NS)
6
Roof Slab
Description of Item
Earth work in excavation in foundations,
trenches etc. in all kinds of soil not exceeding 2
meter depth including dressing of bottom and
sides of trenches, stacking the excavated soil,
clear from the edge of excavation and subsequent
filling around masonry, in 15cm layers with
compaction, including disposal of all surplus soil,
as directed within a lead of 30 metres. (HSR 6.6)
Cement concrete 1:1.5:3 with stone aggregate 20
mm nominal size for reinforced concrete work for
walls exceeding 20cm thickness (straight and
curved) beams, girders, stairs, columns, (square
or rectangular) battens and lintels etc. excluding
steel reinforcement but including centering and
shuttering, laid in position complete in all
respect. (HSR 10.86+10.95a)
Cement concrete 1:4:8 with stone aggregate 40
mm nominal size in foundation and
plinth.(HSR10.39)
Earth filling under floors from all leads and lifts
including ramming watering and consolidating
complete. [N.S]
Cement concrete 1:1.5:3 with stone aggregate 20
mm nominal size for reinforced concrete work in
slabs with inclination not exceeding 25 degrees
with horizontal excluding steel reinforcement but
including centering and shuttering laid in position
complete in all respects.(HSR 10.82+10.95a)
103.53 5.40 sqmtr 500 32.40
9
30.55 393.45 cum 600 2754.15
1.59 461.40 cum 600 3229.80
11
18.00 414.45 cum 600 2901.15
12
4.17 482.40 cum 600 3376.80
13
3.68 12.40 cum 600 86.80
14
3.16 422.70 cum 600 2958.90
0.48 84.45 cum 600 591.15
16
2.74 60.45 sqmtr 600 423.15
First class brick work laid in cement sand mortar
1:6 in foundation and plinth. [HSR 11.2]
8
Note: In case the inclination of the R.C.C slab is
more than 25 degree, the labour as well as
through rate of item No. 9.1 shall be increased by
10 percent and nothing extra shall be paid for
lesser inclination.
Centring and shuttering for flat surfaces such as
suspended floors, roofs, landings, chhajjas,
shelves etc. inclination not exceeding 25 degree
with horizontal.
Extra for smooth shuttering
[HSR 9.1+ Note]
First class brick work laid in cement sand mortar
1:6 in first storey upto 4 meters above plinth +
extra for additional storey upto 4 metres above
the top of structural roof of lower storey.
(HSR 11.7+11.41)
15 Extra for brick work in arches including cost of
Shuttering. (HSR 11.44 b)
(b) More than 1.50 meters, but upto 3 meters
span.
10 First class brick work laid in cement sand mortar
1:3 in foundation and plinth (HSR 11.5)
Verndha pillar
First class brick work laid in cement sand mortar
1:3 in first storey upto 4 metres above plinth
level.[HSR-11.10]
First class brick work laid in cement sand mortar
1:6 in 1
st
storey upto 4 meters above plinth level
(HSR 11.7)
Extra for brick work in Square or Rectangular
pillars in buildings.(HSR11.42)
Brick Jali with 22.86 cm x 11.43 cm thick
alternate layers laid cement sand mortar 1:4 using
58 numbers bricks. (HSR 11.71)
17
70.44 52.95 sqmtr 600 370.65
18
4 105.00 each - 105.00
19
4 12.30 each 240 41.82
20
4 64.30 each 240 218.62
21
65.87 36.95 sqmtr 400 184.75
22
113.64 28.15 mtr - 28.15
23
68.04 37.60 sqmtr 400 188.00
24
4.13 46.30 sqmtr 400 231.50
25
25.72 85.55 sqmtr 600 598.85
13.99 14.55 sqmtr 500 87.30
42.82 10.65 sqmtr 500 63.90
Brick-on-edge flooring laid in cement sand
mortar 1:4 on 75mm thick cement concrete
1:8:16 and 100mm sand filling cement pointed
1:2 on top [HSR 14.23]
12mm thick cement plaster 1:6
18 mm thick grey polished skirting or dado
consisting of bottom layer of 15 mm thick cement
sand plaster 1:3 and finished with 3 mm thick
topping of neat cement rubbed and polished
including rounding off junction with floors. (HSR
14.18)
Bottom Khurra on ground 1.2 m x 0.6 m
consisting of brick on edge laid in cement mortar
1:3 over 75 mm cement concrete 1:8:16 including
12 mm thick cement plaster 1:3. (HSR 13.57)
Providing and fixing P.V.C rain water pipe
100mm dia 4 feet long on parapet in cement
mortar 1:3 in parapet complete in all respect, as
per direction of Engineer-in-charge. [N.S]
Terracing consisting of tiles 22.86 cm x 11.43 cm
x 3.81 cm laid over 87.50 mm mud filling on a
layer of 25mm mud plaster and an other layer of
mud mortar for laying the tiles, including two
coats of bitumen laid hot at 1.65 Kg. per sqm on
the top of R.C.C slab including grouting with
cement sand mortar 1:3 and top surface to be left
clean etc. (HSR-13.13)
Top Khurra 0.6mx0.6m. For rain water pipe in
25mm thick cement concrete 1:2:4 over 50mm
thick cement concrete 1:8:16. (HSR-13.50)
Providing and fixing asbestos strips 40x6mm size
in floor including cutting to size complete and to
the entire satisfaction of Engineer-In-Charge.
(NS)
Base course of floors consisting of 100 mm thick
cement concrete 1:8:16 and 100 mm sand or
stone filling. (HSR 14.1)
Conglomerate floor 50 mm thick cement concrete
topping 1:2:4 (HSR 14.10)
HSR 15.7
28 15 mm thick cement plaster 1:6 on the rough side
of single or half brick wall.
26 10mm thick cement plaster 1:3
27
HSR 15.51
108.47 13.10 sqmtr 500 78.60
29
101.83 9.25 sqmtr 500 55.50
30
9.72 14.90 sqmtr 500 89.40
31
22.17 30.70 sqmtr 500 184.20
32
28.35 2.95 sqmtr 230 9.74
33
28.35 9.40 sqmtr 230 31.02
34
165.28 1.80 sqmtr 230 5.94
35
307.19 50.00 kg - 50.00
36
1.44 650.00 sqmtr - 650.00
3 16.35 each 300 65.40
38
1.44 99.10 sqmtr 500 594.60
Providing and fixing sliding bolt with nuts and
screws etc. complete- (HSR 17.83)
c) Iron
Painting two coats excluding priming coat with
synthetic enamel paint in all shades on new wood
work or plastered or concrete surface to given an
even shade (HSR 16.3).
Applying primer coat with metal primer on new
steel or iron work including preparation of
surface. (HSR 16.9)
28
(HSR 15.12)
White washing two coats + two coats of color
wash. (HSR 16.47+16.50)
37
Cement pointing 1:3 deep varity on brick and tile
work. (HSR 15.61)
Fiber sheet in ventilators (NS)
6 mm thick cement plaster 1:3 with floating coat
of neat cement 1.5mm thick and one coat of
white washing on bearing of RCC slab.
(HSR 15.83)
20 mm thick cement plaster damp proof course
1:3 with two coats of bitumen at 1.65 Kg per
sqm. Laid hot and sanded (HSR 15.77a)
Vertical D.P.C
Wire gauze of 140G or 120 G designation fixed
on steel windows of standard rolled steel section,
with 3mm thick flat iron cover moulding of 12.5
mm width, fixed with machine screws welded
complete in all respect. (HSR 18.32)
Steel door with 40x40x6mm angle for doors and
35x35x5mm angle for windows, 30x5 mm braced
strips and 2 mm thick sheet. (N.S)
II) iron size 250 mm x 16 mm.
39
10.67 71.55 mtr 500 429.30
58.69 58.60 mtr 500 351.60
40
33.61 5.35 mtr 240 18.19
41
16.48 917.05 qtl 500 5502.30
42
0.70 1040.35 qtl 500 6242.10
43
2 600.00 each - 600.00
44
1 370.00 each - 370.00
45
0.59 55.10 sqm 600 385.70
Providing teaching chalk boards with dark green
pigment mixed with neat cement on 12 mm thick
cement sand plaster 1:3 with core belling all
around of size cement 6 X 4.5 complete as per
design and providing marble stone at the bottom
of size 1'-0"x9" for keeping duster chalk etc.
[N.S]
(b)76mm x 38mm with 35 mm rebate
Painting for logo, new letters and figures of any
shade with synthetic enamel black or any other
approved colour to give an even shade.
Size 6 X2 (N.S)
11.43 cm. thick brick wall laid in cement sand
mortar 1:4 in superstructure. (HSR 11.48a)
Fe-500 EQR TMT steel bars for bars RCC,
works, where not including in the complete rate
of RCC including bending, binding and placing
in position complete. (HSR 18.22)
(a) 89mmx50mm with 40mm rebate
Pressed steel sheet frames (Chowkhat), consisting
of 2 mm thick steel sheet of the specified section,
including iron lugs (hold fasts), iron hinges,
conforming to PWD specifications, including
bolts for fixing stops, locknotch provision for
receiving tower bolts, and finished with one coat
of ready-mixed paint red lead non-setting primer,
of approved quality, fixed in position including
the cost of cement concrete 1:3:6 for filling in the
frame and cement concrete 1:3:6 for lugs
complete:- (HSR 18.34)
Cement concrete 1:2:4 gola 10cmx10cm quadrant
along junction of roof with parapet wall finished
smooth, whrer specially specified. (HSR 13.64)
Grill size 20 x 5 mm both windows
Wrought iron and mild steel using angles flats,
square, bars, tees and channels) ladders, grills,
grating frames, window guards, iron doors open
able or fixed stair case or parapet or any other
type of railing, gates and tree guards etc.
including cost of screws and welded rods or bolts
and nuts complete fixed in position. (HSR 18.12)
46 101.83 7.25 sqmtr 230 23.93
47 70.44 7.45 sqmtr 500 44.70
Add 10% expected tender premium
Add 3% contingency charges
Total amount
Total
Add L/S for electrical fitting
Total
Ded contractor profit 10%
Total
Grand Total
Cement Pointing 1:2 flush on brick & tile walls
(HSR 15.62)
Finishing walls with exterior decorative cement
based paint such as snowcem, Robbincem etc. on
new work , two coats to give an even shade (HSR
16.61)
Amount
3168
293
2613
28844
42498
51311
456
ABSTRACT OF COST OF LAB/COMPUTER ROOM SIZE 26'-3"X21'-0" WITH
6'-0" VARANDAH RMSA 2012-13
3354
84139
5135
52221
14081
319
9350
284
1159
26109
420
167
874
12169
3199
12792
956
15402
1221
2736
8526
5652
869
4084
276
879
982
15360
936
196
856
4581
20635
611
90678
4369
1200
370
228
2436
3149
542145
16000
558145
55815
502331
15070
517400
51740
569140
Sr.No
.
No. L B H Qty.
1x1 1 31.50 3.50 3.25 358.31 cft
1x1 1 31.50 4.50 3.25 460.69 cft
1x2 2 17.75 4.50 3.25 519.19 cft
1x2 2 2.125 3.50 3.25 48.34 cft
1x4 4 4.00 4.00 3.25 208.00 cft
1x3 3 5.00 1.50 2.00 45.00 cft
1x4 4 1.125 4.00 3.25 58.50 cft
1x2 2 33.75 1.50 1.50 151.88 cft
1x1 1 33.00 1.50 1.50 74.25 cft
1924.16 cft
54.45 cum
54.45 / 3 18.15 cum

1x1 1 26.25 21.00 2.25 1240.31 cft
1x1 1 26.25 6.00 2.25 354.38 cft
1594.69 cft
45.13 cum
19.00 cum
26.13 cum
DETAIL ESTIMATE FOR LAB/COMPUTER OF SIZE (26'-3"X 21'-0") WITH 6'-0"
VERANDAH RMSA 2012-13
Room
Earth filling under floors from all
leads and lifts including ramming
watering and consolidating
complete. [N.S]
Verandha
Deduct qty. of item no. 2 i.e.
19.00cum.
3
B/F qty. item No - 1.
2
Take 1/3 of Excavation i.e
Description of Item
Centre wall W2
1 Earth work in excavation in
foundations, trenches etc. in all
kinds of soil not exceeding 2 meter
depth including dressing of bottom
and sides of trenches, stacking the
excavated soil, clear from the edge
of excavation and subsequent filling
around masonry, in 15cm layers
with compaction, including disposal
of all surplus soil, as directed within
a lead of 30 metres. (HSR 6.6)
Horizontal back wall W3
Room side wall vertical W2
Front veranda Pillar
Veranda side wall W3
Front Toe Wall
Plinth Protection Toe Wall
Back pillars
Earth filling under floors with
surplus soil excavated from
foundation and taken only from
outside the building plinth in 15 cm
layer including ramming watering
and consolidating lead upto 30
metres. (HSR 6.13a)
1x1 1 31.00 3.50 0.75 81.38 cft
1x1 1 31.00 4.50 0.75 104.63 cft
1x2 2 17.75 4.50 0.75 119.81 cft
1x2 2 2.125 3.50 0.75 11.16 cft
1x4 4 4.00 4.00 0.75 48.00 cft
1x3 3 5.00 1.50 0.25 5.63 cft
1x2 2 33.75 1.50 0.50 50.63 cft
1x1 1 33.00 1.50 0.50 24.75 cft
1x4 4 1.125 4.00 0.75 13.50 cft
459.47 cft
13.01 cum
3x2 6 2.25 0.75 0.50 5.06 cft
1x2 2 1.125 0.75 0.50 0.84 cft
1x2 2 1.125 1.125 0.50 1.27 cft
1x3 3 27.75 0.75 0.50 31.22 cft
1x2 2 21.00 0.75 0.50 15.75 cft
1x2 2 6.75 0.75 0.50 5.06 cft
1x4 4 1.125 1.125 0.50 2.53 cft
1x2 2 27.75 0.75 0.75 31.22 cft
1x2 2 21.00 0.75 0.75 23.63 cft
1x2 2 6.75 0.75 0.75 7.59 cft
1x1 1 27.75 0.75 0.75 15.61 cft
1x2 2 8.25 1.25 0.167 3.44 cft
1x2 2 29.25 1.00 1.00 58.50 cft
1x6 6 0.375 0.375 15.50 13.08 cft
2x2 4 0.25 0.75 6.75 5.06 cft
2x2 4 0.25 0.75 4.50 3.38 cft
2x1 2 0.25 0.75 4.50 1.69 cft
1x3 3 2.75 1.375 0.25 2.84 cft
1x1 1 2.75 1.375 0.50 1.89 cft
229.66 cft
6.50 cum
Cub Board Shelves.
Back side window sun shade
Vertical Reinforcement in Corner
Back pillars
Room back and middle horizantal
wall
Plinth protection walls
Earthquick resistance provision
W1
W2
Varanda side wall
Roof Beam
Verndha Pillar
Bed Plate
Cement concrete 1:1.5:3 with stone
aggregate 20 mm nominal size for
reinforced concrete work for walls
exceeding 20cm thickness (straight
and curved) beams, girders, stairs,
Cement concrete 1:4:8 with stone
aggregate 40 mm nominal size in
foundation and plinth.(HSR10.39)
Front on arch
Veranda vertical wall
Class room (vertical wall )
Room back , middleand Front(
horizantol wall )
Room side wall
Lintel Beam
4
Back pillars
Toe wall
5
Plinth Beam
Back pillar
1x1 1 30.00 27.00 0.375 303.75 cft
8.60 cum
1x3 3 27.75 0.75 62.44 sft
1x2 2 21.00 0.75 31.50 sft
1x2 2 6.75 0.75 10.13 sft
1x4 4 1.125 1.125 5.06 sft
109.13
10.14 Sqm
1x1 1 26.25 21.00 551.25 sft
1x1 1 26.25 5.75 150.94 sft
2x2 4 21.00 0.75 63.00 sft
2x2 4 6.00 0.75 18.00 sft
3x2 6 27.75 0.75 124.88 sft
2x2 4 27.75 0.75 83.25 sft
2x2 4 21.0 0.75 63.00 sft
2x2 4 6.00 0.75 18.00 sft
1x2 2 27.75 0.75 41.63 sft
1113.94 sft
103.53 Sqm
Varanda side
Front
[HSR 9.1+ Note]
Note: In case the inclination of the
R.C.C slab is more than 25 degree,
the labour as well as through rate of
item No. 9.1 shall be increased by
10 percent and nothing extra shall
be paid for lesser inclination.
Roof Slab
Cement concrete 1:1.5:3 with stone
aggregate 20 mm nominal size for
reinforced concrete work in slabs
with inclination not exceeding 25
degrees with horizontal excluding
steel reinforcement but including
centering and shuttering laid in
position complete in all
respects.(HSR 10.82+10.95a)
Verndha
Back pillars
Centring and shuttering for flat
surfaces such as suspended floors,
roofs, landings, chhajjas, shelves
etc. inclination not exceeding 25
degree with horizontal.
Room side
Lintel Beam, Back & Centre
Back, Centre and Front
Extra for smooth shuttering
Plinth, beam (side beam) room
8
6
Room
Verndha
2 coats of bitumen 20/30
penetration at 1.65 kg. per sqm. On
plinth beam laid hot and sanded
(NS)
Horizontal wall of room Back,
Room side wall
Verndha wall
7
1x1 1 24.375 2.625 0.25 16.00 cft
1x1 1 24.75 2.25 0.25 13.92 cft
1x1 1 25.13 1.875 0.25 11.78 cft
1x1 1 25.50 1.50 0.25 9.56 cft
1x1 1 25.88 1.125 3.75 109.16 cft
1x1 1 26.25 0.75 0.25 4.92 cft
1x2 2 25.125 3.375 0.25 42.40 cft
1x2 2 24.75 3.00 0.25 37.13 cft
1x2 2 24.38 2.625 0.25 31.99 cft
1x2 2 24.00 2.25 0.25 27.00 cft
1x2 2 23.63 1.875 0.25 22.15 cft
1x2 2 23.25 1.50 0.25 17.44 cft
1x2 2 22.88 1.125 3.25 167.27 cft
VIIIth step 1x2 2 22.50 1.125 0.25 12.66 cft
1x1 1 28.875 3.375 0.25 24.36 cft
1x1 1 28.50 3.00 0.25 21.38 cft
1x1 1 28.125 2.625 0.25 18.46 cft
1x1 1 27.75 2.25 0.25 15.61 cft
1x1 1 27.375 1.875 0.25 12.83 cft
1x1 1 27.00 1.50 0.25 10.13 cft
1x1 1 26.625 1.125 3.25 97.35 cft
VIIIth step 1x1 1 26.25 0.75 0.25 4.92 cft
1x2 2 3.375 2.625 0.25 4.43 cft
1x2 2 3.75 2.25 0.25 4.22 cft
1x2 2 4.125 1.875 0.25 3.87 cft
1x2 2 4.50 1.50 0.25 3.38 cft
1x2 2 4.875 1.125 0.25 2.74 cft
1x2 2 5.25 0.75 2.75 21.66 cft
1x3 3 8.25 1.125 0.25 6.96 cft
1x3 3 7.875 0.75 3.50 62.016 cft
1x2 2 31.50 1.125 0.25 17.72 cft
1x2 2 31.125 0.75 2.50 116.72 cft
cft
1x1 1 35.125 1.125 0.25 9.88 cft
1x1 1 34.75 0.75 2.50 65.16 cft
1x4 4 1.125 3.0 0.25 3.38 cft
1x4 4 1.125 2.625 0.25 2.95 cft
1x4 4 1.125 2.25 0.25 2.53 cft
1x4 4 1.125 1.875 0.25 2.11 cft
IIIrd step
VIth step
VIth step
Vth step
VIIth step
Vth step
IVth step
Back pillars
Vth step
IVth step
IVth step
Ist step
Ist step
9
IInd step
Varanda side wall W3
Ist step
IInd step
IInd step
Plinth Protection Toe Wall
Side wall
Back Wall
IInd step
IIIrd step
Toe wall in both pillars
1
st
step
Vth step
VIIth step
IInd step
IIIrd step
IVth step
1
st
step
IIIrd step
IInd step
IIIrd step
VIth step
Centre wall W2
Side wall W2
1
st
step
1
st
step
IInd step
VIth step
1
st
step
Back wall W3
First class brick work laid in cement
sand mortar 1:6 in foundation and
plinth. [HSR 11.2]
IVth step
1x4 4 1.125 1.50 0.25 1.69 cft
1x4 4 1.125 1.125 3.75 18.98 cft
1078.78 cft
30.55 cum
1x4 4 3.375 3.00 0.25 10.13 cft
1x4 4 3.00 2.625 0.25 7.88 cft
1x4 4 2.625 2.25 0.25 5.91 cft
1x4 4 2.25 1.875 0.25 4.22 cft
1x4 4 1.875 1.50 0.25 2.81 cft
1x4 4 1.50 1.125 3.75 25.31 cft
56.25 cft
1.59 cum
1x2 2 27.75 0.75 10.00 416.25
1x2 2 21.00 0.75 10.00 315.00
1x2 2 5.25 0.75 10.00 78.75
1x3 3 7.875 0.75 5.00 88.59
898.59 cft
25.45 cum
1x2 2 3.75 0.75 6.75 37.97
1x2 2 5.00 0.75 4.25 31.88
1x2 2 1.75 0.75 4.25 11.16
1x4 4 3.00 0.75 2.00 18.00
1x2 2 1.75 0.75 2.00 5.25
1x2 2 27.75 0.75 0.75 31.22
1x2 2 21.00 0.75 0.75 23.63
1x1 1 27.75 0.75 0.75 15.61
3 2/3 7.875 2.25 35.61
1x1 1 5.25 0.75 5.625 22.15
1x1 1 6.00 0.75 6.75 30.38
262.84 cft
7.44 cum
18.00 cum
1x4 4 1.25 1.25 10.00 62.50
1x4 4 1.50 1.125 10.00 67.50
1x3 3 10.125 0.75 0.75 17.09
Vth step
IInd step
H.Wall of Room- Back & Centre
Deduction
Side wall of Room
Front wall above Arch Portion
VIth step
Door D
Vth step
Add for arch portion (b)
Back Pillars (a)
Pillar
12
Middle window W2
Ventilator 1
Ventilator 2
Lintel beam-Back & Centre
First class brick work laid in cement
sand mortar 1:3 in first storey upto
4 metres above plinth level.[HSR-
11.10]
Net Quantity
11
Side wall of verndha
First class brick work laid in cement
sand mortar 1:6 in 1st storey upto 4
meters above plinth level (HSR
11.7)
Brick Jali
Window [Back] W1
Side veranda opening
Circular portion of Arch
Room, Side Wall
Front on arch
10
1
st
step
Verndha pillar
VIth step
First class brick work laid in cement
sand mortar 1:3 in foundation and
plinth (HSR 11.5)
IIIrd step
IVth step
9
147.09 cft
4.17 cum
130.00 cft
3.68 cum
1x2 2 27.75 0.75 1.50 62.44
1x2 2 28.875 0.75 1.50 64.97
127.41 cft
1x2 2 27.75 0.375 0.375 7.80
1x2 2 28.875 0.375 0.375 8.12
15.93 cft
111.48 cft
3.16 cum
1x3 3 10.125 0.75 0.75 17.09 cft
0.48 cum
1x1 1 5.25 5.625 29.53 sft
2.74 Sqm
Brick Jali with 22.86 cm x 11.43
cm thick alternate layers laid
cement sand mortar 1:4 using 58
numbers bricks. (HSR 11.71)
Front Arches
B/F qty. item No.13 i.e. Pillar
only[A]
Extra for brick work in arches
including cost of Shuttering. (HSR
11.44 b)
(b) More than 1.50 meters, but upto
3 meters span.
Net Quantity
Brick Jali
16
15
14 First class brick work laid in cement
sand mortar 1:6 in first storey upto
4 meters above plinth + extra for
additional storey upto 4 metres
above the top of structural roof of
lower storey. (HSR
Parapet H. wall
Side wall
Deduction
Roof portion
13
12
Extra for brick work in Square or
Rectangular pillars in
buildings.(HSR11.42)
1x1 1 26.25 28.875 757.97 sft
70.44 Sqm
18
1x4 4 nos
19
1x4 4 nos
1x4 4 nos
1x1 1 26.25 21.00 551.25 sft
1x1 1 26.25 6.00 157.50 sft
708.75 sft
65.87 Sqm
Base course of floors consisting of
100 mm thick cement concrete
1:8:16 and 100 mm sand or stone
filling. (HSR 14.1)
17
Top Khurra 0.6mx0.6m. For rain
water pipe in 25mm thick cement
concrete 1:2:4 over 50mm thick
cement concrete 1:8:16. (HSR-
13.50)
21
20
Verndha
Room
Tile terracing
Bottom Khurra on ground 1.2 m x
0.6 m consisting of brick on edge
laid in cement mortar 1:3 over 75
mm cement concrete 1:8:16
including 12 mm thick cement
plaster 1:3. (HSR 13.57)
Bottom Khurra
Terracing consisting of tiles 22.86
cm x 11.43 cm x 3.81 cm laid over
87.50 mm mud filling on a layer of
25mm mud plaster and an other
layer of mud mortar for laying the
tiles, including two coats of
bitumen laid hot at 1.65 Kg. per
sqm on the top of R.C.C slab
including grouting with cement
sand mortar 1:3 and top surface to
be left clean etc. (HSR-13.13)
Providing and fixing P.V.C rain
water pipe 100mm dia 4 feet long
on parapet in cement mortar 1:3 in
parapet complete in all respect, as
per direction of Engineer-in-charge.
[N.S]
Providing and fixing asbestos strips
40x6mm size in floor including
cutting to size complete and to the
entire satisfaction of Engineer-In-
Charge. (NS)
1x5 5 26.25 131.25 rft
1x7 7 21.00 147.00 rft
1x2 2 26.25 52.50 rft
1x7 7 6.00 42.00 rft
372.75 rft
113.64 Rmt
23
1x1 1 26.25 21.00 551.25 sft
1x1 1 26.25 6.00 157.50 sft
1x2 2 3.75 0.75 5.63 sft
1x3 3 7.875 0.75 17.72 sft
732.09 sft
68.04 sqm
18 mm thick grey polished skirting
or dado consisting of bottom layer
of 15 mm thick cement sand plaster
1:3 and finished with 3 mm thick
topping of neat cement rubbed and
polished including rounding off
junction with floors. (HSR 14.18)
1x3 3 26.25 0.333 26.22 sft
1x2 2 21.00 0.333 13.99 sft
1x2 2 5.25 0.333 3.50 sft
1x2 2 7.875 0.333 5.24 sft
48.95 sft
sft
1X2 2 3.75 0.333 2.50 sft
1X1 1 6.00 0.333 2.00 sft
4.50 sft
44.46 sft
4.13 sqm
1x2 2 32.25 3.00 193.50 sft
1x1 1 27.75 3.00 83.25 sft
25
H. Room
Opening deduction
Vertical wall
Verandha wall
24
Net Quantity
Opening
Door D
Brick-on-edge flooring laid in
cement sand mortar 1:4 on 75mm
thick cement concrete 1:8:16 and
100mm sand filling cement pointed
1:2 on top [HSR 14.23]
Door D
Deduction
Room
Conglomerate floor 50 mm thick
cement concrete topping 1:2:4
(HSR 14.10)
Vertical
Horizontal
Vertical
Verndha
Verndha
22
Room Horizontal
Verandah Opening
276.75 sft
25.72 sqm
1x2 2 30.375 0.75 45.56 sft
1x1 1 27.75 0.75 20.81 sft
1x2 2 21.75 0.75 32.63 sft
1x2 2 6.75 0.75 10.13 sft
1x1 1 27.75 0.75 20.81 sft
1X2 2 8.25 1.25 20.63 sft
150.56 sft
13.99 sqm
1x1 1 26.25 9.67 253.84 sft
2x3 6 (3+2) 0.625 18.75 sft
sft
2x2 4 0.625 6.75 11.38 sft
1x2 2 0.625 3.75 6.38 sft
2x4 8 0.625 4.50 13.13 sft
2x2 4 0.625 5.0 9.63 sft
2x2 4 0.625 1.75 6.38 sft
1x2 2
(27.375
+26.25) 0.75 80.44 sft
1x2 2 0.375 4.5 6.88 sft
1x2 2 0.75 4.5 7.25 sft
1x1 1 3.75 6.75 11.50 sft
4x2 8 0.625 2.0 10.63 sft
4x2 8 0.625 3.0 11.63 sft
2x2 4 0.625 2.0 6.63 sft
2x2 4 0.625 1.75 6.38 sft
460.78 sft
42.82 sqm
1x2 2 21.0 9.67 406.14 sft
1x2 2 26.25 9.67 507.68 sft
1x2 2 6.00 9.67 116.04 sft
1x1 1 26.25 6.00 157.50 sft
1x2 2 31.375 1.50 94.13 sft
1x2 2 26.25 1.50 78.75 sft
1x1 1 6.00 2.00 12.00 sft
1372.23 sft
1x2 2 3.75 6.75 50.63 sft
26
25
27
Horizontal jamb of door
Parpet.
Front side plaster logo
Vertical wall
Above Arch Portion
Vertical
Horizontal
Below plinth beam
11.43 cm. H. wall CB. Outer side
inner side
Ventilator V2 (Verticial member)
(Horizontal
Ventilator V1 (Verticial member)
(Horizontal
Middle window
Back side Window chajja
D
Door[D] vertical jamb
Verndah jamb
Vertical H.wall
Jamb window [V]
[H]
Lintel beam room side
Horizontal
Plaster outer side plinth beam
vertical
HSR 15.7
Front
verandha side
12mm thick cement plaster 1:6
HSR 15.51
10mm thick cement plaster 1:3
Vertical wall of Room
Horizontal wall of room
Deduction D
28 15 mm thick cement plaster 1:6 on
the rough side of single or half brick
wall.
(HSR 15.12)
1x2 2 5.00 4.25 42.50 sft
Central window 1x2 2 1.75 4.25 14.88 sft
1x1 1 6.00 6.75 40.50 sft
1x1 1 4.75 5.63 26.74 sft
3 2/3 7.875 0.75 11.87 sft
1x3 3 3.0 2.0 18.00 sft
205.11 sft
1167.12 sft
108.47 sqm
1x2 2 30.375 11.50 698.63 sft
1x1 1 27.75 11.50 319.13 sft
1x1 1 27.75 7.50 208.13 sft
1225.88 sft
1x1 1 6.00 6.75 40.50 sft
1x1 1 4.75 5.625 26.72 sft
1x2 2 5.00 4.50 45.00 sft
1x3 3 3.00 2.00 18.00 sft
130.22 sft
1095.66 sft
101.83 sqm
1x3 3 26.25 0.75 59.06 sft
1x2 2 30.375 0.75 45.56 sft
104.63 sft
9.72 sqm
1x4 4 26.25 1.50 157.50 sft
1x2 2 21.00 1.50 63.00 sft
1x2 2 6.00 1.50 18.00 sft
238.50 sft
22.17 sqm
Side wall
Back, middle, centre wall
jali (4.75+1.5)
Vertical DPC
6 mm thick cement plaster 1:3 with
floating coat of neat cement 1.5mm
thick and one coat of white washing
on bearing of RCC slab.
(HSR 15.83)
20 mm thick cement plaster damp
proof course 1:3 with two coats of
bitumen at 1.65 Kg per sqm. Laid
hot and sanded (HSR 15.77a)
Vertical D.P.C
Back jail
ventilator
Deduction
Opening
Horizontal wall
Front wall
Back side window
Arch Portion
Net Total
Window
28
29
30
Ventilator
Cement pointing 1:3 deep varity on
brick and tile work. (HSR 15.61)
Opening
Deduction
Vertical wall
31
2x2.2 4.5 3.75 6.75 113.91 sft
2x2.2 4.5 5.00 4.25 95.63 sft
2x2.2 4.5 1.75 4.25 33.47 sft
2x4 8 3.00 2.00 48.00 sft
2x2 4 1.75 2.00 14.00 sft
305.00 sft
28.35 sqm
28.35 sqm
t
13.99
sqmt
r
42.82 sqmt
108.47 sqmt
165.28 sqm
t
1x2 2 3.50 6.625 46.38 sft
132.63 kg
1x2 2 4.75 4.25 40.38 sft
103.36 kg
1x2 2 1.75 4.25 14.88 sft
38.08 kg
1x1 1 2.25 5.75 12.94 sft
33.12 kg
307.19 Kg
1x4 4 3.00 1.00 12.00 sft
1x2 2 1.75 1.00 3.50 sft
15.50 sft
33
34
B/F qty. item No. 28
Weight @2.56kg/sft.
White washing two coats + two
coats of color wash. (HSR
16.47+16.50)
Steel door with 40x40x6mm angle
for doors and 35x35x5mm angle for
windows, 30x5 mm braced strips
and 2 mm thick sheet. (N.S)
Ventilator V2
a) Door D1
b) Window shutter size W1
W2
Applying primer coat with metal
primer on new steel or iron work
including preparation of surface.
(HSR 16.9)
Fiber sheet in ventilators (NS)
35x35 x5mm
Ventilator V1
Painting two coats excluding
priming coat with synthetic enamel
paint in all shades on new wood
work or plastered or concrete
surface to given an even shade
(HSR 16.3).
B/F qty. item No. 33
Weight @2.56kg/sft.
Cup Board
Weight @2.56kg/sft.
Weight @2.86kg/sft.
B/F qty. item No. 27 (lintel beam )
B/F qty. item No. 29
V2
D
W1
W2
V1
35
36
32
1.44 sqm
1x3 3 No
38
1.44
sqm
t
2x1 2
3.75+
6.875
+6.875 35.00 rft
35.00 rft
10.67 mtr
2x1 2
2 x
(5+4.25
) 37.00 rft
1x2 2
2x(1.75
+4.25) 24.00 rft
2x2 4
2x(4.25
)1.5 46.00 rft
1x4 4 2(3+2) 40.00 rft
W2
Pressed steel sheet frames
(Chowkhat), consisting of 2 mm
thick steel sheet of the specified
section, including iron lugs (hold
fasts), iron hinges, conforming to
PWD specifications, including bolts
for fixing stops, locknotch
provision for receiving tower bolts,
and finished with one coat of ready-
mixed paint red lead non-setting
primer, of approved quality, fixed in
position including the cost of
cement concrete 1:3:6 for filling in
the frame and cement concrete 1:3:6
for lugs complete:- (HSR 18.34)
(b) Size 76 mm x 38 mm with 35
mm rebate.
Providing and fixing sliding bolt
with nuts and screws etc. complete-
(HSR 17.83)
c) Iron
(a) Size 89 mm x 50 mm with 40
mm rebate.
Door D
Ventilator V1
Wire gauze of 140G or 120 G
designation fixed on steel windows
of standard rolled steel section, with
3mm thick flat iron cover moulding
of 12.5 mm width, fixed with
machine screws welded complete in
all respect. (HSR 18.32)
Window W1
36
37
39
1x2 2
2(1.75+
2) 15.00 rft
1x4 4 2.666 10.66 rft
1x2 2 1.416 2.83 rft
1x1 1
2(2.5+6
) 17.00 rft
192.50 rft
58.69 mtr
1x2 2 26.25 52.50 rft
1x2 2 28.875 57.75 rft
110.25 rft
33.61 rmtr
41
16.48 Qtl
2x17 34 4.50 153.00 Rft
2x17 34 1.50 51.00 Rft
204.00 Rft
62.20 Rmt
70.28 kg
0.70 Qtl
Ventilator V1 ( Horizontal)
As per design detailed
12 mm square bar.
V2 ( vertical)
Cub board
Wrought iron and mild steel using
angles flats, square, bars, tees and
channels) ladders, grills, grating
frames, window guards, iron doors
open able or fixed stair case or
parapet or any other type of railing,
gates and tree guards etc. including
cost of screws and welded rods or
bolts and nuts complete fixed in
position. (HSR 18.12)
Cement concrete 1:2:4 gola
10cmx10cm quadrant along
junction of roof with parapet wall
finished smooth, whrer specially
specified. (HSR 13.64)
40
42
W2
Weight @1.13Kg per Rmt
@3C/C W1
Fe-500 EQR TMT steel bars for
bars RCC, works, where not
including in the complete rate of
RCC including bending, binding
and placing in position complete.
(HSR 18.22)
V2
39
43
2 No
44
1 No.
1x2 2 0.375 6.00 4.50 Sft
1x2 2 0.375 2.50 1.88 Sft
6.38 Sft
0.59

sqm
46
101.83 sqm
47
70.44 sqm
Providing teaching chalk boards
with dark green pigment mixed with
neat cement on 12 mm thick cement
sand plaster 1:3 with core belling all
around of size cement 6 X 4.5
complete as per design and
providing marble stone at the
bottom of size 1'-0"x9" for keeping
duster chalk etc. [N.S]
45
Finishing walls with exterior
decorative cement based paint such
as snowcem, Robbincem etc. on
new work , two coats to give an
even shade (HSR 16.61)
11.43 cm. thick brick wall laid in
cement sand mortar 1:4 in
superstructure. (HSR 11.48a)
Cement Pointing 1:2 flush on brick
& tile walls (HSR 15.62)
Painting for logo, new letters and
figures of any shade with synthetic
enamel black or any other approved
colour to give an even shade.
Size 6 X2 (N.S)
Sr. No. Description Shape of Bars Dia of Bars Cutting
Length
No.
8 tor 10 tor 12 tor 16 tor 20 tor
1 Roof Beam B1
Bottom Bar 1,3 20 30.875 2 x 2 123.50
Top Bar 6 20 9.75 2 x 1 19.50
Crank 2 20 34.375 2 x 1 68.75
Ring 6" c/c 8 4.25 2 x 63 535.50
Top Bars 4, 5 20 30.875 2 x 2 123.50
2 Ver. Beam B2(Hor.)
Bottom Bar 1,2,3 16 28.25 1 x 3 84.75
Top Bars 4, 5 12 28.25 1 x 2 56.50
Ring 9" c/c 8 3.25 1x 37 120.25
3 Lintel Beam B2(Ver.)
Bottom Bar 1,2,3 16 8.50 2 x 3 51.00
Top Bars 4, 5 12 8.50 2 x 2 34.00
Ring 9" c/c 8 3.50 2 x 9 63.00
4 Lintel Beam B3(Hor.)
top & bottom 1 to 4 12 31.75 2 x 4 254.00
Ring 9" c/c 8 3.00 2 x 37 222.00
5 Lintel Beam B3(Ver.)
top & bottom 1 to 4 12 35.00 2 x 4 280.00
Ring 9" c/c 8 3.0 2 x 42 252.00
6 Plinth beams 12 31.25 3 x 4 375.00
Ring 9" c/c 8 3.0 3 x 37 333.00
12 35.0 2 x 4 280.00
Ring 9" c/c 8 3.0 2 x 39 234.00
7 Bed plates 12 2.50 6 x 4 60.00
12 1.875 2 x 4 15.00
12 1.50 2 x 4 12.00
Ring 6" c/c 8 2.50 23 57.50
STEEL CALCULATION OF LAB/COMPUTER ROOM 26'-3"X21'-0" WITH 6'-0" VERANDAH
Total Cutting Length
8 Sun shade 8 8.625 2 x 3 51.75
8 2.25 2 x 15 67.50
9 Cupboard 8 1.375 4 x 6 33.00
8 3.25 4 x 2 26.00
10 Roof slab
St. Steel bars 10 27.00 1 x 28 756.00
Crank bars 10 27.75 1 x 27 749.25
Extra Bars on beam 10 6.00 2 x 28 336.00
On end wall 10 2.625 2 x 28 147.00
Roof slab Temp/disribution
St. Steel bars 8 30.125 1 x 21 632.63
Crank bars 8 30.625 1x 20 612.50
Extra under crank portion
bars 8 30.125 1x 30 903.75
Extra Bars on wall 8 6.00 1 x 21 126.00
On end wall 8 2.625 2 x 21 110.25
11 Vertical Bar on joints 16 16.0 4 64.00
Total Rft 4380.63 1988.25 1366.5 199.75 335.25
Rmt 1335.56 606.17 416.62 60.90 102.21
Weigth of Bars in Kg/Rmt 0.39 0.62 0.89 1.58 2.47
Kg. 520.87 375.83 370.79 96.22 252.46
Total 1616.16 Kg. / 16.16 Qtl.
Add 2% extra 10.42 7.52 7.42 1.92 5.05
531.28 383.34 378.20 98.15 257.51
Grand Total 1648.49 Kg. / 16.48 Qtl.