Anda di halaman 1dari 34

Risk Category

(Phase wise) COST/E.Hr


1 Technical Risks
Requirements
Specifications
Technology
Complexity
Interfaces
Performance
Quality
Safety
Security
2 External Risks
Contractors
Sub-contractors
Suppliers
Regulatory
Market
Customer
Weather
3 Organizational Risks
Project dependencies
Resources
Funding
Prioritization
Org. Breakdown Str
Resp. Assigned Matrix
4 Proj Mgmt Risks
Estimating
Planning
Controlling
Resource Utilization
Communication
Information
Health/Safety
RISK REGISTER
Project Name:
Description of Risks
Identified Risks/Triggers
Impact (+ ve or - ve) on Project Objectives
Environment
5 Commercial Risks
Contractual
Financial
Regulatory
Consents
Reputation
Project Phase DELIVERABLES CEO
Major deliverable/WP deliverables
Responsibility Assignment Matrix - RAM
NAME OF THE PROJECT
Control Qualitative Analysis
TIME QUALITY SCOPE I/E VH/H/M/L/VL
Risk
Owner
Project Manager:
Impact (+ ve or - ve) on Project Objectives
Project Manager
A B C D E
PERMORMING ORGANIZATION
Sr.Mgmt
% P Consequence Risk
%P x I Thresholds Time period (hr/dy) Cost/Res hrs
Date of Review:
Risk Buffer
Ph-1 I/c Ph-2 I/c Ph-3 I/c Ph-4 I/c Function Hd-1
Function Heads
PERMORMING ORGANIZATION
Phase Incharges
Priority/
Resource Buffer Ranking EV VAC-1 VAC-2 VAC-3 CPI SPI
Date of Review:
Risk Buffer TRENDS
CEO Sr. Proj
Function Hd-2 Function Hd-3 mgmt mgr
Function Heads
PERMORMING ORGANIZATION
Function Heads
Origination Organization
List of potential Common Risk
Responses Causes Positive Risk Strategies
Avoid/Transfer/Mitigate/Accept
Date of Review:
Contingency Plans
Phase Team Members
Incharges
Function Heads
Origination Organization
Negative Risk Strategies
Avoid/Share/EnhanceAccept
STATUS REPORT &
ACTION PLAN
Date of Review:
Contingency Plans
Performing Organization
Team Members
Fallback (backup) Plan Workaround Plan
Results Results
Date of Review:
WP-D
DAY A B C Total %C EV AC Rate
M.Hr. M.Hr. M.Hr. M.Hr. A.MHr. Rs.
1 8 8 75% 6 8
2 8 8
3 8 10 18
4 8 10 6 24
5 8 10 6 24
6 10 6 16
7 10 6 16
8 6 6
9 6 6
10 6 6 BAC=
Planned %P 6.1% SV= EV-PV -2 CV= EV-AC -2
Completed %C 4.5% SPI= EV/PV 0.75 CPI= EV/AC 0.75
SV% SV/PV -25% CV% CV/EV -33%
VAC-1 BAC-EAC
VAC-2 BAC-EAC
PHASE -A:
BACph PVph
WP BAC %P PV %C EV AMHr
A 500 80% 400 60% 300 375 500 400
B 600 75% 450 50% 300 325 1100 850
C 450 50% 225 45% 202.5 250 1550 1075
D 132 6.1% 8 4.5% 6 8 1682 1083
E 400 2082
F 350 2432
G 300 BAC= 2732
Actuals Activities
Cummulative
Planned %Pph 39.6% SV= EV-PV -274.5 CV= EV-AC -149.5
Completed %Cph 29.6% SPI= EV/PV 75% CPI= EV/AC 84%
SV% SV/EV -25% CV% CV/EV -18%
VAC-1 BAC-EAC
VAC-2 BAC-EAC
PROJECT -A:
BACp
PHASE PV %Pph PVp %Cph EV AMHr
A 2732 39.6% 1083 29.6% 809 958 2732
B 3550 6282
C 2880 9162
D 3850 13012
Planned %P 8.3% SV= EV-PV -274.5 CV= EV-AC -149.5
Completed %C 6.2% SPI= EV/PV 0.747 CPI= EV/AC 0.844
SV% SV/PV -25% CV% CV/EV -18%
VAC-1 BAC-EAC
VAC-2 BAC-EAC
Calculating Risk in Project Network based on PERT calculation
ACTIVITY Predecessor Optimistic Most LikelyPessimistic Time EstimateVariance Std Dev
Start (o+4m+p)/6
A Start 10 22 22 20 4 2
B Start 20 20 20 20 0 0
C Start 4 10 16 10 4 2
D a 2 14 32 15 25 5
E b,c 8 8 20 10 4 2
Cummulative
F b,c 8 14 20 14 4 2
G b,c 4 4 4 4 0 0
H c 2 12 16 11 5.4 2.33
I g,h 6 16 38 18 28.4 5.33
J d,e 2 8 14 8 4 2
Finish j,i,f
43 33 5.745
Assume Project Manager has commited 50 days to the customer, what are the chances of meeting the dead lines?
We need to calculate the value of 'Z'
Z = (D-u)/Std Deviation
D = Desired Project Completion Date = 50 days
u = The critical time of the project = 43 days
Z= 1.22 Std Deviation of the critical path = 5.745
Z = The number of Std Deviations of a normal distribution
Refer Table A below, The probability Z of 1.22 (column 1.2 and .02) occurs .8888 or say 89%
We can also calculate backwards:
What deadline is consistent with a 95% probability of on-time completion?
Here the 'Z' value associated with 0.95 is 1.645
We know that u is 43 days and Std Deviation is 5.745
D = u + Std Dev ( correspondence value of Z)
52.45
What are the chances that the non-critical Path c-h-I will make the project late?
Now D = 43, so we have Z= (43-39)/6.155 = 0.65
Now Z = .65 is associated with 0.74 of being on time, or 1-.74 = 0.26 chances of delaying the project
Duration Variance Std Dev
Project Duration =
Refering non-critical path C, H, I
39 37.9 6.155 Z= 0.65
Assuming that these two paths (a-b-j and c-h-I) are independent. What is the probability that both paths will be complated on time.
The probability is 0.50 x 0.74 = 0.37
TABLE - A: Cummulative (Single Tail) Probabilities of the Normal Probability Distribution
Z 0.00 0.01 0.02 0.03 0.04 0.05 0.06 0.07
0.0 0.5000 0.5040 0.5080 0.5120 0.5160 0.5199 0.5239 0.5279
0.1 0.5398 0.5438 0.5478 0.5517 0.5557 0.5596 0.5636 0.5675
0.2 0.5793 0.5832 0.5871 0.5910 0.5948 0.5987 0.6026 0.6064
0.3 0.6179 0.6217 0.6255 0.6293 0.6331 0.6368 0.6406 0.6443
0.4 0.6554 0.6591 0.6628 0.6664 0.6700 0.6737 0.6772 0.6808
0.5 0.6915 0.6950 0.6985 0.7019 0.7054 0.7088 0.7123 0.7157
0.6 0.7257 0.7291 0.7324 0.7357 0.7389 0.7422 0.7454 0.7486
0.7 0.7580 0.7611 0.7642 0.7673 0.7704 0.7734 0.7764 0.7794
0.8 0.7881 0.7910 0.7939 0.7967 0.7995 0.8023 0.8051 0.8078
0.9 0.8159 0.8186 0.8212 0.8238 0.8264 0.8289 0.8315 0.8340
1.0 0.8413 0.8438 0.8461 0.8485 0.8508 0.8531 0.8554 0.8577
1.1 0.8643 0.8665 0.8686 0.8708 0.8729 0.8749 0.8770 0.8790
1.2 0.8849 0.8869 0.8888 0.8907 0.8925 0.8944 0.8962 0.8980
1.3 0.9032 0.9049 0.9066 0.9082 0.9099 0.9115 0.9131 0.9147
1.4 0.9192 0.9207 0.9222 0.9236 0.9251 0.9265 0.9279 0.9292
1.5 0.9332 0.9345 0.9357 0.9370 0.9382 0.9394 0.9406 0.9418
1.6 0.9452 0.9463 0.9474 0.9484 0.9495 0.9505 0.9515 0.9525
1.7 0.9554 0.9564 0.9573 0.9582 0.9591 0.9599 0.9608 0.9616
1.8 0.9641 0.9649 0.9656 0.9664 0.9671 0.9678 0.9686 0.9693
1.9 0.9713 0.9719 0.9726 0.9732 0.9738 0.9744 0.9750 0.9756
2.0 0.9772 0.9778 0.9783 0.9788 0.9793 0.9798 0.9803 0.9808
2.1 0.9821 0.9826 0.9830 0.9834 0.9838 0.9842 0.9846 0.9850
2.2 0.9861 0.9864 0.9868 0.9871 0.9875 0.9878 0.9881 0.9884
2.3 0.9893 0.9896 0.9898 0.9901 0.9904 0.9906 0.9909 0.9911
2.4 0.9918 0.9920 0.9932 0.9925 0.9927 0.9929 0.9931 0.9932
2.5 0.9938 0.9940 0.9941 0.9943 0.9945 0.9946 0.9948 0.9949
2.6 0.9953 0.9955 0.9956 0.9957 0.9959 0.9960 0.9961 0.9962
2.7 0.9965 0.9966 0.9967 0.9968 0.9969 0.9970 0.9971 0.9972
2.8 0.9974 0.9975 0.9976 0.9977 0.9977 0.9978 0.9979 0.9979
2.9 0.9981 0.9982 0.9982 0.9983 0.9984 0.9984 0.9985 0.9985
3.0 0.9987 0.9987 0.9987 0.9988 0.9988 0.9989 0.9989 0.9989
3.1 0.9990 0.9991 0.9991 0.9991 0.9992 0.9992 0.9992 0.9992
3.2 0.9993 0.9993 0.9994 0.9994 0.9994 0.9994 0.9994 0.9995
3.3 0.9995 0.9995 0.9995 0.9996 0.9996 0.9996 0.9996 0.9996
3.4 0.9997 0.9997 0.9997 0.9997 0.9997 0.9997 0.9997 0.9997
Projects 6 6 6 6 6 6 6 6
A
B
C
D
E
F
G
H
Total Hrs.
Experience Verification - Reporting Months
BACKUP DOCUMENT BEFORE FILLING EXPERIENCE VERIFICATION FORM
(6 years if graduate; and 8 years if non-graduate from the date you apply for PMP certification)
PROJECTS
A B C D E F G
List major deliverables for each project work that you personally undertook:
How to prepare for PMP certification: Assumption: Study @ 2 effort hrs per day only
week #
1 Definitions - PMBOK
2 Understanding Input-Output relationship : refer to PMCC Handouts
3 Mug-up Input-Output relationship : refer to PMCC Handouts
4 Understand Generic Management & Project Initiation
5 Understand Project Scope mgmt
6 Understand Project Time & Cost mgmt
7 Understand Project Quality, HR and Communication mgmt
8 Understand Project Risk mgmt & perform PMKQ practice
GO FOR PMP CERTIFICATION
Controlling
Closing
Proj Total hrs:
Initiation
Planning
Execution
PV EV AC
M.Hr. M.Hr. M.Hr.
8 6 8
16
34
58
82
98
114
120
126
132
ETC= BAC-EV 126 To complete balace work
EAC-1 AC+ETC 134 To complete total work
EAC-2 BAC/CPI 176 To complete total work
-2
-44
EVph ACph
300 375
600 700
802.5 950
808.5 958
Cummulative
Cummulative
ETC= BAC-EV 1924 To complete balace work
EAC-1 AC+ETC 2882 To complete total work
EAC-2 BAC/CPI 3237 To complete total work
-149.5
-505.18
PVp EVp ACp
1083 808.5 958
ETC= BAC-EV 12204 To complete balace work
EAC-1 AC+ETC 958 To complete total work
EAC-2 BAC/CPI 15418 To complete total work
12054
-2406.1
Cummulative
Assume Project Manager has commited 50 days to the customer, what are the chances of meeting the dead lines?
D = Desired Project Completion Date = 50 days
u = The critical time of the project = 43 days
Std Deviation of the critical path = 5.745
Z = The number of Std Deviations of a normal distribution
Assuming that these two paths (a-b-j and c-h-I) are independent. What is the probability that both paths will be complated on time.
TABLE - A: Cummulative (Single Tail) Probabilities of the Normal Probability Distribution
0.08 0.09
0.5319 0.5359
0.5714 0.5753
0.6103 0.6141
0.6480 0.6517
0.6844 0.6879
0.7190 0.7224
0.7517 0.7549
0.7823 0.7582
0.8106 0.8133
0.8365 0.8389
0.8599 0.8621
0.8810 0.8880
0.8997 0.9015
0.9162 0.9177
0.9306 0.9319
0.9429 0.9441
0.9535 0.9545
0.9625 0.9633
0.9699 0.9706
0.9761 0.9767
0.9812 0.9817
0.9854 0.9857
0.9887 0.9890
0.9913 0.9916
0.9934 0.9936
0.9951 0.9952
0.9963 0.9964
0.9973 0.9974
0.9980 0.9981
0.9986 0.9986
0.9990 0.9990
0.9993 0.9993
0.9995 0.9995
0.9996 0.9997
0.9997 0.9998
@1200 hr/y
Total
6 6 6 6 7200 hrs
5040 30% effective Utilization
4680 35% effective Utilization
Total 4500 37.5% effective Utilization
Experience Verification - Reporting Months
BACKUP DOCUMENT BEFORE FILLING EXPERIENCE VERIFICATION FORM
(6 years if graduate; and 8 years if non-graduate from the date you apply for PMP certification)
PROJECTS
H hrs
List major deliverables for each project work that you personally undertook:
Assumption: Study @ 2 effort hrs per day only
Understanding Input-Output relationship : refer to PMCC Handouts
Mug-up Input-Output relationship : refer to PMCC Handouts
APPLY FOR PMP CERTIFICATION
Understand Project Quality, HR and Communication mgmt
Understand Project Risk mgmt & perform PMKQ practice
1 IT PROJECT
2 BUSINESS OPPORTUNITY
3 INITIATE BUSINESS OPPORTUNITY
4 Start Project
5 Create Opportunity/Problem Statement
6 Develop Initial Project Team
7 GATHER SUPPORTING DATA
8 Gather High Level Business Requirements
9 Conduct Management/Business Survey
10 Analyze Survey Findings and Business Functions
11 Develop High Level Scope, Objectives, and Constraints
12 ANALYZE CURRENT SYSTEM
13 Assess Current System Capacity/Functionality
14 Assess Current System Cost/Benefit
15 ASSESS ALTERNATIVES
16 Define General Systems Requirements
17 Define Potential Build vs. Buy Alternatives
18 Evaluate Technical Implications of Alternatives
19 Estimate Cost/Benefit/Risk of Alternatives
20 Compare Potential Solutions with Project Objectives
21 PRESENT ALTERNATIVES
22 Review Findings on Alternatives with Project Sponsor
23 Obtain Sponsor Approval
24 Determine Project Priority
25 DEVELOP PROJECT PLAN
26 Finalize Project Definition/Scope Statement
27 Determine Project Staffing Needs - User and Technical
28 Develop Project Plan/Schedule
29 FUNCTIONAL REQUIREMENTS AND LOGICAL DESIGN
30 DESIGN FUNCTIONAL SYSTEM
31 Conduct JAD to Define and Document Detailed Functional Requirements
32 Develop Conceptual Design
33 Document Business Process Flows
34 Define Logical I/O Format
35 Define Processing Requirements
36 Define Logical Data Structures
37 Develop Screen Dialogs
38 Develop Overall System Flow
39 Identify Acceptance Testing Criteria
40 Hold Design Walkthru with User and Technical Analyst(s)
41 PREPARE USERS DOCUMENTS
42 Determine User Operations/Data Entry Procedures
43 Determine User Training & Education Requirements
44 Identify Security Requirements
45 Prototype Business Process
SAMPLE PROJECT FOR DEVELOPING PROJECT PLAN
For a typical IT Project, the deliverables upto level-2 has been given below. You
are required to eloborate further 2 levels of deliverables upto "Work Packages".
You are then required to list down the activities for each Work Package.
Inter-Link
Work
Packages
.
46 REVIEW LOGICAL DESIGN
47 Prepare Presentation for Project Sponsor
48 Obtain Sponsor Approval of Logical Design
49 INTERNAL REQUIREMENTS AND PHYSICAL DESIGN
50 DEVELOP DETAILED SPECIFICATIONS
51 Outline Programs, Files, Jobs, Tables
52 Identify Data Elements
53 Define/Document Program Specifications
54 Define/Document Job Specifications
55 Define/Document File Specifications
56 Define/Document Table Specifications
57 Define/Document Detailed Screen Layout and Report Specifications
58 Define/Document Security Specifications
59 Hold Specification Walkthru with Technical Analyst(s)
60 FINALIZE TECHNICAL REQUIREMENTS
61 Define System Control Considerations
62 Define System Backup/Recovery Needs
63 Determine Data Retention Requirements
64 Review Memory Requirements
65 Review Peripheral Equipment
66 Review Workstation Requirements
67 Review Disk Space Requirements
68 Review CPU Requirements
69 Determine Technical Training Requirements
70 REVIEW PHYSICAL DESIGN
71 Prepare/Conduct Management Review of Physical Design
72 Obtain Sponsor Approval of Physical Design
73 CODING AND TESTING
74 ESTABLISH PROGRAM TEST STRATEGY
75 Review Physical Testing Environment
76 Schedule and Prioritize Test Shifts
77 Establish Test File Sources
78 Establish Test Sequence
79 Determine Software Testing Requirements
80 Determine Operations Requirements
81 Test Strategy Complete
82 CODE AND UNIT TEST PROGRAMS
83 Code and Unit Test Required Program #1
84 Code and Unit Test Required Program #2
85 Code and Unit Test Required Program #3
86 Code and Unit Test Required Program #4
87 Code and Unit Test Required Program #5
88 Code and Unit Test Required Program # n
89 OUTLINE TEST SPECIFICATIONS
90 Develop System Test Plan
91 Develop Stress Test Plan
92 Develop Acceptance Test Plan
93 Develop Parallel Test Plan
94 SYSTEM TEST
95 Execute System Tests
96 Perform Stress Testing
97 Review Results with User and Operations
98 Complete System Test
99 ACCEPTANCE TEST
100 Finalize Acceptance Test Criteria
101 Review Acceptance Test Plan
102 Perform Acceptance Test
103 Complete Acceptance Test
104 PARALLEL TEST
105 Review Parallel Test Plan
106 Perform Parallel Test
107 Complete Parallel Test
108 IMPLEMENTATION
109 PLAN AND COMMIT COMPUTER SERVICES
110 Prepare Site in User Location(s)
111 Order Computer Supplies
112 Review Test Controls
113 Review Site Operation
114 Review Personnel Requirements
115 Establish System Security
116 SYSTEM DOCUMENTATION
117 Complete Operations Documentation
118 Complete Program Documentation
119 Complete User Guide
120 PREPARE ORGANIZATION & FINALIZE USER PROCS
121 Finalize User Documentation
122 Finalize Data Input Procedures
123 Finalize Data Output Documents
124 Review Manual User Procedures
125 Review Business Recovery Plans
126 Perform Hardware Testing
127 COMPLETE USER EDUCATION AND TRAINING
128 Train Trainers
129 Train Installation Team
130 Train User Personnel
131 INVENTORY SOFTWARE/REVISE DOCUMENTATION
132 Prepare Software Libraries
133 Build Documentation Library
134 DEVELOP SYSTEM CONVERSION REQUIREMENTS
135 Develop Conversion Plan/Schedule
136 Design Conversion Programs/Procedures
137 Hold Conversion Strategy Walkthru
138 Execute Mock Conversions
139 Execute Data Conversion
140 Data Conversion Complete
141 CUTOVER
142 Set Up Environment
143 Install Data Bases
144 Move from Test to Production
145 Monitor and Certify the System
146 OBTAIN SPONSOR SIGN-OFF
147 Secure Sponsor Sign-off on System
148 Secure Sponsor Sign-off on User Guides
149 INITIATE NEW SYSTEM OPERATION
150 Transfer Operational Responsibility to User
151 Establish Change Control Procedures
152 Transfer System Responsibility to Technical Maintenance Function
153 System Implementation Complete
154 CLOSE DOWN OLD SYSTEM
155 Establish Programs Retention Period
156 Archive System Documentation
157 Archive Master Data Files
158 Re-Allocate Computer Resources
159 Archive Programs
160 CONDUCT EVALUATION
161 Develop/Distribute Customer Questionnaire
162 Evaluate Customer Responses
163 Hold Lessons Learned Meeting
164 End Project
165 PROJECT ADMINISTRATION
166 Project Administration
167 Project Planning and Control
168 Project Meetings
169 Staff Administration - Non-Project Related
170 Staff Activities
171 Staff Meetings
172 Production Support and Maintenance
WBS ID WBS DESCRIPTION
1 Power & Utilities Simulation Model - PWUS
1.1 REQUIREMENTS PHASE
1.1.1 Discover User NEEDS
1.1.1.1 Prepare Preliminary User Needs / Requirements
1.1.1.1.1 Establish Project Objectives & Management Concerns
1.1.1.1.2 Get functional requirements
1.1.1.1.3 Get information on external interface
1.1.1.1.4 Get operating environment requirements
1.1.1.1.5 Get performance requirements
1.1.1.1.6 Get standard requirements
1.1.1.1.7 Get special user requirements
1.1.1.1.8 Prepare Prototype
1.1.1.1.9 Evaluate Prototype
1.1.1.1.10 Conduct feed back session
1.1.1.1.11 Document User Needs and Preliminary Requirements
1.1.1.2 Technically Analyze Requirements
1.1.1.2.1 Develop process model
1.1.1.2.2 Develop logical data
1.1.1.2.3 Verify Requirements
1.1.1.2.4 Set up data dictionary
1.1.1.3 Obtain Approval of Customer needs and requirements
1.1.2 Prepare Preliminary Project Planning
1.1.2.1 Develop Preliminary Project Plan
1.1.2.1.1 Prepare Preliminary Scope statement
1.1.2.1.2 Prepare WBS upto level-1 of project life cycle
1.1.2.1.3 Prepare Milestone Chart
1.1.2.1.4 Prepare RAM, Comm Plan, Sch., Scope, Cost & Risk Mgmt Plan
1.1.2.1.5 Prepare change control system
1.1.2.1.6 Prepare Resource estimation and project schedule
1.1.2.1.7 Prepare Preliminary Project Plan
1.1.2.2 Prepare High-level project Cost and Schedule Budget
1.1.2.2.1 Estimate high-level project cost and prepare budget
1.1.2.2.2 Prepare high-level Milestone Schedule of project life cycle
1.1.2.2.3 Document project constraints and assumptions
1.1.2.3 Obtain Preliminary Project Plan Approval
1.1.3 Finalize Project Requirements
1.1.3.1 SRS finalization
1.1.3.1.1 Prepare SRS
1.1.3.1.2 Obtain Approval of SRS
1.1.3.2 Test Case Preparation
1.1.3.2.1 Prepare Test case
1.1.3.2.2 Obtain Approval of Test case
1.1.3.3 Obtain Customer Approval
1.2 DESIGN PHASE
1.2.1 Standards & Checklists Preparation
1.2.1.1 Top Down Design Standards & Checklists
1.2.1.1.1 Top Down Design Standards & Checklists Preparation
1.2.1.1.2 Top Down Design Standards & Checklists Review
1.2.1.1.3 Top Down Design Standards & Checklists Fixation
1.2.1.1.4 Top Down Design Standards & Checklists Verification
1.2.1.1.5 Top Down Design Standards & Checklists SQA Review
1.2.1.1.5 Top Down Design Standards & Checklists Baseline and Release
1.2.1.2 Coding Standards & Checklists
1.2.1.2.1 Coding Standards & Checklists Preparation
1.2.1.2.2 Coding Standards & Checklists Review
1.2.1.2.3 Coding Standards & Checklists Fixation
1.2.1.2.4 Coding Standards & Checklists Verification
1.2.1.2.5 Coding Standards & Checklists SQA Review
1.2.1.2.6 Coding Standards & Checklists Baseline and Release
1.2.1.3 Math Modeling Standards & Checklists
1.2.1.3.1 Math Modeling Standards & Checklists Preparation
1.2.1.3.2 Math Modeling Standards & Checklists Review
1.2.1.3.3 Math Modeling Standards & Checklists Fixation
1.2.1.3.4 Math Modeling Standards & Checklists Verification
1.2.1.3.5 Math Modeling Standards & Checklists SQA Review
1.2.1.3.6 Math Modeling Standards & Checklists Baseline and Release
1.2.1.4 Graphics Standard & Checklists
1.2.1.4.1 Graphics Standards & Checklists Preparation
1.2.1.4.2 Graphics Standards & Checklists Review
1.2.1.4.3 Graphics Standards & Checklists Fixation
1.2.1.4.4 Graphics Standards & Checklists Verification
1.2.1.4.5 Graphics Standards & Checklists SQA Review
1.2.1.4.6 Graphics Standards & Checklists Baseline and Release
1.2.2 Top Down Design
1.2.2.1 TDD Preparation
1.2.2.2 TDD Review
1.2.2.3 TDD Fixation
1.2.2.4 TDD Verification
1.2.2.5 SQA Review
1.2.2.6 TDD Baseline and Release
1.2.3 Math Modeling
1.2.3.1 MMN Preparation
1.2.3.2 MMN Review
1.2.3.3 MMN Fixation
1.2.3.4 MMN Verification
1.2.3.5 SQA Review
1.2.3.6 MMN Baseline and Release
1.3 DEVELOPMENT PHASE
1.3.1 Coding
1.3.1.1 Utility Boiler Coding
1.3.1.1.1 Coding
1.3.1.1.2 Code Review
1.3.1.1.3 Code review Fixation
1.3.1.1.4 Code Review Verification
1.3.1.1.5 SQA Review
1.3.1.1.6 Code Baseline and Release
1.3.1.2 Pressure Flow Network Coding
1.3.1.2.1 Coding
1.3.1.2.2 Code Review
1.3.1.2.3 Code review Fixation
1.3.1.2.4 Code Review Verification
1.3.1.2.5 SQA Review
1.3.1.2.6 Code Baseline and Release
1.3.1.3 Wet Gas Compressor Coding
1.3.1.3.1 Coding
1.3.1.3.2 Code Review
1.3.1.3.3 Code review Fixation
1.3.1.3.4 Code Review Verification
1.3.1.3.5 SQA Review
1.3.1.3.6 Code Baseline and Release
1.3.1.4 Turbine Coding
1.3.1.4.1 Coding
1.3.1.4.2 Code Review
1.3.1.4.3 Code review Fixation
1.3.1.4.4 Code Review Verification
1.3.1.4.5 SQA Review
1.3.1.4.6 Code Baseline and Release
1.3.1.5 Surface Condenser Coding
1.3.1.5.1 Coding
1.3.1.5.2 Code Review
1.3.1.5.3 Code review Fixation
1.3.1.5.4 Code Review Verification
1.3.1.5.5 SQA Review
1.3.1.5.6 Code Baseline and Release
1.3.2 Configuration
1.3.2.1 Instructor Station Confugration
1.3.2.1.1 Instructor Station Configuration Preparation
1.3.2.1.2 Instructor Station Configuration Review
1.3.2.1.3 Instructor Station Configuration Fixation
1.3.2.1.4 Instructor Station Configuration Verification
1.3.2.1.5 Instructor Station Configuration Baseline and Release
1.3.2.2 Operator Station Configuration
1.3.2.2.1 Operator Station Configuration Preparaton
1.3.2.2.2 Operator Station Configuration Review
1.3.2.2.3 Operator Station Configuration Fixation
1.3.2.2.4 Operator Station Configuration Verification
1.3.2.2.5 Operator Station Configuration Baseline and release
1.3.2.3 Graphics Development
1.3.2.3.1 Graphics Preparation
1.3.2.3.2 Graphics Review
1.3.2.3.3 Graphics Fixation
1.3.2.3.4 Graphics Verification
1.3.2.3.5 Graphics Baseline and Release
1.3.3 Unit Testing
1.3.3.1 Utility Boiler Unit Testing
1.3.3.1.1 Testing
1.3.3.1.2 Bug Fixing
1.3.3.1.3 Verification
1.3.3.2 Pressure Flow Network Unit Testing
1.3.3.2.1 Testing
1.3.3.2.2 Bug Fixing
1.3.3.2.3 Verification
1.3.3.3 Wet Gas Compressor Unit Testing
1.3.3.3.1 Testing
1.3.3.3.2 Bug Fixing
1.3.3.3.3 Verification
1.3.3.4 Turbine Unit Testing
1.3.3.4.1 Testing
1.3.3.4.2 Bug Fixing
1.3.3.4.3 Verification
1.3.3.5 Surface Condenser Unit Testing
1.3.3.5.1 Testing
1.3.3.5.2 Bug Fixing
1.3.3.5.3 Verification
1.3.4 User Manual Preparation
1.3.4.1 Preparation of User Manual
1.3.4.1.1 Review User manual
1.3.4.1.2 Fixation User manual
1.3.4.1.3 Verification user manual
1.3.4.1.4 SQA Review
1.3.4.1.5 Conversion of User Manual to Online Help
1.3.4.1.6 Review of Online Help
1.3.5 Integrating Testing
1.3.5.1 Integrated Dynamic Testing
1.3.5.1.1 Testing
1.3.5.1.2 Bug Fixing
1.3.5.1.3 Verification
1.3.6 Acceptance / Domain Testing
1.3.6.1 Acceptance / Domain Testing
1.3.6.1.1 Testing
1.3.6.1.2 Bug Fixing
1.3.6.1.3 Verification
1.4 PROJECT MANAGEMENT
1.4.1 Project EV Progress Meetings
1.4.1.1 Project & Risk Review Meetings
1.4.1.1.1 Project Kick-off meeting
1.4.1.1.2 Project Review Meeting #1
1.4.1.1.3 Project Review Meeting #2
1.4.1.1.4 Project Review Meeting #3
1.4.1.1.5 Project Review Meeting #4
1.4.1.1.6 Project Review Meeting #5
1.4.1.1.7 Project Review Meeting #6
1.4.1.1.8 Project Review Meeting #7
1.4.1.2 Milestone Meetings
1.4.1.2.1 Completion of Presales and Planning
1.4.1.2.2 Completion of Requirement PUSW SRS
1.4.1.2.3 Release of PUWS
1.4.1.2.4 Completion of Acceptance (PUWS)
1.4.2 Training
1.4.2.1 Domain Training
1.4.2.2 Domain Training
1.4.3 Project Metrics Report
1.4.3.1 December Project Meterics Report
1.4.3.2 January Project Meterics Report
1.4.3.3 February Project Meterics Report
1.4.3.4 March Project Meterics Report
1.4.4 Release Audit
1.4.4.1 Release to Acceptance
1.4.4.2 Product Release
Establish
Activity
dependencie
s.
Identify
activity
attributes
.
Identify
activity
risks .
Estimate
Activity
duration in
Eff hrs
Estimate
Activity
Resource
reqmts.
Identify
WP
Risks
.

Anda mungkin juga menyukai