AIR BLOWING

1.0:Line 8-22-NG2002(P20/P2):
1. K-411 discharge NRV is to be dropped, connect a temporary 4 line from PA
discharge in place of NRV !ith a temporary "al"e.
#. $ns%re K-411 discharge no&&le is blinded and ade'%ate gap has been pro"ided
bet!een no&&le and discharge no&&le.
(. $ns%re )$-#**1 is dropped.
4. +pen compressor discharge "al"e and blo! the line at ompressor discharge.
,. ontin%e to blo! the line till the line is free of moist%re-d%st.
1.1:Line from FE-2001 o E-20!-2:
1. $ns%re K-411 bypass "al"e is closed.
#. $ns%re )$-#**1 is dropped
(. +pen 4 air line temporary "al"e and blo! at $-#*#-# inlet
4. lose the inlet air "al"e
,. $-#*4-# inlet header !elding to be completed after blo!ing.
2.0:Line 10-22-NG200" #n$ 10-22-NG2010
1. $ns%re R-#*1 o%tlet line is deflanged and inlet no&&le is blinded ade'%ate gap has been
pro"ided.
#. $ns%re $-#*4-# $-#*4-1 inlet o%tlet headers !elding completed.
(. +pen 4 temporary air line "al"e at K-411 discharge NRV.
4. .lo! the line N/-#*1* at R-#*1 till the line is free from moist%re -d%st.
%.0:Line 10-22-NG201%(P1P%): R202B o&'e o F(-202):
1. .$ns%re )V-#*#0, )V-#*#1 dropped and a 0 temporary air line is installed from K-
4#1 discharge.
#. $ns%re )$-#*#0, )$-#*#1 dropped and flange bo2ed %p.
(. $ns%re R-#*#. o%tlet is deflanged, blinded and ade'%ate gap has been pro"ided.
4. lose )V-#*#0 do!nstream "al"e.
,. lose )V-#*#0 %pstream "al"e, )V-#*#1 %pstream "al"e and charge air. .lo! at the
dropped flange of )V-#*#1.
0. lose )V-#*#1 %pstream "al"e.
3. .lo! at R-#*#. o%tlet.
1. ontin%e to blo! tilll the line is clear off moist%re-d%st
4. . lose )V-#*#0 %pstream "al"e
!.0: 20-22-NG-201!(F(-202) o E-201 in'e)
1. +pen )V-#*#0 do!nstream "al"e, close )V-#*(*, #*(4 common o%tlet "al"e
#. +pen 0 temporary air "al"e.
(. +pen )V-#*#1 do!nstream "al"e.
4. .lo! at $-#*1 inlet, till the line is clean
,. lose )V-#*#0 do!nstream "al"e.
*.0:20-22-PG-1*00
1. $-#*1 inlet !elding to be completed after blo!ing
#. $ns%re primary reformer t%be inlets to be deflanged and inlets are to be co"ered.
(. lose )V-#*#0 %pstream "al"e.
4. +pen )V-#*#0 do!nstream "al"e and open the air inlet to )V-#*#0 line , blo! at
primary reformer top t%be inlet.
,. ontin%e till the line is clean
0. lose )V-#*#0 do!n stream "al"e.
).0 Air 'ine from F(-2011/F(201) o R-20%:
1. Air line from K-4#1 to 5V-#*11 is already blo!n !hile blo!ing the 6ynthesis loop.
#. Keep hold of !elding at $-#*#-# o%tlet. Pro"ide s%fficient gap and co"er the o%t let
line.
(. lose the %pstream isolation "al"es of )V-#*11 and )V #*10.
4. +pen the do!nstream isolation "al"es of )V #*11 and )V #*10
,. +pen )V#*11 and )V #*10.
0. lose 7V-#*43.
3. 6tart the compressor and open %pstream isolation "al"e of )V#*11 to blo! the line
%pto $-#*#-#. lose the %pstream isolation "al"e of )V #*11 and open the isolation
"al"e of )V #*10 and blo! the line.
1. 8et the !elding of $-#*#-# o%tlet be completed.
4. Keep the air inlet flange of R-#*( open, ma9e s%fficient gap, co"er the inlet no&&le of
R-#*(.
1*. .lo! the line %p to R-#*( inlet flange.
11. +pen 7V-#*43 and blo! the line again. .lo! %ntil the line is clear.
+.0: R-20! in'e 'ine:
1. onnect 1 temporary air line at :V #,,# in the :6 line to R-#*4.
#. lose :V #*,3.
(. +pen R #*4 inlet flange, ma9e s%fficient gap, co"er R #*4 inlet no&&le.
4. +pen the isolation "al"e in the temporary air line and blo! the line %ntil it is clear.
+.1: R-20! o E-20" 'ine:
1. $-#*4 o%tlet is not connected and s%fficient gap is there, $-#*4 o%tlet no&&le is
co"ered.
#. R #*4 inlet flange is blinded.
(. +pen :V #*,3 and %pstream isolation "al"e of PV-#*0#.
4. +pen the isolation "al"e of temporary air line at :V #,,#.
,. .lo! the line %ntil the line is clear.
+.2: (en 'ine # E 20" o&'e:
1. $-#*4 o%tlet is blinded.
#. PV-#*0# is not connected.
(. PV #*0# %pstream isolation "al"e is +pen
4. +pen the "al"e in the temporary air line at :V #,,#
,. .lo! the line %ntil the line is clear.
8.0: E-212, o&'e o R-20! o&'e no--'e
1. 7emporary air line is pro"ided at 7V #111.
#. 7V #111 %pstream flange is blinded.
(. R-#*4 o%tlet flange is opened, s%fficient gap is made, o%tlet no&&le of R #*4 is
co"ered.
4. lose 7V ((,(., +pen isolation "al"e in #4-##-P/ #**1 and +pen isolation "al"e in
#1-##-P/#**0.
,. lose the %pstream isolation "al"e of :V #*11 and :V #*1(
0. +pen isolation "al"e in the temporary air line pro"ided at 7V #111.
3. .lo! the line %ntil the line is clear.
1. +pen 7V ((,(. and close the "al"e in #1-##-+/ #**0
4. .lo! the line again .
1*. +pen the flange %pstream 7V#111 and blo! the bypass line of $ #1#.
".0: E-212, o&'e o R-20* In'e:
1. R #*, inlet flange is opened, s%fficient gap is made and inlet no&&le of R #*, is
co"ered.
#. lose #4-##-P/-#**1 isolation "al"e.
(. +pen :V #*11 %pstream isolation "al"e and :V #*11.
4. lose :V #*1(.
,. .lo! the line %ntil the line is clear.
10.0: .#r &/ niro0en 'ine from R 20* o E21):
1. R #*, inlet flange is blinded.
#. ;rop )7 #0** and connect the flange.
(. Remo"e the internals of NRV in the line.
4. +pen the discharge flange of <-#*(, ma9e s%fficient gap, co"er the discharge no&&le of
<-#*( properly.
,. +pen %pstream isolation "al"e of :V#*11 and :V #*11.
0. +pen the air "al"e in the temporary air line at 7V #111.
3. .lo! the line till it is clear.
11.0: R 20* in'e 'ine o ( 20! in'e f'#n0e:
1. V #*4 inlet flange is opened, s%fficient gap is made, V #*4 inlet no&&le is co"ered.
#. lose the %pstream isolation of :V #*11.
(. +pen :V #*1(
4. lose the do!nstream isolation "al"e of :V #*1#.
,. +pen the "al"e in the temporary air line at 7V #111.
0. .lo! the line %ntil the line is clear.
12.0: R 20* in'e 'ine o R 20* o&'e f'#n0e:
1. R #*, o%tlet flange is opened, s%fficient gap is made, o"er the o%tlet no&&le of R
#*,.
#. .lind the inlet flange of V #*4.
(. +pen :V #*1# do!nstream isolation "al"e and close :V#*11 %pstream isolation
"al"e. +pen :V#*1#.
4. lose the isolation "al"e in the start %p nitrogen line.
,. +pen the "al"e in the temporary air line at 7V#111.
0. .lo! the line %ntil it is clear.
1%.0: .#r &/ niro0en 'ine from R 20* o&'e o ( 202:
1. .lind R #*, o%tlet flange.
#. +pen the inlet flange of V #*#, ma9e gap, co"er the inlet no&&le of V #*#.
(. lose the isolation "al"e in 1#-##-<N 3**4.
4. +pen the isolation "al"e in the temporary air line at 7V #111.
,. .lo! the line till it is clear.
1!.0: ( 20! o&'e o (en 'ine o&'e ( 20!:
1. V #*4 inlet flange is connected.
#. PV #*30 A and . are %nder hold.
(. :V #*11 %pstream isolation "al"e and :V #*1# do!nstream isolation "al"e are
closed.
4. :V#*1( is opened
,. V #*4 o%tlet isolation "al"e is closed.
0. +pen the isolation "al"e in the temporary air line at 7V#111.
3. +pen PV#*30A %pstream isolation "al"e and blo! the line %ntil the line is clear.
1. lose PV#*30A %pstream isolation "al"e and open PV #*30. %pstream and blo! the
line.
1*.0: ( 20! o&'e 'ine o L( 20+):
1. PV #*30 A and . %pstream isolation "al"es are closed.
#. 8V #*30 installation is %nder hold.
(. +pen 8V #*30 %pstream isolation "al"e.
4. +pen the "al"e in the temporary air line at 7V#111.
,. .lo! the line till the line is clear.
1).0: .#r &/ Niro0en 'ine from ( 20! o (202:
1. +pen the isolation "al"e in the line.
#. .lo! the line %pto V#*# inlet flange.
1+.0: Line from ( 20! o ( %0! in'e f'#n0e:
1. V (*4 inlet flange is open, s%fficient gap is made, V (*4 inlet no&&le is co"ered.
#. V #*4 o%tlet isolation "al"e is opened.
(. =solation "al"e in 1#-##-:63*4# is closed.
4. +pen the isolation "al"e in the temporary air line at 7V#111.
,. .lo! the line %pto V(*4 inlet flange till the line is clear.
18.0: (%0! o L(%0*):
1. V (*4 inlet flange is connected.
#. 8V (*,0 installation is %nder hold.
(. lose :V(*,*.
4. +pen isolation "al"e %pstream 8V (*,0.
,. +pen the isolation in the temporary air line at 7V#111.
0. .lo! the line till it is clear.
1".0: (%0! o 1( %0*2:
1. 8V(*,# %pstream isolation "al"e is closed.
#. :V (*,# %pstream isolation "al"e is opened.
(. =solation "al"e in the temporary air line at 7V#111 is opened.
4. .lo! the line %ntil it is clear.
20: (%0! o ,%0% in'e f'#n0e:
1. (*( inlet flange is opened.
#. :V(*,# %p steam isolation "al"e is closed.
(. :V(*,1 is opened.
4. =solation "al"e in the temporary air line at 7V#111 is opened.
,. .lo! the line till it is clear.
21.0: Line from E%11B o ,%0% $o2n3re#m f'#n0e:
1. (*( o%tlet flange is open, s%fficient gap is made, (*( o%tlet no&&le is co"ered.
#. 7emporary air line is connected at 7V((,(A.
(. .lind is pro"ided at the %pstream 7V((,(A and $(11. inlet flange.
4. +pen 5V((,(.
,. +pen the isolation "al"e in the temporary air line at 7V((,(A.
0. .lo! the line %ntil it is clear.
22.0: Line from E%11B o R%01 in'e:
1. .lind is remo"ed from the inlet flange of $(11..
#. 5V((,* is closed.
(. R(*1 inlet flange is opened, s%fficient gap is made, R(*1 inlet no&&le is co"ered.
4. +pen the "al"e in #*-##-P/(*1*.
,. lose the "al"e in 10-##-P/(**4
0. .lo! the line %p to R (*1 inlet.
3. lose the "al"e in #*-##-P/(11*
1. +pen the "al"e in 10-##-P/(**4
4. Again blo! the line %ntil the line is clear.
2%.0: Line from P( %%*1 o R%0* o&'e f'#n0e:
1. 7emporary air line is connected at PV ((,1.
#. R (*1 o%tlet flange is opened, s%fficient gap made, R(*1 o%tlet no&&le co"ered.
(. Ann%bar is 9ept %nder hold.
4. =nternals of NRV remo"ed.
,. :V40*1 %pstream isolation "al"e is closed.
0. 8V ((,( %pstream isolation "al"e is closed.
3. +pen the isolation "al"e in the temporary air line at PV ((,1.
1. .lo! the line %ntil the line is clear.
2!.0:Line from ( %11 o 1(!)01.
1. onnect V (11 o%tlet flange.
#. Keep blind in the inlet flange of V (11
(. $ns%re the internals of )$ ((,* and :V40*1 are dropped.
4. +pen the %pstream isolation "al"e of :V 40*1.
,. +pen the isolation "al"e in the temporary air line at PV((,1 and blo! the line.
2*.0: Re454'e 15$ro0en 6e#$er #n$ 7r#n46e3 form 1G 'ine $o2n3re#m ( %11:
1. )V #*(4, )V#*(4, 5V,#*41, )V 41#1, NRVs in theline from V #*4 and (*( are
dropped.
#. )$ #*(4, #*(,, #,33, 41#1 are not installed and the flanges bo2ed %p.
(. +pen the isolation "al"e in #-##-:/ (*** o%tlet V(11.
4. All other isolation "al"es in the :/ header connected branches are close.
,. +pen the isolation "al"e in the temporary air line at PV ((,1.
0. +pen the isolation "al"e %pstream )V#*(, and blo! the line.
3. lose isolation "al"e of point 0 and open isolation "al"e %pstream )V #*(4 and blo!
the line.
1. lose the isolation "al"e of point3 and open the isolation "al"e %pstream :V #,30 and
also :V #,30 in the line to < #*( and blo! the line.
4. lose the isolation "al"e of point1 and +pen the isolation "al"e %pstream )V41#1 and
blo! the line.
1*. lose the isolation "al"e of point 4 and open the isolation "al"e in the line to (*(
and blo! the line.
11. lose the isolation "al"e of point 1*. ;rop the NRV do!nstream PV 40*( and blo!
the line.
1#. )i2 bac9 the NRV of point 11 and drop the NRV do!nstream PV,*1# and blo! the
line.
#0.*> 8ine from V (11 to 8V ((,(>
1. +pen 8V ((,( %pstream isolation "al"e and blo! the line.
#3.*> 8ine from V (11 to R (*1 o%tlet>
1. Remo"e blind in V (11 %pstream.
#. +pen R(*1 o%tlet flange and ma9e a gap.
(. o"er R (*1 o%tlet no&&le.
4. lose the isolation "al"e %pstream :V40*1
,. lose the isolation "al"e in the recycle hydrogen line and hydrogen line from 8 ,0*.
0. +pen the "al"e in the temporary air line at PV ((,1 and blo! the line %ntil it is clear.
#1.*> )%el gas line from .attery limit>
1. Pro"ide temporary air line at )V #*43.
#. lose the %pstream "al"e of )V #*43.
(. +pen 5V #*(0 and 5V #*(4.
4. +pen the do!nstream isolation "al"e of )V #*43.
,. .lo! the ring headers by opening the respecti"e isolation "al"es one after the other.
0. .lo! all the b%rner points one after the other.
3. lose the do!nstream isolation "al"e of )V#*43.
1. .attery limit isolation "al"e is closed and do!nstream flange is opened and made gap.
4. Val"e in the line to ) ,*1 is closed.
1*. )V #*43 %pstream isolation "al"e is opened.
11. 7he line %pto battery limit isolation "al"e is blo!n.
1#. )V #*43 %pstream isolation "al"e is closed.
1(. 7he flange at the battery limit is bo2ed %p.
14. PV ,**0 is dropped.
1,. PV ,**0 %pstream and do!n stream isolation "al"es are closed.
10. PV ,**3 %pstream isolation "al"e is closed.
13. +pen 5V ,**#. and lose 5V ,**#A and 5V ,**(A.
11. +pen )V #*43 %pstream isolation "al"e.
14. +pen the "al"e in the line to ) ,*1.
#*. +pen the bypass "al"e of PV ,**0.
#1. +pen the PV ,**0 %pstream and do!n stream isolation "al"e to blo! the pieces.
##. .lo! the line by opening the indi"id%al b%rner points.
Note> 7he pilot gas lines of ) ,*1 are to be blo!n !ith temporary line seperately.